Is it possible to process eCATT in scheduled backgroung job?

Hi,
Can you give me a hint, if you know.
Is it possible to process eCATT in scheduled backgroung job?
I read a thread: eCATT: Scheduling SAPGUI in BackGround.
https://forums.sdn.sap.com/click.jspa?searchID=19274150&messageID=654134
But the problem wasn't solved then.
regards,
Katsumi

Hi,
If you use SECATT or the transactions of the SAP Test Workbench to
execute the test configuration, the file is found and the test    
configuration is executed without problems.                       
is defined in symptom of the Note 1237232.
It is very clear from note that testing in background cannot be automated or scheduled .
But background here means execution in background .
Solution                                                                  
1.) Start the relevant tests in the background.                                                                               
2.) If you have to start tests in the background, use transaction SECATT  
to load the data from the external variants file to internal variants of  
the test configuration before the test execution. You must carry out      
this procedure manually in SECATT, and this cannot be automated as part   
of the test.                                                              
If you want to schedule a particulat eCATT ( regardless of TCD or SAPGUI etc)
we can do it in NW 710  release.
we have a new scheduler for anytype of eCATT , from which we can schedule SAPGUI , TCD,FM...etc..etc.
regards
vinay

Similar Messages

  • Process Steps to schedule the job in background

    What are the process Steps to schedule the job in background?
    Sai.

    You can set up the different step while schedule the back ground job. Each step will have the program name, variant.
    You can do his using transaction SM36 -> JOB WIZARD.
    Thanks,
    Srinivas

  • Background Processing? how schedule job for "System Error" Message .

    Hello everyone,
    in sap help i have read.
    http://help.sap.com/saphelp_nw04/helpdata/en/5a/f72040599a8f5ce10000000a155106/frameset.htm
    PCK> Monitoring>Message Monitoring-->Background Processing
    you can schedule jobs for various background processing:
    ●     Archiving of messages processed successfully
    ●     Deletion of messages that are not to be archived
    ●     Restarting of messages with errors
    ●     Rescheduling of lost messages
    can anyone understand this docu?
    give me some introduction, how can i define and schedule these jobs ?
    thx in advance!!
    best regards
    Yaning

    Background Processing
    Prerequisites
    You have started the message monitor on the initial screen of the PCK and are in Background Processing.
    Features
    Archiving
    You require two archiving sessions to archive messages:
    ●     One session to write the messages to the archive
    ●     One session to delete the persisted messages that have been archived
    To do this, you schedule an archiving job, which implicitly schedules the sessions to write to the archive and delete the archived messages.
    You can define one or more rules for each archiving job; these rules contain conditions that a message must meet in order to be archived by the job. At least one of the defined rules must be met for archiving to take place.
    All information that is displayed for a message in message monitoring is archived, in addition to the audit log for each message.
    Deleting
    A standard delete job is created automatically. It runs once a day. You can schedule additional delete jobs; however, you cannot define rules for them.
    Restarting
    Instead of restarting messages with errors manually with message monitoring, you can schedule a job to automatically restart these messages. This is possible for all messages for which the number of defined restart attempts has been exceeded (messages with the system error status).
    You can define one or more rules for each job to restart messages; these rules contain conditions that a message must meet in order to be restarted by the job. At least one of the defined rules must be met for archiving to take place.
    Rescheduling
    A standard job to reschedule messages is created automatically. The job runs once a day and ensures that messages lost as a result of database failure, for example, are rescheduled. You can schedule additional rescheduling jobs; however, you cannot define rules for them.
    Thx Aamir.
    But I mean the messages with errors in Adapter Engine , not in Intergrations Engine.
    the situation is like Naveen Pandrangi's WebLog
    II. Errors in Adapter Engine [XI :  How to Re-Process failed XI Messages Automatically|XI :  How to Re-Process failed XI Messages Automatically]
    I
    Till now we have seen how to resubmit/restart message that failed in Integration Engine.  One a message makes it from Integration Engine to Adapter Engine, the message is flagged as checked in Integration Engine. The status of the message in Adapter engine does not effect the processed state in Integration Engine. Now if this message was asynchronous, XI will by default try to restart the message 3 times at intervals of 5 minutes before the status of the message is changed from Waiting to System Error .
    *how can i schedule a job to automatically restart these messages with errors?
    best regards
    Yaning
    Edited by: Yaning Liu on Aug 18, 2008 1:43 PM

