Internal Order Budgeting for HR and Plant maintenance

Dear All,
I am using internal order for budgeting control. I want to use internal order budgeting for Payroll also. How do i assign internal order for the same.
I want to check budget through internal order for plant maintenance order also. At the time of issue of material to PM order or at the time of settlement.
regards
ranga

Budget Profile:
IMG => Internal Orders => Budgeting and Availability Control => Maintain Budget Profile
Make sure activation type made to 1.
Availability control settings:
IMG => Internal Orders => Budgeting and Availability Control => Define Tolerance Limits for Availability Control
Regards,
Ravi

Similar Messages

  • PLM table for Internal Order budget, Actual Cost and Actual Hrs

    Dear all
    In cProjects version 4.0, we have integration with existing ECC 6.0. We create Internal Order manually and assign it to cProjects.
    One cProject  having one Internal Order.
    Resource Planning part is managed in cProjects while Actual Time keeping(CATS with reference to Internal Order), budgeting of Internal Order, Material and Service Procurement which is done against Internal Order is managed in ECC. ECC and PLM are separate systems.
    We have RFCs established to transfer actual hrs, budget and actual cost data from ECC to PLM.
    Which is the ABAP table in PLM where we get linking of cProject with Internal Order and also actual hrs, budget and actual cost data in PLM system?
    Thanks & Regards
    Ashish

    actual hrs, budget and actual cost data in PLM system?
    Its not there, actual hours can be found in DPR_Task but it needs to be transferred by running a report.
    The planned cost etc is also calculated at runtime and passed on to Costing object in ECC (Int order/PS)
    Actual hours will be in CATSDB in ECC
    needless to say actual cost will also be there in ECC and not in PLM, PLM only displays at runtime based on RFC.
    If you want to try, Break the RFC and try to check the Evaluation..
    Niranjan

  • How to block entry through internal order budget in F-02

    Hi,
    Kindly tell me during Purchase order creation through internal order (Order related PO) whreas budget is maintained against that internal order if the PO amount is exceede than budgeted amount it gives warning / error messge that budget is exceeded. Same internal order or any other internal order which has budget against that internal order if I go to  F-02 tcode and pass entry with cost center and internal order(budget is given) both it does not give any warning message if budget value exceeded i.e, F-02 posted amount is greater than budgetd amount. It goes to next screen which should not do. Kindly tell me the reason why it is not being blocked and goes to next screen or if there is any configuration  please guide me.
    Best Regards,
    Samrat
    Edited by: Samrat Roy on Nov 2, 2010 11:43 AM

    Hi Eli,
    Now I have observed during saving the record in F-02 it gives warning message as per tolerance limit set in config area. Actually I want in F-02 screen when you put Document date, posting date, type, period, company code, currency, posting key(debit), GL account, next 2nd screen you mention amount, cost center, internal order(budget is maintained), posting key(credit) and press enter for next 3rd screen to put credit amount. While you go from 2nd screen to 3rd screen then warning / error message should give if amount is exceeded than budgeted amount which I am getting during saving. Is it possible to make any check between two screens ????
    Beside I would ask you here tolerance limit is set as 95%, 100% and 102%. During PO creation through internal order it gives error message when amount is exceeded than 102% as budget is exceeded. If the amount is between 95% to 99% it does not give warning message which should do. But from posting in F-02 screen it gives proper messge in all levels since 95 % to 99% and 101% to 102%.
    Regards,
    Samrat

  • Internal Order Budgeting with Purchase Order

    Hi,
    I am creating a purchase order for a material with account assigned as Order.
    I have maintained a substitution wherein from a cost center Internal Order is derived.
    I have created an Internal Order with Category - Overhead and activated the availability control for the Order. Also maintained the Budget for the Internal Order.
    Now when I am creating the Purchase Order and giving the Cost center, it is deriving the Internal order but not doing the availability check.
    What can be the issue in terms of Configuration or Am I missing any steps.
    Please help
    Regards
    Kami

    Thanks Eli,
    If I activate the committment Management at Controlling Area level and the order type, the budget will be consumed at the Purchase Order level itself. I hope I am right ?
    But I want , at PO level only the control and check (in terms of error message and the system should not allow me to save the PO) and not the consumption of budget. I want to utilise the budget only at the time of issuance of the materials.
    Can we achieve this without Committment management active or is it mandatory?
    Any help on this.
    Thanks and regards
    Kami

  • Internal order budget release

    hai,
    i have prepared internal order budget. how to release the budget?because system is saying that avilability control is not activated.
    govind.

