Inventory Valuation Difference for Finished Goods

Dear Experts,
I have a following query below when the FG Inventory valuation differences are posted
Finished goods price control is set as u201CSu201D
Eg: In Jan 2010 stock value 1000 ( 100*10)
Feb 2010 , opening stk of 1000 ( 100 units * 10 per piece)
In Feb 2010 , FG price has changed to 12 per piece ( Standard cost estimate executed)
System  has posted the price difference entry
Debit FG stock 200/-
Credit Inv Price Diff 200/-
Now the query is,  stocks pertaining to Jan 2010 are lying in Feb 2010,
When Inventory  valuation is done,  my profit is overstated in Feb 2010 for Jan 2010 stocks by 200/-
Is there any way to handle in SAP that it would post the price diff in Jan 2010, instead of Feb2010.
Advance thanks
Sanjai

Dear Ajay,
I will release std cost est  in Jan and also in Feb.
But since the Jan stock is carried to Feb, during the month end when I value the FG , price difference for Jan stock is posted in Feb .
Currently the client wants to value the stock on actual basis, what is the best option to overcome. we are in BBP stage
Eg Jan stock value is 2000 ( 200*10)
     Feb Stock Value of goods produced in Feb is (100*12) 1200
     Feb end stock as per the client it should be 2000+1200 = 3200
     Note - But as per standard costing my price will be 3600 ( 300*12
Thanks
Sanjai

Similar Messages

  • Split valuation for Finished Goods - Target cost was not updated

    Hi,
    We are following split valuation for 'Finished goods'.
    Valuation typte 1 is for 'manufacture' and
    Valuation type 2 is for 'External procurement'
    For production orders with this material, we are not getting target costs. It is showing zero.
    We have done release of standard cost estimate before creation of production orders and goods receipt for these orders. But still it is not updating.
    Pls guide me.
    Regards
    MadhuSekhar Gupta

    Hi,
    Thanks for your reply.
    At the time of variance calculation only the credit part of target cost will update and at the time of goods receipt debit part of the target cost will update.
    Our client has done goods receipt but debit part of the target cost was not updated. and the order status is DLV.
    I simulated the scenario in QAS by creating new finished goods materials (Industry-Construction) one is with split valuation and another is without split valuation, then the debit part of target cost was updated at the time of goods receipt and credit part was updated at the time of variance calculation for both the materials. So this problem was not arised because of split valuation.
    Was this problem arising because of the material master data, because for one material it is updating and for another it is not for the same configuration?
    Regards
    MadhuSekhar Gupta
    Edited by: gms gupta on Oct 22, 2011 3:39 PM
    Edited by: gms gupta on Oct 22, 2011 3:41 PM

  • If Excise invoice required for finished goods.

    Hi All
    I have doubt, whether excise invoice is required for finished goods or not. As I am trying to create MIGO doc for PO of finished material, and it is saying, no excise invoice possible for finished material RG1.
    Can you advise please.
    Regards
    Mukta

    HI
    Thanks for this. When we are executing Utilization transaction J2IU, it is giving dump after prompting popup with  'Data will be lost PLA NCCD B35', 'No record selected , excise invoice cancelled'.
    Run time error is saying -
    Short text
        Structure-type conflict when calling a FORM
    What happened?
        Error in the ABAP Application Program
        The current ABAP program "J_1IRUTZ" had to be terminated because it has
        come across a statement that unfortunately cannot be executed.
    An exception occurred that is explained in detail below.
    The exception, which is assigned to class 'CX_SY_DYN_CALL_ILLEGAL_TYPE', was
    not caught and
    therefore caused a runtime error.
    The reason for the exception is:
    The call of the FORM "DETERMINE_DEFAULT_VALUES" is incorrect:
    The actual parameter no. 2 is at PERFORM not compatible with the
    structure type requested by FORM "DETERMINE_DEFAULT_VALUES".
    The FORM "DETERMINE_DEFAULT_VALUES" is defined in program "SAPMJ1II".
    This error occurs in Unicode if the fragment view of the types is
    incompatible.
    Can some one suggest if we need to apply any OSS NOTE.
    Regards
    Mukta

  • Validation of batch nos. in migo for finished goods (fert)

    I want to validate batch number entered by user at the time of migo for finished goods (fert) against the batchs in mcha. how can i do this? also is it possible to give f4 help to user for available bach nos. for the particular material ?

