Internal Batch no. assignment

Friends,
Can we have Internal batch no. assignment active for a specific plant only?
Regards.

>
James Bh wrote:
> Friends,
>
> Can we have Internal batch no. assignment active for a specific plant only?
>
> Regards.
Check this related link. Its discussing of 2 different number ranges on plant meaning it can be applied for specific plant.
Internal Batch number customer exit problem.

Similar Messages

  • How to do the internal batch no. assignment using SAPLV01

    what is the use of internal batch no assignment using the exit mentioned above? where we use it?

    Hi,
    QI am working on make to order scenario .For delivery of order may I see the batch no.of esch order.
    A. Yes you can see batch number for each order
    QHow system will get the internal number batch.
    A. there are two possiblities assign you batch number at production order before release or assign batch or each GR at the time of executing GR transaction.
    QI have config. batch management.
    A.In Material master you also have to tick for batch managemnt relevency
    QWhat should be the next process.
    A. Consult again if any thing missing
    Regards,
    Syed

  • Internal Batch No. Assignment for Materials generating different series.

    Dear Experts,
    Required your Valuable suggestion on Batch Number assignment.
    My Client Requirement is he has only 5 Materials for which Batch Management needs to be activated.
    Consider These 5 Materials are 10000, 10001, 10002, 10003, 10004, and 10005. These 5 Materials should have an Independent Internal Number Range. All these Materials belong to same material type.
    Like for example consider
    10000 material the Batch internal  number should be u201CA00001, A00002, A00003, A00004u2026..etc
    Similarly for 10001 material the Batch internal number should be u201CB00001, B00002, B00003, B00004u2026..etc
    Similarly for 10002 material the Batch internal number should be u201CC00001, C00002, C00003, C00004u2026..etc
    Similarly for 10003 material the Batch internal number should be u201CD00001, D00002, D00003, D00004u2026..etc
    These no. ranges need to be picked up automatically at the time of Goods Receipt.
    Is there any User Exit Or Customer Exit available on this. Kindly suggest your Valuable Suggestion on this.
    Best Regards

    Try with user exits EXIT_SAPLV01Z_001 and EXIT_SAPLV01Z_002.
    Per OSS note 148765 - Sample source code f.internal batch no. allocation, it looks you can assign the internal number range based on material number.
    Regards,

  • Batch Numbers Skipping in Internal Number range Assignment

    Dear Gurus,
    We have Batch Management at Material Level. For a Material, we are facing an issue in Internal Batch Number Assignment. Systems Skipping 15-20 numbers buffer in Internal Number Assignment, we want it to be in a sequence. In OMAD for BATCH_CLT, No of Numbers in Buffer is 0.
    Kindly guide me why the system is doing this.
    Regards,
    Johi Kapoor

    No its not working. I want to set my batch number range from client level to material level. Kindly tel me how can i do that....?

  • Internal Batch number not getting generated

    Dear Experts,
    We want to generate internal batch numbers during production order creation. To achieve the same ,
    the following Customization settings were done:
    1. Acitvate Internal Batch number assignment (T-code OMCZ)
    2. Maintain Internal Batch number Assignment Range  (No exits will be used for batch number generation)
    3. Creation of New Batches  -->  Define Batch creation for prdn. order --> Automatic batch creation during order creation
    4. Creation of New Batches  --> Define Initial Creation of Data for Batch Master Transactions --> Automatic creation
        only allowed for a material type.
    All the relevant materials are markes as Batch Managed.
    But when we are creating a Production order system generates a error shown below.
    No batch numbers could be determined
    Please guide.
    Regards,
    Namratha

  • Internal Batch Numbering

    Hi Gurus,
    We have internal batch number assignment for receipts against purchase order. Now we want to have different internal no range for returns. Can we have two internal number ranges active at the same time & how the system will assign numbers diff. for receipts against purchase order & for returns against sales order.
    Regards
    Amit

    311 is a transfer posting, do you really want each time new batches when you move the material from one storage location to another?
    if yes, then try the following:
    Make message M7 199 an error message in OMCQ and try again.

