Is it possible to create a Purchase order wrt a Scheduling agreement?

Is it possible to create a Purchase order wrt a Scheduling agreement?

Hi,
It is not possible to create PO wrt a Scheduling Agreement. Po is basically a formal instruction given to the supplier by the purchasing dept. It is non-binding. Delivery of the goods is not mandatory for a PO. However, in the case of SA, we create SA
and maintain SA Schedule lines (ME38) with reference to SA. The agreement created with vendor is binding and fixed.
Hope it clarifies.
Regards,
Bijoy Kumar S.P.

Similar Messages

  • IDOC: MM purchase order to SD scheduling agreement

    Dear experts,
    Is below scenario technically feasible?
    - Purchase order created in customer system, and sent to vendor system via IDOC
    - Scheduling Agreement created in vendor system against the received IDOC
    - Goods issue posted for delivery schedule of Scheduling Agreement, and sent to customer system via IDOC as Shipping Notification
    - Inbound Delivery created for purchase order in customer system against the received IDOC.
    - Billing created in vendor system and sent to customer system via IDOC
    - Invoice verification created in customer system against the received IDOC.
    The scenario is obviously feasible between Purchase Order-Sales Order, but I'm not sure whether it will work with Purchase Order- SD Scheduling Agreement or not. According to SAP Help, it seems that only MM Scheduling Agreement can work SD Scheduling Agreement.
    Thanks a lot,
    Duc.

    Hello Indu,
    I created two partner profiles but still receive that message above:
    Partner No: 999999
    Partner Type: LI
    Outbound parameters: ORDERS
    Outbound Options
    Message type: ORDERS
    Receiver port: A0000000006
    Pack. size: 1
    Basic type: ORDERS05
    Message Control
    Application: EF
    Message type: Z40B
    Process code: ME10
    Partner No: XXXCLNT100
    Partner Type: LS
    Inbound parameters: ORDERS
    Inbound Options
    Message type: ORDERS
    Process code: ORDE
    Kind Regards,
    Florian

  • BADI:to create automatic Sales order(va01) from Scheduling Agreement(ME31L)

    Gurus,
    I want to create SO after Scheduling agreement creation.
    I am trying to do it using BADI: ME_PURCHDOC_POSTED method Posted.
    I've implemented it, and it is getting called, I am trying to create SO using SO create BAPI in the BADI.
    though the same code of SO creation with schedule line Through BAPI working fine with reports, its not able to create SO with schedule line when i use it in BADI.
    Point rewarded for any help.
    Rgs
    Ashok.
    Edited by: Ashok Gupta on Mar 30, 2008 5:20 PM

    i've done it.

  • Create another purchase order for a material ordered in full

    Hello friends,
    I have a little MM question for you.
    I've created a purchase requisition with a material A and quantity 100 UN
    I've then created a purchase order in reference to this PR.
    This PO has been released.
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?
    How does SAP control that ? (customizing path ??)
    Regards,
    Bahia.

    Dear,
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?  Yes it is possible in SAP
    How does SAP control that ? (customizing path ??): SAP controls in that way, when ever you create purchase requisition with a material A and quantity 100 UN...Now PO created and released...
    Now again if you try to create PO wrt PR, you can observe this time you will get all deatils in PO without quantity...reason behind that is, you have already released an order for full qty w.r.t. that PR...So this time qty field will be empty..You have to manually enter this field.
    Now the same you can see in the the PR status in ME53N Tcode.
    Regards
    Utsav

  • DBIF_RSQL_INVALID_RSQL when creating a Purchase Order (ME21N)

