Investment profile to AUC?

hi all,
can any one please make me understand me that the difference between summary breakdown and line item settlement?
i came to know with f1 help that summary breakdown is nothing but all line items together will make whole sum and settled to only one AUC. or one cost object or one g/l account
and in line item settlement  single single line ltem will seperatly settled to differenr AUCs or orders or gl account......
am i correct..:)
Please guide me in this complex underastanding to me.
Thnaks.

Basically, yes.
Summary settlement: AuC and Final asset mapping is 1:1, meaning you will have to settle the total amount to one final asset.
Line item settlement: AuC and final asset mapping is 1:N, meaning you can settle some percentage (or use amounts or equivalent numbers) to one final asset and remaining to another.
Thanks,

Similar Messages

  • How to change IM Profile after AUC settlement done

    Hi,
    I have an issue here.We have a WBS element having an IM profile allowing summary settlement.WBS released,AUC created.Cost have been posted and settled to AUC.Later it was noticed that the IM profile is in correct and need another IM profile for the WBS.I reversed the settlement and transferred the cost of the WBS to another WBS by KB15N.now when I am going to change/delete the IM profile,system is not allowing it.AUC cant be deleted as it was automatically created.
    Can anyone let me know whether it is possible anyhow to change the IM Profile now and whats the procedure for that.Its critical for my client so any t response will be highly appreciated.
    Regards,
    M T  Haque

    Hi Prasad,
    Thanks for looking into it.I need to change the Investment Profile assigned to the WBS element.AUC has been created based on the Investment Profile and cost settled to AUC.Now I need to change the Investment Profile of the WBS element.I have tried reversing the settlement and then transferring the WBS cost to another WBS by KB15N but still system doesnt allow change/delete the Investment Profile.says AUC already posted.
    any other ideas please.
    Regards,
    Mohammed T Haque

  • Hide the Investment profile in WBS - Control Tab

    Hi,
    Our project has four level of WBS elements. The fourth wbs element  would have investment profile attached to it and would be relevant for AuC and settlement.
    I request you experts to suggest how should I grey out the Investment Profile in WBS Control Tab, so that no one would by mistake enter a Investment profile, in only top 3 wbs elements.
    Thank you
    KAP

    T Code OPUK- Field selection for WBS elements.
    Double click on the field Investment profile (PRPS-IMPRF), position the cursor on level field and click on new value button. Mention the level 1,2 and 3 and select the radio button 'Invis' (Invisible). Save.
    With this Investment profile field will not be displayed at level 1-3 but would be visible at level 4.
    Regards
    Sreenivas

  • Investment measure settlement doubles after investment profile change

    We changed the indicator "Summary Settlement/Line Item Settlement" in Investment Profile (which was already used for Investment Measures) and "Amount and Percentage" indicator to allow the amount wise capitalization of AuC/Investment Measure on various fixed assets.
    Now, while we try to settle the amount through CJ88, the system is settling the values that were already settled in previous periods. As a result the expenses become understated and Asset are over stated. How can we resolve this issue while we have already changed the Investment Profile as mentioned above.?

    We are trying to settle March 2014 period therefore we can't carry out any new postings other than settlement.
    For your reference, here is the Case:
    EAC003 is an expense account and primary cost element
    ABA001 is CWIP Account with Statistical Cost Element
    The amount posted in March 2014 on account EAC003 is 323,813 which has value type 4 (Actual). When we run the settlement, the system settles the amount 3,053,065 (including 2,729,252 of value type 11: Statistical Actual)

  • WBS elements in Investment profiles

    Hi Experts,
    Is there any way we can check that to which all WBS element an investment profile is attached?
    Regards,
    Vijay

    Hi Vijay,
    If an inv. profile (or other customizing settings) is used somewhere, it must not be deleted in the customizing table, otherwise it cause database inconsistency.
    To forbid the user to maintain this field at wbs, you can use the
    customizing item
    'Define Field Selection for Work Breakdown Structures'  to hide\disable the filed. in the following path: Project System -> Structures -> Operative Structures -> Work Breakdown Structure (WBS) -> User Interface Settings.
    Please reward points, if it is helpful.
    Kind regards,
    Zhenbo

  • Investment Profile

    Hi
    Could any please explain me the difference between CWIP and Investment Profiles. And please tell me the configuration required for the Investment Profiles.
    Thanks & Regards
    Ramki

    Have a look in the SAP help in the part project or internal orders to understand how investments are working in SAP. You first need to undersatnad this befre you start
    How to set this up is depended of your requerements. There are example profiles / order types in the system available.
    Play with it in a sand box

