Is it Possible to create a simulation purchase requisition?

Hi everybody,
I was wondering  whether it is possible to create a simulative purchase requisition in transaction MS02.
Or if it is possible to convert a Simulative Planned Order into a purchase order in transaction MD02/MD04.
Thank you kindly for your help.
Best regards
Mitch

Hello
There is no such thing as a simulative purchase requisition on LTP. Even for externally procured materials, system still created a planned order.
What you can do is to copy a simulative planned order to the operative MRP. Later, this planned order can be converted to purchase requisition and to purchase order.
Take a look on the following link for more details:
Copying the Long-Term Planning Results to Operative Planning - Long-Term Planning (PP-MP-LTP) - SAP Library
BR
Caetano

Similar Messages

  • Is it possible Line level approval for purchasing requisition in AME?

    hi
    is it possible Line level approval for purchasing requisition  in AME?
    so that send each line to separate approver ?

    If using AME, it should be possible. Check AME Guide for POs for details. Let me know if you run into issues.
    Thanks
    Shree

  • Attaching document in CREATE mode on Purchase Requisition?

    Hi,
    I am running ECC5.00.
    If using the document management system (DMS), is there any way to configure DMS such that a user can attach a document (e.g. a PDF file) to the requisition in CREATE mode, i.e. during ME51N?  Is there anyway to configure the DMS system such that the attachment is required prior to saving the requisition?
    Cheers.

    Hi,
    Yes. It is possible through Object Linking from DMS. You need to follow the below stated steps to achive Object linking.
    1.Goto SPRO->CA Components->Document Management->Control Data--->Define Document Types.
    2.Select the desired Document type which you need to make it available in your Purchase requisition. for ex: Contracts e.t.c.
       & Click on "Define Object Links" from the left hand Panel.
    3.Goto New Entries and Object as EBAN & Screen No as 247 & Save the entries.
    4.Now go to DMS & Upload your documents.
    5. To access Documents at Purchase Requisition Level first you need to maintain the Item level Details. Then Select an item and Click on the Icon "DOCUMENTS"  just above the Item level. you can access only those document types which have been defined through Object linking.
    with regards,
    S. Dayananda Murthy

  • Error While Creating Workflow for Purchase Requisition Rejection

    HI Experts,
    Purchase Requisition No is not Displaying in the Business Workplace Inbox after my Work  flow got triggered.
    In Work flow i am Using the Task  97600004  which i copied from the Standard Task  65400032. This Task i called in the Activity Step having Work Item Display Tab. In this Tab while i am checking at Work Item Text  for Identification  of Work item in work flow inbox level it is Giving Error "Container element '_WI_OBJECT_ID' does not exist and also Insert Expression is in Disable Mode.
    In Business Workplace Inbox i am getting message as "Purchase requisition  00000 rejected".
    Please Suggest where i am Committing Error.
    Thanks in Advance
    Srikanth Kumar

    HI.
    I Have Checked the work flow as suggested Dheepak
    In Start Event of Work flow i declared BUS2105 as BOR Object . The Task which i copied contains BUS2009 as default.
    As Raj Suggested In Task i have Created a New Element BUS2105 at Container Tab and set binding in task and set the Binding between Work flow and Task. Now it is working fine and i am getting the PR No in the Message of SBWP inbox.
    But i Having one more doubt regarding this issue only Why BUS2009 BOR object Type is not working which is the Task as default even though its binding is set between work flow and task?
    Thanks Dheepak and Raj for Your Valuable Suggestions. My gmail id is srikanth537. Can u add me In your Friends list.
    Thanks
    Srikanth Kumar
    09937876902
    Edited by: Srikanth Kumar Talasu on Dec 23, 2008 11:59 AM

  • Click a line in query created from SQ01 - Purchase requisition.

    Hi all,
    my problem is: Tcode SQ01, i've created a query where query's fields are:
    purchase order,
    purchase requisition,
    maintenance order.
    In change query phase, menu Goto --> Report assignment
    i've choosed two standard Tcode:
    IW32
    ME53N
    so that when i click a line of my query and chose iw32 i really can change the order clicked on my query but when i choose ME53n i can only display the last purchase requisition displayed e not that I really clicked on my query!
    So, how can i display the purchase requisition clicked on my query?
    Are there someone help me?
    Thanks a lots,
    Alex.

