Intra-Company STO freight Charge

Hi all,
       As we know, during Intra-company STO there is no FI posting. But my client wants to post the Freight charge and analyzes it u2026
                      What is the different option with this ??? means how I post Freight charge for Intra-Company .
Regards
Asim

hI,
Ofcorse during UB type STO for intra company PO there is no FI postings for stocks , system allows to post the frieght and give provision in the PO.
Please check at sprommpurchasingconditionsprice determination process--calculation schema and check which price schema is assigned to the document type UB and the condition types in the schema.This default schema can be used for the postings.You can do GR for the same and MIRO too.
Take the F4 in the conditions tab for condition types and use them.
Regards,

Similar Messages

  • Intra Company STO with Billing

    Hello,
    Let me explain the Basic requirement from our client.
    One Company code has 15 plants.
    Material are being transferred across plants
    We record revenue or expenditure to the respective plant when transfer.
    As I had inquired and surfed in many threads,we couldnt get the better solution as everyone suggesting to create separate plant as company code and do STO Inter company for getting the billing.
    But we required intra company STO with Billing.
    Any advice would be appreciated
    with regards,
    Vignesh

    Hi,
    Expenditure occur for transferring material between two plants, can be capture in a condition type and then do invoice for transferring value
    Refer a discussion to capture transferring amount in STO
    Freight Expenses for Transportation to Depot Plant
    Regards,
    Biju K

  • Inspection lot with 01 origin for stock transfer (Intra company STO)?

    Hi Sap Gurus,
    As per standard SAP configuration for 101 movement type, 08 is the inspection type used for stock transfers (Intra company STO). But, there is a requirement from business to use 01 for Intra STO. Is it possible to get an inspection lot with 01 origin while GR to the delivery created for Intra STO ( Stock transfer B/n plants from same company code)?.
    Thanks in advance
    Venkat V

    Hi All,
    Thanks for your replies..
    Its STO Purchase order between two plants under same company code. System triggers movement type 101 with movement indicator B - Goods movement for Purchase order and Receipt indicator X - Stock transport order. Here system expects inspection lot origin 08 as per standard SAP configuration(OMJJ).
    I just wanted to check, is it possible to get inspection lot from 01 origin for this type of stock transfers. If anyone who worked on this area, please share your inputs. 
    Thanks in advance
    Venkat V

  • Intra company STO- MRP element reservations

    Dear All'
    I request your help to resolve following issue.
    I have created Intra company STOs based on different plant's requirements. say PO# 1, 2, 3...100.
    The system is reserving available qty based on POs in sequence. When I process PO# 56 for example, when doing PGI in VL02N, the system is throwing error saying deficit of qty in stock.
    But I can see stock as available in MMBE, but in mD04, mrp elements are created based on POs created earlier.
    But business needs can be, I can process any PO first for delivery and PGI based on urgency.
    Request you help in this regard.
    Best Regards
    Rahul

    Hi Maria,
    Thanks for your quick reply.
    I have checked ATP, that is not activated.
    Best Regards
    Rahul

  • Intra Company STO pricing Procedure assignment

    Hi
    In intracompany STO we need to raise invoice from the supplying plant to receiving plant.So i created STO pricing Procedure with Cost price plus Profit margin and transportation cost .Now where to assign this pricing procedure?Whether to assign this to NL Delivery doc type or in IV billing doc type.
    Regards
    Jyoti

    JYOTI PRAKASH KUNNAR,
    1. The Delivery Type that you use is NL for Intra company STO
    2. PO Document Type you use is UB
    you will mainatin Assignemnt of the above
    img>material managment>purchasing>purchase order>set up stock transport order--->assign delivery and checking rule
    3. NLN is item category used for Intra STO
    4. STock Transfer pricing procedure is maintained in SD for Billing with Docu PP + Custpp
    5. The Flow of Pricing is taken care by copy controls VTFL choose NL Delivery type and intra company billing type , choose item category NLN where Pricing type = B, Price Source = Purchase order.
    BEing INTRA stock scenario we don't use IV billing. Because transaction is happening within company code between two plants.
    Check the link it will be useful
    [http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm]
    Regards
    Sathya

  • Intra company STO repair

    Hello All,
    Please inform what is the best way to handle the intra company STO repair material. STO with SD delivery is done from plant 10 to plant 30 and few materials are needed to send back to plant 10 (supplying plant) for repair due to quality problems. what can be done here and how to amend the cost?
    Thanks in advance for your help.
    Best regards,
    Rajashree

    Perform a STO and then let the process be carried out in the other plant through production order.
    And get back the product thru another STO.
    Reg,
    Deepak.

