Is it possible to run delta upload in both servers simultaneously?

Dear SAP gurus,
We already have a running BW server version 3.0 B,Now we are planning to use another server having BI 7.0.Both thease servers needs to extract data from a single R/3 server.We have delta upload for some master info objects,Is it possible to run delta upload in both servers simultaneously?
If so,pls. let me know how to implement the same.
Regards,
Anuradha

HI
As said in the previous post u can run the delta in both the systems. Follow the same procedure how u do while u create a new infrastructure and do init without data transfer and do the delta loads.
correct me if i am wrong
Khaja

Similar Messages

  • Is it possible to run two different version of jre simultanously ?

    My client is using two diffrent application those supports two different versions of jre(1.2 & 1.4). If he uses jre1.2 only one application works ,and if he uses jre1.4 then the other works but the 1st shows error messege And vice versa.
    Is there any solution to shortout this issue?

    Is it possible to run two different version of jre simultanously ?Yes. In different processes, of course.

  • Can I run the admin and managed servers as different users?

    in unix, is it possible to run my admin and manged servers as different users with
    7.1?

    As long as users are in admin group, there could be different users starting different
    servers.
    "Frank" <[email protected]> wrote:
    >
    "Erik Johnson" <[email protected]> wrote:
    Hi, Frank.
    Could you be a little more specific about what it is you want to do?
    Thanks.
    erikUh, I'm on unix, I have Weblogic 7.0 service pack4. I have 1 managed
    server and
    I have one admin server...Can I run the admin server as user 'hithere'
    and run
    the managed server as user, 'byethere'......
    "Frank" <[email protected]> wrote:
    in unix, is it possible to run my admin and manged servers as different
    users with
    7.1?

  • Is it possible to run 3 DIMMs with Dual Channel on K7N2-Delta-L?

    I was wondering whether it is possible to run Dual Channel with all 3 slots.
    I noticed the manual said Dual Channel is only enabled when running 1/3, or 2/3.
    However, friends with Asus and Abit boards of similar design (nForce 2 400 with 3 DIMM slots) told me they can run Dual Channel with DIMMs in all three slots.
    Has anyone tried something like this with the K7N2 Delta-L?

    Quote
    Power: CompUSA 500W Specs
    +3.3V = 15A
    +5V = 42A
    +12V = 19A
    -5V = 0.6A
    -12V = 0.6A
    +5Vsb= 2A
    Total 500W
    the 3.3v rail is terrible.
    i have 20 amps on the 3.3v rail and i have a generic 300w psu.
    time to buy a new one and make that a antec enermax or any other good psu.
    drop a post here if you want any advise on which psu you should buy
    3.3v 25a
    5v   35a
    12v  16a
    something like this is minimum of what you should have.
    500w does not mean anything when looking at a psu.
    an enermax 350w has almost twice the power output as a q-tec 550w.

  • I am running full upload daily now i want to load delta records how can i

    Hi Gurus,
      I am running full upload daily now i want to load delta records how can i do that could any body help recording this..
    Regards
    Kiran Kumar

    Hello Kiran,
    First make sure that you datasource is delta enabled. If so create a new infopackage for Init without data transfer and execute it. Then create a InfoPackage for Delta.
    Thanks
    Chandran

  • Init and delta uploads using process chain

    Hi,
        I have a scenario where for the first upload i use init upload for that i have an infopackage now for the subsequent uploads i.e delta upload i get the option for the same only once i have run the init upload.
           so the doubt is can i use a process chain defined to carry out the whole task?????
    Regards

    Hi Virat,
    AS init is a one time activity, so what you can do is.
    1> set the init in infopack and run the process chain.
    2> remove the infopack and then include a new infopack with delta option or change the existing infopack to delta option.
    3> schedule the infopack.
    whatever you are expecting is not possible.
    Hope I answered your question.
    THanks and Regards,
    Suneel

  • How to re-init a delta upload?

    Hi experts
    I have done a delta initialization, and delta updates; but after occurs some troubles and then I must do a full update. Now when i want do new deltas uploads, the system tell me that can't find the last "mark". Im try to do an "initialization with out transfer data", but the message is that already exist delta loads for the same period in the id request 25910 (this id is the first inicialization)
    How can I do a re-init delta upload?
    Thank you in advance

    Sorry, I think that I dont understand you well..
    Please check if this right: "I can delete the init with Id request 25910 (in the way that wou tell me) , and the data in this id requist NOT will be delete in the Infocube"  is this true?
    In need to the re-init because when I run the delta actualizations the error msg is "Nº RSBM103 - Delta upload is possible after successfull init"
    Anyway, I understand that when is do a full update i lost the mark. Is this true?
    Your commets are very helpful!!