  • Assets (Investment profile): Transfer value from AuC to Fixed asset

    Good afternoon all,
    We have implemented Assets across investments profile. The settlement of investment is u201CSummary settlementu201D and we do not have u201CList of Originsu201D.
    We have created a project and then a WBS that automatically creates the AuC (asset under construction).  Transaction code CJ20N.
    Then we have created the purchase order (ME21N) and afterwards we have carried out an entry sheet (ML81N) where we have informed the WBS previously created.
    Through CJ88 we have done the settlement of the WBS and we have checked it.
    Now we have created the fixed asset and we would like to transfer the value of the AuC to the fixed asset. I am not able and I am a bit lost. I do not how to perform it.
    Any idea?
    Many thanks and regards in advance. Daniel

    Hi Renfe,
    If the asset is an asset under construction belonging to an investment measure, then the transaction code KO88 needs to be used.
    Warm regards,
    Murukan Arunachalam

  • Maintain allocation profile for AUC

    Hi Frnds,
    When i m executing settlement rule for AUC, the system is showing the following error :-
    Allocation profile  not maintained
    Message no. AW063
    Diagnosis
    There is no profile for the settlement of assets under construction assigned to the company code you entered.
    Procedure
    Enter a settlement profile in the definition of the company code.
    Wht should i do?

    Check if a settlement profile for settlement of AUC has been defined in OKO7 and it is assigned to your company code in OAAZ.
    Thanks and regards
    Kedar

  • Posting from Top Level WBSE to AUC

    Hi Friends,
    I am facing problem in doing settlement from Top level WBSE to AUC. I feel I have done the required settings. I am not able to generate settlement rule for the top level WBSE. Please help me out. I would appreciate some screen-shot help from anyone.
    regards
    Pratap.V

    Hi,
    Captain Caveman: I want the settlement from the top level WBSE to AUC get generated automatically. My Top level WBSE has an Investment profile. AUC is created automatically only. Since the settlement rule did not get generated automatically, I tried to set the rule manually. Still the system is not allowing me to do. Top level WBSE is acc assigned.
    Steve: In my settlement profile, I have given the default object type as FXA.
    Subhrajyoti: I have checked the asset class. The asset is not blocked. Also the status of AuCi s set right.
    Thanks guys for your replies. I will do the whole process again.
    I will check and let you know the results today itself.
    thanks
    Pratap.V

  • Investment Project

    Hi All.
    Need some suggestion if it is possible to avoid copying of  Investment profiles in lower WBS while creating project structure.
    Need investment profile for AUC only in the Top WBS. Means need only one AUC for the whole project.
    Thank You
    Best Regards
    Maneesh

    Or else better not to maintain it in project profile. Maintain manually in top WBS.
    Regards

  • Internal Order settlment with Fixed amount

    Hi. I'm having hard time. Please help me out.
    Requirement:
    I need to create settlement rule for Internal order.
    When I do so, I need to define Fixed amount in OBJECT CURRENCY.
    Given Condition:
    Object Currency and Contorolling Area Currency is DIFFERENT.
    (Controlling area currency is EURO, while Object currency is country local currency.)
    Problem that I'm facing now:
    When I try to create a settlement rule, it allows only Controlling area currency
    for fixed amount, even though I need to create it with Object currency.
    (Directly, the Field name is indicated as "Amount in EUR".
    You know, usually we have 2 fields; 1 for value, 1 for currency. But in this case,
    it seems that we have only 1 field for 1 fixed currency, which is Controlling area currency)
    Is there any way to solve this issue?
    I've looked into Settlement profile and Investment profile (for AuC order),
    but both of configuration just had an indicator to enable fixed amount settlement,
    but nothing about currency.

    There is not a perfect solution, however you can check OSS note 769818 for some helpful hints.  It sounds like you want to use this for settlment of investment measures.  If that's the case, you may want to consider using line item settlment intead of summary settlement.  You have a little more flexible with that type of settlement and it may get you closer to what you want.
    thanks,

  • Legacy AuC - Investment Measure

    Dear Experts
    One of our SAP client is getting merged into another SAP client effective 1st April 2011.
    I'am not sure regarding the takeover of AuC which are not completely capitalised.
    I've read several threads and it has been suggested to use TType 900 for prior year data in AS92.
    I've tried that but system doesnt allow this Ttype in case of AuC created as Investment Measure under asset class 4001.
    Error msg-
    Trans. type 900 allowed only for assets u. const. Please correct.
    Message no. AA967
    Our Investment profile is created with 'Summary Settlement'.
    Please suggest how to go ahead in such case.
    Regards
    Kapil