    Hi,
    Use OKOB and check availability section for activation type.
    Regards,
    Murali

  • Multiyear internal order budget

    Hi,
    I have a question from the controlling regarding the internal orders.
    The point is that we have multiyear internal orders.
    For exemple: Internal budget 10 have a budget of 10000 u20AC for 2012 and 15000 for 2013.
    In 2012, they will create a purchase order of 25000 that will use this internal order.
    The point is that this order will be partially invoiced in 2012 and 2013.
    I maintained the budget profile (OKOB), ticked the overall availability control and in the time frame I ticked "Total values" and "Annual values".
    When I want to create the purchase order, I have a blocking message telling that the budget was exeeded for fiscal year 2012.
    Do you have an idea of how I can bypass this issue?
    Thank you for your help.
    R.

    Hi Paolo,
    Finally, we found an alternative for our issue.
    My question is answered.
    Thank you very much for your help.
    R.

  • Internal order Budget upload

    Hi
    Can one tell me which layouts i can use for internal order planning and Internal order budgeting uploads in SAP.
    Thanks
    Lily

    Lily,
    Hope you have sorted out the upload of plan data. For uploading the budgets the work around is below:
    Upload the budget data as plan using the planning layout suggested by others. Then in the transaction KO22 select the budget column and use the copy view option under Edit menu and select Planned total.
    Once the Budget details are uploaded you can upload the plan values later.
    Hope this Helps
    Cheers
    Sreenivas

  • Internal order-budgeting & settelemnt

    Hi friends,
    What is the internal order-budgeting & settlement?How to the settled and budgeted?Please explain with example in simple way?
    Regards,
    Chandra.

    Hi internal order settelement  means, Internal orders are used to captute the details of the  event.
    EX: If you  organoging ana event.
    therer are lot of expencesoccuring  in that event.
    So first you give teh budget amount for your event,
    There are lot of cost cenetrs are also required .
    if you post teh transaction to teh cost center you dont know how much total actaul cost you put in teh event.
    so that we will use internal order concept.
    what ever transaction we will post to internal order ( not for teh cost center)
    suppose event is X , CREATE INTERNAL ORDER xxxxx.
    so we will post all transaction to XXXXXX.
    AT THE MONTH ENDOR COMPLETIN OF TEH EVENT YOU WILL SETTLE THIS INTERNAL ORDR TO ACTUAL COST CENTERS.
    iNTERNAL AMOUNT 100000 .
    THEN you will settele to respactive cost centers cc1-3000
    cc2-4000, cc3-3000.
    from internal order you settle to teh cost centers./
    chandra

  • Internal Order Budget - Availability Control

    I have done the budget profile, entered the budget figures, created internal order budget with the required profile.  However, when I entered the fi document with this statistical IO, system does not give any message as per the tolerance setting actions.  I tried to run the activate availability control again.  But the system gives a message that availability control is not activated.  Why this is happening ?  Where can I see the availability control is activated for this Internal order ?

    Hi
    1. Check if your order is released
    2. Check in budget profile (OKOB) if activation type is "1" and whether you have checked "overall" or not....
    3. Hope you have defined tolerance limits against the combination of contr area and budget profile
    Regards
    Ajay M

  • How to reverse Internal order Budget document?

    Hi,
    How to reverse the Internal order Budget document.
    I m abble to see the doc by KO2B.
    Please let me know if more information required.
    Thanks.