  • Batch no assignment as per material type

    Hello All
         I have requirement wherein the batch no is dertermined based upon the material type, I have used userexit EXIT_SAPLV01Z_001 for the same, initially it was finalised that batch no would be inernal, so I went for internal batch no assignment wherein I was using no. range object BATCH_MAT & I have defined sub-object for each material type & assigned no. range interval for each sub-object. It was working fine.
              Now  there is a requirement that for material type ROH(raw material) batch no has to be externally assigned. Kindly suggest how this requirement can be catered. Looking forward to your valuable inputs.
    Regards,
    J K Tharwani

    Thanks Aneesh for your valuable inputs,
            I am able to resolve my problem, what I have done let me explain you here, I have used same user exit which I have mentioned in this thread & I have defined a subobject ZROH under No Range object BATCH_MAT with no range interval as: AZZZZZZZZZ-ZZZZZZZZZZ(External).
    Now for movement type 101 I have I have done little change in the customization of Batch Management. I have set indicator as "B"(Automatic/manual & check in user exit) in following node:
    SPRO>Log Gen>Batch Mgmt>Creation of new batches>Define Batch creation for goods movements.
          The above settings have resolved my problem.
    Regards,
    J K Tharwani

  • Both External & Internal Batch Numbers

    We have turned on batch management @ material level. Is it possible to have both external and internal batches.
    Eg.
    M1 has external batch no.
    M2 has internal batch no.
    M1 is ROH
    M2 is Fert, whose batch will be generated during autoGR
    Regards.

    Hi,
    What Mr. Rajesha told is right It is not possible to have two different type of batch no assignmenmt External & Internal Batch Numbers.
    You can use some of the standard User Exits or develop a custom user exit for this purpose.
    You can use SAP enhancement SAPLV01Z for internal batch number assignment. This enhancement contains two function module exits that you can use to define number ranges or templates for batch numbers:
    EXIT_SAPLV01Z_001. You use this exit to replace the number range object and/or interval proposed by the system with your own number range object and/or interval.
    In addition, you can, for instance, stop the system from assigning an internal number depending on the material or plant. You can also use this exit to stop the dialog box from appearing.
    EXIT_SAPLV01Z_002. Using this exit, you can either change the number assigned by the system, or assign your own number.
    There are many such user exits, please check and use the appropriate user exit.
    Regards,
    R.Brahmankar

  • Re: Internal Batch Generation for Process Order while release

    Hi All,
    While releasing the Process Order I intend that the system should create a Internal Batch. But this is not happening.
    I have checked all the necessary configs  for this purpose. Still Invain.
    Please Advice,
    Vivek

    >
    Prasobh Karunakaran wrote:
    > Vivek,
    >
    > Please check in transaction OMCZ, whether radio button is active for "Active". Also check whether your material is assigned with a suitable production scheduling profile in work scheduling view. You can check the production scheduling details in CORY transaction, here in Batch management section for Automatic batch creation in order should be with value "2".
    >
    > Regards,
    > Prasobh
    Vivek,
    Did you check the points mentioned by me.
    1. OMCZ
    2. Check whether you have assigned that production scheduling profile to your material?
    Regards,
    Prasobh

  • How to stop the internal batch session

    Hi ,
    How to stop the internal batch session, which is triggered from the program.
    When I execute the program, there is an batch session, which starts processing in parallel with the program, and causes an error message for the program, so the further process is affected.
    I tried finding the session through the Transactions - SM35, SM37. However, I could find any session in my name.
    However, when I try thro SM04, I could find an session with the same error message. But I am not able to end the session.
    Pleas advise.
    Thanks,
    cartesian.

    Go through transaction SM50. In case you have more than one application server (transaction SM51 will show) you can also use SM66 which will show all running processes on all application servers.
    With SM50 you will only see the process running if it is running on the same application server you are logged on to.
    Mark the process and use menu 'Program/Session - End Session' or 'Process - End with or without Core'
    Hope that helps,
    Michael

  • Problem in using the enhancement SAPLV01Z for batch no assignment

    Hi,
    i am using the enhancement SAPLV01Z for using the user defined batch number.
    In which i am allowing the system to generate the internal batch number if it is newly created batch for that particular material,site and MRP combination.For this i am using the function module EXIT_SAPLV01Z_001 and if the batch is already available in ztable suppress the internal batch number generation.
    And by using the function module exit EXIT_SAPLV01Z_002 i am copying the already available batch and passing to the variable new_charge in that function module.
    every thing is OK. But the prob is system checking the availability of the batch for combination of materila and site in batch master table MCHA and throwing an error saying that no batch is found,enter batch.
    Now i want to skip the checking of MCHA table if it is already there in my ztable.For that i am implemented the OSS Note 1035372 but it is not working.
    And one variable call_vb_create i need to pass X for that i need access key.
    Can any body have solution with out using the access key..
    Thanks and regards
    anil

