We run a planning sequence from within a process chain. As the data transferred are quite a lot, we have packaged with setting "automatically" and with 30 packages to be built. Now the function returned (it ran already successfully before!) an error message stating:
Master cannot read return value from subprocess 2
and another error:
An error occurred with the maintenance of the query directory.
Do you have any idea what this could be?
Many thanks in advance,
Andreas

Hi Rakesh,
         It's a BASIS problem. After transport during process chain activation, the background user tries to logon with the password and if it fails the chain will not be activated. The contents will be transported though. You can manually activate the chain. You can request the Basis guys to fix this.
- Ram

Similar Messages

  • Planning sequence in Process chain

    HI,
        I have used Planning sequence in process chain, But while executing it, it throws a following message
    "Inconsistent input parameter (parameter: <unknown>, value <unknown>)""
    Any Guess??
    Regards,
    Meiy

    HI,
          I have created a planning sequence in IP. I wanted to execute it in Process chain. While executing in process chain it throws a error which is mentioned above.
    Regards,
    meiy

  • BI IP Executing planning sequence via process chain not possible

    Hi,
    we use BI IP and have defined a process chain (RSPC) with value type process planning sequence. When we execute it, we get error message
    "Inconsistent input parameter (parameter: <unknown>, value <unknown>)"
    When we execute this planning sequence via the modeller or via SE38 RSPLS_PLSEQ_EXECUTE everything works fine. I thougt the cause could be the user of the job itself (job is executed with different user, and variant of planning sequence is user-dependent!), but I changed the user in the job itself as well without results.
    any thoughts?
    regards
    D
    null

    Hi,
    I executed with my user and have a SAP_ALL authorization. Perhaps it could be because we use authorisation with the old method (4.0) (-> I'm not sure on this). I also think it has to do with authorization. I'll check this out with our authorization consultant.
    D

  • Error in execute planning sequence variant in process chain

    Hi ,
    While creating an Execute planning sequence variant in process chain in Quality system , i am getting an error" variable variant not selected ' though i created a variable variant and selected it in execute planning seq variant.
    Transporting it from development system didnt work therefore i am trying to create it directly in Quality .
    Any idea what could be the issue.

    Hi,
    Variable variant can be saved for planning sequence in modeler and then cab be used in process chains.
    In process chain you can choose "Execute planning sequence"( separate process type) and add planning sequence with variant.
    [http://help.sap.com/saphelp_nw2004s/helpdata/en/43/1d000c41130bd5e10000000a422035/frameset.htm]
    Thanks
    Pratyush

  • Any ideas on this plan for a process chain?

    Hi,
    I have 6 ODSes. I load these on a daily basis with 6 different flat files. ODS1, ODS2 and ODS3 needs to be loaded first before ODS4, ODS5, ODS6.
    Once all six ODSes are loaded, they are then aggregated based on some two key fields to and loaded into a cube. Npw I want to automate the process.
    Can you please check if my plan for the process chain is right:
    1. Start Process:   
    direct Scheduling
    Change Selections:
    Start date & Time
    Period Jobs: check
    Periodic Values: Daily
    Restrictions: Always execute job
    2. Indexes:(this flows into the first 3 ODSes)
    Delete indexes
    3. Load Data:
    Load Data ODS1 
    Load Data ODS2
    Load Data ODS3
    4. Activate ODS1
    5. Activate ODS2
    6. Activate ODS3
    (? What do I setup here so that the following will be loaded only if ODS1, ODS2 and ODS3 are successful)
    7.Load Data
    Load Data ODS4
    Load Data ODS5
    Load Data ODS6
    8.Delete Indexes
    9. Load Data
    Load data from ODS1, ODS2, ODS3, ODS4, ODS5, ODS6 to the CUBE
    10.Activate Cube (?Needs to activate cube? Is there a process type like that of activate ODS)
    11. Create Index  (Hm, will the Delete and create indexes in this plan take apply to both ODS and Cube)
    Thanks, I will lovr to get hint from you. How do I factor in PSA? i.e. To always go to PSA then to ODS and Cube?

    Hi,
      1.Start the process.(as per your requirement)
      2. Load the data to ODS in parallel (ODS1 , ODS2 & ODS 3)
      3. Activate the three ODS , with separate ODS activation process type.
      4.Put an AND condition
      5. load data to ODS4 ,5 and 6
      6. Activate ods4 ,5, & 6.
      7. delete index for cube
      8. load different data from ods to cube
    9. create index.
                    start
    load ODS1  -- Load oDS2 -- Load ods 3
    Activate ODS1 - Activate oDS2 - Activate ODS3
                     AND (process)
    Load oDS4      load ods5    load ODS 6
    Activate oDS4  Activate ODS5  Activate ODS 6
                     AND
              Delete the index
               Load data from different ODS to cube
                Create Index
       there is no concept of activating the cube .. it is only applicable to ods.
    Regards,
    Siva.