  • Delta upload for flat file extraction

    Hello everyone,
    Is it possible to initialize delta update for a flat file extraction, If yes please explain how to do that??

    Hi Norton,
    For a Flat file data source, the upload will be always FULL.
    Please refer to following doc:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/a0b3f0e2-832d-2c10-1ca9-d909ca40b54e?QuickLink=index&overridelayout=true&43581033152710   if you need to to extract delta records from Flat file. We can write routine at infopackage level.
    Regards,
    Harish.

  • RSA7 shows zero records for delta upload of 2LIS_03_BF Datasource

    Dear Professionals,
    I am having constant issues with inventory management DataSource (2LIS_03_BF). I scheduled delta upload in r3 production using LBWE, keeping in mind that in LBWE there is no options for posting dates, ETC... In RSA3, there are records, but when i check RSA7, it is showing 0 records. What could be the problem. Do i need to do anything/activation anywhere in LBWE or RSA7 to see the records. Please advise.

    Hi,
    Normally there should be a collective run which transfers data from the application-specific queues to the BW delta queue (RSA7), just like this workflow:
    MCEX03 queue==> RMBWV03 (Collective run job) ==> RSA7-Delta queue => BW
    It is necessary to schedule the job control regularly - see point 3 of SAP Note 505700.
    Check also these SAP Notes:
    869628     Constant WAITUPDA in SMQ1 and performance optimization
    728687     Delta queued: No data in RSA7
    527481     tRFC or qRFC calls are not processed
    739863    Repairing data in BW
    Rgds,
    Colum

  • Is it possible to run a excel with vba program in IPAD

    Hi,
    I would like ask if it is possible to run a excel with vba program/macros in IPAD?
    Thanks

    I am not sure, but the best Free App is Google Drive, you get 15 GB free storage which you can upload photos , videos and files, pretty much amazing, also I have read news that Microsoft is planning to have iOS office 365 but cost annual subscription fees almost 99$ kinda lame, try also Cloudon App, is very nice app , you can use word , power point and Excel

  • How to do Delta upload and consolidate in SSM, how to use transformer.ini

    Hi,
    Can anybody explain me how to do Delta data upload and also how to do delta data consolidation in SAP SSM.
    Also how can i create and use transformer.ini file.
    Thanks and reagrds
    Edited by: Himanshu Bisla on Mar 25, 2009 2:09 PM

    Hi,
    Where from are you planning to upload data?
    When you mention a delta upload, does it mean loading new data for a new PERIOD, where no data yet existed, or loading values to measures for periods where data already exists, doing a SUM?
    When loading from an external source, you use a READ command, which by default replaces existing values with those that are being loaded. If you add the parameter ADD or SUBTRACT to that IDQL command you are able to change this default behaviour to enable delta loads (with SUM or SUBTRACTION operations).
    As for the CONSOLIDATIONS, you can define a date range for the consolidation, or run it for a single period (month, quarter) if needed, or restrict the number of measures you want to consolidate. There is no way to automatically define that only the measures and periods that have new data will be consolidated. This has to be made explicit in the CONSOLIDATE instruction.
    Regarding the Transformer.ini, are you planning to use PAS as an ETL tool? Unfortunately, I can only point you to the information that is available on the PAS Help, but that's probably where you found the reference to this function in the first place...
    Hope this helps!
    Best regards,
    Ricardo

  • LO Extraction - error in delta upload

    Hi,
    I try to do some delta upload. The delta initialization works fine. I run OLI8BW and created an InfoPackage for delta initialization.
    Now I have problems with the delta upload. I selected update method 'queued delta' in LBWE and run the job. If I try to start the loading via InfoPackage (delta upload) an error occurs. In RSA7 I can see the delta's, but there is nothing in LBWQ. The error message in the BW monitor is the following: 'Transfer structure field not contained in DataSource'. There is one field in Transfer structure, which isn't contained in data source, but I fill it via a routine. Any ideas what the problem could be?
    Thanks a lot.
    Gabi