    Hi,
    If you are sure that the AuC has to be linked ot and Invesmtnet measure, then create the Invetment order or the WBS, post the openning balance of the AuC by using a cost element crated for this exercise, maintain the allocation structure by defining that the settlement has to be executed with the primary cost element and settle the order.
    Regards,
    Mariya

  • Distribute AuC (Investment Measures) to a number of AuCs  AIAB, ABUMN

    Dear All,
    maybe you can help me with this problem we have here:
    Why isn't it possible to define an Asset Class (TCode OAOA ) as an Investment Measure ( ANKA-XINVM ) and line item settlement ( ANKA-XOPNVW ) at the same time (i know that a radio button allows only one of it).
    So that you are able to distriubte/split defined Investment Measure AuCs to a number of AuC with the TCode AIAB (the usual way to distriubte normal AuC to a number of AuCs).
    The TCode ABUMN isn't able to distribute/split one AuC (Investment Measure) to a number of AuCs.
    Maybe some has a solution for me.
    Thanks for your help!

    First of all thanks for your help.
    I have done your suggestions already. But my problem is, that I have an AuC (which is defined as an investment measure with an investment profile and the transaction type 348/349). On these AuC i have some values from an internal order (settled on the AuC with KO88).
    Now I have to move the values from the AuC wich has the Asset Class 1520 (AuC as investment Measure) to a number of  finished Assets (i.e. xxxx, yyyyyy) with the Asset Class 1161 Machinery.
    And with the TCode ABUMN wich is mentioned in the SAP library for the investment measures you are only able to transfer one asset to another asset.

  • Order 23 is not a capital investment measure for Asset accounting(AUC)

    Dear All,
    Help This Error
    For T Code  Ko02 select order for AUC  getting this error
    Order 23 is not a capital investment measure
    Message no. AY097
    Diagnosis
    Object concerned: Order 23 .
    The object is not an investment measure, either because there is no investment profile entered for it, or the indicator "manage asset under construction" is not set in the investment profile.
    System Response
    Processing is not carried out.
    Procedure
    If you want to create assets under construction for the object, then enter an investment profile in the master data for the object.
    Check if the the indicator "manage asset under construction" is set in the definition of the investment profile.
    Replay solution ASAP
    Regards
    Nag
    Edited by: Nagaraju Chagonda on May 24, 2011 1:18 PM
    Edited by: Nagaraju Chagonda on May 24, 2011 1:19 PM

    Hi Nag,
    Please check if correction note 1165656 is valid to your release. It can correct this error.
    Best Regards,
    Vanessa.

  • Change auc from investement internal order

    hi sap experts,
    my client has created one internal order with investment profile and assign in auc and now he wants to change the respective auc from internal order.
    for example
    They created one Internal order as 70000500 with investment profile
    earlier they have assigned auc as 5000035 and now they want to change the auc as 5000044.
    i would request to all please guide me how to change the Auc from Internal order .
    regards
    syamala

    Hi All
    I believe you cannot change the AUC in KO02 transaction once you have already settled.
    There is an option Block/Delete but it was greyed (disabled).
    Usually you create the investment order (KO01) and soonafter the AUC and they are linked forever, until the full settlement to asset.
    Well if you really need to transfer the expense from the original AUC to the other AUC you could try the Line Item Apportinment.
    1-Run KO88 to settle all expenses to original AUC.
    2-Run KO88, menu Environment - Line Item Apportinment, update settlement rule for preliminary and try.
    In my box, it was not allowed to settled for AUC, maybe for your box is configured.
    I dont know if maybe by the FI-AA side you can fix it.
    Regards

Maybe you are looking for

  • HOT Redeployment of EAR fails with Classloader error

    App Server: WLS 10.3 OS: Solaris 9 I have installed WLS installed with a domain, admin and a managed server. Everything is working fine. I have WAR and EAR deployed successfully on the Managed Server. HOT deployment of WAR files works perfectly fine.

  • Sales order deletion

    Please send me the steps to delete a sales order. thanks in advance. my id is [email protected]

  • Error when opening connection in SQL Developer 3.1

    I just downloaded SQL Dev 3.1 and had it copy my preferences from 3.0.0.4. Now when I try to open a connection I get the error message in the logging page: SEVERE     29     9453     oracle.dbtools.raptor.utils.Connections     For input string: "" Th

  • SUS PO PDF copy problem

    Hello Everyone, We are using SRM 5.0 with ECS. vendor gets PO's in SUS, and can see the changes made to a PO on the screens. But when they use the Print or Download buttons to see the PDF copy of the PO, it shows them an old version of the PO, withou

  • When open link in safari images are dark

    This started after a recent Update. Not sure what causes it or how to fix it. Can someone steer me on the correct path? Thanks! I have MacBook Pro retina running OS X 10.8.4