Internal Concurrent Manager deactivated.

Hi
Iam working on setting up R12 instances on Amazon Cloud Virtual machines.
After running post clone steps when I check the concurrent managers - manage screen I see old node name. How to update this with the new node name.
Also after changing the node name the internal concurrent manager is in deactivated state, How to get this activated.
Pls let me know how to resolve the issue.
Sree

After running post clone steps when I check the concurrent managers - manage screen I see old node name. How to update this with the new node name. You can update TARGET_NODE column in FND_CONCURRENT_QUEUES table from the backend.
Also after changing the node name the internal concurrent manager is in deactivated state, How to get this activated. From the application (as mentioned above by Taher) or stop/start the CM using adcmclt.sh script.
Thanks,
Hussein

Similar Messages

  • Internal concurrent manager is not up

    HI
    db : 11g
    apps : 11.5.10.2
    I found this error in internal conc mgr log file.
    APP-FND-01564: ORACLE error 1 in insert_icm_record
    Cause: insert_icm_record failed due to ORA-00001: unique constraint (APPLSYS.FND_CONCURRENT_PROCESSES_U1) violated.
    The SQL statement being executed at the time of the error was: INSERT INTO FND_CONCURRENT_PROCESSES (CONCURRENT_PROCESS_ID, LAST_UPDATE_DATE, CREATION_DATE, CREATED_BY, LAST_UPDATED_BY, ORACLE_PROCESS_ID, QUEUE_APPLICATION_ID, CONCURRENT_QUEUE_ID, OS_PROCESS_ID, SESSION_ID, PROCESS_START_DATE, PROCESS_STATUS_CODE, MANAGER_TYPE, NODE_NAME, DB_NAME, DB_DOMAIN, SQLNET_STRING, DB_INSTANCE, Instance_Number) VALUES (:cpid, SYSDATE, SYSDATE, :mgrusrid, :mgrusrid, :opid, :qappid, :qid, :ospid, :osid, SYSDATE, 'A', 0, :node, :dbname, :dbdomain, :dbinst, (Select instance_name from v$instance), (Select instance_number from v$instance)) and was executed from the file &ERRFILE.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The PROJ2_0907@PROJ2 internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting PROJ2_0907@PROJ2 Internal Concurrent Manager -- shell process ID 7041
    logfile=/oracle/instance/proj2/proj2comn/admin/log/PROJ2_rh53vm01/PROJ2_0907.mgr
    PRINTER=noprint
    mailto=oracle
    restart=N
    diag=N
    sleep=60 (default)
    pmon=20 (default)
    quesiz=1 (default)
    establish_icm - Unable to insert ICM record
    Call to establish_icm failed
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 07-SEP-2009 06:36:25 -
    Shutting down Internal Concurrent Manager : 07-SEP-2009 06:36:25
    List of errors encountered:
    _ 1 _
    Routine AFPCSQ encountered an ORACLE error. .
    Review your error messages for the cause of the error. (=<POINTER>)
    APP-FND-01564: ORACLE error 1 in insert_icm_record
    Cause: insert_icm_record failed due to ORA-00001: unique constraint (APPLSYS.FND_CONCURRENT_PROCESSES_U1) violated.
    The SQL statement being executed at the time of the error was: INSERT INTO FND_CONCURRENT_PROCESSES (CONCURRENT_PROCESS_ID, LAST_UPDATE_DATE, CREATION_DATE, CREATED_BY, LAST_UPDATED_BY, ORACLE_PROCESS_ID, QUEUE_APPLICATION_ID, CONCURRENT_QUEUE_ID, OS_PROCESS_ID, SESSION_ID, PROCESS_START_DATE, PROCESS_STATUS_CODE, MANAGER_TYPE, NODE_NAME, DB_NAME, DB_DOMAIN, SQLNET_STRING, DB_INSTANCE, Instance_Number) VALUES (:cpid, SYSDATE, SYSDATE, :mgrusrid, :mgrusrid, :opid, :qappid, :qid, :ospid, :osid, SYSDATE, 'A', 0, :node, :dbname, :dbdomain, :dbinst, (Select instance_name from v$instance), (Select instance_number from v$instance)) and was executed from the file &ERRFILE.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The PROJ2_0907@PROJ2 internal concurrent manager has terminated with status 1 - giving up.
    =============
    _ 1 _
    Routine AFPEIM encountered an ORACLE error. ORA-00001: unique
    constraint (APPLSYS.FND_CONCURRENT_PROCESSES_U1) vio.
    Review your error messages for the cause of the error. (=<POINTER>)
    Where as all other conc mgr are up and when i submit one conc request it completed normal.
    How should i bring the ICM up?
    Thanks a lot................

    Hi,
    Please refer to (Note: 552142.1 - Error APP-FND-01564 ORA-00001 when Starting the Concurrent Managers).
    Regards,
    Hussein

  • How to check Internal, Concurrent Manager status in Oracle Apps R12 from fr

    Step by step how to check Internal, Concurrent Manager status in Oracle Apps R12 from front end and how to start them.