  • GETWA_NOT_ASSIGNED error while running abap prog in process chain

    Hi.
    I am getting a runtime error GETWA_NOT_ASSIGNED while running an ABAP program in process chain.
    But when i execute pro in SE38 , it's not giving any error.
    Please any one can suggets what will be error.

    Hi,
      i also used to get error for a program executed through process chain but when it is executed in se38 it used to work... that is because my program try to access a application server folder and reads the file from there... the authorisation to this is not proper through process chain ..... once authorisation to the folder was given properly .. i am able to run...
      Such things can happen in your case also... Try to analyse the dump in st22.... what happened ...
    Regards
    vamsi

  • How to put system info. in error mess. sent by email through process chains

    When I get an error message by email from the process chain saying that the process bombed, it does not tell me from which SAP system the problem occured? (Whether Dev or QA or Prod). Is there a way to put the SAP system in the email along with the error from the process chain?
    Thanks
    Ram

    Hi Akshay,
    I am in version 3.5. I believe you can do it in 7. We have a standard user id called ALEREMOTE coming from all 3 systems. We would ideally like the message to say ALEREMOTE - (the error message with DEV specified), ALEREMOTE - (the error message with QA specified) and ALEREMOTE - (the error message with PRD specified).
    Thanks
    Ram

  • Error in delta run in the process chain

    Hello Experts,
    I have a delta infopackge that runs everyday , since many days the process chain is giving error at the IP.
    The IP is red everyday and the following objects does not start, however when I check in the monitor the ip is completed successfully without any errors.
    I checked the logs which is in greeen in the batch job , please find the details below.
    Job started
    Step 001 started (program RSPROCESS, variant &0000000111903, user ID ALEREMOTE)
    Last delta upload not yet completed. Cancel
    Data saved successfully
    Start InfoPackage ZPAK_4EH1CYBST65PTYCQVFAQY6ZI7
    Last delta upload not yet completed. Cancel
    Last delta upload not yet completed. Cancel
    InfoPackage ZPAK_4EH1CYBST65PTYCQVFAQY6ZI7 created request
    Request REQU_4L001XOSR2IQQ14M90QLO1CTA could not be generated with InfoPackage REQU_4L001XOSR2IQQ14M90QLO1CTA without errors
    Last delta upload not yet completed. Cancel
    Error After Starting InfoPackage ZPAK_4EH1CYBST65PTYCQVFAQY6ZI7 in Process Chain ZIM_INT_ORDER
    Entire chain now has status 'A'
    Job finished
    Could you please suggest.

    Hello
    Thanks for your reply
    the problem was with the way it was schudled, the chian was ticket at periodic run , as a result it as running automatically, and causing problem.
    I have removed the periodic n saved it again ...the error stopped appearing !
    The issue is resolved now.
    Thanks for your help.

  • Error when convert planned order to process order

    when using tcode COR7, unable to convert planned order (make to stock) to process order.
    error message: No default value is maintained for operation generation for order type ZI03
    note: order type is customised.
    please assist where to check or maintain the default value..TQVM

    Dear ,
    Create default operation for the process order type and plant combination in OPJG and then check for converting the planned
    order to process order.
    If you want the system to automatically pick the master recipe,then make the necessary settings and selection ID for the process
    order type and plant combination in COR4.
    Check and revert
    Regards
    S Mangalraj
    Edited by: Mangalraj.S on Sep 24, 2010 1:51 PM

  • Error in Step Copy Plan version in Process Chain

    Hi all,
    We have  step in Process Chain called 'Copy Plan version'.This stet is getting failed quite frequently. I just repeat it and the error is getting solved. I just wanted to know that is there any permanent solution for that. We cant afford to getting it failed that frequently.
    I dont have any idea about this step. Can you please provide me information about this step and a possible remedy aw well.
    The error messaage is :
    Selection accesses data that is currently locked; user     
    Job cancelled after system exception ERROR_MESSAGE.
    Please suggest.
    Regards
    sunny

    This is due to "Selection accesses data that is currently locked; user" , there is another process from another process chain which locked the object at the same time frame , so due to that this step is failing
    you can increase waittime 30mins(example)before this Step Copy Plan version executes in the process chain.
    OR, change the schedule time for this process chain

  • Planning function in process chains.