  • MOV 68A and 68E (intra company) duplicate freight cost

    Hello,
    We are currently in version 702 with EP5.0. We activate BF LOG_MM_SIT and we are using scenario N6 for intra company process and N3 for inter.
    Process: We add a freight cost in the Intra PO header to be charged to a third party (intra company process). When we process the GI for VL02N the system post the movement type 68A. In this moment the system considers already the freight costs (incorrectly).
    Then when I perform VLPOD without any difference, the system post the movement 68E and again consider the freight cost. So we have twice the additional price condition.
    Do you have any idea on how we can solve this issue?
    Didn't find any OSS Note.
    Thanks in advance.
    Best regards.
    Tania Trindade

    Hi Atif,
    as of SAP TM 9.0 there is a means to enter the inbound freight costs from TM into ERP material valuation via the agency billing document.
    The process is documented here:
    http://help.sap.com/erp2005_ehp_06_hana/helpdata/en/8a/0c5d09a7794ae6938f9c8184f4251f/content.htm
    and here
    Cost Distribution for Shippers - Settlement - SAP Library
    I hope that helps,  best regards,  Udo

  • How to use frieght cost in intra company STO

    how to use frieght cost in intra company STO

    For Inter company STO, pls follow the below steps.
    1) Create delivering plant as vendor in receiving plant’s company code & sales area – XK01
    2) From the vendor number created in step 1, create Vendor info record for the material that needs to be stock transferred.
    3) Ensure material is extended to both plants
    4) Delivering plant must be assigned to the receiving sales organization
    5) In the Vendor info record, go to MK03 and change the “add purchasing data” to delivering plant.
    6) Create receiving plant as customer in delivering plant’s company code & sales area.
    7) Ensure Purchase organization for the receiving plant is maintained
    8) Go to IMG- Materials Management-Purchasing-Purchase Order-Set up stock transport order ( transaction code:OMGN) and complete all the settings.
    Note:
    Maintain receiving plant / customer number from step 6/ delivering sales area
    Delivering plant/ customer number from step 6/ receiving sales area
    Maintain NLCC replenishment for cross company stock transfer with delivery type NB
    9) ME25- Create Purchase Order from receiving plant
    10) VL10B - Create delivery order from delivering plant’s shipping point with reference to the purchase order number raised in step 9.
    Save.
    11) Go to VL02n & pick /post goods issue for the delivery order number created in step 10
    12) Do VF01 & bill to customer
    In step 8 You have the option of UB type in place of NB
    In step 10 you can also use VL04.
    In step 12 you select F8 type (pro-forma invoice).
    Reward if useful.
    raaj

  • Intra company STO via delivery

    Hi,
    can someone pls explain when should one go for STO with delivery in case of Intra company stock transfers. pls explain the real practical situation when I shuould go thru the Delivery route instead of NO delivery.
    Thanks in advance.....

    Hi,
    Check out the link :
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/content.htm
    http://www.sap-img.com/sap-sd/configure-intercompany-stock-transport-order.htm
    Regards
    Anand

  • Intra-Company  STO)

    Hi All,
    This is regarding the Intra-company code STO between two plants for Same Company Code.
    We have one Plant 1010 in Mumbai, which is mapped in SAP and another plant in Delhi, which is not mapped in SAP.
    Both are under same legal entity i.e., same Company Code 1000.
    Now we want to map the Delhi plant in to SAP, with Delhi Plant 1020 , so that we can do the STO.
    Under STO, we would like to raise the Invoice, Excise Invoice on the Receiving Plant.
    As far I understand we can raise the invoice for Cross-Company codes, but in our scenario, both the plants belong to same Company Code 1000.
    So, how can we map the entire scenario in SAP, so that I can raise the Invoice on the receiving plant 1020 becoz., excise is to be applicable as the goods are moving out of Factory.
    Kindly, guide me and suggest me as to how I need to proceed with the current scenario and the possibilities exists, if any.
    Thanks and regards,
    SAP Prod