    Hi,
    Cannot you use message M7 668 for this purpose?
    Problem is "batch has been already posted in stock"
    Regards,
    Csaba

  • How to get unit cost for finished goods in prod order

    HI all,
    IN a production order of type PP04, there is cost analysis you can get from CO03.  This shows the cost for finished goods and BOM components.  Would anyone know how the cost for finished goods are calculated ?  The issue i have is that the unit cost of the finished goods is not correct.  It is higher than what it should be.  I looked at the moving avg price at material master but the cost used in calculation is different than in material master.   Can anyone shed light how finished goods are calculated and why it is picking up a higher unit cost ?  Where is the higher cost coming from  for finished goods material as shown in CO03 ?  The BOM materials are picking unit cost correctly.  Would this have anything to do with cost settlement ?
    thank you.
    joyce

    Hi,
    Finished goods price will depend on BOM componenet price,  activity price and overhead price. Check whether this prices are picking correctly or not.
    Regards,
    Sreekanth

  • PO for Finished Goods with Tax Code - Inventorise

    Hi All,
    Our Client is procuring Finished Goods from Domestic Vendor & Excise Duty is paid to the Vendor for that i am defining the tax code in PO. Over here For the Finished Good in Tax Code it is not capturing - (Condition Type - JMO2). I have checked it in PO for ROH, HALB tax code is working perfectly with (Condition Type - JMO2). I like to know will it work for finished goods or not. In J1ID i have maintained Excise Rate.
    I had followed the following steps.
    1) Material code- Chapter id maintained in J1ID
    2) Vendor code excisable in J1ID
    3) Maintain condition record in FV11 for the correct validity period
    4) Check the PO creation date whcih should fall between condition record validity period
    Every thing is maintained i have checked it Thoroughly fot this particular material i am not getting it. This one is a finished goods material.
    I am not able to identify what is happening.
    I will give the flow so that you can help me out.
    1. Created Material - Finished with all views except - Classification, Forecasting,
    Work Scheduling & QM
    2. Create Info Record - Tax Code given
    3. J1ID - Chapter ID, Chap ID with Material, *** Val for Mat, Vendor Excise Detail, Excise ind. for Plant, Excise ind. for Plant & Vendor, & Excise Tax Rate.
    4. FV11 - Maintained till - 31.12.9999.
    5. FTXP - Tax Code is Maintained & it's working fine with other PO.
    6. ME21N - PO is done for Domestic vendor with Standard PO With no condition & With only tax code for ED & CST.
    7. In J1ID cenvat determination has been maintained.
    Also the material type should be raw in material chapter id combination instead of RG1 even though the material is finished to take credit of excise it should be maintained as RAW .
    Over Here if i see i am not able to capture (JMO2 A/P Eduty for Inven 0.000%) &
    For Sale tax i have maintained it in FTXP as (A/P C Sales Tax Inv  NVV   12.500%  JIP1) but it is not appering in PO Tax code. I can See the sale tax is geting updated in Tax code for Inventorise if i give it with out ED in tax code. With ED it is not Appering in Taxcode.
    Can you help me resolving the issue.
    Once again thanks for youre help.
    Thanks in Advance,
    sapuser.
    Edited by: sapuser on Dec 26, 2008 10:10 AM

    Hi All,
    Just give a check by entering cenvat determination table. System checks this by default for excise details. Enter i/p and o/p material as same.
    Hope this will resolve you Problem,
    Pherasath

  • Uploading Production Requirements For Finished Goods From External System To Run MRP For Components in SAP.

