Is it possible to change order of plug-ins in the environment?
Hi
I know how to change the order of the plug-ins in the arrange window (command and drag). When I try this in the environment it changes to the midi assign tool instead. Does anyone know of a way to change the order of pluggins on audio objects in the environment?
Thanks
May I ask why you want to do this?
cheers
rob
Similar Messages
-
Is it possible to change an IDOC and save on the same IDOC number..?
Hi all,
I have an IDOC. When I processed the IDOC, it ended up with error status '51'. There was some problem with the data. So, I changed the data and reprocessed using the T-Code 'WE19' and it was processed successfully. When we reprocess the IDOC using 'WE19', it generates another IDOC number. But, the client is asking that, it should not generate another IDOC number. When we change the IDOC number, it should be saved under the same(ORIGINAL) IDOC number. Is it possible to change an IDOC and save under the same number..? Is there any transaction code to do so. Please give your valuable inputs.
Thanks in advance.
Thanks & regards,
Paddu.Hi,
You can use the transaction WE09..to edit the IDOC data...
Then use the transaction BD87 to post the IDOC..
Thanks
Naren -
How do I visually monitor instrumental plug-ins from the SAME computer??
Hello -
My set-up is noted below. Please note that my audio device for my main computer (the Mac Pro) is the _Motu 2408 MK3_.
For larger sequencing projects, I use up to a choice of three slave computers (an aging Dell Precision Workstation, a Receptor and a MacBook Pro). I am happy to say that all works fine with this set up.
I own many instrumental plug-ins for the MacPro (and the slave computers). Most of the instrumental plug-ins in this computer (and the others) are "powered" by Native-Instrument's Kontakt 2 Player or the full version of Kontakt 2.
For the first time, I was experimenting with the MacPro's IAC Driver. So, for example, I was able to get the piano to play using Kontakt 2 OUTSIDE of the Logic program using the IAC Driver. It is very nice to know that I am able to do this. However, I was not able to visually monitor the audio signal from within Logic as I was playing the piano sound from the "external" Kontakt 2 program. So, to clarify my problem, I could hear the piano, but I could not see the audio signal on the audio meter from within Logic.
First, I tried using the Logic's "*External Instrument*" plug-in. That did not work. Second, communicating with the "external" Kontakt 2 program using Logic's midi instrument via the IAC driver, I tried monitoring the audio signal using an Audio Channel from Logic. I Could not figure out how to route the audio signal so that it could be seen by Logic, so that did not work.
I tried seeing if I could somehow configure the 2408 MK3 driver and CueMix Console. Nothing.
So, here is my question (possibly two questions):
1) Is it possible to configure the MOTU 2408 MK3 device so that I can monitor audio signals from within Logic that originate from instrumental plug-ins activated OUTSIDE of Logic?
If yes, then. . .
2) HOW do I configure the MOTU 2408 MK3 device and/or configure Logic so that the audio signals can be monitored? (And so that I can add EQ and audio effects, etc.??)
Thank you in advance. . .
TedFirst, noequplease, THANK YOU very much for taking the time to answer my question. I sincerely appreciate the time and effort that you shared!!!
I need to clarify myself, I guess. These are not "external" synths in the literal sense. Everything is "internal" within the same computer (the MacPro) as the Logic Pro program. These are instrumental plug-ins like the *Kontakt 2 Player* or the *Kontakt 2* (full version). What I've learned how to do is connect to these instrumental software plug-ins external from the Logic Pro program via the IAC Driver. So, it's all "internal" within the computer, just "external" from Logic. (If that makes sense.)
The reason I'm attempting to connect Logic this way is so that I can use more of the 8 GBs of RAM found within my MacPro. So, in other words, I would use the Kontakt 2 Player as an instrumental plug-in within the Logic Pro program and ALSO connect Logic Pro to the "external" *Kontakt 2 Player* (the _stand alone_ plug-in version) via the IAC Driver.
I can communicate with the stand alone version(s) of Kontakt via the IAC driver. Sound is coming out. However, I have yet to figure out a way route the audio signals from the stand alone plug-in to inside Logic.
I suspect that your suggestion of using an external mixer might be the answer (despite using computer-based instrumental plug-ins). I don't think that there's a way of routing the audio signal from a stand alone plug-in to Logic without the use of some kind of mixer. I most probably will need a digital mixer to take advantage of the 2408 MK3's ADAT digital signals to route the signals back into the MacPro. Sadly, I can't afford a digital mixer at this time.
I don't know. . . .
BUT, like I said in my original post, my CURRENT set-up using the "slave" computers works just fine. I'm just trying to figure out a way to make use of all of my MacPro's 8 GBs of RAM. UGH.