    hi,
    check sap oss note
    881207
    Symptom
    You load data in Delta mode and the system issues error message R3 037 in the monitor:
    Transfer structure field not contained in DataSource.
    Note 868059 did not deliver a complete correction.
    In Delta requests or repeat requests that contain time-dependent selections, these time dependencies are always transferred to the source system with the 'DATETO' and 'DATEFROM' field names.
    Time selections are also transferred to the source system if the time-based fields are not known as selectable fields in the DataSource.
    Other terms
    Scheduler, Update tabstrip, repeat, DATETO, DATEFROM,
    Delta, Init, date selection, InfoPackage, selection, M, X, 1. R3 037
    Reason and Prerequisites
    The problem is caused by a program error.
    You have implemented Note 868059 as an advance correction or you have imported it using a Support Package.
    Solution
    BW 3.0B
               Import Support Package 29 for 3.0B (BW3. 0B Patch 29 or SAPKW30B29) into your BW system. The Support Package is available when Note 0783251 "SAPBWNews BW3.0B Support Package 29", which describes this Support Package in more detail, is released for customers.
    BW 3.10 Content
               Import Support Package 23 for 3.10 (BW3. 10 Patch 23 or SAPKW31023) into your BW system. The Support Package is available when Note 0783253 "SAPBWNews BW3.1 Content Support Package 23", which describes this Support Package in more detail, is released for customers.
    BW 3.50
               Import Support Package 15 for 3.5 (BW3.50 Patch 15 or SAPKW35015) into your BW system. The Support Package is available, when Note 0836440 "SAPBWNews BW Support Package 15 NetWeaver'04 Stack 15", which describes this Support Package in more detail, is released for customers.
    BW 7.0
               Import Support Package 05 for 7.0 (BW7.0 Patch 05 or SAPKW70005) into your BW system. The Support Package is available, when Note 0829625 "SAPBWNews BW 7.0 Support Package 05", which describes this Support Package in more detail, is released for customers.
    To provide advance information, the notes mentioned above may be available before the Support Package is released. In this case, the short text of the note still contains the words "Preliminary version".

  • Delta upload in different times and targets

    Dear BW Gurus,
    I have to fill a Master Data table with a delta (for performance reasons) from an ODS object, and later fill an InfoCube with the same delta from the same ODS Object. This two step approach is necessary because the Cube uses the Master Data filled in the first step - so I cannot do the two uploads within the same InfoPackage.
    My approach was the following in a Process Chain:
    1. Fill and activate "source ODS"
    2. Load request from "source ODS" to PSA only
    3. Update Material Master from PSA using "Read PSA and Update Data Target" process with the variant setting the PSA table and the Master Data InfoObject as Data Target.
    4. Run "Attribute Change" process for the Master Data IO
    5. Update InfoCube from the same PSA that was used for the Master Data InfoObject. This is also a "Read PSA and Update Data Target" process with the variant setting the same PSA table as before and now the InfoCube as the Data Target.
    To me this seemed logical but when I run the Process Chain I got the following error message at point 3 (update Master Data from PSA): "No request for posting found in the variant".
    This appears strange to me because if I specified the request, it would only work for the first upload and not for all the others.
    Can anyone please help me how to overcome this issue of Delta upload in different times and targets?
    Thanks in advance,
    Attila

    Gopi,
    If I create two delta InfoPackages, the first one clears the delta queue, so the second InfoPackage won't find any data. This is unfortunately not the way to do...
    Srini,
    Your proposal is quite original - if I upload the same ODS with its data (amended by the date field) that would in fact generate a new delta for the same ODS.
    However, in the meantime a more simple idea came up in our BW team, inspired by your proposal. For the uploading of the Master Data I now don't use the delta functionality of the ODS export Data Source, but instead I set up a full upload filtered for the actual date. This ensures the good performance of Master Data load (load time will not increase with time) and also we will have all recent Master Data uploaded from the ODS because that load is in the same Process Chain where the "Source ODS" is updated. Later in the same Process Chain I simply start the delta upload for the Cube.
    Thanks a lot for all your help.
    Attila
    P.s. I will be out of office for until 24th July.

