Is it possible to create a project template? (dsp v4)

Hi I'd like to create a dvd studio pro project template where I can make different DVDs, all with the same format and menus, just by replacing the video tracks on the disk with new ones. For instance I'd have a folder with my video source:
track.01.m2v
track.02.m2v
track.10.m2v
And I have a dvd studio pro project where menus are all layed out for thos tracks. I'd like to make a new DVD just by replacing track.01.m2v,... with different files.
However when I do this, DVD studio pro gets the start and end points for the new tracks wrong (it keeps the start and end points of the old tracks). When I delete the video clips for the tracks and replace them, they are right, but I'd like to streamline this as I often have 60+ tracks.
Any one else out there creating project templates like this? Is this even possible (I can't find documentation on it).
Thanks!
--Jennifer

as you have described: no
DVDsp project file stores the length video on its tracks and does not refresh it when new assets are detected, so you end up needing to drag the end of each video file to stretch it to the length of the replacement asset.
What I havent tried, and may be worth an attemp, is to see how DVDsp responds when the replacement asset is shorter in length than the original. perhaps then DVDSP will refresh the video track accordingly. If this is the case you could then use videos of black, named 1.m2v, 2.m2v, etc and make sure all of their lengths is longer than any video you could possibly replace it with.
If that doesnt work, i suggest creating the project with empty video tracks and saving that. Everytime you start a new project open up that template, save as a different name, and drag all of the new m2vs into the empty video tracks.

Similar Messages

  • I know how to create a PROJECT template, but is there a way to create SLIDE templates?

    Basically I've got several modules, and throughout all the modules is several different pages (text&graphic page, hot graphic page, tab page etc etc).
    What I would love to do is create a set template for each page type (a template for text&graphic, a template for tab page etc) as I have numerous instances of the same pages throughout all the modules (and also for continuity as well).
    It would be great to create placeholders for slide templates just like the application in project templates, and then be able to drop these slides into different projects to have the same foundation to start adding data.
    Project templates is a good start, but only if i want to use the same template throughout the entire module.
    Any one know how to do this?
    Thank yo
    Rich.

    If you're using Cp5/5.5 you can create multiple master slides to them apply to the applicable slides (I don't remember if it was in Cp4).
    Master slides are portable, also, you can copy all the elements and paste them onto new slides in the same project or a different project.
    Insert > Master Slide
    Which should create a new blank slide in the Master Slide panel.  You add items to the slide like backgrounds, captions, rollover captions, highlights, shapes, animations (buttons/click boxes are not allowed).  You use the timeline as you would with a 'normal' slide, but you can't adjust the length of the master slide (this doesn't impact the length of a 'normal' slide).
    On your content slides you select the master slide in the Properties panel, general, master slide dropdown.

  • Is it possible to create informatica visio template for sales force soruce and target objects.

    Hello Anmol, I have a similar requirement where I need mass generation of mappings using Salesforce Objects as a source. As per your instruction, I used cloud version of Mapping Architect of Vision and create a template with normal source and target and Application Source Qualifier. I also mentioned Salesforce as the database type. However, when importing into Informatica PowerCenter Designer, it shows all other sources except for Salesforce sources. Can you please help me out. RegardsManish

    Hi Munisekhar, Yes it is possible. In most cases it will be easier to create such a template directly in Visio.  If you need to get the mapping from PowerCenter into Visio, make a copy of the original mapping and replace the Source, Target and ASQ (Application Source Qualifier that you link the source to) with a relational or a flat file source, target and SQ respectively. Then import it in Visio. Make sure to change the source, target and SQ again back to Salesforce specific objects. So when you import such a copy (that used relational or file objects) in Visio, do the following:1. Edit the source definition and change the Database Type to Salesforce2. Edit the target definition and change the Database Type to Salesforce3. Remove the object SQ (linked from source)4. Drag the ASQ object icon from the Informatica stencil and link it the same way the SQ was linked earlier. That should validate and work fine. Let me know if you still face any issues. Note: You might already be aware of this, but you use the standard SQ  transform/object when you use a relational or flat file source, and use  an ASQ transform/object when you use application sources like  Salesforce. While doing this, make sure to retain your original mapping in PowerCenter so you can start from that again if you need to. Thanks and regards,Amol

  • Re: is it possible to create informatica visio template for sales force soruce and target objects.

    We are using Informatica PowerCenter 9.1 HotFix 1 with PowerExchange for Salesforce.Do Cloud Mapping Designer requires seperate license? We do not have Informatica Cloud license.

