Invoice verification - reg.

While doing invoice verification with respect to po no. it adopts the goods received data as per the goods receipt and its document no.  In some cases it is observed that two or more documents data is displayed in one line item.  Why it is happening? Reply pl.

Hi Srinivas,
In Invoice verification with refernce to PO, multiple line items are displayed when you do multiple GR's for the PO Line item.
If we would like to settle the invoice  for one GR only we can select that line item & post the invoice.
For Eg:  I craeted a PO for 1000 & I have done GR's as
GR1- 2, GR2 - 30 & GR3- 50
I get an invoice for 20 with reference to the delivery note of GR1, in that case i can select the single line & get that posted.
Reward points if useful
Thanks & Regards
Kishore

Similar Messages

  • MM- INVOICE VERIFICATION- Reg

    Dear ,
    Plz clarify me that on
    1)After the document's INVOICE VERIFICATION OVER - can it be made - as Return delivery / Vendor return.
    Regards,
    SURESH.P

    hi Suresh,
    I believe you want to know the process of return delivery to vendor, then the answer is yes even if you have the posted the Invoice in SAP system using trax MIRO...
    The process is to create an return PO with return Po indicator checked in the line item of the return material
    then do MIGO with respect to the PO with movement type 161 (return delivery to vendor)
    If the material is excisable then do create excise invoice for other movements in J1IS (create) & J1IV (print invoice)
    then go to MIRO and pass an credit note with respect to the return PO.
    Hope it helps..
    Regards
    Sujoy

  • Reg: Maximize the Number of Line Items in Invoice Verification

    Hi Gurus,
                 For a Client who is dealing in Retail business,there is a necessity to maintain a huge number of line items at Invoice Verification level.Standard SAP has some maxium line items for each document type.Where are the control for maximum line items and how to increase that?
    Regards,
    Sarosh

    Hi,
    At Billing-Country specific settings you will be able to maintain maximum 3 digit billing item no i.e 999.
    Any other suggestion.
    Regards,
    Sarosh

  • Reg:Assignment test in Invoice Verification

    Hi,
           We are doing upgrade from 4.6C to ECC6.0.When I checked the delta functionality,SAP has explained the functionality as shown below.Is it a transaction or Program?Please give me the details.
    "You can use the assignment test in the logistics invoice verification. The assignment text is a process step preceding the invoice verification in background processing. The software checks cyclically whether an open goods receipt exists for the invoices entered in background processing. The software begins the invoice verification only when open goods receipts exist for an invoice. Effects on system administration are characterized as follows: the assignment test should be called in background processing before the report for the invoice verification, because the assignment test helps create the worklist for background processing. An assignment test is faster than a complete invoice verification in background processing, inasmuch as the software does not have to process as much data from the database and does not have to execute as many checks and reports. In addition, the software does not execute full assignment of the open goods receipts as in background processing; it executes only basic assignment"
    Thanks&Regards
    Venkadesh

    Hi,
    As per requirement we need to make settings for Assignment test for LIV.
    Has anyone can explain how it works and what settings we need to carry out.
    Thanks

  • Invoice verification only after quality acceptance

    The GR stage to Invoice verfication as detailed below:
    1.  Once material comes in, the store will check the documents and check the PO and prepare GRN.
    2.  Then, Quality will check the quantity and quality of the item and make necessary QM entry for acceptance / Rejection in the system.
    3.  Finance does the Invoice verfication and makes the payment depending on the due date.
    However, a serious problem arises in this present process at Invoice verfication stage ie., suppose the quality makes delay in checking the quantity and quality of the item and subsequent acceptance / Rejection, there is a scope for making the payment to the vendor even for rejected items since the system allows you to process invoice verification for GRN quantity and make the payment for the same. It is very difficult to recover from the vendor towards rejected items when once the payment is done. 
    Therefore, we need some control in the system at Invoice verfiication stage that the system should  not allow us to verify the Invoice for GRN quantity instead the system should allow us to make invoice verification only for accepted quantity by quality.
    Is there any method to do this ?