Any ideas?? -
Thanks Andy's FREE plug-ins (especially the 4:3 to 16:9 "fake" anamorphic)
This a message to "Andy" who frequents this discussion group. It was for his comments on his plug in site (Great free and useful plug-ins by the way) but the image verification isn't working. Others may find it useful if they're interested in converting old 4:3 video to 16:9 widescreen TV's.
http://web.mac.com/andymees/Freeand_Easy/main/Entries/2008/3/3_Andy’s_ElasticAspect.html#
Hi Andy, excellent filter addressing something of an issue for me right now (converting old 4:3 video to 16:9 aspect for viewing on my plasma)
You're being a little hard on yourself saying is far from perfect; it's more like "nearly perfect" I've been experimenting with it, and before that Mattais Sandstrom's Smart anamorphic from Too Much too soon plugins. That was a script that I tried to modify (knowing nothing of computer code; just FCP's plugin builder) and I know it's a ***** getting the kinks out of the "bending" around the points of distortion. You've managed very well and with possibly a smoother blend (Protection override helps) this could be perfect. As it is, the user control; the ability to keyframe the sliders makes this a great plugin. I've done some tests and like you say, a static image works great. the give away is a panning shot or if you keyframe the protected area to move (to sometimes track a subject) That said it's densely detailed backgrounds that give away effect; out of focus works a treat. I tend to key frame on the edit so on the next frame the area has has jumped to protect another subject. If I have to track a figure for instance I try to keep the move as long as possible so the effect of "bulging" is gradual and less noticable. I also "squeeze" the footage slightly to produce two slight black bars either side of the screen, barley noticable, bur lessens the stretching of the protection override. ( I have best "compromise" settings of protection width 30, Protection override 3-6, and elasticity of 4) I think if you can smooth out that distortion around the protected area you'll have a "perfect" plug-in! I'd even make a donation to see this gets done! Great work Andy, Thanks!if the source is 4:3 and the target is 16:9 then you will need to blow-up the image so that the horizontal axis fills the 16:9 image width ... that means you will have to crop the image either top or bottom or a bit of both.
simplest is to nest the 4:3 sequence into a 16:9 one and then resize the nest to 133% using the motion tab scale attribute and accept the default centre cut cropping of top and bottom of the image.
for more control you may want to reframe each shot for best placement -
Is it possible to edit parameters of an object in the environment using a midi controller?
Is it possible to edit parameters of an object in the environment (such as the key parameter of a chord memorizer) using a midi controller?
Anyone know what I can do? Maybe even some kind of setup in the environment that will do this?
Thanks -
Hi Friends,
While Installing Mobile Plug-Ins in the Netweaver IDE 7.1 I am unable to find the com.sap.tc.ap\comp folder which should be present there as per the configuration guide available at the link http://help.sap.com/saphelp_nwmobile71/helpdata/en/b6/0f5c4a07cd4bcdb58598760cb27766/frameset.htm.
Please Suggest.
Regards
NiteshHI David ,
The Procedure given in the tutorial has given the steps as shown below but they have not given the detailed steps that how can we create the
1. Data Objects ,
2. Create back-end adapters
3. Create associations ,
4. Activate the data objects and the back-end adapters in the DOE ,
5. Create a distribution model and Assign this distribution model to your test device
The tutorial discribes in the below shown manner .
1. Create an SWCV called ServiceOrderManagement.
2. In the ServiceOrderManagement SWCV, create the standard data objects: Customersand ServiceOrders.
The Customer data object must have the following attributes:
○ CUSTOMERID
○ CUSTOMERNAME
○ STREET
○ ZIPCODE
○ TOWN
○ REGION
The ServiceOrders data object must have the following attributes:
○ CUSTID
○ ORDERID
○ EQUIPTYPE
○ DESCRIPTION
○ PERC_DONE
○ HOURS_SPENT
○ MATERIAL
3. Create back-end adapters for the data objects.
4. Create associations between the two data objects: the CUSTOMERID attribute of the Customer data object must have as association with the CUSTID attribute of the ServiceOrder data object.
5. Activate the data objects and the back-end adapters in the DOE.
6. Create a distribution model for the data objects and activate them.
7. Assign this distribution model to your test device
Please suggest.
Regards
Nitesh -
Erasing and installing plug ins from the internet
erasing and installing plug ins from the internet?
What plug-in what browser??
FireFox>Tools>Add-ons>Plug-ins, etc
Safari>Preferences>Extentions
Safari>Help>Installed Plug-ins -
No destructive editing using installed plug-ins in the sample editor.
It is a shame that it looks like there still is no destructive editing using installed plug-ins in the sample editor. Seems very obvious to me that this feature should be included in Logic. Very disappointing. I’m assuming that you will be able to do this via Soundtrack Pro, but that’s just another layer added to the work flow.
fermusic wrote:
in any case there are no reason to use Soundtrack pro for make a destructive editing with AU plugins.