    Hi Amol, Thanks amol for quick reply. i have created visio template as per your comments. at the time of validating the template it was showing error. Please find the below error.   Thanks,Munisekhar N

  • RoboHelp 9 HTML: Is it possible to create a project with just the help files?

    I have the help files but not the project... and I am just wondering if I can somehow import those help files into RoboHelp?

    Ok, this is shameless advertising, but here it goes anyway: Peter's way works perfect, but it will take a huge amount of time. You may also want to consider one of my recovery scripts that can recover a project in minutes: Recovery script | WvanWeelden.eu
    In the interest of full disclosure: Please note that these scripts are commercial.
    Kind regards,
    Willam

  • Project template distribution

    Hi,
    I made a project template that I want to use for all my projects. It includes controls, VIs and a specific archtiecture in the project view (autopopulating folders, etc...).
    Is it possible to create a project template such as a VI template ?
    If not, is there a way to use an installer to copy all files in a specific folder, rename a part of VI and control names, and have the project running ?

    Hi zyl7,
    If i well understand what you want to do, you would like to create a project template and to use it for several projects. The best way for you to do that is to create your project and save it in a folder as your template project. When you will need to use this to implement a project you will just have to open it rename it and build your project.
    This way is the same thing as if you had a project template.
    There is another discussion in the forum that could interest you, here is the link:
    http://forums.ni.com/ni/board/message?board.id=170&message.id=172972&requireLogin=False
    Regards,
    Jérémy M. | Certified LabVIEW Developer
    Design Engineer - LinkedIn - Contact
    Don't forget to give Kudos to good answers.
    N'oubliez pas de donner un compliment aux bonnes réponses.

  • Problem while creating a new project template

    I am trying to create a new project template under one operating unit newly created.
    I am using P A Super User responsibility for that operating unit.
    In profile setting the above responsibility has been assigned the new operating unit under Mo operating unit profile.
    Now when I go to Setup>>Projects>>Project Templates and click on New, the form to create new Project template opens up but in the field where I have to select the operating unit, it shows no values in the LOV.
    Can anyone please help me to know what setting do I have to perform so that I can select the operating unit in this new Template creation Form.
    Regards
    Hawker Hunter

    Dear Mr. Govind,
    we have followed all the Project Implementation Setup for the new operating unit except for the Implementation options which we have to fill up for each operating unit.
    In the implementation Options form in the first tab 'System' there are many fields to be filled up.
    For 'Summarization period Type' we choose 'G L Period' and based on this the fields 'Calendar Name' and 'P A Period Type' automatically gets populated.
    But in our case the 'P A Period Type' is not getting populated.
    Can you let me know where we can link the 'P A Period Type' to the chosen 'Calendar name'?
    Also there is a check box - 'Maintain common PA and GL Periods'. If we tick this check box, a message says: 'The Period Type and Calendar of the PA Period does not match the Period type and Calendar of the corresponding GL Period.'
    Can you please let me know where to create the PA Period based on the corresponding GL periods?
    Regards

  • Unable to see my project template after creating the same

    Hi All,
    I Created one (Multi Org)Organization and enable all the required secutiry profiles (HR: Business Group, HR:Security Profile, HR:User Type,MO:Security Profile),When i am creating the Project Template unable to see the same template its moving to some other Org its showing.
    what i have to check in setups. could you please any one.
    Thanks

    Hi Murali,
    Can you check whether you have setup the following profile options for that responsibility to see the created templates.
    PA: Cross Project User -- Update
    This option allow you to update the project with out assignment on the project.
    PA: Cross Project User -- View
    This option allow you to view the project templates by using that responsibility.
    Best Regards,
    Sreenath