    Hi,
    If the material is in quality system should not allow to post Invoice verification. Is it your requirement ? Pls correct me if im wrong.
    The above requirement can achieve with standard SAP settings. You need to activate QM settings for the plant.
    In material master select the Quality Management view, in procuremen data, in QM control key field, select 0007(i.e.Delivery release, Invoice block).
    If the material is in quality you cant post invoice.
    reg
    Durga
    *Assign points if the info is useful

  • Out put logistic invoice verification (print out need in chinese language)

    Hi All
    In MR90 out put logistic invoice verification I am getting output (Printout) in English the requirement is chinese language has to add in output.I know however I need to take help of abaper.I want to know what r the configuration steps to fill this requirement.can any one help me regarding this. Points will be added..
    Thanks
    Srini

    Hello
    Check this link and coordinate with ABAper.
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/d1/27d457f17b11d287d0080009b98822/frameset.htm
    Reg
    *assign points if useful

  • Excise Duty (IS-OIL) - Invoice verification and accounting ED

    Hello experts,
    I have a case in my importation process with excise duty (IS-OIL). I have the following scenario: Purchasing Ed free material and receive it in ED paid Storage Location. So I use Handling type 00 and Valuation type TAX in the PO excise duty item data. I woul like to kwon Which is the standard process for the invoice verification of the excise duty cost when the handling type is 00 and the valuation type TAX?. And How can I do the invoice verification (MIRO) if there is not a specific line in the purchase order history for the excise duty cost?
    I have another case in the accounting of movement type 301 (transfer posting between 2 plants). The accounting posting is the following:
    Examle:
    Account                       Transaction
    1. STOCK FUEL          S                    BSX (Stock account)
    2. STOCK FUEL            H             BSX (Stock account)
    3. STOCK EXCISE DUTY     S             SVO (ED Account)
    4. EXCISE DUTY FUEL           H             ZZP (ED Account)     
    The problem is that the 4th account must be STOCK EXCISE DUTY ACCOUNT from SVO transaction.
    I would be grateful if someone could help me with these cases.
    Thank in advance.
    Pablo

    Dear Prashant,
    Thanks for reply, but i checked my excise cond types, in all conditions, cond cat is blank & cond class 'A' is maintained i.e. Discount & Surcharge.
    My problem is that, my excise value is not got posted in net receivable value in accounts. This problem arise, when we make sales order, Net Value field doesn't pick excise there & while invoicing, it post only the base value & rounding off adjustments at header level. I don't know, from where this Net Value field in sales order is picking the value but my problem will solve if my grand total value(base valueexciseedu cess+higher edu cess) will pass to Net Value field while making sales order. Kindly help.

  • PO valueless that goods receipt value once Invoice verification is done

    HI Gurus,
    I
    have created a PO for Value 2500 with Account assignment F (Order), done Invoice verification for value 2500. Then I have changed this line item value to 1500 in POand then tried doing Goods receipt against the PO. This way I was expecting system to throw an error at the tiem of GR but it posted GR successfully that too for an value of 2500 without giving an error or any message system should not post 2500 value as PO value at the time of GR was 1500 or it should have posted a GR for value 1500.
    Pls assist me in understanding the system behavior.
    Thank you in advance.
    Regards
    Nilesh

    I guess you need to ristrict changing value for PO line item if  Invoice verification is done that will solve lot many problems

  • Purchase Orders Pending for Invoice Verification

    Good Afternoon,
    I'm looking a report with purchase orders waiting or pending for Invoice Verification.
    Those PO's already has the Goods Receipt, and just pending for Invoice Verification.
    Thanks for the help.
    Hector.

    Use report ME2N with selection parameter as RECHNUNG.
    or else you can create your own seleciton parameter where you can pull the report only for the invoice which has GR done.
    to do that go to SPRO-MM-purchasing-reporting-maintain purchaisng list-selection parameter-define seleciton parameter
    hit new entry or copy RECHNUNG
    create new one with
    IR planned  +
    Delivered  >= 0 ord
    and Invoiced  < ord
    save and use this parameter in ME2N
    you will only get the POs list where GR done but no IR

  • Difference in Invoice verification ( GR/IR)- for Line item wise

    Hi,
    I have done invoice verification against PO but in my PO having 4 line items 10 to 40 so while doing invoice verification i have made a mistake in line item 10 i made quantity +1008 made extra and in line item 20 i have made less 1008 and i get to know information while doing MR11 line itme show higher quantity and lower quanty so GR/IR Clearing in not possible bacause of difference quantity and so i already paid entry tax on this PO and i can not do MR8M, is their solution workaround to nullyfy the line item
    could u suggest if any kind of solution i will appriciate for ur valid suggestion.
    Regards
    Vinu.