    Hi,
    The system is generating a short dump DBIF_RSQL_INVALID_RSQL when a user tries to create a purchase order.
    what could be the cause of this? i have analysed the short dump in st22 and looked at sm21 and st11 and they are giving very little detaill.
                                                                                    Error in the module RSQL accessing the database interface.                                                                               
    What happened?                                                                               
    Error in ABAP application program.                                                                               
    The current ABAP program "SAPLZMM_GET_ACT" had to be terminated because one of    
    the                                                                               
    statements could not be executed.                                                                               
    This is probably due to an error in the ABAP program.                                                                               
    What can you do?                                                                               
    Print out the error message (using the "Print" function)                          
    and make a note of the actions and input that caused the                          
    error.                                                                               
    To resolve the problem, contact your SAP system administrator.                    
    You can use transaction ST22 (ABAP Dump Analysis) to view and administer          
    termination messages, especially those beyond their normal deletion              
    date.                                                                               
    Error analysis                                                                               
    An exception occurred. This exception is dealt with in more detail below  
    . The exception, which is assigned to the class 'CX_SY_OPEN_SQL_DB', was  
    neither                                                                  
    caught nor passed along using a RAISING clause, in the procedure          
    "ZMM_GET_ACT_PLN" "(FUNCTION)"                                           
    Since the caller of the procedure could not have expected this exception  
    to occur, the running program was terminated.                            
    The reason for the exception is:                                          
    The SQL statement generated from the SAP Open SQL Statement violates a    
    restriction imposed by the database system used in R/3.                                                                               
    Possible errors:                                                          
    o The maximum size of an SQL statement has been exceeded.                
    o The statement contains too many input variables.                       
    o The space needed for the input data exceeds the available memory.      
    o ...                                                                               
    You can usually find details in the system log (SM21) and in the          
    developer trace of the work process (ST11).                               
    If an error occurs the developer trace often informs you about the        
    current restrictions.                                                                               
    How to correct the error                                                                               
    The exception must either be prevented, caught within the procedure             
    "ZMM_GET_ACT_PLN"                                                              
    "(FUNCTION)", or declared in the procedure's RAISING clause.                    
    To prevent the exception, note the following:                                   
    The SAP Open SQL statement must be divided into several smaller units.          
    If the problem occurred due to the use of an excessively large table            
    in an IN itab construct, you can use the addition FOR ALL ENTRIES               
    instead.                                                                        
    When you use this addition, the statement is split into smaller units           
    according to the restrictions of the database system used.                                                                               
    You may able to find an interim solution to the problem                         
    in the SAP note system. If you have access to the note system yourself,         
    use the following search criteria:                                                                               
    "DBIF_RSQL_INVALID_RSQL" CX_SY_OPEN_SQL_DBC                                     
    "SAPLZMM_GET_ACT" or "LZMM_GET_ACTU01"                                          
    "ZMM_GET_ACT_PLN"                                                               

    Hi,
    Wherever you have used SQL statement please do check all the fields here as some of the fields are not in correct order as they are required per the actual table in dictonary, to just verify that you can use addition of "INTO CORRESPONDING FIELDS OF INTERNALTABLE" in your SQL statement as this will not require the fields to be in order but this may cause performance issue.
    Thanks and Regards
    Sudharshan

  • Creating a Purchase Order, is there any help out there?

    I am creating a purchase order for our sales team that can be utilized on iOS. I have two issues:
    1) Some of our sales will be exempt and will need to be toggled off. How do you go about doing this while not destroying the end total?
    2) Our sales tax varies due to county's jurisdiction. Is there a way to change that once the form is ready to be filled out?
    Thanks Guys
    Below is how my form is being set up, mind you this is an import from excel.

    I don't see a way for you to currently specify that an item is exempt...
    Maybe add another column with check-boxes for the exempt status. However,
    implementing this in the calculation will require a custom-made script.
    As for the sales tax, you can place that in a text field as well and use it
    in your calculation directly. It's even possible to set it up so that a
    selection in a county drop-down will automatically populate the Sales Tax
    field with the correct value.

  • Steps to create a purchase order in SAP r/3

    Hi All,
        I need to create a purchase order in SAP R/3,I am very new to SAP R/3 just started using material managements module in R/3.Could any one please help me to know what all steps i need to take for creating a PO.Do i require some pre-requisite data in R/3?
    Waiting for your reply!
    Thanking you.
    Regards,
    Namrata.