  • Project Templates with Enterprise Resources

    I'm using Project Server 2013 ( latets updates installed for both Client and Server)
    I've created a project template and attached this to a project type. My template has enterprise resources speciified. So far so good.
    Now I'm trying to create a project using this template and I'm getting some errors.  (See below)
    As soon as I remove the resources from my template the project creates fine.
    It looks like 'rsResourceCannotAddLocalWithSameNameAsEnterprise'  in the error below means that Project Server looks at the resource in the template and considers the resources in the template always to be a local resources. And of
    course the resource already exists in my enterprise resources and therefore the project creation fails.
    Datasets:
    ProjectDataSet
    Table ProjectResource
    Row:  RES_UID='0bb2c5b5-1716-e311-a1c1-005056992257' PROJ_UID='3121855b-f13b-e311-9f7f-005056991b52'
    Error rsResourceCannotAddLocalWithSameNameAsEnterprise (2058) - column
    RES_UID
    General
    Queue:
    GeneralQueueJobFailed (26000) - ProjectCreate.ProjectAddToMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='353d845c-f13b-e311-9f7f-005056991b52' JobUID='3a21855b-f13b-e311-9f7f-005056991b52' ComputerName='13fdabbe-0ac0-4cca-b382-49d1853aec73'
    GroupType='ProjectCreate' MessageType='ProjectAddToMessage' MessageId='1' Stage='' CorrelationUID='147f4f9c-ae30-b04b-aec7-382a52fa5fdf'. For more details, check the ULS logs on machine
    13fdabbe-0ac0-4cca-b382-49d1853aec73 for entries with JobUID
    3a21855b-f13b-e311-9f7f-005056991b52.
    My questions are:
    Are Enterprise Resources in templates supported?
    Is there a way around this? We're trying to make it easy to select a subset of the enterprise resources available.

    I have experienced this exact same thing and my situation is highly irregular. 
    This is with Project Server 2013.
    I had an EPT with a Project Schedule that had Generic Enterprise Resources assigned and was able to create new projects without problems using the EPT from the New button in the Project Centre in PWA.
    I was creating new projects to test and demonstrate Portfolio Analysis and was able to model Organisational Capacity represented by my Generic Resources and also the Surplus/Deficit element of Resource Constraints on a Portfolio. The Hired Resource Report
    was failing.
    A Service Pack and Cumulative update were applied to the Server and now I cannot create new projects using EPTs that have a project schedule with Generic Enterprise Resources assigned to tasks in the schedule.
    I checked the error message for the Failed and Blocking job in the queue and the GUIDs were for my Generic Enterprise Resources. I deleted the offending Generic Enterprise Resources and then re-created them anew, edited the Project Template to have
    these Generic Enterprise Resources on the Project Team and randomly assigned them to tasks in the schedule to generate a notional demand for work in the Project Template. I then Saved the Template in Project as a new Project Template and edited my EPT
    to reference this new Project Schedule. 
    Same error encountered again.
    Perversely I can open the Template schedule in Project Professional and do Save As and save it as a new project to the Server and that works just fine - the schedule is visible in the Project Centre and I can edit the schedule in both Project Pro and in
    PWA.
    My hunch is that the Cumulative Update and Service Pack which were applied to try and resolve the failing "Hired Resources Report" in Portfolio Analysis, which sadly it didn't resolve - has probably provoked this interesting challenge as it is
    the only material thing to change on the Server during the time that this issue has manifested itself.
    Am I the only one to encounter this?
    Dominic Moss | MAPM Microsoft Certified Technology Specialist | Our Newsletter:
    PM News Project Server Specialists
    Project Server PRIME | Twitter:
    @Twitter | Facebook:
    @Facebook | Linkedin:
    Wellingtone

  • Is it possible to create a WBS without Company code

    Hello,
    I am a SAP CRM guy and I am creating a WBS in PS system from CRM Campaigns.
    My question is whether its possible to create a WBSE without having a Comapny code?
    The reason we need this is because we are planning campaigns at a very high level and later we want to procure for these cmapaings at multiple company codes and cost centers through SRM. So we do not want to restrict the WBSE to one comapny code.
    Regards,
    Vicky

    Hi Ammar,
    The reason this scenario does not seem to be feasible is we have a one to one relationship between campaigns and WBSEs. Creating multiple WBSEs would translate as creating multiple campaigns, which we want to avoid at the first place as this increases the amount of data entry for planning and planning will become based on the procurement we is not the right way.
    However, atleast I am sure now that I cannot have WBSE without company code.
    Abdul,
    Now I am thinking whether its possible to create a Project instead of WBSE and then procure wrt project?
    I need to check the possibility of creating project from a campaign, but from the procument perspective, do you know if its possible to procure wrt project?
    Thanks & Regards,
    Vicky

  • Using aggregator, project template and master slides

    I have been hired to create an online course on project management using Captivate. The organisation has colour coded 5 areas of the project cycle. I have never used Captivate, but I was wondering if the following is on the right track and if there are any issues I would need to be aware of. I thought I would create a project template; create a separate module for each part of the project cycle (plus the introduction, conclusion and quiz) and use a different master slide for each module to use their colours; then aggregate. It will be published as SCORM to be uploaded into the learning management system in Sharepoint. Thank you in advance for your advice.