    Hi
    If MR8M is not possible, then you can post a credit note using the same T.code MIRO for the difference for the excess quantity and later later post an invoice for the short posted quantity.
    Regards

  • GR/IR Freight Clearing Account - GR & Invoice Verification

    Dear Gurus,
    I have made a PO for 1200 pcs unit price 69.20$.  (GR based IV).   (Valuation - Moving average price)
    Delivery costs - Freight (FRB1) - 1200$
    I have splitted the PO quantity in to 3 different Inbound deliveries
    Inbound 1 - 400 pcs
    Inbound 2 - 400 pcs
    Inbound 3 - 400 pcs
    I have made the Goods receipt for the 1st Inbound - 400 pcs.
    Goods Receipt 1 - 400 pcs.  The value in the GR/IR freight clearing a/c credited by 400$
    Invoice Verification1 - 400 pcs. The value in the Invoice verification is 1000$.
    The value in the GR/IR freight clearing a/c debited by 1000$
    Goods Receipt2 - 400 pcs. The value in the GR/IR freight clearing a/c got credited by 400$
    Invoice Verification2 - 400 pcs. The value in the Invoice Verification is 2000$
    The value in the GR/IR freight clearing a/c got debited by 200$ and Stock in Hand debited by 1800$
    Goods Receipt3 - 400 pcs. The value in the GR/IR freight clearing a/c got credited by 200$
    Invoice Verification3 - 400 pcs. The value in the Invoice Verification is 1500$
    The value in the GR/IR freight clearing a/c got debited by 133.33$ and Stock in Hand debited by 1366.67$
    I don't understand how the logic works for seggreating the amount to GR/IR freight clearing account and GR/IR account.
    For the first 2 GR and IV I could understand that there is a  balance in the PO condition but for the Invoice verification 3. The value debited to GR/IR freight account is 133.33$. Can anyone help me how the calculation is taking place and how the system has arrived to figure 133.33$ in the Invoice verification for GR/IR freight clearing a/c
    Strangely when I have cancelled the Invoice Verification document 3.
    The value Credited to GR/IR freight clearing account is 333.33$ instead of 133.33$
    Can somebody help me to figure out the calucation for IR after the GR for planned delivery costs.
    If any SAP notes or help files can be provided then it would be really helpful.
    Regards
    Fazal.

    Refer this note 311496 & 460244, 129066
    Symptom
    Delivery costs were planned for a purchase order item.
    A goods-receipt-based invoice verification is set.
    Several goods receipts are posted. For invoice entry, both in conventional invoice verification (transaction MR01/MRHR) and in logistics invoice verification (transaction MR1M/MIRO), the delivery costs for each purchase order item are displayed in total.
      This is the same as when, for example, only one of several GR documents/delivery notes is selected.
    Example of a purchase order history:
    Cat. Doc. no.    Itm    MvT Pstg.dt.            Qty.in BUoM       Value in local curr
    GR   5200002605 0001 101 June 16, 2000      5  PC         50,00 DEM
    GR   5200002606 0001 101 June 16, 2000      5  PC         50,00 DEM
    Sum of goods receipts                      10  PC        100,00 DEM
    DCGR 5200002605 0001     June 16, 2000       5  PC           3,33 DEM
    DCGR 5200002605 0001     June 16, 2000       5  PC           5.00 DEM
    DCGR 5200002606 0001     June 16, 2000       5  PC           3,33 DEM
    DCGR 5200002606 0001     June 16, 2000       5  PC           5.00 DEM
    Total delivery cost GR                                                 16,66 DEM
    If you only select the first GR document in the selection, you get
    the following default values for the delivery costs:
    Amount    Quantity  BUoM Itm  Decription              Vendor
    6,67         10      PC  10    Freight value        VEND01
    10,00        10      PC  10    Freight/quantity     VEND01
    (and not, as sometimes expected: -  3,33 DEM    5 PC
                                        -  5,00 DEM    5 PC)
    Other terms
    WEBRE, delivery costs, planned delivery costs, goods-receipt-based invoice verification, invoice verification
    Reason and Prerequisites
    A function such as the goods-receipt-based invoice verification is not available for delivery costs.
    Solution
    This is not an error; this is a consulting note.

