Is it possible to set lead time with reference to Inco term

Is it possible to set lead time with reference to Inco term.I want to capture transit time in combination of Vendor & Material with reference to Inco term. Any other provision except the field of Plnd delivery time of Info record & GR processing time of Material Master.

Hi,
Your planned dely time should consider this.I think not possible.
Thanks
suresh

Similar Messages

  • Is it possible to use face time with my iphone4 with 3G  when the wi-fi is not avalable because my friend own a 4S and he can? Thank you...

    Is it possible to use face time with my iphone4 with 3G when the wi-fi is not avalable

    Hi,
    The Blurb
    The * items message that is at the bottom
    *FaceTime video calling requires a FaceTime-enabled device for the caller and recipient and a Wi-Fi connection. FaceTime over a mobile network requires iPhone 4S, iPhone 5 or iPad (3rd generation) with mobile data capability. Availability over a mobile network depends on carrier policies; data charges may apply.
    Some features may not be available in all countries or all areas. Click here to see complete list.
    It is not specifically saying it is 4G only phones.
    It is not saying it is 3G either.
    It is not listing an iPhone 4  (only the 4S)
    It seems whether 3G can or cannot or if the iPhone can do 4G and it is available it seems that particular model will not.
    10:26 PM      Friday; March 29, 2013
      iMac 2.5Ghz 5i 2011 (Mountain Lion 10.8.3)
     G4/1GhzDual MDD (Leopard 10.5.8)
     MacBookPro 2Gb (Snow Leopard 10.6.8)
     Mac OS X (10.6.8),
     Couple of iPhones and an iPad
    "Limit the Logs to the Bits above Binary Images."  No, Seriously

  • Supplier Processing Lead Time with ASCP Unconstrained Plan

    Hi All,
    Is it possible for unconstrained plan to consider supplier lead time constrained which we define in ASL?
    I have defined an Unconstrained Plan & the plan is not considering Item Level , ASL Lead times & generating the planned Orders to meet demand due dates by compressing the Lead time.
    Constraint option is not checked in plan options.
    Appreciate your advise on this issue.
    Regards,
    Pranay Saxena

    Hi Pranay,
    An unconstrained plan cannot have ANY constraint.
    So it is not possible to have just the supplier lead time as constrained.
    Alternatively, if that is what is your requirement, you may run a constrained EDD plan with just the material constraints enabled and the "Enforce Purchasing Lead Time" Flag checked.
    If the supplier capacity is NOT set.. it will be treated like infinite..
    This way you will force the engine to respect the lead times from ASL and acheive a near unconstrained plan.
    Another alternative is use constrained plan as explained above and set the profile MSO: Lead Time Control to Do not Violate Minimum processing LT... in this case even the processing LTs for the MAKE items are also respected.
    Hope that helps.
    Regards,
    Mohan Balaji
    NOTE: Please mark the post as Helpful or Answered if the update has really helped you. This would also bring the thread to logical conclusion and will be helpful for the viewers.

  • Possible to set burn speed with DVD Studio Pro?

    Is it possible to set or adjust the burn speed with DVD Studio Pro ver 3..?

    Build in DVD Studio Pro, then burn in Toast. Toast will let you adjust the burn speed.

  • Is it possible to make a timer with AS3 which is accurate upto one millisecond.

    I am new to AS3. I have somehow developed a auditory and visual reaction timer by taking script from here and there. I know its not accurate and I also know that I will write it correctly when I have learned the script thoroughly,
    But I was checking the net about the timer class and various posts on it and  I am vexed with a question "if its possible to make an accurate timer with AS3?" can somebody please tell me for sure. and I will be grateful if I know how to make it correctly. I can post the code which I have written ( assembled ).

    the answer is, maybe. but for, for most coders, the answer is, no.
    getTimer() is accurate to within 1 ms.  but that allows you to determine time/elapsed time and does not call or execute code on a regular timed schedule. it can be used with the timer class or enterframe events to do some things accurately.
    however, the timer class is not accurate in the way beginning coders think.  it will, on average, allow calling a function at close to the designated interval if there are no performance issues with your swf.  it does not allow each function call to occur at a regular interval.