    Hello Production Planning experts,
    I'm looking to solve the current business problem:
    The company bought a third party software (JD Edwards) to calculate production requirements instead of using SAP's standard Production Planning or a tool like SAP's APO. They run a batch job to query Sales Orders, Deliveries, available stock, stock in transit, etc. from sap and feed/upload it to the third party software so it can calculate the Finished Goods Production Requirements for them. They love the third party software, so replacing it is not an option. Since the third party software is already taking into account Sales Orders, Deliveries, available stock, stock in transit, etc. from SAP, it just outputs a "Finished Goods Production Schedule" by week.
    My questions are:
    1) What's the best way to upload something like that in SAP in the form of Planned Orders or something of that nature?
    After i get that schedule in SAP:
    2) Is there any way to calculate components' requirements for that "Finished Goods Production Schedule" alone? The company would like to IGNORE existing stock AND expected-goods-issues in the future (sales orders, deliveries, etc) for Finished Goods ONLY. The components calculations would work the standard MRP way, taking into account existing stock and AND expected-goods-issues in the future (sales orders, deliveries, etc)
    I started looking into Master Production Schedule (MPS), but I don't know if that's the right approach since I'm not very familiar with it.
    Thanks in Advance! I will gladly reward points for helpful/correct answers.

    Hello Oscar
    I suggest you to upload your production plan in the for of "Planned Independent Requirements" using BAPI BAPI_REQUIREMENTS_CREATE. Later, MRP will create planned orders to cover the PIRs.
    If you don't want to consider the existing stock of the finished product, you should use the planning strategy 11 to create your PIRs. Take a look on the following link for more details about this planning strategy:
    Gross Requirements Planning (11) - Demand Management (PP-MP-DEM) - SAP Library
    Here you will find the following information:
    The make-to-stock strategy gross requirements planning is particularly useful in mass production environments; it is often combined with repetitive manufacturing. This strategy is particularly useful if you need to produce, regardless of whether you have stock or not. For instance, steel or cement producers might want to use this strategy because they cannot shut down production; a blast furnace or a cement factory must continue to produce, even if this means having to produce to stock.
    This strategy is also frequently used if there is a Material Requirements Planning system in a legacy system that needs to be linked to an SAP system which serves as a production execution system. The legacy system calculates a specific production plan, which has to be executed, regardless of the stock situation in the SAP system
    It looks like this planning strategy is exactly what you are looking for.
    BR
    Caetano

  • Discontinuity and Follow-up Materials for Finish Goods

    Dear all,
    We have used for a long time the Discontinuity functionality and Follow-up Materials for Raw and Packaging materials (components in BOMs).
    We would like to use the same functionalities for Finish Goods, but after setting fields in MRP4 View, it seems not to work as it did for components.
    Is it possible to reproduce the same effect in Finish Goods as we had with components, i.e., use some kind of Discontinuity and Follow-up materials for Finish Goods?
    We currently work with R/3 V.4.7.
    Thank you all in advance for any support.
    Best Regards,
    Alberto

    Dear Alberto,
    If my understanding is correct then this discontinued material concept works only for the components and not for the finished
    product during MRP.
    Discontinuation Data Use
    In MRP, the discontinuation functionality is used to transfer dependent requirements of a component to one or several follow-up
    materials, if the requirements are no longer covered by stock. You can also define a follow-up material in the bill of material.
    Check this link to explore more.
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/b1/c044d1439a11d189410000e829fbbd/frameset.htm
    Regards
    Mangalraj.S

  • Re: Automatic Reorder point Planning for Finished Goods

    Hi All,
    I have some doubts regrading the Automatic Reorder point Planning for Finished Goods.
    For testing purpose I have entered the consumption values for two month.
    Say :
    Nov-08=13
    Dec-08=20
    ROL level=5
    Safety stock =4
    Model =constant
    Now when I execute the forecasting,The system gives me the forcast for the next two month jan & Feb.
    But when I run the MRP I see planned order for 5.So how to fulfill my forecast for jan?
    Please Advice.
    Regards,
    Vivek