    Hi,
    Please first create an auxiliary program ZDELORBU as an executable program in a customer owned development class and with the source code in the note 1145955.
    To delete the budgets of orders and to reset their 'Budgeted' status, please:
    -  run txn KO32 to deactivate availability control of orders (if active)
    -  run ZDELORBU for orders.
    please test this throughly in a test system first.
    regards
    Waman

  • KO22 internal order budget issue

    Hello All,
    while making changes for internal order budget with transaction code KO22 the system shows a error as u201CItem order xxxxxx budget exceededu201D & for some orders u2018Item order xxxxxx budget almost exhaustedu201D & also referring to a budget for year 2006,2007,2008 . & The system doesn't accept those changes .
    Another strange thing is that  the system allows the same changes for few items  (maybe 4, 5, or six that time it will get saved that time it will not give error) ,
    but trying to do  10-15 changes , the system shows the warning message as stated above
    If anyone has encountered this strange issue please share your inputs
    Thanks & regards,
    Prashant

    Dear,
    When making changes to budget then make sure you are increasing it not decreasing....
    When you decrease the budget then system will check tolerance defined............and display warning or error....
    For e.g in tolerance you have defined that system should display warning at 95% absorption of budget and Error at 100%.
    You have set budget 10000 INR for the Internal Order. So it means at 9500 INR system will issue warning and at 10000 INR or more system will give error.
    If posted amount to order is 9000 INR so you can noway reduce budget less than 9000 INR because it is 100% and system will give error.
    Regards,
    Chintan Joshi

  • Internal Order budgeting not checking at the time of FB60

    Dear All Experts,
    Very Good Morning !
    I have configured IO budgeting with Overall Planning ticked budget profile. I have assigned budger profile to Order type also.
    In KO23 I have given limit also of Rs.10,000 /- for overall and yearly 2011 Rs,5,000 /-. In define tolerance I have maintained two entries as below : 1 is with 01 Group wich will check PO's and 2nd one is 04 Group which will check Financial account document. ( I hope this correct, If not please rectify me ). In tolerance limit I have given 3 as a error should throw.
    I refer this thread [Internal Order Budget - Availability Control|Internal Order Budget - Availability Control; from our SDN forum. I activated budget control from KO23 and referring KO30 now system is showing GREEN Availability control is active.
    Now when I am running FB60 with assignment IO, system is not throwing any error, warning , it remains normal posting is happening.
    If anybody has gone through the same issue, experts inputs / guidance will be very helpfull.
    Regards,
    Revati Joshi.

    Your tolerance limits are fine
    Let me put you some points here.
    Creating IO
       1. Investment Profile is mandatory for Capital projects
       2. If you are using Investment management, then check IM32, & IM52
       3. KO02 - Check  - Investments tab - IM Program and Position ID assinged or not
       4. Need to assign the budget in both Controlling area currecny and object currency (KO12, & KO22)
       5. Availability control should be Active - KO30
       6. Planner plofile - KP04 - Just press F4 and check - if there are any created for your controlling area
       7. Check if you have any line itesm already posted to the IO - KOB1, KOB2, KOB3
    Now, the actual plan is - KPF6 and KDF6
    Here you need to input the below details
    Version                    0
    From Period               01
    To Period                      12
    Fiscal Year          2011
    Order                                           input the order
                      to
             or group
    Cost Element                              which Cost elemtn you are going to post in FB60
                      to
             or group
    Enter those details and in next screen - give the amount for that cost element.
    Now o and post in FB60
    Hope it helps
    Thanks