    Richa wrote:
    Step by step how to check Internal, Concurrent Manager status in Oracle Apps R12 from front end Concurrent Processing - Concurrent Manager Generic Platform Questions and Answers [ID 105133.1]
    and how to start them1) Using adcmctl.sh (from the backend)
    2) Using Activate button (from the front-end) -- http://docs.oracle.com/cd/E18727_01/doc.121/e12893/T174296T174302.htm#4334248
    Thanks,
    Hussein

  • Internal Concurrent Manager status could not be determined

    Hi Experts,
    After installation of EBS 12.1.1 we got above error
    "Internal Concurrent Manager status could not be determined"
    while starting CM. and form are not open getting error
    "FRM -92101 there was a failure in the form server durring startup."
    Please help.
    thanks in advance.

    Hi Experts,
    after compile JSP pages i got error in log file as
    [13931] translating: 17s elapsed, 200 successful 0 failed
    [13932] translating: 18s elapsed, 200 successful 0 failed
    [13931] translating: 18s elapsed, 200 successful 0 failed
    [13932] translating: 26s elapsed, 200 successful 0 failed
    [13931] translating: 30s elapsed, 200 successful 0 failed
    [13932] !!TRANSLATION ERROR(0) pvxPrtnrRelLOVMain.jsp:
    [13932] !!TRANSLATION ERROR(0) amsProdCreatMain.jsp:
    [13931] !!TRANSLATION ERROR(0) iecalgrelcontrollist.jsp:
    [13932] !!TRANSLATION ERROR(0) asfAdminQuotaLOVMain.jsp:
    [13931] !!TRANSLATION ERROR(0) pvxEnrlReprtParamMain.jsp:
    [13931] !!TRANSLATION ERROR(0) csfwctrc.jsp:
    [13932] !!TRANSLATION ERROR(0) jtfutc.jsp:
    [13931] !!TRANSLATION ERROR(0) jtfDpfFlowSteps.jsp:
    [13932] !!TRANSLATION ERROR(0) amsTargetGroupDtailMain.jsp:
    [25393] could not delete /u01/VISION/apps/apps_st/comn/_pages/_cabo/_jsps/_gr.java
    [25393] !!COMPILATION ERROR(0) cabo/jsps/gr.jsp:
    javac: file not found: cabo/jsps/_gr.java
    Usage: javac <options> <source files>
    use -help for a list of possible options
    [25393] could not delete /u01/VISION/apps/apps_st/comn/_pages/_jsp/_wf/_WFNtfDetails.java
    [25393] !!COMPILATION ERROR(0) jsp/wf/WFNtfDetails.jsp:
    javac: file not found: jsp/wf/_WFNtfDetails.java
    Usage: javac <options> <source files>
    use -help for a list of possible options
    [25393] could not delete /u01/VISION/apps/apps_st/comn/_pages/_jsp/_fnd/_aolj__framework__agent.java
    COMPILED: 5973 [failed: 556] in 7m58s
    13903 FINISHING Mon Mar 26 05:42:23 2012
    Please help.
    Thanks,
    Mohammad

  • Internal Concurrent Manager is Not Active at this tim

    Dear,
    We are on 11.5.10,
    Concurrent manager is not working properly. whenever, we start concurrent manager it's whow active but after few second approvx 15 second show not active.
    Any boday have idea.
    thanks

    i have run cm clean and restart concurrement it was active but fiew second later it's showing inactive againg.
    -- out put of log file.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 5112060
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 09:04:48 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 09:04:48
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 4260082
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 12:50:42 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 12:50:42
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 15204490
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 12:59:31 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 12:59:31
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 20250840
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:01:10 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:01:10
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 4260094
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:07:04 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:07:04
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 19792126
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:12:57 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:12:57
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 11468854
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:15:38 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:15:38
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 21168284
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:18:37 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:18:37
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 16187636
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:21:43 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:21:43
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 15269970
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 13:34:50 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 13:34:50
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 21954618
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 14:47:57 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 14:47:57
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ========================================================================
    Starting orcl_1211@orcl Internal Concurrent Manager -- shell process ID 17826000
              logfile=/apps/applmgr/orclcomn/admin/log/orcl_career1/orcl_1211.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=60 (default)
                 pmon=20 (default)
               quesiz=1  (default)
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 11-DEC-2013 15:17:50 -
    Shutting down Internal Concurrent Manager : 11-DEC-2013 15:17:50
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The orcl_1211@orcl internal concurrent manager has terminated with status 1 - giving up.
    ------- end  out put

  • The Internal Concurrent Manager has encountered an error.

    Routine &ROUTINE has attempted to start the internal concurrent manager. The ICM is already running. Contact you system administrator for further assistance.afpdlrq received an unsuccessful result from PL/SQL procedure or function FND_DCP.Request_Session_Lock.
    Routine FND_DCP.REQUEST_SESSION_LOCK received a result code of 1 from the call to DBMS_LOCK.Request.
    Possible DBMS_LOCK.Request resultCall to establish_icm failed
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 06-JUN-2012 00:51:22 -
    Shutting down Internal Concurrent Manager : 06-JUN-2012 00:51:22
    List of errors encountered:
    _ 1 _
    Routine AFPCSQ encountered an ORACLE error. .
    Review your error messages for the cause of the error. (=<POINTER>)
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The PPD_0606@PPD internal concurrent manager has terminated with status 1 - giving up.
    Edited by: sahil jain on Jun 6, 2012 10:10 PM