    Dear
    First define both the plants in system.
    1) Then define both plants as vendors (XK01) and as customers (XD01)
    2) Prepare STO between one plant and another ( Supplying plant as mumbai and receiving as delhi)
    3) Prepare a Goods Isue with Mvt 351 (MIGO - Mumbai Plant will issue Goods with reference to the PO)
    4) Prepare an excise inovice with reference to the Goods Issue ( J1IS - enter transaction as MATD and enter the GI Document No.)
    5) Post the Excise Invoice.
    6) Enter GR with reference to the PO (Delhi plants PO)
    7) During MIGO in the excise invoice tab enter the excise invoice no. of mumbai plant.  The system will automatically pick up the excise values.
    8) Post the GR
    Thanks
    Viral Bhinde

  • Intra company sto with excise

    In sto I did
    1.Raised a P.O using me21n with doc.type UB
    2.VL10b
    3.VL02n
    4.J1is
    until this every thing fine.
    A)when i try to capture Excise Invoice Using J1iex wrt P.O system is not allowing
    B) i even tried J1IEX without P.O -system is asking for vendor. Why
    (Since this is plant to plant within the company I cannot maintain supplying plant as vendor as per SAP Standards)
    Please let me know the solution for capturing of excise duty in receiving plant
    Thanks,
    VVSRS

    Hi VVSRS, check the STO cycle as under :
    1. Me21n - Create STO in receiving plant (Order Type UB ) Supplying plant - receivable plant - qty - material etc.
    2. Vl10b - Create replenishent delivery - collect sales document no from layout screen.
    3. Ref. to that sales doc no do the PGI in supplying plant - post delivery goods not save --- check mov type is 641 in po.
    4. J1IIn if excise invoice for supplying plant or if depot then do the j1ij for the same.
    5. VF01-create STO invoice in supplying plant - without a/c doc (select order type excise invoice india).
    6. Migo-Do GR in receiving plant w.r.t the outbound delivery made in supplying plant.
    7. Update excise if required j1ig & create internal excise inv.

  • Not possible to determine shipping data for material in intra company STO

    Hi,
    just trying to set up a STO material movement between two plants belonging to same company code,sto customization is done,i have chosen raw material whose stock got maintained in both plants........when trying to post it gives an error message ....NOT POSSIBLE TO DETERMINE SHIPPING DATA FOR THE MATERIAL...COULD SOME ONE HELP ME...

    SPRO->Material Management->purchasing->scheduling Agreement->Setup Stock transport scheduling Agreement->Define shipping data for plants.
    Select the particular plant and click on details there also you have to maintain the same customer that you have maintained in J1ID.
    Then it will allow to create Stock transport order.
    I did the same thing it was working for me.
    Edited by: Vanitha Krishnamurthy on Jul 27, 2010 12:07 PM

  • Intra company STO for product under consigment from vendor

    Hi
    I know in 4.5 we were unable to transfer inventory under vendor consignment between plants using an STO. This was driven by the STO having item category U and consignment needing item category K. It looks like this also remains true in ECC 6.0 but does anyone know of a way of doing this there?
    Help appreciated. Answers rewarded.
    Thanks
    Duncan

    Hi
    I dont think there is any way to make STO for consignment in SAP. Please let me know the reason why you want to map the process as consignment STO and how you are doing it now. You can make a return delivery to vendor and can again receive the required quantity as consignment in other plant. For reporting you can create new reason code for mvt type 122.
    Regards
    Praful

  • Intra company STO(UB Document type)

    Hi All
    We have a problem with STO please see the details below.
    We have created STO PO with qty 160 with 5 batches.
    Created a delevery wrt to the PO for qty 160.
    PGI was done for the delivery.
    Did the GR(101 mvmt) wrt to the out bound delivery for 160 qty.In po history in the field reference it is showing out bound delivery number for the above material docs.
    After a day GR was cancelled with movement type 102 for the material document which we have created with mvmt 101. But in the  reference field it is not showing any thing.Above procses was done in the year 2004.
    Now we are trying to cancel the cancelled the  material document( mvt type 102)it is giving the error " Document flow for the delivery can not be updated and we are not able to save the document.
    The reason why we are doing all the exercises is to close the po, that is already 160 qty was issued by supplying plant now we want to receive the same to receiving plant.
    Now all the stocks atre showing in stock in transit (MB5T).
    Please help.Urgent
    Regards,
    Manik