    Hi Phyllis,
    I face the same problem that Alessandro and I've changed the report assignment to the old transaction ME53. Unfortunately, when I click in the purchase requisition the new ME53N is called instead of ME53.
    Do you have any idea why is this happening?
    Thanks in advance for any help.
    Regards,
    Sara

  • Create a Service Purchase Requisition using BAPI_PR_CREATE

    Hi Everyone,
    I am using BAPI_PR_CREATE.
    I am able to create Standard Purchase requisition.
    But while creating Service Purchase Requisition, i am not able to create.
    I am getting no errors for the PR Item, but even after entering Services for the PR Item i am getting error message in return table of bapi "Please Maintain Services or limits'.
    Do i have to pass value to Package_No field in the item level table of BAPI_PR_CREATE.
    Please help.
    Regards,
    Akash

    Hi,
    Check this link for creation of services.
    Bapi_pr_change in services
    PO Upload through BAPI_PO_CREATE1 - Problem in Service Item
    BAPI_PO_CREATE1 Error
    Hope it helps
    Sujay

  • WorkFlow and "Created" Event in Purchase Requisition

    Dear Experts,
    I have created a new workflow for the Purchase Requisition
    The problem is that when i tried to use "Start Event" for the object type "BUS2105" i didn't find the event "created"
    I need this event "Created" because my work flow starts with the creation of the PR
    Please supoort my with the full steps i need to overcome this problem
    Waiting for youe advice
    Best Regards
    Edited by: Sap Sap on Jun 29, 2009 11:10 AM

    You can use "releaseStepCreated" Event for the start.

  • How can create IDOC for Purchase Requisition

    Hi all,
    whenever I change the Purchase requisition(Tcode-ME22N),IDOC has to be generated automatically.Please help me out.

    Hi ravi,
    It seems you are talking about the purchase order change.
    because ME22N is a transaction for editing the purchase order.Purchase req. is a internal document which we dont send out to any one.
    Anyway what is the output type you are using?.
    If you use NEU then no need for any changes.
    otherwise use NACE transaction and select your output type then mark the 'multiple issuing ' flag.
    So whenever there is a change system senses that and proposes the output.
    After that you got to make the settings at the partner profile using WE20 transaction.There at the message control parameters level mention the output type and set the change flag.
    Entry could be EF ( App.id) NEU (output type) and X (Change flag).
    So system generates the IDOC whenever you do the change using ME22n transaction.
    Please let me know if you have any issues.
    Thank you.
    Regards,
    karun.M

  • Create contract with Purchase Requisition reference using BAPI

    Hi friends! I need some help here to create a contract with reference to some purshase requisition. I found BAPI_CONTRACT_CREATE to do this, but I have no idea how to do to create with reference to pruchase requisition.
    Anyone can give me a sample code or an idea how I can do this?
    Thanks in advance for any help.

    Thanks friend. I filled Header, Headerx, item e itemx but I'm getting this error:
    No instance of object type PurchasingContract has been created. External reference: # 1
    Item category 9 not supported
    I need fill something else?

  • Stock transfer purchase requisition through project builder

    Hi Friend's,
    For transfering material from one plant to another plant we have to create stock transfer purchase requisition through project builder.
    Can is it possible to create stock transfer purchase requisition through project builder which will have account assignment category as Q & item category U.
    Thanks & Regards,
    Sandeep

    Hi Sam,
    Thanx for your input.
    We are dealing with project specific stocks & customer project scenario.
    My requirement is that we having 2 plants. Projects are created in 1001 plant, same plant does the mfg. of FG items required for projects & 1002 plant manufactures MTS items which are required to mfg. project FG items as well as same items will bring into 1001 plant and then delivered to customer.
    Here my clients want to create stock transfer pr through project builder to bring MTS items from 1002 plant to 1001 plant & then delivered to customer.
    I think as you said this is not possible in std. sap to create stock transfer pr through project builder.
    Thanx & Regards,
    Sandeep
    Edited by: Sandeep Theurkar on Mar 23, 2011 7:11 PM

  • Sub contracting Purchase requisition not created thru Service Order

    Hi Experts,
    I configured to create Service order automatically from Customner service.
    Now we have the SM03 repair service order .When we try to create Sub contracting Purchase requisition.
    (Selecting Subcontr tick in External tab of Components tab)system gives error saying  --
    Op. 0010 must have exactly one component as 'Rework Material to Subcontr.'
    Message no. AD_SUBCON109
    I checked the notes and It was not help ful.I understand I was doing something wrong in creation.
    The control key used is SM03. Can any body help me in the above problem.
    Regards
    Rammohan.