    Hi;
    1. What is EBS version?
    2. Did you check:
    Concurrent Managers Will Only Start on One Node in PCP/RAC Environment [ID 264296.1]
    Concurrent Processing - The Concurrent Manager Fails to Start on GSM Enabled Due to DBMS_LOCK.Request ResultCall Failed to Establish ICM [ID 245563.1]
    Regard
    Helios

  • Internal concurrent manager is not active in R12.1.3

    hi,
    i have R12.1.3 installed on guest OEL 5.5.
    my concurrent manager is down.
    here is the output of adcmctl,
    when i start using the above utility, ICM becomes active but after a min it again goes back to inactive status.
    it would be great if someone can help me on bringing this up.
    regards,
    ad
    adcmctl.sh status apps/apps
    You are running adcmctl.sh version 120.17.12010000.5
    Internal Concurrent Manager is Not Active at this time.
    adcmctl.sh: exiting with status 0
    adcmctl.sh: check the logfile /u01/oracle/VIS/inst/apps/VIS_localhost/logs/appl/admin/log/adcmctl.txt for more information ...

    thanks Hussain.
    i see following in the CM log,
    please advice.
    thanks,
    ========================================================================
    Starting VIS_0519@VIS Internal Concurrent Manager -- shell process ID 15416
    logfile=/u01/oracle/VIS/inst/apps/VIS_localhost/logs/appl/conc/log/VIS_0519.mgr
    PRINTER=noprint
    mailto=oracle
    restart=N
    diag=N
    sleep=30
    pmon=4
    quesiz=1
    Reviver is ENABLED
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 19-MAY-2013 11:43:50 -
    Shutting down Internal Concurrent Manager : 19-MAY-2013 11:43:50
    List of errors encountered:
    _ 1 _
    Concurrent Manager cannot find error description for CONC-System Node
    Name not Registered
    Contact your support representative.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The VIS_0519@VIS internal concurrent manager has terminated with status 1 - giving up.

  • Internal concurrent manager is 0

    After completion of cloning, internal manager is 0.,but other managers are 1and 1.,can anyone help me?

    vaaru wrote:
    After completion of cloning, internal manager is 0.,but other managers are 1and 1.,can anyone help me?Please do the following:
    - Stop the CM
    - Purge FND_NODES table then run AutoConfig on all tier nodes -- How to get a clean Autoconfig Environment ? [ID 391406.1]
    - Run cmclean.sql script -- Concurrent Processing - CMCLEAN.SQL - Non Destructive Script to Clean Concurrent Manager Tables [ID 134007.1]
    - Start the CM
    If you still have the same issue, please check the contents of the CM log file.
    Thanks,
    Hussein

  • Could not activate Internal Concurrent Manager

    Hi all,
    I downloaded ebiz suite from edelivery and installed it on my stand alone xp system, giving a random domain name during installation (and editing the etc/hosts file before that). For some reason I couldn't activate ICM in windows services folder listed as OracleConcMgr_VISLocalhost. I manually tried to start the service by clicking on start, it starts up and stays there for 10 secs and then shuts it self down. I even tried starting the ICM by running 'adcmctl start apps/apps'. But it simply exits with a status 0, and it doesn't generate any log file in viscomn/admin/logs/vis_localhost.
    The output for the above command:
    Starting concurrent manager for....
    adcmctl.cmd exiting with status 0
    I've also tried cmclean.sql. Please help me in solving this issue as all my request are in 'no manager available' status. I even tried re installing the apps but it still gives me the same error.
    Thanks
    Suneel

    Fadi Hasweh, you rock!!!
    It works!!!
    Wierdly the tnsnames.ora file is located under F:\visora\8.0.6\NET80\ADMIN\VIS_localhost directory . I added the entries as you suggested and restarted the system. And that earlier error doesn't show up any more.
    Now I got a new error when I try to run a report:
    +---------------------------------------------------------------------------+
    Receivables: Version : 11.5.0 - Development
    Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved.
    ARXCTA module: Adjustment Approval Report
    Current system time is 27-FEB-2007 11:06:31
    +-----------------------------
    | Starting concurrent program execution...
    +-----------------------------
    Arguments
    P_ORDER_BY='Adjustment Name'
    APPLLCSP Environment Variable set to :
    Current NLS_LANG and NLS_NUMERIC_CHARACTERS Environment Variables are :
    American_America.UTF8
    LOG :
    Report: F:\visappl\ar\11.5.0\reports\US\ARXCTA.rdf
    Logged onto server:
    Username:
    LOG :
    Logged onto server:
    Username: APPS
    ERR REP-3002: Error initializing printer. Please make sure a printer is installed.
    Program exited with status 3
    Cause: The program terminated, returning status code 3.
    Action: Check your installation manual for the meaning of this code on this operating system.
    Concurrent Manager encountered an error while running Oracle*Report for your concurrent request 2719522.
    Review your concurrent request log and/or report output file for more detailed information.
    Executing request completion options...
    Finished executing request completion options.
    Concurrent request completed
    Current system time is 27-FEB-2007 11:06:31
    ---------------------------------------------------------------------------

  • R12.1.3 internal concurrent manager not running  (upgraded from 11.5.10.2)