  • Process Chan (Copy - Scheduling)

    Hi there
    I have created som process chanins that need to run at 02.00 in the night and at 12.00. To my knowledge it is not possible to schedule a process chain in a way that this works. Am i right? If no how is it done?
    As an alternativ i can create 2 identical process chains and schedule them seperately. But it seems that it is not possible to copy the process chain. Is this true? If not how do i copy it?
    Thanks in advance
    Chris

    Hi Chris,
    try this in your ABAP:
    CALL FUNCTION 'BP_EVENT_RAISE'
    EXPORTING
    eventid = 'Your Event'
    eventparm = 'START'
    target_instance = ' '
    EXCEPTIONS
    OTHERS = 01.
    and schedule your process chain, waiting for 'Your Event'.
    regards
    Siggi
    PS: don't forget to assign some points to the guys that help you!
    Message was edited by: Siegfried Szameitat

  • What is process through which schedule lines are cofirmed in Sales Order

    What is the process through which schedule lines are cofirmed in Sales Order

    Hi,
    Schedule lines get confirmed on the basis of backward or forward scheduling carried out by system based on Material Availability date.
    Regards
    SD
    Message was edited by:
            Samier Danish

  • Process chain scheduling error( Job BI_PROCESS_DROPINDEX could not schedule

    Hi,
    I am scheduling the process chain but it was throwing an error.
    Job BI_PROCESS_DROPINDEX could not be scheduled. Termination with returncode 8
    Message no. RSPC065
    Diagnosis
    Program RSPROCESS is to be scheduled as job BI_PROCESS_DROPINDEX under user ALEREMOTE.
    System Response
    Scheduling terminated with return code 8. The meanings of the return codes are as follows:
    SY-SUBRC = 4:
    Scheduling terminated by user
    SY-SUBRC = 8:
    Error when scheduling job (JOB_SUBMIT)
    SY-SUBRC = 12:
    Error in internal number assignment
    Procedure
    Check the system log for more detailed information.
    Execute Function
    for this i have already checked
    in RSPC menu tab
    Process Chain >> Attributes >> Execution User
    Choose "BW Background User" which should be ALEREMOTE.
    above settings i have done.
    even though when i am scheduling the process chain  i am getting the same error
    thanks
    suman

    Suman,
    You are not able to schedule it b'coz it is getting scheduled from user RFCUSER whereas the background user should be ALEREMOTE.
    There is an option somewhere in the Menu bar in RSPC to change the Execution user. Please change that to ALEREMOTE,
    Please check whether your BW user has enough authorization to run this job. The above post tell you how to do it.

  • Processing messages in Scheduled state

    hello all..
    my scenarios of FTP to RFC and FTP to IDOCS are all configured but when executing it, the file is "deleted"...(since i keep the status delete)...
    but in my sxmb_moni transaction it always shows me scheduled(green flag)...
    and the Q-status is stopped..
    any suggestions of how to deal with it..??
    regards.
    vishal

    well arpit/sudhir...
    i did try the solution provided by arpit..
    but still the same error...
    everthing was already activeted although i did it again..but the same problem..
    infact a colleague of mine in somw other state with similar scenario is getting successfullly processed OCCASSIONALLY and scheduled otherwise...
    vishal
    Message was edited by: vishal prabhakar

  • Is it possible to process audio tracks with compression, eq, etc....in Logic Express, similar to the way you can do it in Protools?  If so, how do you do it?

    Is it possible to process audio tracks with compression, eq, etc....in Logic Express, similar to the way you can do it in Protools?  If so, how do you do it?