  • Failure in Delta Upload

    friends,
           we have delta upload for our purchasing data to BW. from the infopackages the data is Updated to ODS- 0PUR_O01, which provides data to Infocubes - 0PUR_C08 and 0PUR_C07 and ODS 0PUR_O02 ( which in turn provides data to infocube - 0PUR_C09 ). 3 days back one request in ODS 0PUR_O01 went into error status. WAfter marking the request "RED" it was deleted from the ODS, but since the request had the same PSA_ID as that of an another successful (GREEN) request in the same ODS with data mart status ticked, this request also got deleted by mistake, as a result the datamart status for all the request in the ODS (0PUR_O01) is missing, from this time onwards the subsequent data updates to infocubes 0PUR_C08 and 0PUR_C07 and ODS 0PUR_O02 (also to Infocube 0PUR_C09 ) are finishing in Error status. we have deleted all the requests (after marking them "RED") for previous three days from the data targets ( infocubes 0PUR_C08, 0PUR_C07, and 0PUR_C09 and ODS 0PUR_O02). we also have deleted the correposnding requests from ODS 0PUR_O01 (after marking them "RED").Now when we are trying to reconstruct the requests at 0PUR_O01, it goes successful, but when we try to activate the requests into subsequent data targets ( back ground job BI_ODSA* ) the job fails with a short dump and the following error message.
    Error Message:-
    Check Load from InfoSource 80PUR_O01 , Packet Delta Package for Update by ODS 0PUR_O01
    Please execute the mail for additional information.
    Error message from the source system
    Diagnosis
    An error occurred in the source system.
    System response
    Caller 09 contains an error message.
    Further analysis:
    The error occurred in Extractor .
    Refer to the error message.
    Procedure
    How you remove the error depends on the error message.
    Note
    If the source system is a Client Workstation, then it is possible that the file that you wanted to load was being edited at the time of the data request. Make sure that the file is in the specified directory, that it is not being processed at the moment, and restart the request.
    Short Dump:-
    What happened?
       The current application program detected a situation which really
       should not occur. Therefore, a termination with a short dump was
       triggered on purpose by the key word MESSAGE (type X).
    What can you do?
       Print out the error message (using the "Print" function)
       and make a note of the actions and input that caused the
       error.
       To resolve the problem, contact your SAP system administrator.
       You can use transaction ST22 (ABAP Dump Analysis) to view and administer
        termination messages, especially those beyond their normal deletion
       date.
       is especially useful if you want to keep a particular message.
    Error analysis
       Short text of error message:
       Request 0000017556 in ODS 0PUR_O02 must have QM status green before it i
       s activated
       Technical information about the message:
       Message classe...... "RSM1"
       Number.............. 110
       Variable 1.......... 0000017556
       Variable 2.......... "0PUR_O02"
       Variable 3.......... " "
       Variable 4.......... " "
       Variable 3.......... " "
       Variable 4.......... " "
    How to correct the error
       Probably the only way to eliminate the error is to correct the program.
       You may able to find an interim solution to the problem
       in the SAP note system. If you have access to the note system yourself,
       use the following search criteria:
       "MESSAGE_TYPE_X" C
       "SAPLRSATREE" or "LRSATREEF28"
       "RSATREE_START_ACTIVATION"
       If you cannot solve the problem yourself and you wish to send
       an error message to SAP, include the following documents:
    Please suggest a solution for this problem and to bring back the missing data mart statuses of the all the requests in ODS 0PUR_O01.

    hi olivier,
       the said request is in ODS 0PUR_O02. will try to explain the scenario:
    the data flow in this regard is:
    PSA ->          Infopackages                       -
    > *
              (2LIS_02_SGR, 2LIS_02_ITM  etc.)     
    *-----> ODS (OPUR_O01)  --> Infocube (OPUR_C07)
    *-----> ODS (OPUR_O01)  --> Infocube (OPUR_C08)
    *-----> ODS (OPUR_O01)  --> ODS (0PUR_O02) -
    > ***
    ----> Infocube (OPUR_C09)
    now when we try to reconstruct a request in ODS OPUR_O01, the a new request is created (Requid- 175429) with green status but without datamart icon. Now when this request is activated in 0PUR_O01 and since "Activate ODS object Data automatically and   Update Data Targets from ODS object automatically"  is checked in 0PUR_O01, new requests are created in ODS 0PUR_O02 (Requid- 17566)and infocubes  OPUR_C07(Requid- 17566) and OPUR_C08(Requid- 17566).  All these requests are with 0 data and PSA_ID are also 0. and then the above short dump and error comes in.. one thing to note here is
    "Activate ODS object Data automatically and   Update Data Targets from ODS object automatically" option is also checked in ODS 0PUR_O02.
    Hope this clears up everything..
    Edited by: Nivin Joseph Varkey on Jan 14, 2008 7:20 AM

  • Deal the Error messge in Delta upload

    Hi,All:
       Now we face this problem:
       The value of characterstic in record is not standard.
    The traffic light is red, and not activity request in ODS.
       Now we change value in source system manual,and we want to redo the delta upload and upload the data for cube.
       How to solve this problem?Can you give me some helps?
    Regards&Thanks!
    zagory

    Hi,all:
       Now I face the new problem:
       The status of Total is yellow light, and the status of Technical is yellow light.
       The system message as follow:
    <i>Request still running
    Diagnosis
    No errors could be found. The current process has probably not finished yet.
    System response
    The ALE inbox of the SAP BW is identical to the ALE outbox of the source system
    and/or
    the maximum wait time for this request has not yet run out
    and/or
    the batch job in the source system has not yet ended.
    Current status
    No Idocs arrived from the source system.</i>
    We have 7 delta upload like this.I find something unusually is <i>211 from 0 records</i>.I think it means BW system do not upload data,and the process is running now.
    How to process the step? I waiting for 2 hours.
    Regards&Thanks!
    zagory
    Message was edited by: zagory

Maybe you are looking for