    I have an instance that I have upgraded from 11.5.10.2 --> 12.1.1 --> 12.1.3 (db is 10.2.0.4)
    oldservername CRMTESTAPP (still machine name)
    newservername CRMR12 (alias in DNS and hosts to same machine)
    After doing the upgrade I ran into an issue where the hostname.domainname was 31 characters long, which created an issue trying to start the ICM due to column limits in FND_CONCURRENT_PROCESSES (doc 413164.1)
    We created an alias to the server that was shorter and I ran the adcfgclone to configure the instance with the new server name.
    Everything ran, completed and the ICM will still not start. It seems to be looking for the FNDFS_oldservername instead of using the newservername
    in FND_NODES only the newservername and authentication are listed. I shut everything down, ran cmclean.sql and I have also tried the CM Recovery wizard.
    In OAM when you click the ICM, and click Edit it shows the newservername as the only node listed, yet still when you click Log you get:
    "An error occurred while attempting to establish an Applications File Server connection with the node FNDFS_CRMTESTAPP. There may be a network configuration problem, or the TNS listener on node FNDFS_CRMTESTAPP may not be running. Please contact your system administrator."
    Also when I click Internal Manager, then click the Environment button it seems to be referencing the old 11.5.10 install directories instead of the new ones.
    How can I define which server the instance needs to use other than the methods I have tried?
    Thanks

    None of the env files reference the old host
    What about other CMs?
    All are defined as the correct node
    Can you find any errors in the CM log file?
    None other than the 30 chararcter limit error.
    If the internal manager shows the correct hostname, then you should find it in the table. For now, take a backup of this table, and update the target_node column for all CMs and try again.
    I have updated the table, however it doesn't make a difference because none of the other CM will run without the ICM running according to their diagnostic logs.
    I was looking through document 413164.1 and noticed it said that hostname / domainname has to be less than 30 characters. Is this to say hostname has to be less than 30 AND domainname has to be less than 30 OR hostname.domainname together have to be less than 30?
    I also looked on our current 11.5.10.2 instance which has the same 30 character limit on the node_name column in fnd_concurrent_queues and it only populates with hostname. Which I assume is what R12 would do as well, which means I am well under the 30 character limit for just node_name.
    Is there something I can trace to see what the insert statement is trying to put into the node_name column? The ICM according to OAM is still configured to point to the old 11.5.10 home as opposed to the new 12 home? Autoconfig files have nothing to reference the old home that I have found, where does the ICM pull the environment settings from?
    Thanks again

  • Concurrent manager not working on multi tier apps r12.1

    Hi All,
    I've created clone environment from our production environment, following details of the environment:
    DB: 11.1.0.7 - 2 nodes RAC
    APPS: 11.1.3 - 2 nodes
    OS: LINUX 64bit
    hosnames: terbdb1, terbdb2
    my problem is any request immediately appear as inactive nomanager.
    here's cm log file of both nodes:
    TERBDB1:
    ========================================================================
    Starting TEST_0620@TEST Internal Concurrent Manager -- shell process ID 22842
              logfile=/app1/TEST/inst/apps/TEST_terbdb1/logs/appl/conc/log/TEST_0620.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=30
                 pmon=4
               quesiz=1
              Reviver is ENABLED
    Routine &ROUTINE has attempted to start the internal concurrent manager.  The ICM is already running.  Contact you system administrator for further assistance.afpdlrq r
    eceived an unsuccessful result from PL/SQL procedure or function FND_DCP.Request_Session_Lock.
    Routine FND_DCP.REQUEST_SESSION_LOCK received a result code of 1 from the call to DBMS_LOCK.Request.
    Possible DBMS_LOCK.Request resultCall to establish_icm failed
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 20-JUN-2013 00:57:38 -
    Shutting down Internal Concurrent Manager : 20-JUN-2013 00:57:38
    List of errors encountered:
    _ 1 _
    Routine AFPCSQ encountered an ORACLE error. .
    Review your error messages for the cause of the error. (=<POINTER>)
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    The TEST_0620@TEST internal concurrent manager has terminated with status 1 - giving up.
    You have new mail in /var/spool/mail/applmgr
    TERBDB2:
    ========================================================================
    Starting TEST_0620@TEST Internal Concurrent Manager -- shell process ID 24424
              logfile=/app1/TEST/inst/apps/TEST_terbdb2/logs/appl/conc/log/TEST_0620.mgr
              PRINTER=noprint
               mailto=applmgr
              restart=N
                 diag=N
                sleep=30
                 pmon=4
               quesiz=1
              Reviver is ENABLED
    +---------------------------------------------------------------------------+
    Application Object Library: Concurrent Processing version 11.5
    Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved.
    Internal Concurrent Manager started : 20-JUN-2013 00:53:21
    +---------------------------------------------------------------------------+
                       Process monitor session started : 20-JUN-2013 00:53:21
    Starting INVTMRPM Concurrent Manager               : 20-JUN-2013 00:53:21
    Starting RCVOLTM Concurrent Manager                : 20-JUN-2013 00:53:21
    Starting FFTM Concurrent Manager                   : 20-JUN-2013 00:53:21
    Starting C_AQCT_SVC Concurrent Manager             : 20-JUN-2013 00:53:21
    Starting FNDCPOPP Concurrent Manager               : 20-JUN-2013 00:53:21
    Starting DownloadProcessorMigrationMode Concurrent Manager : 20-JUN-2013 00:53:22
    Starting DownloadProcessorNormalMode Concurrent Manager : 20-JUN-2013 00:53:22
    Starting FNDCRM Concurrent Manager                 : 20-JUN-2013 00:53:22
    Starting FNDSCH Concurrent Manager                 : 20-JUN-2013 00:53:22
    Starting AMSDMIN Concurrent Manager                : 20-JUN-2013 00:53:22
    Starting OAMCOLMGR Concurrent Manager              : 20-JUN-2013 00:53:22
    Starting IEU_WL_CS Concurrent Manager              : 20-JUN-2013 00:53:22
    Starting PASMGR Concurrent Manager                 : 20-JUN-2013 00:53:22
    Starting IEU_SH_CS Concurrent Manager              : 20-JUN-2013 00:53:22
                         Process monitor session ended : 20-JUN-2013 00:53:22
    Kindly advice.
    Regards,
    Ahmed