    Hi Brahamakar,
    Can you please help me.
    Regards
    Vivek

  • Plantwise Production & Sales report for Finished Goods

    Dear All,
                  Please let me know how to generate Plantwise Production & Sales report for Finished Goods. Is there any t code?
    Regards,
    Anil

    Dear All,
                         Thank you for the solutions. But can i draw the values in one single report. It will be more useful.
    Regards
    Anil

  • Moving average price for finished goods

    Hi All
    I am using moving average price for finished goods.  My question is, Does the price on the material master record adjusts, when we do goods receipt on a production order( If there are variances)?
    here is a scenario:
    Moving avrage price  of finished goods=2$ and total stock =1
    it has two components in the Bom
    Raw1-3$
    Raw2-3$
    Now when I am producing 1 qy of finished goods with 6 $ of Raw materials, moving average price of fert should  be 6+2/2=4 $. But I noticed the moving average price  in the material master record is not changing.
    My question is, Does the MVP changes with production order goods receipt, If so, what setting should I change to acheive that functionality.
    Thanks
    Steve

    Hi Guys
    Thanks for responding
    I am aware that sap does not recommend MAP for finished goods. But we have a weird requirement. And I am doing a demo on this. My thought on MAP is, It changes for every goods receipt. But when I am doing goods receipt on production order, It is not changing the MAP, Even though there is variance on production order. So, My question is, Did I miss any configuration ?

  • PO for Finished Goods with Tax Code

    Hi All,
       Our Client is procuring Finished Goods from Domestic Vendor & Excise Duty is paid to the Vendor for that i am defining the tax code in PO. Over here For the Finished Good in Tax Code it is not capturing - (Condition Type - JMO1). I have checked it in PO for ROH, HALB tax code is working perfectly with (Condition Type - JMO1). I like to know will it work for finished goods or not. In J1ID i have maintained Excise Rate.
    Help me to resolve tis issue.
    Thanks in Advance,
    sapuser
    Edited by: sap user on Dec 18, 2008 4:04 PM

    Hi All,
    Every thing is maintained i have checked it Thoroughly fot this particular material i am not getting it. This one is a finished goods material.
    I am not able to identify what is happening.
    I will give the flow so that you can help me out.
    Created Material - Finished with all views except - Classification, Forecasting,
    Work Scheduling & QM
    Create Info Record  - Tax Code given
    J1ID - Chapter ID, Chap ID with Material, *** Val for Mat, Vendor Excise Detail, Excise ind. for Plant, Excise ind. for Plant & Vendor, & Excise Tax Rate.
    FV11 - Maintained till - 31.12.9999.
    FTXP - Tax Code is Maintained & it's working fine with other PO.
    ME21N - PO is done for Domestic vendor with Standard PO With no condition & With only tax code for ED & CST.
    Over Here if i see i am not able to capture (JMO1 - A/P Eduty for Setoff 0.000 %).
    Any other thing has to be taken care let me know.
    Help me out in Solving this issue.
    sapuser

  • Kanban for finished goods (discrete manufacturing)

    Hi gurus,
    I am using kanban for finished goods(with MRP) to triggers production order(discrete manufacturing). If i set the status "empty" system is creating a planned order directly. It is not coming for MRP run. I suppose, that planned order should be created through MRP run(since i am using kanban with MRP). Can you please tell what settings i need to be checked?
    Regards
    Rajib Pathak