    Hi
    please find below OSS Notes which is related to your problem.
    <b>Summary</b>
    <b>Symptom</b>
    The system generates message M7352 'Document flow for delivery cannot be updated'.
    This is no program error but the meaning of the message is not clear.
    <b>Additional key words</b>
    Stock transport order, shipping notification
    <b>Cause and prerequisites</b>
    The system displays message M7352 during goods receipts for deliveries if the following two requirements are met:
    You created a delivery for the stock transport order (entry in table EKPV).
    The goods movement does not refer to the delivery.
    When is the system unable to determine a delivery and thus unable to update the document flow?
    You post the goods receipt with reference to the purchase order or to an inbound delivery and not with reference to the delivery
    or
    You cancel a material document for which the system can no longer find the original delivery. This can occur if you have entered a delivery note (field MKPF-XBLNR) manually during goods receipt.
    (As of Note 358454, the system tries to find the delivery using an index on table VBFA. Before Note 358454, the cancellation must be posted via Transaction MB0A/MIGO with reference to the delivery).
    <b>Solution</b>
    It is not required to implement all corrections concerning M7352 because the message is correct in most cases. With Note 358454, the system tries to find a delivery for a material document even if none is entered manually. However, the note is not absolutely necessary if you already enter all goods movements with reference to the delivery.
    <b>Why is the message output at all if it is not an error?</b>
    The message can be set as a warning message or as an error message or it can be deactivated. It informs you that the document flow is not updated what can lead to follow-up problems with the delivery.
    Check your business process for stock transport orders:
    If the update of the goods receipt posting is important to you, set the message as an error message.
    If you have no use for the document flow update during goods receipt, you can set the message as a warning message or deactivate it completely.
    please check let me know
    regards
    Srinivas
    reward if it is helpful

  • Partial reversal of Intra company STO

    Hi Gurus,
                 How to reverse partial quantity in the intracompany STO with delivery.
                    After make GR  we reverse the partial qty  by using mvt type 122. Then the stock will be SIT of the receving plant. How to reverse that qty in to supplying plant's stock. If we use the VF09 it reverse the whole qty.
    Pls clarify.

    Hi,
    the system behaviour is correct. With 122 you are only sending the material back from your receiving plant but the stock has not reached or been received in the supplying plant. Unlike 351, movement type 122 is not meant for stock transfer. If you see the material document you will only see one line, unlike 351 which will have a - from supplying plant & a + to the receiving plant,which is the reason why the stock goes into SIT of the receiving plant in the 1st instance.
    BR

Maybe you are looking for

  • MXF read errors in CC 2014.1

    Has anyone else noticed a sudden onset of MXF read errors after updating to the latest version of Premiere?  I'm getting the dreaded "Red Frames" on footage that works fine in the previous version (2014.0).  The problem doesn't occur on import, meani

  • Syncing Mac with Outlook through Palm

    My wife is a switcher and I am trying to set her up with a three way sync between her Mac and work PC with a Palm OS device in between. The only problem so far is the email fields. The Mac address book fields for email addresses can be labeled work a

  • What is HMI stands for

    In the post-processing of PI,  There is a step to create remote connection in SM59, a connection name INTEGRATION_DIRECTORY_HMI which used to update run time cache when activate ID objects, what  is HMI stands for?

  • NMAS Keeping .STR files from getting to inventory server

    I'm in the testing phases of setting up inventory. My inventory server is up and running great. I installed the latest Zen 7 SP1 IR4 on 12 PC's in a lab to see how things would go. 6 of the 13 would not properly upload their STR files. The minimal in

  • Errors when redeeming a digital copy and trying to transfer to ipod

    I redeemed a digital copy of a movie from Itunes and every time I try to transfer it to my Ipod I get the error message "{name of movie] can not be copied to ipod because it can not be played on the Ipod." I even contacted Itunes about it and they to