    Salam Hussein,
    this's output of PROD:
    SQL> select concurrent_queue_name, p.node_name, db_instance
      2  from fnd_concurrent_processes p, fnd_concurrent_queues q, fnd_cp_services s
      3  where p.queue_application_id = q.application_id
      4  and p.concurrent_queue_id = q.concurrent_queue_id
      5  and q.manager_type = s.service_id
      6  and p.process_status_code = 'A';
    CONCURRENT_QUEUE_NAME          NODE_NAME                      DB_INSTANCE
    FNDCRM                         ERPAPP1                        MCITERP1
    FNDICM                         ERPAPP1                        MCITERP1
    FNDSCH                         ERPAPP1                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    CONCURRENT_QUEUE_NAME          NODE_NAME                      DB_INSTANCE
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    STANDARD                       ERPAPP2                        MCITERP1
    PODAMGR                        ERPAPP1                        MCITERP1
    PODAMGR                        ERPAPP1                        MCITERP1
    PODAMGR                        ERPAPP1                        MCITERP1
    PODAMGR                        ERPAPP1                        MCITERP1
    CONCURRENT_QUEUE_NAME          NODE_NAME                      DB_INSTANCE
    RCVOLTM                        ERPAPP1                        MCITERP1
    PASMGR                         ERPAPP2                        MCITERP1
    INVMGR                         ERPAPP2                        MCITERP1
    INVTMRPM                       ERPAPP1                        MCITERP1
    WFALSNRSVC                     ERPAPP1                        MCITERP2
    WFMLRSVC                       ERPAPP1                        MCITERP1
    FTE_TXN_MANAGER                ERPAPP2                        MCITERP1
    IEU_SH_CS                      ERPAPP1                        MCITERP1
    IEU_WL_CS                      ERPAPP1                        MCITERP1
    OAMCOLMGR                      ERPAPP1                        MCITERP1
    FNDSM_ERPAPP2                  ERPAPP2                        MCITERP1
    CONCURRENT_QUEUE_NAME          NODE_NAME                      DB_INSTANCE
    FNDSM_ERPAPP1                  ERPAPP1                        MCITERP1
    WFWSSVC                        ERPAPP1                        MCITERP2
    AMSDMIN                        ERPAPP1                        MCITERP1
    FNDCPOPP                       ERPAPP2                        MCITERP2
    FFTM                           ERPAPP1                        MCITERP1
    38 rows selected.
    Regards,
    Ahmed