  • Set until time WITH RMAN

    Hi
    I have tested the codes too but it doesn't seem to be able to recover the database (including the tablespace which I have dropped). Why?
    # RMAN backup
    run
    allocate channel ch1 type disk;
    sql 'alter system archive log current';
    backup format '/backup/orcl/%d_t%t_s%s_p%p'
    filesperset=4
    database;
    release channel ch1;
    RMAN > list backup;
    File LV Type Ckp SCN Ckp Time Name
    1 Full 4072944 06-JUL-05 /oracle/oradata/system01.dbf
    8 Full 4072944 06-JUL-05 /oracle/oradata/tools01.dbf
    12 Full 4072944 06-JUL-05 /oracle/oradata/test01.dbf
    # Drop tablespace
    drop tablespace test including contents;
    # RMAN Recovery
    shutdown immediate;
    startup mount;
    # time is set to after rman backup and before tablespace dropped
    RMAN>
    run {
    set until time "to_date('06-07-2005 16:50:00','dd-mm-yyyy hh24:mi:ss')";
    restore database;
    recover database;
    RMAN > list backup;
    File LV Type Ckp SCN Ckp Time Name
    1 Full 4072944 06-JUL-05 /oracle/oradata/system01.dbf
    8 Full 4072944 06-JUL-05 /oracle/oradata/tools01.dbf
    12 Full 4072944 06-JUL-05
    Why is the RMAN list empty for the deleted tablespace? That's the reason why there is nothing to reover from?

    check at sql prompt
    select substr(name,1,50),status
      2    from v$datafileYours test01.dbf file should have status recover and filename should be missing.
    Khurram

  • Is it possible to set up Time Capsule on one network and then access its stored data (movies) using Back to My Mac from another network that also has Apple TV to play them?

    I recently purchased a Time Capsule to store data at my office.  I have an Apple TV at my home that I would like to start using to play my movies.  With the storage of the new Time Capsule, I am curious if I can somehow store my iTunes movies on the Time Capsule at my office and then use Back to My Mac to access the TC from my home and then play them via Apple TV.  Does this sound possible?  We have an iMac at the office that remains on 24/7 connected to the TC.

    ATV cannot play movies from the TC, even if it is on your home network.. ATV is a streamer.. it is not a media player.. and the TC is a dumb as a board hard disk in a router.. so it has nothing in it either.
    You cannot play movies from ATV without itunes, which streams to the ATV.
    If the iMac is running 24/7 then you should be able to connect to the iMac remotely and run from iTunes on that, which could then play movies stored on the TC.. with the following issues.. if you use wireless on the iMac forget it. The iMac has to be ethernet connected as it has to pick up the movie on the library and play it back to the TC to network to your home.
    The next issues is speed of slowest connection.
    Your download to your home maybe great.. what is the upload speed from your office like??
    If you pay for uploads and downloads you will pay for the movie 3x.. first to download it.. second to upload it.. office to net..  and third to download it again.. net to home..  Sorry but it is better to play the movie directly from online itunes store.
    If you plan to try and play non-itunes movies over the connection, it won't work.. ATV as stated is linked to itunes and cannot play movie files.
    Overall this sounds like you need to think it out a bit more.

  • Set polling time with BPEL and ESB File Adapters

    We have create file adapters in BPEL and ESB. We see where you can set the frequency for polling but do not see a place to set the polling time. We would like it to check a directory every 24 hours at midnight. We can set the 24 hours but not the midnight. How does ESB and BPEL determine the time to run based upon the interval?

    Oracle SOA is started, from the time the adapter is loaded, the interval counting starts. It is not on a particular time.
    If you want to start a BPEL process on a certain time, you could use the quartz timer fucntionality of BPEL to start an instance on a particular time (like unix cron tab).
    Marc

  • Is it possible to set the database with nulls first for all its tables ?