    Hi,
    Pls. find details about settings for KANBAN With MRP:
    KANBAN With MRP
    Prerequisites
    In this process, the storage location assigned to the supply area is not excluded from MRP.
    If a material is planned and procured with MRP, you must make the following settings:
    You must maintain a valid MRP type for the material. This means, the setting "ND" (No planning) is not allowed.
    You must maintain all other control parameters required for MRP for the material.
    You must maintain a repetitive manufacturing profile (in the MRP data screen) for replenishment strategies with a cost collector (in-house production with run schedule quantities, manual KANBAN). In the SAP standard system, a profile is available that is specially intended for KANBAN, that is, using this profile, the system creates a cost collector without a run schedule header.
    Features
    Here, the total production quantity or the procurement quantities of a certain period are planned in the planning run and the replenishment elements are also created in the planning run. For in-house production, you can use either Repetitive Manufacturing or production orders to plan the production quantities per period. For external procurement, all the standard replenishment elements are available. The replenishment elements created in the planning run, however, are not intended to trigger production or replenishment directly. Instead, they exist to provide the supply source with a preview. Actual production and material flow are controlled and triggered by setting the kanban to FULL and EMPTY. Backflushes and goods receipts are posted with no reference to the kanban. This means that you can backflush daily quantities, for example.
    In this procedure, the following is valid for materials with BOMs:
    Components that are used in KANBAN materials can be planned using any one of the MRP procedures. However, the system has to be organized so that the supply source does not produce the material for the replenishment element created in MRP immediately but awaits the kanban request.
    As the system creates preview data in the procedure with MRP, it is particularly useful for replenishment with run schedule quantities (Repetitive Manufacturing) and scheduling agreement releases.
    HOpe this helps.
    Regards,
    Tejas

  • Assgn of batch nos. for finished goods

    Dear,
    GURUS!!!!
    I am working on make to order scenario.I am using batch management here.
    I am activate the batch management configuration guide.
    What is the next process for batch activation ?
    Is this system take internal batch no directly.?
    What is the process for finished goods batch no?
    Please coordinate me .
    Thanks with Regards,
    Nitin

    HI
    Kindly check the following link for more information:
    http://help.sap.com/saphelp_47x200/helpdata/en/25/2838bf4f7811d18a150000e816ae6e/frameset.htm
    thanks

  • How to generate Serial(Unique) Number for finished goods?

    Guru's,
    How do i generate Serial(Unique) Numbers for finished goods.Suppose,if we get an order for a finished good A of 10 qty.We want to generate unique number to identify each and every A item separately for quality purpose.Any help is much appreciated.
    thanks Guru's

    Depending on serial control of item, you will need to generate serial numbers at the time of WIP Completion transaction using Serial Entry window (i.e. if serial control is At Receipt) or at the time of job creation (i.e. if you are using serial control as predefined)
    In latter case, you will have to use MES or MSCA screens to perform serialized WIP completion.
    Thanks,
    Hrishi

Maybe you are looking for

  • To do's before and after upgrade

    On another post, I noted that I cleared my home screens prior to upgrading as was suggested on a droid life site.  The upgrade notification will be obvious and you get to choose between install now, or wait, or get more information.  I just held off

  • Memory Leak in Report after upgrading from Crystal Reports 10.5 to 13.0.1/2

    I'm currently having an issue with crystal reports 13 (Visual Studio 2010), We have recently updated our CRM Solution to use the newer crystal reports runtime as we are now using Visual Studio 2010, We have a client who has a report which contains a

  • Unable to see Remote App and Desktop Connection in Group Policy Management Editor

    I am unable to see the Remote App and Desktop Connection in Group Policy Management Editor on my 2012 R2 DC. I am therefore not able configure the connection URL in Access RemoteApp and desktops in our Windows 8.1 client environment. Within the Group

  • Error code 2 155 33

    Bought a canoscan 9000F just over a year ago, unit worked perfect. Have had stored away safely in its box. Came to use it today and wont scan.  Tried reloading the drivers - zip, tried replacing the cable - zip.  All it does is make its warm up noise

  • Using a Dimension in Multiple Modules...........

    Hi All, Can anyone tell me how to use a "Dimension created in One module in another module. Waht I did was, copied the Dimension from Module1 (Dimension) to the Module2(Dimension) -- is this is the right way? + Module1 + Dimension Common_DIM + Modile