  • CONCURRENT MANAGER SETUP AND CONFIGURATION REQUIREMENTS IN AN 11I RAC ENVIR

    제품 : AOL
    작성날짜 : 2004-05-13
    PURPOSE
    RAC-PCP 구성에 대한 Setup 사항을 기술한 문서입니다.
    PCP 구현은 CM의 workload 분산, Failover등을 목적으로 합니다.
    Explanation
    Failure sceniro 는 다음 3가지로 구분해 볼수 있습니다.
    1. The database instance that supports the CP, Applications, and Middle-Tier
    processes such as Forms, or iAS can fail.
    2. The Database node server that supports the CP, Applications, and Middle-
    Tier processes such as Forms, or iAS can fail.
    3. The Applications/Middle-Tier server that supports the CP (and Applications)
    base can fail.
    아래부분은 CM,AP 구성과
    CM과 GSM(Global Service Management)과의 관계를 설명하고 있습니다.
    The concurrent processing tier can reside on either the Applications, Middle-
    Tier, or Database Tier nodes. In a single tier configuration, non PCP
    environment, a node failure will impact Concurrent Processing operations do to
    any of these failure conditions. In a multi-node configuration the impact of
    any these types of failures will be dependent upon what type of failure is
    experienced, and how concurrent processing is distributed among the nodes in
    the configuration. Parallel Concurrent Processing provides seamless failover
    for a Concurrent Processing environment in the event that any of these types of
    failures takes place.
    In an Applications environment where the database tier utilizes Listener (
    server) load balancing is implemented, and in a non-load balanced environment,
    there are changes that must be made to the default configuration generated by
    Autoconfig so that CP initialization, processing, and PCP functionality are
    initiated properly on their respective/assigned nodes. These changes are
    described in the next section - Concurrent Manager Setup and Configuration
    Requirements in an 11i RAC Environment.
    The current Concurrent Processing architecture with Global Service Management
    consists of the following processes and communication model, where each process
    is responsible for performing a specific set of routines and communicating with
    parent and dependent processes.
    아래 내용은 PCP환경에서 ICM, FNDSM, IM, Standard Manager의 역활을 설명하고
    있습니다.
    Internal Concurrent Manager (FNDLIBR process) - Communicates with the Service
    Manager.
    The Internal Concurrent Manager (ICM) starts, sets the number of active
    processes, monitors, and terminates all other concurrent processes through
    requests made to the Service Manager, including restarting any failed processes.
    The ICM also starts and stops, and restarts the Service Manager for each node.
    The ICM will perform process migration during an instance or node failure.
    The ICM will be
    active on a single node. This is also true in a PCP environment, where the ICM
    will be active on at least one node at all times.
    Service Manager (FNDSM process) - Communicates with the Internal Concurrent
    Manager, Concurrent Manager, and non-Manager Service processes.
    The Service Manager (SM) spawns, and terminates manager and service processes (
    these could be Forms, or Apache Listeners, Metrics or Reports Server, and any
    other process controlled through Generic Service Management). When the ICM
    terminates the SM that
    resides on the same node with the ICM will also terminate. The SM is ?hained?
    to the ICM. The SM will only reinitialize after termination when there is a
    function it needs to perform (start, or stop a process), so there may be
    periods of time when the SM is not active, and this would be normal. All
    processes initialized by the SM
    inherit the same environment as the SM. The SM environment is set by APPSORA.
    env file, and the gsmstart.sh script. The TWO_TASK used by the SM to connect
    to a RAC instance must match the instance_name from GV$INSTANCE. The apps_<sid>
    listener must be active on each CP node to support the SM connection to the
    local instance. There
    should be a Service Manager active on each node where a Concurrent or non-
    Manager service process will reside.
    Internal Monitor (FNDIMON process) - Communicates with the Internal Concurrent
    Manager.
    The Internal Monitor (IM) monitors the Internal Concurrent Manager, and
    restarts any failed ICM on the local node. During a node failure in a PCP
    environment the IM will restart the ICM on a surviving node (multiple ICM's may
    be started on multiple nodes, but only the first ICM started will eventually
    remain active, all others will gracefully terminate). There should be an
    Internal Monitor defined on each node
    where the ICM may migrate.
    Standard Manager (FNDLIBR process) - Communicates with the Service Manager and
    any client application process.
    The Standard Manager is a worker process, that initiates, and executes client
    requests on behalf of Applications batch, and OLTP clients.
    Transaction Manager - Communicates with the Service Manager, and any user
    process initiated on behalf of a Forms, or Standard Manager request. See Note:
    240818.1 regarding Transaction Manager communication and setup requirements for
    RAC.
    Concurrent Manager Setup and Configuration Requirements in an 11i RAC
    Environment
    PCP를 사용하기위한 기본적인 Setup 절차를 설명하고 있습니다.
    In order to set up Setup Parallel Concurrent Processing Using AutoConfig with
    GSM,
    follow the instructions in the 11.5.8 Oracle Applications System Administrators
    Guide
    under Implementing Parallel Concurrent Processing using the following steps:
    1. Applications 11.5.8 and higher is configured to use GSM. Verify the
    configuration on each node (see WebIV Note:165041.1).
    2. On each cluster node edit the Applications Context file (<SID>.xml), that
    resides in APPL_TOP/admin, to set the variable <APPLDCP oa_var="s_appldcp">
    ON </APPLDCP>. It is normally set to OFF. This change should be performed
    using the Context Editor.
    3. Prior to regenerating the configuration, copy the existing tnsnames.ora,
    listener.ora and sqlnet.ora files, where they exist, under the 8.0.6 and iAS
    ORACLE_HOME locations on the each node to preserve the files (i.e./<some_
    directory>/<SID>ora/$ORACLE_HOME/network/admin/<SID>/tnsnames.ora). If any of
    the Applications startup scripts that reside in COMMON_TOP/admin/scripts/<SID>
    have been modified also copy these to preserve the files.
    4. Regenerate the configuration by running adautocfg.sh on each cluster node as
    outlined in Note:165195.1.
    5. After regenerating the configuration merge any changes back into the
    tnsnames.ora, listener.ora and sqlnet.ora files in the network directories,
    and the startup scripts in the COMMON_TOP/admin/scripts/<SID> directory.
    Each nodes tnsnames.ora file must contain the aliases that exist on all
    other nodes in the cluster. When merging tnsnames.ora files ensure that each
    node contains all other nodes tnsnames.ora entries. This includes tns
    entries for any Applications tier nodes where a concurrent request could be
    initiated, or request output to be viewed.
    6. In the tnsnames.ora file of each Concurrent Processing node ensure that
    there is an alias that matches the instance name from GV$INSTANCE of each
    Oracle instance on each RAC node in the cluster. This is required in order
    for the SM to establish connectivity to the local node during startup. The
    entry for the local node will be the entry that is used for the TWO_TASK in
    APPSORA.env (also in the APPS<SID>_<HOSTNAME>.env file referenced in the
    Applications Listener [APPS_<SID>] listener.ora file entry "envs='MYAPPSORA=<
    some directory>/APPS<SID>_<HOSTNAME>.env)
    on each node in the cluster (this is modified in step 12).
    7. Verify that the FNDSM_<SID> entry has been added to the listener.ora file
    under the 8.0.6 ORACLE_HOME/network/admin/<SID> directory. See WebiV Note:
    165041.1 for instructions regarding configuring this entry. NOTE: With the
    implementation of GSM the 8.0.6 Applications, and 9.2.0 Database listeners
    must be active on all PCP nodes in the cluster during normal operations.
    8. AutoConfig will update the database profiles and reset them for the node
    from which it was last run. If necessary reset the database profiles back to
    their original settings.
    9. Ensure that the Applications Listener is active on each node in the cluster
    where Concurrent, or Service processes will execute. On each node start the
    database and Forms Server processes as required by the configuration that
    has been implemented.
    10. Navigate to Install > Nodes and ensure that each node is registered. Use
    the node name as it appears when executing a nodename?from the Unix prompt on
    the server. GSM will add the appropriate services for each node at startup.
    11. Navigate to Concurrent > Manager > Define, and set up the primary and
    secondary node names for all the concurrent managers according to the
    desired configuration for each node workload. The Internal Concurrent
    Manager should be defined on the primary PCP node only. When defining the
    Internal Monitor for the secondary (target) node(s), make the primary node (
    local node) assignment, and assign a secondary node designation to the
    Internal Monitor, also assign a standard work shift with one process.
    12. Prior to starting the Manager processes it is necessary to edit the APPSORA.
    env file on each node in order to specify a TWO_TASK entry that contains
    the INSTANCE_NAME parameter for the local nodes Oracle instance, in order
    to bind each Manager to the local instance. This should be done regardless
    of whether Listener load balancing is configured, as it will ensure the
    configuration conforms to the required standards of having the TWO_TASK set
    to the instance name of each node as specified in GV$INSTANCE. Start the
    Concurrent Processes on their primary node(s). This is the environment
    that the Service Manager passes on to each process that it initializes on
    behalf of the Internal Concurrent Manager. Also make the same update to
    the file referenced by the Applications Listener APPS_<SID> in the
    listener.ora entry "envs='MYAPPSORA= <some directory>/APPS<SID>_<HOSTNAME>.
    env" on each node.
    13. Navigate to Concurrent > Manager > Administer and verify that the Service
    Manager and Internal Monitor are activated on the secondary node, and any
    other addititional nodes in the cluster. The Internal Monitor should not be
    active on the primary cluster node.
    14. Stop and restart the Concurrent Manager processes on their primary node(s),
    and verify that the managers are starting on their appropriate nodes. On
    the target (secondary) node in addition to any defined managers you will
    see an FNDSM process (the Service Manager), along with the FNDIMON process (
    Internal Monitor).
    Reference Documents
    Note 241370.1