    Hello,
    I have a schema of 117 tables and I would like Oracle to behave nulls first when doing any order by on any tables.
    Is there a way to tell that respectable old database server to do such a thing ?
    As it is today, I have to write some custom DAO specific to Oracle just so as to have a nulls first in the sql statements.
    Kind Regards,

    user573224 wrote:
    I have a schema of 117 tables and I would like Oracle to behave nulls first when doing any order by on any tables.Basically this is an application (sql) issue. If you do not code explicitly, ascending ordering is default and also means that nulls last is the default.
    http://docs.oracle.com/cd/E11882_01/server.112/e26088/statements_10002.htm#i2171079
    As 'nulls first' belongs to order by clause of select statment, this seems like a question for the SQL forum. {forum:id=75} That you happen to run sql on XE does not matter.
    As it is today, I have to write some custom DAO specific to Oracle just so as to have a nulls first in the sql statements.Changing how a database engine behaves seems like the opposite of dbms agnostic application, if that's the purpose. Also in general, database agnostic/ignorant applications are often considered a sure way to unscalable and unmanageable systems.
    One could also consider that customers having Oracle as part of their infrastructure, would like to see that applications make good use of Oracle's strong and highly capable features and options -- not treat it as some sort data dumping bin.
    (Ok, granted, with XE this might not be true. Instead there are issues of limitations and lack of support (patches), that you might not want or can take on as an applications vendor.)
    Btw, good to see that you've found a fix in sql for your problem, and thank you for reverting back with that to the forum!
    Edited by: orafad on Dec 7, 2012 10:29 PM
    Edited by: orafad on Dec 7, 2012 10:31 PM

  • Is it possible to do goods movement with reference to PR or STR?

    My client wish to follow following process for fulfilling the material requirement.
    1. User will create Purchase Requisition or stock transport requisition.
    2. Purchase dept. will check the stock and will ask stores to issue the goods if available. This goods movement should be reflected in PR as history. There won't be any creation of PO or STO.
    3. If stock is not available then Purchase dept will create a PO or STO.
    In the above process, can reservation be used instead of PR or STR ?  However problem is, this will lead to material getting reserved (Blocked), system will not allow goods movement (issue) for other issuances (for other departments who has not created reservation) if sufficient stock is not available in storage location.
    What is the best possible solution for this?
    Thanks in advance,
    Sanjog

    Hi,
    As per i understand your Problem i am suggesting.
    See as you said the stock is already present in the system or stores this means previously it has been received with any GR based on PO. so you have the PO. and now why you want a amend in the system when there is defined sequential process steps in SAP for STO's or for any purpose.
    Creation of GR/GI/TR's are important at user levels for moving the material's but at the time of audit/ Checks in SAP how you will deal with it i dont know. as all the database are made in such a format so that you can generate each and every Report of movement/ or material in SAP so that your client will also find some clear picture of there store's.
    so try to convince your client for standard processes in SAP.
    Regards
    Ninad Kshirsagar

  • Purchase-How could I consider Transit time and lead time in imported mat.

    My doubt refers about master data configuration of imported material.
    My sittuation is :
    Material - Lead Time:  (depend on source)
                   Transit Time: (depend on source)
    My company is responsable to transport all bought material. Besides, I can buy of differents suppliers.
    Considering these rules, It s impossible to fix dates in material master, because material purchase is related with center and not with supplier. By the way, I need to discover other master data to configure it maybe : Inforecord, quotization... Whatever...
    I need to correct this to generate Purchase order with dispatched date of my source against required date of my company after execute MRP.
    I tried to study this scenario but until now I ve not got a solution.
    Probably, you have had it before and can help me.
    I hope your help!
    Thank you!
    Regards!