    Trigger
    A purchase order needs to be created, and the vendor is known
    Business Process Description Overview
    A purchase order is a legal document issued by the buyer to the vendor to supply materials or service at the agreed price, terms and conditions. The Purchase Order forms the basis for all follow-on activities like Goods Receipt, Invoice Verification, etc. The Purchase Orders can be created directly by entering all the required data, copying already created purchase order, with reference to an RFQ/Contract or with reference to a PR.
    Purchase Order creation is possible only if sufficient budget allocation is there for the Fund Centers. It is not possible to create Purchase Orders for a Vendor who is blocked for procurement or not maintained in source list for that item. Also it is not possible to create PO for Quantity more than the PR quantity.
    All the price components which are to be paid to vendors and requires to be inventoried has to be included in PO.It is possible to add different vendors for delivery costs. The tax codes should be correctly maintained in PO for the purpose of Cenvat availment etc.
    The payment term defaulted from Vendor Master or RFQ has to be verified and changed if required.
    The incomplete Purchase Orders can be saved as HOLD document and later completed and saved thru Change PO menu
    Input - Required Fields     Field Value/Comments
    Vendor     Vendor number
    Purchasing Organization     1000
    Purchasing Group     Purchasing Group code
    Date     Purchase order date
    Account assignment category     Where costs will be allocated
    Delivery Date     Anticipated Delivery Date
    Plant     For which plant we are buying the material
    Output - Results     Comments
    Purchase order document     Can be changed, displayed or printed which can then be mailed to vendor
    Tips and Tricks
    The Purchase Orders can be created directly by entering all data required for creating PO or by copying another PO or with reference to RFQ/Contract/PR.To create a purchase order by copying existing document (PO/RFQ/PR), you can either select the desired document in the document overview   .and adopt it in the current purchase order in the right-hand area of the screen using the ADOPT button   .In addition you can drag it onto the shopping basket symbol   with the left-hand mouse button. 
    Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data.  This will reduce the amount of redundancy in the data entry, i.e. plant, company code.
    One Purchase Order may be created for several purchase requisitions
    Procedural Steps
    1.1.     Access transaction by:
    Via Menus     Logistics èMaterials ManagementèPurchasingèPurchase OrderèCreateèVendor/Supplying Plant Known.
    Via Transaction Code     ME21N
    1.2.     Double-click   
    On screen “Create Purchase order”
    On screen select Domestic Purchase order in this screen . You can also select other document if you want to create other. Here drop down menu is available.
    Click   to enter the organization data.
    Screen will change in the header; enter data as given in the table below:
    Field Name     R/O/C     Description
    Purchasing Org.     R     Enter the purchasing organization code.
    Example: 1000
    Purch. Group     R     Enter the purchasing Group which is procuring the material
    Example: P01
    Company Code     R     Enter the company code under which above purchasing
    Organization is.
    Example: 1000
    After entering the organization data enter the vendor or material supplier in the field    here drop down is available.click   to see the drop down.
    Field Name     R/O/C     Description
    Search term     O     Text that describes the vendor in more detail.
    Example:     MICON
    Vendor     O     Description of the vendor.
    Example:     100008
    Click   .
    System displays all possible entries available as per data entered
    Restrict value range (1)   1 Entries found
    To select required Vendor Click   .
    Click   .
    Vendor selected
    Now go to   ,here the system will pick up the data automatically from the vendor master but if you want to chane the data you can change the data. Here drop down menu is available.
    Now go to   to mainatin the text.
    After maintaining the text if you want to see or change the vendor address click   and do the amendments.
    Now Go to   and click to enter the Items and other data as per the table given below:
    Field Name     R/O/C     Description
    Account Assignement     R     Key that identifies specific settlement receiver types such as cost centers, internal orders, work orders, asset accounts, or project WBS elements.Example: K
    drop down menu is available here.
    Item Cateogry     O     How the procurement of a material is controlled.
    Drop down menu is available here.Example: Standard
    Material     R     Here you will enter the material to be purchased from the
    Vendor.
    Here also drop down menu is available. Use the following
    to select the material. Example ZROH-DEMO
    In the figure above enter the search cretira for the material for example ZROH-DEMO and click
      . The follwing result will appear on the screen select the line item and click   to select
    the material.
    Short Text     R     Enter here short description about the material,if the text is not
    automatically picked up from the material master.
    PO Quantity     R     Enter here quantity to be ordered.
    Example 10
    Order unit     R     Here we enter the order unit’s of measurement.
    Here also drop down menu is available.
    Example : KG
    Category of delivery date     O     Here you can enter deleviery date format.
    Here also drop down menu is available.
    Example : Day format
    Delivery date     R     Enter the delivery date. You can use the calender provided by
    the system.
    Example : 28.02.2006
    Net price     R     Enter the net price of the material here
    Example : 1000 INR
    Material group     R     Enter the material group to which that material belongs.Here
    also drop down menu is available. This field is also automatic
    picked up field.
    Example : M10001
    Plant     R     Enter the plant code for which you are purchasing the material
    Here also drop down menu is available.
    Example : 1100
    Storage location     O     Here you will enter where the material is to be stored. Drop
    Down menu is available here.
    Example WH01
    Click Enter and system will give you message  
    You will now see the screen
    Field Name     R/O/C     Description
    Cost Centre     R     The purchase is done for which purpose. Here also drop down
    Menu is available.
    Example: 11050 for CDU/VDU /SGU OP
    G/L Account     R     G/L account from which payment will be done.
    It will be automatically be picked up from the material group
    You can change it also.
    Unloading Point     O     Specifies the point at which the material is to be unloaded.
    Recipient     O     Specifies the recipient for whom the material is destined.
    Click   to see and to change the Tax Code at item level.
    Select    to view the taxes applied on the line item.
    click   to go back to the previous screen .
    On the main screen in the same tab if you want to change the taxe select the tax code from the drop down available
    After selection again, Select    to view the taxes applied on the line item.
    If you want to add more conditions click   tab and enter the conditions from the drop down
    You can also maintain the text at item level by clicking   tab.
    After completeing this all click   to check wether here is any error in the purchase order , If there will not
                             ↓
    any error then on the screen following line will appear.
    If there will be some error the system will throw the message on the screen
    select the line item and click   to see the detail of the error.
    close this window now and goto main screen to rectify the error.
    After rectifying the error again click   to check wether here is any error in the purchase order.
    Now click   to save the purchase order, after clicking the button the following message will appear