    What is your database version? OS?
    We are using VCP suite for Planning Purpose. We are using VCP environment (12.1.3) in Decentralized structure connecting to 3 differect source environment ( consisting 11i and R12). As per the Oracle Note {RAC Configuration Setup For Running MRP Planning, APS Planning, and Data Collection Processes [ID 279156]} we have implemented RAC in our test environment to get better performance.
    But after doing all the setups and concurrent programs assignment to different nodes, we are seeing huge performance issue. The Complete Collection which takes generally on an avg 180 mins in Production, is taking more than 6 hours to complete in RAC.
    So I would like to get suggestion from this forum, if anyone has implemented RAC in pure VCP (decentralized) environment ? Will there be any improvement if we make our VCP Instance in RAC ?Do you PCP enabled? Can you reproduce the issue when you stop the CM?
    Have you reviewed these docs?
    Value Chain Planning - VCP - Implementation Notes & White Papers [ID 280052.1]
    Concurrent Processing - How To Ensure Load Balancing Of Concurrent Manager Processes In PCP-RAC Configuration [ID 762024.1]
    How to Setup and Run Data Collections [ID 145419.1]
    12.x - Latest Patches and Installation Requirements for Value Chain Planning (aka APS Advanced Planning & Scheduling) [ID 746824.1]
    APSCHECK.sql Provides Information Needed for Diagnosing VCP and GOP Applications Issues [ID 246150.1]
    Thanks,
    Hussein

  • Concurrent Manager not starting automatically with adstrtal.sh apps/apps

    I am facing an issue with ICM, its not starting automatically when I start the application with help of
    /d01/oracle/viscomn/admin/scripts/VIS_oracleapps/adstrtal.sh apps/apps
    But, I am able to start it manually with adcmctl.sh start apps/apps - any clue why its not starting automatically?
    Pls let me know if any suggestions to troubleshoot...
    CM log file snip -
    Shutting down Internal Concurrent Manager : 26-JUN-2008 11:06:13
    List of errors encountered:
    _ 1 _
    Routine AFPCMT encountered an ORACLE error. ORA-01012: not logged on
    Review your error messages for the cause of the error. (=<POINTER>)
    _ 2 _
    Routine AFPCSQ encountered an ORACLE error. ORA-01017: invalid
    username/password; logon denied
    Review your error messages for the cause of the error. (=<POINTER>)
    The VIS_0626@VIS internal concurrent manager has terminated with status 1 - giving up.
    Thanks,
    Ambi

    This issue has been fixed, it was due to (apps) password was misspelt in the script calling the adstrtal.sh script.