    Hello,
    Yes, add such effects using the insert slots on the track strip.
    Click on the slot, choose your plugin from the list. Double click to bring up its control window to set parameters.
    Alastair.

  • Process chain design/schedule/monitoring/debugging

    hi  friends
    pls  help  me on  the  issue of process chain design/schedule/monitoring/debugging
    with  one  of  real  time  scenario, with help of t-codes and  detail  navigation
    thanks in advance
    venkatp

    I have listed below the major informatin neede for your requirement...
    1.Go to RSPC to view all the chains.
    2.There click on any chain which you want to run/view.
    3.Click on the <b>log view(</b>shift+F1) to view all the previous runs of the chain and whether they have failed or successful(here you can select 1 day,week ,month etc in the display range)
    4.If you want to modify the chain /add a process type /change the variant  then click (Ctrl+F9) and do the changes.
    Even  you can change the start variant in change mode for manual scheduling>right click on start process typeselect display variant--now select  start Direct Scheduling/ API  or Metachain
    under <b>direct scheuling</b> option you can trigger it by setting start immediately /Date-time/After job/event whatever you want to do
    Else you can make it part of a Metachain consisting of different such small local process chains.
    Now Click on Schedule (F8) to run this chain manually.
    5.For <b>Monitoring</b> use Tcodes SM37/RSPCM/SM50
    Also you can use BWCCMS.
    I usually prefer sm37 to view all the background jobs but SM50 is also useful.
    6.<b>debug loop</b> can be used to debug a process chain.(you have to specify here the gap between one event been triggered and the next subsequent process starting)
    to capture process in debugger go to  SM37(job overview) or to SM50(process overview)

  • Exception Message 30 "Plan process according to schedule"

    Dears ,
    In exception Message 30 "Plan process according to schedule " 
    What is the action should be taken by MRP Controller 
    Regards
    Rami

    The meaning of EM 30 is as below
    30: Plan process according to schedule
    i.e.For one of the following reasons, the (non-firmed) order proposal could not be planned on time:
    - On the basis of backward scheduling, the system calculated a start date in the past. The system automatically switched to forward scheduling and planned the order proposal in the future using the in-house production time or the delivery time
    - On the basis of the planning time fence and a fixing type, the order proposals are moved to the finish date of the planning time fence. With this logic, order proposals must be correctly planned manually.
    The date displayed is the date on which the receipt is to be available for materials planning. This contains the goods receipt processing time. If this is not equal to zero, the necessary goods receipt date is also displayed for information purposes.
    Hence the exception is displayed in the MRP list along with the rescheduling date.Hence MRP controller need to manullay reschedule the order as per the rescheduling date given in the rescheduling column in MRP list in MD05. If you cannot reschedule practically, then you need to talk to the concern so that requirement date can be postponed to match the rescheduled dates.
    Example requirement date - 30.08.2008 for 100 qty
    after running MRP the planned order date given is 25.09.2008
    against which system will show maessage 30 with reschdule date as 30.08.2008 as it is required on 30.08.2008.
    Now how system behavious is as below
    the planned delivery days for this item is say 30 days.
    Hence from 30.08.2008 system does backward scheduling and reaches today i.e. 24.08.2008 and then go for forward scheduling to give the date as 24.08.2008+30 cal days i.e 25.09.2008 and displyes the EM as 30 with rescheduling date as 30.08.2008. Hence it is upto MRP controller whether he will convince purchase dept to get the material with in 30.08.2008 or ask the production people to wait till 25.09.2008.
    I hope you understood, if not com beack.