  • User Exit to Create Production Order when creating of Purchase Order

    Hi Guru's,
    I want to create the Production Order when creating the Purchase Order. i want to know is there any user exit exists for that??
    My scenario is as follows.
    we are converting the Purchase Requisition to the Purchase Order , while doing this we want to create the Production Order.. Is this possible??
    If possible how can we do that???Please suggest me the possible solution.
    Thanks in advance.
    Thank you,
    Adi.

    Teja,
    My Scenario is as follows.
    P1- Manufacturing Plant
    P2 - WareHouse Plant (Procures Material from P1 using STO)
    When we run the MRP in P2, it creates a Purchase Requisition, that Purc.Req is going to be convert as STO (Stock Transport Order) in P1 Plant.
    When converting the Purchase Req to STO, we need to create a Production Order in P1 Plant.
    we know that system will creae the Purchase Order only, is there any possibility that,For creating the Production Order is there any user Exit/BADI or any other procedure while creating the Purchase Order????
    Thanks,
    Adi.

  • Allow to create a purchase order with purchase requisiton item deleted

    Dear all,
    I have a question about creation purchase order process.
    Firstly, I have a purchase requisition with 2 items, first of them is deleted.
    If I try to create a purchase order thru transaction ME57N with the previous purchase requisition, I can only create it with one item (the one wich is not deleted)
    However, if I try to create the purchase order thru transaction ME21N, with purchase requisition as reference, I can create the PO with item that was deleted in PR.
    I don't understand why system allows to create a purchase order with an item that previously was deleted in PR.
    Does anyone have a explanation about this issue?
    Many thanks in advance
    Best Regards.

    Hi,
    In the document overview of ME21N you get all the items of the purchase
    requisitions, no matter if they are deleted or not.
    When you convert the deleted item into a Purchase Order you get message
    06 050 stating that this item is deleted in the purchase requisition.
    This message can be defined as an error message in the customizing
    transaction OME0. This way, it will not be possible to order an item
    which is deleted in the referenced purchase requisition.
    BR
    Nadia Orlandi

  • Is there any Enhancemnet in MM where we can create a Purchase order immedia

    Dear ABApers,
    Is there any Enhancemnet in MM where we can create a Purchase order immediately after saving the Purchase requisition.
    I basically want the PO automatically after saving the PR.
    Thanks & Regards,
    Ashok.