    Sounds like a good plan to me.  You might also consider using the diagram (if there is one) of the project process on the title slide of each module to help orient the learner as to which part is now being discussed.
    One point though: If your LMS is using SCORM to track the learner's interaction with the course, don't use Aggregator to bundle the movies.  Use the Multi-SCO SCORM Packager instead.
    Aggregator is fine for bundling courses that are just going to be delivered to end users rather than tracked.

  • Creating Multiple Projects in One Workspace

    I've created a new workspace which has two new projects with
    their own packages. When I try to import the package from
    project2 into project1 JDeveloper can't find the class or source
    files. It seems to only see files in it's own directory and not
    one that aren't jar files. Is it possible to create two projects
    simultaneously and have one project import from the other?

    Thanks for replying,
    I want to this type of output,
    In my project one solution two projects(one website and one WCF service)
    what i am asking is 
    this type 
    running both projects single service
    http://postimg.org/image/oijwkbn7h/
    After
    i a hosting into azure that url's like this
    How can i get this type of output
    EX: http://multliplehos.cloudapp.net/ 
    Service url: http://multliplehos.cloudapp.net/Service1.svc
    anilbabu

  • Add Network Header to project template

    Hi All,
    I have created a project template but would like to assign a Network header to a WBS Element in the template as I require the Network for every project.
    Can this be done.
    My project is a customer project. I have created a new project profile, copied from the standard profile.
    Thanks
    Stuart

    Hi All,
    I have created a project template but would like to assign a Network header to a WBS Element in the template as I require the Network for every project.
    Can this be done.
    My project is a customer project. I have created a new project profile, copied from the standard profile.
    Thanks
    Stuart

  • Is there a way to create a Cairngorm "template" Project?

    Would it be possible to create a template for Cairngorm-based Flex projects, since they all have the same general architecture?:
    /src
    /control/events
    /control/commands
    /control/Controller.as
    /control/Services.mxml
    /model/ModelLocator.as
    /valueObjects
    /view
    I basically want to create this folder/file structure, and then start a new project in Flex Builder using this template. I know I can simply copy and paste the structure from a random folder, but I was wondering if there is any way to do this in Flex Builder.
    Thanks.

    FYI, when I try "Import... > General/File System", it only imports folders with files in them (it ignores /control/events, /control/commands, /view, and /valueObjects).
    On Wed, Dec 24, 2008 at 10:05 AM, Eric Belair
    <
    [email protected]> wrote:
    A new discussion was started by Eric Belair in
    Cairngorm Development --
      Is there a way to create a Cairngorm "template" Project?
    Would it be possible to create a template for Cairngorm-based Flex projects, since they all have the same general architecture?:
    /src
        /control/events
        /control/commands
        /control/Controller.as
        /control/Services.mxml
        /model/ModelLocator.as
        /valueObjects
        /view
    I basically want to create this folder/file structure, and then start a new project in Flex Builder using this template. I know I can simply copy and paste the structure from a random folder, but I was wondering if there is any way to do this in Flex Builder.
    Thanks.

  • How to create a FCPX Project Template so you don't have to wait for titles to render each time?

    Hi there
    I'm currently creating 3-4 minute video clips that all look pretty much the same, just with different video and audio really.
    I have a title at the beginning, video and audio throughout (with a couple of cross dissolve transitions) and 2 titles permanently over the video.
    The video changes per video, the audio changes per video, the title at the beginning changes per video, but the two titles over the video do not need to ever change.
    Is it possible to create some kind of Project Template where I just replace the video/audio clip and the rest pretty much stays the same?
    The problem I'm having is that its taking forever to render the two titles over the video each time.
    Is there anyway to get around it having to render the two titles over the video each time as they dont ever change? (Well the length of them does, but not the text itself)
    Thanks

    shippo_uk wrote:
    Is there no way …
    again: each frame has to be re-calculated.
    consider speeding-up render-processes by
    • a new, faster Mac
    • more RAM
    • purchase of Compressor, and use its 'virtual render-farm'-feature aka full-use of all cores of your Mac
    • even more Ram
    • clever 'distribution' of source files and project files onto fast (7200rpm/ fw800) external harddrives instead of one single intHDD for OS&working files
    • a lil' more Ram
    • play wit your kids while Mac's rendering …

Maybe you are looking for