  • Process of payment scheduling.

    hi,
    I want to understand what is a process of payment scheduling and where we set and which type payment schedul we use in SAP setup .
    Seema
    Edited by: seemacg on Mar 4, 2011 6:29 AM

    Hi seema,
    As posted by SAPFICO it can be scheduled in f110s. This is for scheduling a job in future. You can give the run date on which u want to execute. Other parameters are same as it appears in f110. This is basically used for schedulling a payment due in future. You can check in sm37 tge status of the schedule run.
    Regards

  • Removing process chain from schedule

    Hi Gurus
    I have a very basic question, under what circumstances do we take a process chain out of schedule? Till now i was being asked to make occasional changes in Process chains and then revert them back later,i did this activity of changing(adding or removing processes) after removing process chain from schedule( i was asked to do that)...
    Now i need to edit recipient list(add one recipient's name ) in alll the process chains where success and error messages are present.
    I want to know whether i need to remove the chain from schedule before starting with this activity.
    If one chain contains multipe individual chains and every individual chain contains messages,do i need to remove every chain from schedule and edit the recipient list....or this is not required and i can simply open individual chain containing messsages in edit mode and edit the recipient list and save the changes and follow the same for all chains?
    kindly help.

    Hi,
    We would normally be asked to remove the process chains from schedule during any upgrade activities. or it can also be related to any particular flow - this is in case particular process chains are asked to be removed from schedule. This may be due to adding an intermediate step in between the flow or any such scenario.
    And you can change the recipient list when the process chain is running also, because here you will not actually be editing the process chain but will be editing the "message" object. just click "edit message", save the message and come out, do not click save when you are in the process chain maintenance screen.
    Hope this helps.
    Regards,
    Joe

  • How to identify which process Chain is Scheduled.

    Hi All,
    We have 20 Process Chains in our project.In SM37, i have checked the Scheduled Jobs in SM37 and found "BI_PROCESS_TRIGGER" job is triggered. How can i find which process Chain is scheduled out 20 Process Chains.
    Can i get the Process Chain Names from Tcode SM37.Or else, Do i need to check each process chain Start Time ?
    Pls suggest.
    Thanks,
    Jelina.

    Hi,
    Please refer
    /people/gianfranco.vallese/blog/2008/05/30/stop-boring-with-process-chain-monitoring-start-passive-monitoring
    https://wiki.sdn.sap.com/wiki/display/BI/Processchainscreationandmonitoring
    http://help.sap.com/saphelp_nw04/helpdata/en/39/2ade42fa712b78e10000000a155106/frameset.htm
    Hope this helps
    Regards
    Raj

  • Orchestration Process Cleanup Task schedule job getting failed

    Hi All,
    We have an out of the box scheduled job "Orchestration Process Cleanup Task". This job is getting failed with the below error.
    "Failed.oracle.iam.platformservice.exception.OrchDataCleanupException:java.sql.SQLSyntaxErrorException:ora00913:too many values"
    This recon take two parameters in which we have given values as below:
    Batch size:100
    Delete Just One Batch: No
    I am not able to find how this job is configured or how it's deleting the values.
    Please help me out and if anyone know about the links where I can get the info on this job, it will be much helpful.
    Thanks
    Ishank

    As far as the
    http://docs.oracle.com/cd/E21764_01/doc.1111/e14308/scheduler.htm#r26c1-t8
    is concerned,
    Batch Size: Use this attribute to specify the number of completed orchestration processes to be deleted in each iteration.
    Delete Just One Batch: Use this attribute to specify the value true or false. Only a single batch is deleted if the value is true. All the completed events are deleted batch at a time in a loop if the value is false.
    So, let's try:
    Batch Size: 1 (just 1)
    Delete Just One Batch: yes (radio button)

  • Is it possible to process raw camera images using PSE 9?

    Can someone advise me if it is possible to process camera raw images using Photoshop Elements 9.

    That depends. Photoshop Elements 9 is compatible with Camera Raw up to version 6.5. So the files from any camera supported by that version of Camera Raw can be opened. Camera Raw 6.5 is quite old, and a lot of new cameras have been released since then. Newer versions of Camera Raw are required to open those images. But you can download the latest DNG converter and create digital negative copies of raw files from newer cameras. And those DNG files, which contain the raw image data, could be opened with what you have now.

Maybe you are looking for