  • Invoice verification with reference to purchase order

    Hi experts,
    May I know is there any setting or configuration that control the data/field copy from purchase order to invoice in MIRO during invoice verification?
    How do we control which field should be copied? If I add another new field in purchase order, how can I make sure it is copy over to invoice in MIRO during invoice verification?
    Thanks & regards,
    JT

    Hi Andra
    Thanks for your reply.
    Actually what I would like to do is that I added a payment method field in PO. And I would like the payment method to be copied into invoice automatically when we perform the Invoice verification in MIRO instead of manually enter.
    Is there anyway to do that?
    Thanks and regards,
    JT

  • Purchase Order Reprot with Invoice verification details

    Hi Friends,
    I need a SAP standard report, in which I can get the PO details for a perticular period of release date along with Invoice verification details, i.e. how much value has been passed and how much is pending.
    Can you please suggest any SAP standard report for the Subject.
    Kraheja.

    Hi
    Check ME2n report with selection parameter as GUTSCHRIFT or ME80fn with purchase order history.
    Thanks

  • Invoice verification is not posted with T.Code MIRO

    Hi Friends,
    1)
    I created a purchase order with T.Code: ME21N, and Enter Goods Receipts with T.Code: MIGO after that Invoice verification with T.Code:MIRO, but it is not posted:
    Error Message is: Error in account determination: Table T030K Co.Code: RK01 VST.
    2)
    Balance not zero 5000, debits 5000, credits 10000
    for the second purchase order step 1 repeated.
    Please help inthis regard,
    thanks
    ramesh.

    Hi,
    I think there might be some configuration missing with regard to the tax.
    You ahve assign a GL account ot the TAX code for the Transaction Key VST.
    Menu Path: SPRO - > Financial  Accounting - > Financial  Accounting Global Settings - > Tax on Sales/Purchases- > Posting - > Define Tax accounts .
    Thakns
    kiran

  • MIRO - Invoice Verification with reference to Delivery note.

    Dear All,
    In our organisation we are doing MIRO with reference to Delivery note. As same number of delivery note is being submiited by multiple vendors, after entry of that delivery note in MIRO system shows large list (Closed & Open for MIRO). This becomes difficult to select the required delivery note.
    Is it possible to make display of only those delivery notes against which MIRO (Invoice verification has not done).
    Also MIRO with reference to GRN number is possible or not ?
    Please suggest.
    Regards,
    Shekhar Kisan Gaikwad

    In our organisation we are doing MIRO with reference to Delivery note. As same number of delivery note is being submiited by multiple vendors, after entry of that delivery note in MIRO system shows large list (Closed & Open for MIRO). This becomes difficult to select the required delivery note.
    Is it possible to make display of only those delivery notes against which MIRO (Invoice verification has not done).
    Also MIRO with reference to GRN number is possible or not ?
    HI,
    To avoid difficulties post miro with Reference document (PO Reference Tab) - Delivery note click on Radio button a possible entries for delivery note screen will appear. Here you can search specific delivery note by a lot of criteria which will save ur time and effort also you can see MIGO Document.  Click and put tick to adopt and post Delivery note / migo and enter required field.

Maybe you are looking for

  • Can i sync mobile me and exchange contacts at same time?

    hi, i've a mobileme account, with my contacts synchronized. The question is, if now, i configure on that same iphone, an exchange account (my work email), and i also sync exchange contacts, will my mobileme contacts be erased? or they will coexist bo

  • FWD: Re: - no subject (01IB7Q2B9LQW0098V8) -

    The tech notes are now available on Forte's Home page at http://www.forte.com/. On the home page, select " technical information". From there, there is a selection of "technical notes". Before you can access it, you will need to call Forte's technica

  • Password Protecting areas, but not whole phone?

    is it possible to just password protect, say "Notes" ? Say, i wanted to store a bunch of password information in there, and would like to have it password protected from anyone else to see. I know there is a password function for the whole phone, but

  • Compare Oracle Project Management and Primavera

    Hi All, We are using Primavera today and it is not integrated to Oracle. We are also currently implementing Oracle Projects Management (R12.1.3) and trying to evaluate if Primavera can be replaced by Projects Management. Based upon my little experien

  • How to Scan from C3180 on Mavericks 10.9.2

    I recently bought a new Macbook Pro with Mavericks 10.9.2.  I downloaded the drivers for my C3180 All-in-One from the HP site and can now print without a problem.  However I can't scan and see no way to do so. There is no HP Scan nor HP Utility progr