    Hi  Ashok,
      The only way possible in this case is to goto SPRO-> Material Management->Purchasing->Bussiness Add-Ins for Purchasing->Badi:Customer Badi to enjoy Purchase Requisition Bapis.
    In that bapi use the Function module after propor coding BAPI_PO_CREATE1. I think this will help you..
    Cheers ,
    Sany

  • How to create a Purchase order from XI Using ORDERS05

    Hello Experts,
    I need to create a purchase order using OREDRS05 from XI. I was not able to create and I am having these quires.
    1. What are all the mandatory fields that I need to fill in to create a purchase order?
    2. Which part of the SAP will take care of the control record? Is this done by SAP or Integration Tool?
    3. When I have tryed with an existing Inbound Idoc(On R/3 Side) its showing Satus 51 what should I do?(Error: There is no article description for item 000010)
    If Possible give me the step by step procedure to reslove..
    Thanks in Advance,
    Sai Suma

    Hi Suma,
    Check this link
    Creating Purchase Order IDOC through XI
    /people/ravikumar.allampallam/blog/2005/03/03/creating-purchase-order-idoc-through-xi
    Sachin

  • Create a purchase order linked to sale order with DI

    Hello all,
    I tried to create a purchase order based on a sale order with the DI but I get an error message "the business partner selected in base document is different than the target document"
    As you understand, this is normal to have a different business partner. So my question is : is it possible to create with the DI a purchase order linked to a sale order or is this a missing functionality ?
    Thank you
    Sebastien

    Hi sébastien,
       oDoc.Lines.ItemCode = "A00001"
        oDoc.Lines.Quantity = 1
        oDoc.Lines.BaseType = 17
        oDoc.Lines.BaseEntry = 213
    A Purchase document's BaseType can only be a Purchase document itself.
    A Sales document's BaseType can only be a Sales documento itself.
    To create a Purchase Order based on a Sales Order you must go through each row of the Sales Order and copy the values (ItemCode, Quantity, Discounts, VatGroup, etc.) to the Purchase Order.  And remember the VATCode used in a Sales document cannot be the same as the one used in a Purchase document.
    Best Regards,
    Vítor Vieira

  • How can I select alternative BOM when creating subcontract purchase order?

    In our business, a finish good material always has different production versions at the same time. Each of production versions has its own alternative BOM. When I create a planned order, I can select wanted BOM through specifying production version.
    But, when I creating subcontract purchase order, there is no field for me to specify the production version or which alternative BOM I prefer. In this case, I need to create a planned order at first. And then, convert the planned order to purchase. Only through this way, I can create a subcontract purchase order with my wanted BOM.
    So, I wonder if there is any way to select alternative BOM directly when creating subcontract purchase order.
    Thanks a lot!
    Regards
    Robbie

    Dear Mr. MM
    can you give me additional information about your solution?
    BUT I would not expect the sytem to offer you during the Purchasing cycle the different Production Versions as it is not meant to be. I remember having the same requirement some time ago and we solved it the way I described above, additionally we created a Pop up window with a user exit during the PO creation which offered the different production versions and if the one linked with the quota arrangement, the standard PV, is used in the PO.
    We also have the same problem, we activated businessfunction SCM_GEN_02 so that it is possible to have several production versions for one supplier, but unfortunatly it is not possible to change the production version in the purchase order. (business function does not seem to be very integrated)
    So i would be very interested in your solution because acually it seems that i have to modify the sap standard.
    Thank you and best regards
    Lisa

  • Create a Purchase order using the BAPI using the data in the XML file.

    Hello Gurus,
    here is the scenario can anyone help me how to proceed explaining the procedure?
    Create a Purchase order using the BAPI using the data in the XML file.
    comprehensive explanations are appreciated.
    thanks in advance.

    hi,
      first use fm "bapi_po_create".
      then use fm "BAPI_ACC_GL_POSTING_POST"
    The demo environment was made with real business scenario in mind, but following subjects need to be addressed in a live implementation:
    •     No exceptions and error handling is implemented, except the order rejection (e.g. partly delivery);
    •     In Navision both XML Ports and the XML DOM has been used to integrate with SAP XI, because XML ports has some drawbacks regarding to Namespaces in XML Documents (mandatory in SAP XI);
    •     A minimum of SAP and Navision customization is required to implement this solution. (e.g. user exit in SAP, Navision XML DOM).