    Dear Sen,
    The same error message refers to one of the following material provision indicators getting to me also:
    "S" - an entry within table T417 is missing where KZBRS (A&D-Specific Material Provision) is not set
    "X" - an entry within table T417 is missing where KZBLF (Rework Material from Subcontractor) is not set
    "F" - an entry within table T417 is missing where field ADSUB_DEFDLV (Deferred Delivery) is not set
    also, i Insert a row with S and keep MPCust and MPVend blank and Check the A&D MP box
    getting following error "
    Op. 0010 must have exactly one component as 'Rework Material to Subcontr.'"
    Can u tell me the config for MPI??

  • IW31-Create Purchase Requisition automatically from PM order - Release 5.0

    Dear Experts,
    Currently we are working in the 4.6C Release but we are doing the migration for 5.0. In PM, in the 4.6C release when we
    create a PM Order in tcode IW31 we select a component and the system shows us the screen to inform the quantity and
    automatically the system shows us a  screen to Create Purchase Requisition where we can fill or select some fields.
    However, when we create a PM order in the  5.0 using the same tcode, the same material type, the system creates
    automatically the Purchase Requisition without to show us the screen to fill or select the fieds. I´ve checked the customizing
    comparing the systems but I couldn´t find something.
    I was wondering If you could help me with this issue?
    If my comments are not enough to understand me, please let me know...
    BR
    Valdevair

    Dear friend,
    Do check configuration node at
    plantmaintenance and custonmer service - maintenance and service processing -maintenance and service orders - functions and settings for order types - define change documents,collective pur.requisitionsindicator,operation no.interval
    here for your order type and plant  , check whether generation of PURCGHASE REQUISITION from maintenance order settings.
    there will be three options
    1) never
    2) from release
    3) immediatly.
    hipe this will help you.
    Regards,
    pardhu

  • Questions on Rules-Based ATP and Purchase Requisitions for STOs

    Hello experts,
    We are working on rules-based ATP configuration and have several questions about the functionality.  Iu2019m hoping that some of you are using this functionality and can help give us direction.
    In our environment we have multiple distribution centers and multiple manufacturing plants.  We want to confirm sales orders against stock and production orders in any of those plants, depending on the locations that have stock or planned production.  For example, we will place a sales order against plant A.  If there is not enough stock in plant A then rules-based ATP will use location determination to check in plant B, then C.  The scope of check on the ATP check will include stock and released production orders.  We will configure plant A as the u201Cconsolidation locationu201D so if stock is found in plants B or C then stock transport orders will automatically be created to move the stock to plant A before shipping to the customer.
    We have configured rules-based ATP and this functionality is working well in our Development system.  The ATP check is executed and uses the rules-based ATP to find eligible stock in other plants.  The system is also creating purchase requisitions to move the stock to the consolidation plant. 
    Our first concern is that there doesnu2019t appear to be any firm linkage between the sales order and the resulting purchase requisition.  For example, if we create sales order 123 for plant A and the rules-based ATP finds stock in plant B it automatically creates a purchase requisition 987 to move the stock from plant B to plant A.  However, there doesnu2019t appear to be a linkage between sales order 123 and purchase requisition 987.  For instance, if we delete sales order 123 the purchase requisition doesnu2019t get deleted. 
    Our second concern is that the quantity on the purchase requisition can still be confirmed against later sales orders.  For example, say the above scenario resulted in a purchase requisition 987 that consumed all the stock available in plant B.  We then create a second sales order 456 for the same product.  Plant A is out of stock so the rules-based ATP looks in plant B.  We would expect that plant B would also not have any stock because itu2019s all been consumed by the purchase requisition.  Instead, the system creates a second purchase requisition to move quantity from plant B to plant A.  Itu2019s as if the system doesnu2019t realize that the purchase requisition 987 is already planning to move stock out of plant B.
    Does anyone have any thoughts or suggestions on these two scenarios?  Is there a way to configure the system so there is a hard linkage between the sales order and the purchase requisition so that if the sales order is deleted then the purchase requisition is also deleted?  Should ATP realize that purchase orders are consuming inventory and not allow later sales orders to confirm against that same inventory?  Any advice or experience would be greatly appreciated.
    Thanks,
    David Eady
    Application Delivery Team Lead
    Propex, Inc.