    Hi there
    Can we include a planning function in a process chain directly or it needs to be via Planning sequence.
    Thanks
    Sarah

    Hi,
    How to include APD in a Process Chain
    Re: How to include APD in a Process Chain
    APD in the process chain
    Hope this helps.
    Thanks,
    JituK

  • Error While Deleting cube Contents in Process Chain

    Hi All ,
       I am getting a error when i am trying to delete the contents of two cubes in a Process Chain . The data of one cube is getting successfully deleted but while deleting the second one it results in a error.
    Following are the messages :
    1>Database table /BIC/FZCFEXP01 was deleted and recreated     
    2>Database table /BIC/EZCFEXP01 was deleted and recreated     
    3>Database table /BIC/FZCFEXP02 was deleted and recreated     
    4>Database table /BIC/EZCFEXP02 was deleted and recreated     
    5>Content Of Data Target ZCFEXP01 Successfully Deleted     
    6>Content Of Data Target ZCFEXP01 Successfully Deleted     
    7>System error: RSDU_DATA_EXISTS_TABLE_DB6/ DB6     
    8>Drop Cube Failed In Data Target ZCFEXP02
    Can anyone Help ??
    Sam
    Any pointers . Help is highly appreciated.
    Edited by: Samir Bihari on May 14, 2009 8:54 AM
    Edited by: Samir Bihari on May 14, 2009 8:55 AM

    Hi,
    I'm not sure for this issue but it may relate to SP issue...
    jst chk this notes:
    Note 385293
    Note 987754
    rgds,

  • Create Package while transporting a process chain

    I want to transport a process chain but while doing so it is asking for “package” name. I do not have authorization to tcode SE21 to create a Package. I checked with ABAPer and he also does not have access to SE21.
    Is it mandatory to transport a process chain only via a “package”? Are there alternative methods available which you can suggest?

    Thanks..
    Yes, this is the first process chain we are transporting.
    I tried maintaining the paramters in RSTPRFC with the below settings..
    Client: BW client 001
    Destination: TPBWMANDTRFC
    User: ALEREMOTE
    PWD: ************
    I want to know whether the details of teh destination are correct. If so, are these settings need to be maintained in QA and Prod systems as well?
    Thanks and Regards,
    Srinivas

  • "Syntax error in the MDX statement " in Process chain failure??Urgent pls

    Hi Experts,
    could any one suggest me the procedure to rectify the below problems in process chain?
    1."Syntax error in the MDX statement "
    2."Error when getting data (Error when getting data (AXI))"
    Rgds,
    BH

    In which case it'll be that Access has a different date format to MySQL, and you're trying to push the string "'25-Apr-12 10:55 PM" into Access, which it's not understanding. To get around this, you need to treat your variable as a true date/time object, rather than a formatted string.
    CFQueryParams should be used on absolutely every database platform, they'll stop your website being vulnerable to SQL Injection attacks for one, which at the moment you're wide open to. Replace your query with something like this:
    <cfquery name="input_comments" datasource="#DSN#" username="#DSNUSER#" password="#DSNPASS#">
          INSERT INTO comments(
                             commenter,
                             comment,
                             datetime,
                             post_id
                   VALUES(
                             <cfqueryparam cfsqltype="cf_sql_varchar" value="#form.commenter#" />,
                             <cfqueryparam cfsqltype="cf_sql_varchar" value="#form.comment#" />,
                             now(),
                             <cfqueryparam cfsqltype="cf_sql_numeric" value="#form.post_id#" /> )
    </cfquery>
    The QueryParams will handle the data types for you, and should pass values around more safely and with fewer issues. Assuming you just want to store the current date and time you don't even need to get ColdFusion involved, as databases have their own functions for this. I believe Access' version is simply NOW(), so I've put that in your query.
    Give the above a go.

  • What in Natural Number in the Planning View of Process Chains

    Hi Experts,
    Can anyone explain what is Natural number column in the Planning View of the Process Chain?
    Thanks,
    Rajan

    Hello,
    I am a new user. Using SAP BW 7. When I select planning view I would like to see a chain X in gray. How can I? I noticed that the natural number in grayed chains is 3 instead of 0: perhaps this is the procedure? I have to change the natural number?
    Help me!
    Thanks for answer!

Maybe you are looking for

  • How to make the stage transparent for SWF file being used in Dreamweaver

    I have a SWF file in my Dreamweaver site, that plays correctly. The problem is that the stage is white and we would like it to be transparent. Searching the archives the following advice was given: in your html embedding code you need to set the wmod

  • How to transfer ringtones from iphone to itune

    i am trying to transfer ringtones that i download from an app to itune but i download itune on my pc and connected with iphone but dont know what to do next

  • Dynamic Reports. Runtime parameter passing to Report Query.

    Hi everyone, I have developed a report using apex shared components (report query and report layout) along with BI Publisher for report printing in pdf format. the Report template is built using Template Builder for Word. I have configured my Apex4.1

  • HELP!! Nothing about Digital Editions 2.0 is working

    Okay, for the last time (I've only typed this twice before) I need some help with this program.  It either crashes or I get error messages (authorization and ebook access errors) I can't import my existing library or add new books.  The URLLinks don'

  • Windows 7, Home Sharing error 3253

    I just bought Apple TV Model MD 199E/A SW level 5.1.1(5433). I'm trying to activa the home sharing function on my PC (Gateway with Windows 7 Home Premium Serv Pack 1), so thatI can start using the Apple TV gadget  & can not get past error code -3253