While everything you say is absolutely correct, in terms of being able to do this within Logic itself, there are times when using Soundtrack Pro does make more sense for destructive printing of AU FX's.
High pass filtering a vocal track with a lot of plosives comes to mind. It's easier to destructively apply the AU high pass filter on just the plosive syllable, or waveform in STP, than in Logic.
Same goes for some extreme cases of De-essing.
With STP selected as your external audio editor, it's very easy to use from within Logic. The two co-exist quite gracefully.
I'd personally love to see Logic adapt some of STP's destructive capabilities, and I'd actually be surprised if we didn't see that at some point in it's evolution.
But I say none of this to dismiss what you've generously offered here. The information you provided in your first post is important for the Logic novice to be aware of. -
I have installed FF4.0 recently. My operating system is Mac OS X 10.6.7. When I am running with the plug-ins active the following happens . .
Initial memory occupied is around 450 Mb.
Over a period of time 1-3 Hours ( it varies ) the memory used increases to 1.7Gb and my use indicator says this is 100% of available memory.
At that point FF4.0 ceases to respond while other applications are still working ( Mail etc. ).
If I start FF4.0 in safe mode the memory used stays around 500 Mb and is stable over a day at least.I have installed FF4.0 recently. My operating system is Mac OS X 10.6.7. When I am running with the plug-ins active the following happens . .
Initial memory occupied is around 450 Mb.
Over a period of time 1-3 Hours ( it varies ) the memory used increases to 1.7Gb and my use indicator says this is 100% of available memory.
At that point FF4.0 ceases to respond while other applications are still working ( Mail etc. ).
If I start FF4.0 in safe mode the memory used stays around 500 Mb and is stable over a day at least. -
Mastering Plug-Ins on the Bounced File or The Multitrack Mix B4 Bounce?
hey guys..im running logic express and wanted to know should i place the mastering plug-ins on the multitrack mix or should i mix, bounce out, import back in and place the plug-ins on that file?
Hi,
Either way can work.
If you want to easily try different effects on the mixed-down version, do it that way.
If you know how you want the effects to be used, go ahead and apply them to the multi-track version.
WH -
I have downloaded the latest Adobe Flash - it says successful but will not work. It says to 'Manage Plug-ins but the Plug-in says it is enabled but it will not work at all. I have tried disabling and then enabling - no success. Please help!
There's two different versions of Flash. The ActiveX version for IE, and the Plugin version for other browsers. Did you install the correct version? This forum's software doesn't thing that Flash is installed for Firefox or the Plugin is disabled.
1.Download the Flash setup file from here: <br />
[http://fpdownload.adobe.com/get/flashplayer/current/install_flash_player.exe Adobe Flash - Plugin version]. <br />
Save it to your Desktop.<br />
2. Close Firefox using File > Exit <br />
then check the Task Manager > Processes tab to make sure '''firefox.exe''' is closed, <br />
{XP: Ctrl+Alt+Del, Vista: Shift+Ctrl+ESC = Processes tab}
3. Then run the Flash setup file from your Desktop.
4. Start Firefox and test your installation here: https://www.adobe.com/software/flash/about/
* On Vista and Windows 7 you may need to run the plugin installer as Administrator by starting the installer via the right-click context menu if you do not get an UAC prompt to ask for permission to continue (i.e nothing seems to happen). <br />
See this: <br />
[http://vistasupport.mvps.org/run_as_administrator.htm] -
Is it possible to change a SAP BW password from the BI Launchpad?
Hello,
We are currently running:
Business Objects 4.1 SP4
Apache Tomcat Web Server
SAP BW 7.3 SP 7, ABAP stack only
We are using SAP BW as our primary EDW with BI 4.1 as a front end for Reporting and Analytics. SAP Authentication is enabled in BOBJ and that is used as the authentication method for all users. The majority of our user have no reason to ever log onto BW as all of their BI content is attainable through the BI Launchpad. (Analysis and Design Studio)
When a new user is created in BW, it is mandatory by policy for them to change their password upon first login. However, the only way they can do this is by logging in to the SAP GUI to BW. Can this be achieved somehow through the BI Launchpad?
Thank you
ScottIt is not possible to change it in LaunchPad unfortunately, workarounds are discussed here:
http://scn.sap.com/thread/3355098
Best regards,
Victor -
Is it possibly to change file attributes for files in the Program Files directory?
Hi,
I wonder if it is possible to change file time atributes for a file that is in the same folder as the exe file inside the Program File folder. I have the following code that gives System Error Code 5.