  • Concurrent manager problem on Cloud

    Hi
    I did the clone on cloud machine.
    Iam getting issues with concurrent manager.Below is the error in the log file.
    establish_icm - Unable to insert ICM record
    Call to establish_icm failed
    The Internal Concurrent Manager has encountered an error.
    Review concurrent manager log file for more detailed information. : 07-MAY-2011 03:29:04 -
    Shutting down Internal Concurrent Manager : 07-MAY-2011 03:29:04
    List of errors encountered:
    _ 1 _
    Routine AFPCSQ encountered an ORACLE error. .
    Review your error messages for the cause of the error. (=<POINTER>)
    APP-FND-01564: ORACLE error 12899 in insert_icm_record
    Cause: insert_icm_record failed due to ORA-12899: value too large for column "APPLSYS"."FND_CONCURRENT_PROCESSES"."NODE_NAME" (actual: 31, maximum: 30).
    The SQL statement being executed at the time of the error was: INSERT INTO FND_CONCURRENT_PROCESSES (CONCURRENT_PROCESS_ID, LAST_UPDATE_DATE, CREATION_DATE, CREATED_BY, LAST_UPDATED_BY, ORACLE_PROCESS_ID, QUEUE_APPLICATION_ID, CONCURRENT_QUEUE_ID, OS_PROCESS_ID, SESSION_ID, PROCESS_START_DATE, PROCESS_STATUS_CODE, MANAGER_TYPE, NODE_NAME, DB_NAME, DB_DOMAIN, SQLNET_STRING, DB_INSTANCE, Instance_Number) VALUES (:cpid, SYSDATE, SYSDATE, :mgrusrid, :mgrusrid2, :opid, :qappid, :qid, :ospid, :osid, SYSDATE, 'A', 0, :node, :dbname, :dbdomain, :dbinst, (Select instance_name from v$instance), (Select instance_number from v$instance)) and was executed from the file &ERRFILE.
    List of errors encountered:
    _ 1 _
    Routine AFPCAL received failure code while parsing or running your
    concurrent program CPMGR
    Review your concurrent request log file for more detailed information.
    Make sure you are passing arguments in the correct format.
    sh: line 63: mail: command not found
    The DEMO_0507@DEMO internal concurrent manager has terminated with status 1 - giving up.
    [root@domU-12-q1-39-1A-05-F3 log]# hostname
    domU-12-3q-39-1A-05-F3.compute-1.internal
    SQL> select node_name from fnd_nodes;
    NODE_NAME
    AUTHENTICATION
    RDCORACLEAPP
    RDCORACLEDB
    Where does this get the hostname or node name from.
    Pls help.
    Sree

    Where does this get the hostname or node name from.From the hosts file and from the source instance that you have cloned from -- Concurrent Managers Fail To Start After New Install of Release 12 [ID 413164.1]
    Please purge FND_NODES table as per (Concurrent Processing - Steps To Clean Nonexistent Nodes or IP Addresses From FND_NODES [ID 260887.1]) and after correcting all the entries in the hosts file, and check then (make sure you run AutoConfig on the database/application tier nodes).
    Thanks,
    Hussein

  • Concurrent Manager: Service Manager AUTHENTICATION

    Hi hussein/helios
    I navigate to System Administrator > Concurrent > Manager > Administer >
    I checked :
    Concurrent Manager: Service Manager AUTHENTICATION actual = 1; but target = 0; and Status = Target node/queue unavailable
    How do I resolve this issue?
    Thanks a lot
    Ms K

    Hi,
    Please see these documents.
    Note: 353031.1 - Why Does "Internal Concurrent Manager found node AUTHENTICATION to be down" Error Appear in Log?
    Note: 342939.1 - What is the AUTHENTICATION Node and How is it Related to 'Could Not Contact Service Manager FNDSM_AUTHENTICATION_PROD' Message
    Thanks,
    Hussein

Maybe you are looking for

  • Bapi_salesorder_change is not updated

    hai all i am handling a bapi_salesorder_change in which i am changing quantity field,after running alv program  i have to change the quantity field and by calling bapi it should get updated in database.but it is not happenng i am sending code please

  • Table not returning correct information

    We had a problem where doing a select count(*) returned a number, but then when a select * was issued not rows were returned. Many iterations were tried. Some returning rows and others not. Then when trying to truncate FK errors occurred. Does anyone

  • What does it mean "Business Service leak: Web Engine State Properties"

    Hi , We are on the Siebel 8.0.0.2 with extra patches to address the memory Issues. we are experiencing memory Leak, When I increase the logging level to 5 and couple of other parameter enabled, I see statements like "Business Service leak: Web Engine

  • Where can I find Photoshop Elements 6 to download,  I lost my disk

    I lost my disk for Adobe Photoshop Elements 6.  I tried to locate and download at Adobe.com, however I couldn't find it.  Is there a place I can go to download the program or a free trial of version 6?

  • Verizon Internet OUT, Time Warner IN...now what ?

    Verizon has not provided me consistent reliable service in the past 3 months. So I am making the jump to Time Warner Cable Road Runner Internet service. Simply, what changes do I need to do with the Mac OS X Server settings on my end to make the tran