    Create POs with respect to either PIRs (if you don't need to print out) or Contract/item, both of these are Vendor/material specific so you can set lead times accordingly .  Probably best to use Source List and set requirement in material master too (Purchasing view).
    Regards,
    nick

  • Set up time zone in ipad calendar

    Hi,
    is there any possibility to set up time zone for some event? In Mail.app on Mac OS X I create the event and set what time zone is this in and the event change the time according to my time zone. Is this possible also in iPad somehow.
    For example: I live in Czech Republic UTC+2 (summer time) and I want to add the WWDC event into my calendar, which is at 10 a.m. pacific time. Is this possible on iPad or I have to count the correct time?
    Thanks

    mm, that doesn't sound so comfortable. I'll stay with the time counting.
    Thanks for reply;)

  • Setting PC Time

    Hey all,
    I am new to LabView and I had a quick question.  Is it possible to
    set the time on a PC within the LabVIEW environment?  I am going
    to be receiving gps time stamps through the serial port and would like
    to adjust the PC's time and date to the gps values.  Let me know
    if you guys have any suggestions or ideas.
    Thanks,
    Jared Lucey

    Hi Nishant,
    I believe so.  There's a windows function to set and get the timezone info'.  I am attaching a half-finished VI to get the time zone info'.   Maybe you can use this as a starting point for the set function. 
    Good luck!
    -Khalid
    Message Edited by Khalid on 11-14-2006 05:33 PM
    Attachments:
    getSysTimeZone.vi ‏27 KB

  • I have two email accounts, can i set Thunderbird up with two or more accounts? Thanks

    two different gmail accounts and one yahoo. is it possible to set Thunderbird up with two or eventually three accounts so I can receive all the emails in just one place. Thank you!

    ''is it possible to set Thunderbird up with two or eventually three accounts''
    Absolutely.

  • In billing document VAT condition type flowing 2 times with Different value

    Hi,
    1. In my requirement, In order creation time , in the pricing procedure ZPROJT (Proj Material Sales) VAT condition type (JLST) is flowing one time with the condition record of 5% for one line item and the same we changed manually to 12.75 %, for the  same condition type (JLST) and we saved the order. After that  we created delivery with reference to the same order, final  the billing document creation time with reference to the delivery (in the pricing procedure ZPROJT (Proj Material Sales))for the same line item VAT condition type (JLST) is flowing 2 times with 2 different values ( 5% and 12.75%) and it is calculating the 2 different values to the final value. But normally only the manually changed (12.75%) value should be taken to the account. Please help me How to stop the condition type (VAT  C Type "JLST") from flowing two times for the same line item in the billing - and we need to take the value of (12.75% manually changed value) to the final calculation.
    2. In one pricing procedure normally if you add the same "C Type" for two times it will throw the error message like "Duplication Of C type" and you can't save the order with out deleting the same. Please tell me,  where is the contole for the same.

    Hi,
    Check copy control settings in VTFL
    At item level make pricing type as D - Copy pricing elements unchanged
    KAPIL

Maybe you are looking for

  • Still not update my lumia 620

    Hi gud even I done with ur prosess like using Lumia updater itz juz update extra n info... Not update my device...... Now what the next prosess which will do update my Lumia 620.... :'(:'(

  • Hooking my laptop up to my TV

    I have a Macbook Pro and I don't have a DVD player. I'm wondering if there is some product I can use to hook my computer up to my TV so I can watch movies! This may be a dumb question, but I'm pretty illiterate when it comes to techy stuff... Any hel

  • Channel contract mismatch when implementing ISerializable

    Hello, I am trying to retrieve an object via an OperationContract Channel but when I try to implement ISerializable for that class, I receive a CommunicationException client side. The serialization and deserialization work fine server side.  The exce

  • Business Engine Requisition Queue is not available

    Hello, did anyone encounter the error I wrote in the title? I went to http://<Ciaca server>:8080/RequestCenter/businessengine/configdebug.jsp to check the business engine config, every thing seems fine. I'm going to use a clone/Backup of the VM where

  • 3d graph Diadem

    Please inform me if it is possible to set the length of the axis of a 3d graph on a Diadem report. Particularly I'd like to keep fixed the rotation of the graph and spread the x or the y axis Best regard Marco Milan