  • Project-Internal Order Budget Control

    Concerning on the Internal Order Budget in SAP, we have the following questions & need clarification :
    1) Since the promotion involving SD module, could we enhance the SD module with Internal Order functions & budget control as well? According to the SAP help desk documentation, its possible, pls provide guidelines.
    2) I've checked on SAP helpdesk that budget data (including sales & promotion) could capture in COPA via I/Order & pricing conditions. Could we use budget cost in COPA to control the sales & promotion posting in SD module ? pls provide guidelines. We had just implemented COPA with plan but not budget. Could we add this budget as new value field ?
    3) I/Order can be updated through different cost elements but would system allow us to control budget by each cost element but only using one for all the cost element ? According to the helpdesk, we could split the I/Order budget by cost centres, transaction group or budget object. Does this similar to our requirement ?
    4) I/Order Budget will control the spending by actual posting data or commitment ? Could we control both at once ? Example :
    Budget             500k
    Actual posting     300k
    Commitment     300k
    Budget              -ve 100k  not  +ve 200k
    5)  Concerning on the issuance of Credit note requisition (CRQ), if we using manual process as entry as Park document then post to FI (currently) and not using PR/PO process, then, how would we have commitment data ?
    6)  During year end, we may need to perform closing and carry forward the I/Order budget and commitment balance to next fiscal year. Does this mean that controlling need to perform period close also and order settlement even its statistical I/Orders ? we didn't practice this in controlling currently.
    7)  I/Order budget is control annually. Once the budget I/Order completed fully, it cannot be used again. Hence, does this mean that we need to have different set of I/Order for different year?
    Please feedback to us the above soonest possible.
    Thanks..............
    Elaine

    Lot's of questions;
    1) At the time of entering a sales order you can enter an Internal oder number as well. That then could be used as part of a tracking process.
    2) You control the budget by setting up availability control. Then at the time of entry it checks against the budget to see if you are within you tolerances. Youn can also have reporting in COPA to compare actual to plan and budgets. But there won't be the availablity control. It will be analytical reporting instead.
    3)The budget for internal orders is one total. You won't be able to set it up for different cost elements there.
    4)The availability control looks at all the components. Yes you can control both
    5)The credit will be picked up when posted as an actual posting
    6) You will need to do carryforward for all I/O.
    7) You can set up the budgets to be for a particular year not overall for I/O.
    try to limit the size of your questions in the future to make the response easier
    pls assign points if helpful as a way to say thanks.

  • Internal order restriction for a particular GL posting

    Hi SAP Experts,
    I have created an internal order(statistical). I want to restrict the internal order postings for a particular GL accounts.
    For example: Internal order 10001 can post only with GL 500003 and 500004 for Budget and Forecast (KPF6).
    How is it possible.
    Thanks,
    Simar

    Hi
    I do not think that KA02 assignment alone would be a good option. You need to create a validation rule in GGB0 and assign the same in OB28 for your company codes. Also, you can look at the option of Substitution to populate the Internal Order field, when you use these GLs.
    Regards
    Sanil Bhandari

  • Internal orders to track rev and cost

    Hi
    How to track revenue and cost, related to utilization of land using internal order and offset revenue against cost..
    Pls advice? What we can use on this statistical internal order on real internal order ????
    Pls advice in details ... Thank you in advance

    HI,
    If at all you want to use Internal order for this purpose, you have to create a real internal order only for settlement purpose.  Statistical IO can not be settled.
    Try once.
    Regards
    Sarma BH

Maybe you are looking for

  • IPOD not being seen by ITunes

    Message Reads: "Another user on your computer is using IPOD softwear. ITunes cannot read this IPOD, have user disconnect" There is not other user on my computer. Not Good. Ideas Anyone? Dell Dimension 3000   Windows XP  

  • Flash player causing blue screen upon loading video

    Hello, I have recently bought a new system. Everything runs  perfectly except for one critical problem; I can't view flash videos or  anything played in a web browser by flash player. Animated flash  advertisements will load to the first couple of fr

  • Can we integrate Lotus quickr into ep 7 using application integrator

    hi gurus, can we integrate lotus quickr in to ep 7 (i.e sso) using appliction integrator or do we have any other way to do sso, helpful replies are appreciated. Thanks & Regards K Naveen Kishore

  • [solved]Flashplugin doesn't play video

    I have Arch 32 bit on an older Compaq PC. I haven't used it in over a month, and decided to plug it in and see what happens after an upgrade. Now, for some reason, I can't play any video. I re-installed flashplugin, and just did another -Syu upgrade

  • Highlighting field, if it's a repeat/duplicate throughout report

    I want a field to highlight if it's an repeat/duplicate through out the report. I'm using =iif(Fields!PART_ID.Value =previous(Fields!PART_ID.Value), "yellow", "transparent") and currently it only works within a group section of the report. Suggestion