    Sorry I hadn't seen this question.
    I got the same issue today and used EXIT_SAPMM07M_010. It works fine.
    This user exit fix the issue

  • Problem in using the enhancement SAPLV01Z for batch no assignement in MIGO

    Hi,
    i am using the enhancement SAPLV01Z for using the user defined batch number.
    In which i am allowing the system to generate the internal batch number if it is newly created batch for that particular material,site and MRP combination.For this i am using the function module EXIT_SAPLV01Z_001 and if the batch is already available in ztable suppress the internal batch number generation.
    And by using the function module exit EXIT_SAPLV01Z_002 i am copying the already available batch and passing to the variable new_charge in that function module.
    every thing is OK. But the prob is system checking the availability of the batch for combination of materila and site in batch master table MCHA and throwing an error saying that no batch is found,enter batch.
    Now i want to skip the checking of MCHA table if it is already there in my ztable.For that i am implemented the OSS Note 1035372 but it is not working.
    And one variable call_vb_create i need to pass X for that i need access key.
    Can any body have solution with out using the access key..
    Thanks and regards
    anil

    Sorry I hadn't seen this question.
    I got the same issue today and used EXIT_SAPMM07M_010. It works fine.
    This user exit fix the issue

  • Block internal batch number at plant level

    Dear Experts,
    I have activated the internal batch number assignments at client level. But for some plants or one of the company code, I want to block the internal batch number creation during the goods receipt at production order confirmation(CO11N). Is it possible ? How? Can we restrict for some of the plants/comany code and allow for other plants/company code?

    Check this link:
    http://help.sap.com/saphelp_46c/helpdata/en/25/2838bf4f7811d18a150000e816ae6e/content.htm
    FF

  • Batch Class Assignment

    Dear All,
    I have created a material with batch management & i have assigned a Class of type "023" in the classification view.
    When i open the same material again there is no class assigned to the material.
    this is happening to all materials.....
    plzzz guide
    Cheers

    Hi,
    Refer below thread which is similar to your problem,
    [Class not assgin|Re: Batch class assignment on a material]
    Regards,
    Dhaval

  • Enter batch number - No Automatic Batch Number assignment allowed for plant

    Hi SAP Gurus,
    Upon checking the created new Goods receipt for Purchasing Order in tcode migo_gr, checking with the Batch tab, we can't see a batch number, then clicking the classification tab showing the message Enter batch number - No Automatic Batch Number assignment allowed for plant - XXXX
    the question is there any missing configuration based for this kind of error? ive checked the availability check for the plant and it already setup. Hope for your kind responses.
    Thanks

    HI,
    Kindy check the below configuratoin
    Logistics - General>Batch Management>Creation of New Batches>Define Batch Creation for Goods Movements
    for your movement type check what is the Strategy for the new batches.
    here you should assigne only automatic.
    Also let me know what is the level of batch mgt> is it at client level, Plant level, Material level.?
    reg
    Dsk

Maybe you are looking for

  • Can't access EJB deployed on remote OC4J - what am I doing wrong?

    I'm unable to access an EJB deployed on a remote OC4J instance (ie, part of a 9iAS installation on another machine vs local in JDeveloper). I've reverted to a stupid-simple EJB in hopes of getting it going prior to trying my actual code. The EJB work

  • Need help with setting a variable using actionscript

    So I am trying to import in XML and this is working fine, But once in flash I need to reference this variable in a later script. Here is what I got. function loadXML(loaded) { if (loaded) { /////this is the variable, which is working, it pulls the in

  • Does Closed Captioning display differently from one Player/TV to another?

    Hi Everyone, We just completed our first project at our facility that involved Closed Captioning from an .SCC file produced by CPC and when we preview a DVD Test of the project, the captions are not displaying as expected. We received a VHS preview c

  • CV_GET_FRONTEND_TYPE used in fore ground or back ground

    Hello  All, i searched a lot into SDN but did n't get the result. i want to know that CV_GET_FRONTEND_TYPE FM behave for fore ground or back ground . Thanks

  • Cursor with plus sign in navigator?

    I have just noticed that when I'm using navigator in iWeb '09, I'm getting a small plus sign attached to my cursor. I haven't noticed this before. It appears when I'm doing something in the navigator, then disappears when I move the cursor over to th