    Hi,
    The scheduling is done in SCM, and from there, whenever the RBA is triggered, the calculation is done always with the old route in SCM. Until you get back to R/3 this is when your route is determined. But the ATP check is always with the original route. So the idea would be that you change the values of the route while still in APO, this is possible via the user exit. Should be done in scheduling in APO.  
    Hope this information is helpful.
    Regards,
    Tibor

  • Purchase requisition creation (STO) from Sales order

    Hi Gurus,
    Read the following scenario:
    Sales order is created with delivery plant A. No stock on plant A.
    Purchase requisition is created from plant B to plant A (intra-company flow or stock transfer order).
    Problem is that the purchase requisition needs a price. It is not logical because intra-company flow (stock transfer in same company flow) is like a stock transfer without purchasing. So in my mind, I don't have to maintain price.
    Also if I use ME27 to create manually STO between both plants, price is not asked.
    Other question is: is it possible to create directly a purchase order when sales order creation (and not purchase requisition, newt convert into PO)?
    Many thanks.
    Stéphane

    Hi Stéphane Vituret, Did you manage to find a solution for this. I have a similar problem as well.
    Please find the scenario below.
    Cusotmer places order of Mat-XX to Company A. The Company A creates PO to Company B. Company B delivers to Company A and then invoices Company A. Company A receives the goods into own stocks. Now the Company A delivers to the customer from its own stocks and then invoices Customer.
    I decide to go ahead with the Individual Purchase order solution and since the Company A is buying from Comapny B, I decided to integrate the Cross Company STO flow in the procurement part. Hence the flow in SAP is like;
    Cusotmer placese order to Company A
    Comapny A creates a Individual Purchase order type Sales order. So the Item category is TAB.
    This sales order generates a PR. PR is conveted into a CC_STO as thenvendor is Plant B in this case . Now this STO appears in the delivery due list of plant B.
    Now I genreate the delivery to move stocks from plant B(of co.cd B) to Plant A(of co.cd A).
    Here is the problem. I am not able to do PGI as the system checks for "sales order" stock at plant B and throws error
    "Sales order stock 36637 000010 does not exist". This should not be the case as the stocks should get attached to the sales order only when recieved into Plant A. Hence system should not check for "sales order stock" at plantB while trying to deliver from Plant B to Plant A.
    Lets take a normal IPO scenario.
    CusotmerA places order of Mat-A to Company A. This sales order generates a PR. The Company A converts the PR into a std.PO to external vendor. The PO from the sales order will have a account assignment "M- Ind. cust. w/o KD-CO". The stocks will be received into Plant with spl indicator "E" while GR (MIGO). Now the system ensures that this stock can only be delivered against the particular sales order. Thus the stock procured for the customerA is delivered to customerA and not consumed by anybody else. In this case there is only one delivery involved, in SAP, which is 601 mvmt type from the Plant A.
    However if the vendor becomes another Plant (Plant B) belonging to another company code then there are two deliveries involved in the SAP system one with mvmt type 643, from Plant B to Pant A, and the second with 601 from Plant A to the customer. Hence the system should check if the stocks are attached with a spl indicator only during the second delivery of 601 mvmt type. I am facing a problem because the system does it for the first delivery itself. If you know the answer please do let me know. I really appreciate it. Thanks a lot in advance.

  • Purchase Order creation from closed Purchase Requisition

    Hi all,
    Please kindly help with the following questions
    1) Is it possible to lock a purchase requisition such that after a purchase order has been created, another purchase order would not be created from that purchase requisition
    2) also is it possible to assign a fixed vendor to a purchase requisition without an info record.
    Thank You.

    Hi,
    set the two message 06076 & 06400 as error so that no  more purchase order can be created with
    reference to the purchase requisition.
    And also refer the note 385002 for more information.....
    You can fix a source in source determination in source list thriugh ME11 not in info record.

Maybe you are looking for

  • Can not read trace of controlfile...

    hello, we have Oracle 10G production database on RAC on windows 2003 Enterpr 64 bit. i wanted to take the trace of controlfile and read the contents of same.. i took the backup of controlfile with the sql> alter database backup control file to 'd:\co

  • How do I download adobe flash player on my iPad ?

    How do I download adobe flash in my iPad

  • Shopping cart approved PR created but PO not created

    Hi, we are using SRM4.0 classic scenario with  self service procurement business scenario.and my user is getting the problem with PO not receiving in SRM. only backend PR has been created.but he is asking about the PO. when i checked SC  only PR has

  • Multiple text lines

    Newbie to Numbers! I'd like to have multiple lines of text in a single field - how do I create this?

  • T520 (4240) / eSATA / Windows 7 32 bit Problem!

    My first post - hoping someone can help! I have a Lenovo Thinkpad T520 (4240) with Windows 7 32 bit OS.  Purchased an external 3TB OWC Mercury SATA/USB2/FW800/FW400 hard drive and having major problems with eSATA only. I have the internal switch in t