  • Creating a purchase order in web dynpro for java.........

    hello all,
    i am new to web dynpro for java.i have already done an application
    "Creating a Web Dynpro Application Accessing ABAP Functions" this application
    have good document on sdn.
    this application is working fine .
    Now i got an requiremnt for creating a purchase order in web dynpro for java.
    in normal report when i call  the bapi the parameter are the header, headerx,item, itemx is an internal table.
    CALL FUNCTION 'BAPI_PO_CREATE1'
      EXPORTING
        POHEADER                     = HEADER
        POHEADERX                    = HEADERX
      POADDRVENDOR                 =
      TESTRUN                      =
    IMPORTING
      EXPPURCHASEORDER             =
      EXPHEADER                    =
      EXPPOEXPIMPHEADER            =
    TABLES
       RETURN                       = RETURN
       POITEM                       = ITEM
       POITEMX                      = ITEMX.
    i just want to know how can i fill these internal table in web dynpro
    for java to create an application accessing "Bapi_po_create" .
    Thanks

    Hi Gopal,
    I'm not sure what is your issue, it seems you're not really understanding how the Model structure works in WDP.
    I'll assume few things here, like you know how to Import the Model into the WDP, and you know a little bit about what Java Classes will represent this Model in the Project.
    Try these steps:
    1. Import your Model into the Project;
    2. Open your Component Modeler, create a Data Link between your Model / Component (Or Custom Controller, as you prefer)
      - You can also use the "Apply Template -> Service Controler"
    3. Map the Input of your Model as the Main Node, check the Input Tables (you prob. will have two, POITEM = ITEM - POITEMX = ITEMX)
    4. Also, check the Return box, since this is BAPI return (You can use to display Backend messages)
    Now you have the Model mapped into your Controller, you need to develop the Java function to execute it.
    1. Create a new Input class, like
    BAPI_PO_CREATE1_Input purchaseOrderCreateInput = new BAPI_PO_CREATE1_Input();
    2. Bind your Input Node, in the Controller, with your Input Class;
    wdContext.nodeBAPI_PO_CREATE1().bind(purchaseOrderCreateInput);
    3. Set any Import parameters you need:
    purchaseOrderCreateInput.setEXPPURCHASEORDER(XXXX);
    4. To Add references to the Table, you will perform something like:
    First, you need to know what "Structure" you need to add (POItem Structure) - You have a Java class that represents that Structure..
    POITEM_Element poItemElement = new POITEM_Element();
    poItemElement.setPROPERTY();   /// Set your Properties
    purchaseOrderCreateInput.getPOITEM().add(poItemElement);
    5. Execute your Input,
    purchaseOrderCreateInput .execute();
    Hope it helps,
    Regards,
    Daniel

Maybe you are looking for

  • Selection problem of Ref op set while converting plnd to prod order

    Hi PP Professionals, Even though we have maintained 'manual slection (4)'  for Tast list type- S (ref operation set), we are getting error  'Ref Op set is not valid' and in error help 'error in reading PP master data'. Since the Routing is same for a

  • Initial load of PO - Migrate PO from R3 to SRM

    Hi all, we are implementing a SRM 5.0 (ECS) and we have to make an initial migration of po from r3 to srm. Is there a standard functionality (IDOC, BAPI, or transaction) to use for this aim? rds enzo

  • Hp pavillion dv9700 won't start with Ac adapter plugged in

    Dear all, I have a 3 year old hp pavillion dv9700. The problem is that the computer won't turn on when i remove the batteries and leave the Ac adapter plugged in. The led that indicates that the adapter is plugged in is on, so that means that the ada

  • Problem with Xmonad, laptop & presentation

    Hi, I am trying to figure out how I can have Xmonad show a presentation both on the laptop screen as well as on the projector. At this moment I can only either show the presentation on the projector or the laptop, but not both at the same time except

  • How to connect grace digital wifi radio receiver to airport express.

    Hi, I need to connect grace digital wifi radio receiver to airport express. The receiver works fine with belkin n150, however when connected to express as primary base station ( belkin switch off), it displays "Default gateway....... Port 80 not foun