SHGetFolderPath(0, CSIDL_PROGRAM_FILES, 0, SHGFP_TYPE_CURRENT, programpath);
PathAppend (programpath, TEXT("Testprogram/gnsh.dat"));
hFile = CreateFile(programpath, GENERIC_READ | GENERIC_WRITE, FILE_SHARE_READ | FILE_SHARE_WRITE, NULL, OPEN_EXISTING, FILE_ATTRIBUTE_NORMAL, NULL);
If this had worked, I would for instance have done like this
GetSystemTime(&st); SystemTimeToFileTime(&st, &ft);
timeresult = SetFileTime(hFile2, NULL, NULL, &ft);
I am programming in C with WIndows Api.
Thanks in advance for answer.
Best regardsHi Vahmat,
System error code 5 :
ERROR_ACCESS_DENIED
5 (0x5)
Access is denied.
I have tested your code on my side, it will get a error code 5 if you have no permission to access a file. Please try to run VS as a administrator and rebuild your project, after this , you code works well on my side.
Best regards,
Shu Hu
We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
Click
HERE to participate the survey. -
Is it possible to change a marker's color after the fact in Prelude???
I absolutely love Prelude as a program for logging my footage. I have a number of markers that have different colors but I'd like to know if it's possible to change a marker's color after it's been made. I know that this can easily be done in Premiere, but why not in Prelude???
In Premiere you can easily change a marker's color even way after after the marker was made...
...so why can't you change a comment marker's color in Prelude?
Conversely, why is it that Premiere doesn't respect the marker colors made in Prelude and instead defaults them all to green? This should be addressed in the next update.
Otherwise, there's no reason to have multicolored markers in Prelude if they all get changed to the default green once they appear in Premiere.I know this is very old but I’m trying to clean up old posts. Did you ever solve this? If so it would be good if you could post the solution to assist others. If not, at this
stage, as nobody has answered, I would recommend that you call Intune support.
You will find your local Intune support number here
http://technet.microsoft.com/en-US/jj839713.aspx
Gerry Hampson | Blog:
www.gerryhampsoncm.blogspot.ie | LinkedIn:
Gerry Hampson | Twitter:
@gerryhampson -
Crackle noise with plug-ins at the beginning of a region
I've experienced problems with some TC plug-ins and logic. Mostly with the Brickwall Limiter and TC Helicon Voice Modeler.
When I insert one of those plug-ins in a track, the crackle noise occures when the SPL is almost before the start of the region. So, when this region starts at measure 5 I hear this crackle noise somewhere in measure 4 (also in the bounce). And here is the most stupid workaround!! I have to place a dummy region before measure one of the song. Now, I can bounce the song (from measure -1). I still have this crackle at the beginning of my bounce (before the music starts) but now I can cut it because its at the beginning of the song. The crackle doesn't occure a second time, only when the first region on this track is passed.
I had some consultation with TC and they asked me to send them a file although they didn't know about this phenomenon.
They also recommended to experiment with "automatic delay compensation" and buffer size but it didn't help. Any ideas??<snip>
the start of the region. So, when this region starts
at measure 5 I hear this crackle noise somewhere in
measure 4 (also in the bounce). And here is the most
stupid workaround!! I have to place a dummy region
before measure one of the song. Now, I can bounce the
song (from measure -1). I still have this crackle at
the beginning of my bounce (before the music starts)
but now I can cut it because its at the beginning of
the song.
This has been the workaround for quite some time.
Someone else on this list had some luck with changing
Logic's process buffer and/or disk buffer size.
Check the recent "Dropped First Note" topic.
Pancenter
Maybe you are looking for
-
Report S_ALR_87012086
Hi All The out put of the Audit Report S_ALR_87012086 is not user friendly . Is there a way that this can be changed to AVL format , so that it can downloaded on Excel for better analysis. Thanks in advance for your inputs Farruqh
-
How to attach a document to a material
Hi how to attach a document to the material.if i attach a document to a material. will get automatically pulled up to the bom and then to the production order. how to do this.
-
Side by Side Configuration ERROR - PLEASE HELP
I have Lightroom 3.0 installed on my external hard drive which I access always on the same USB port on my laptop. After 30 hours of editing I unplugged the device thinking it was safe. My laptop got hit by a virus that just messed my entire laptop
-
Proposed Solutions to the Mandatory Data Issue
it is almost worth the price to leave i have 5 phones on verizon 2 will be going soon I am going to t mobile where there is no contract, shared unlimited data which slows after a limit but is still there unlimited talk text and data at a lower price
-
Iam working on examples given in jsp.....
hi, i downloaded bea weblogic 6.0 version,and i want work on jsp and servlets in this. just,i started deploying examples given.but,iam facing problems in deploying examples. i followed the procedure given in th