IS-Mill Product.

Dear Guru,
                       What is mean by IS - Mill Product? what is purpose of IS-Mill in SAP plz give me sutiable example releated to this
IS-Mill? What is need for this customizing suppose i am not customizing then what happen?
Regs
Ravi

Ravi,
General Info about Mill Products
http://www.sap.com/usa/industries/millproducts/index.epx
Solution Maps for Mill Products
http://www.sap.com/solutions/businessmaps/F5AE392781A542FABEC2728D9B2E4E56/index.epx
I haven't seen a standalone 'Best Practices' for Mill products since 4.6C.  However, there are some Best practices that use the Mill Products solution.  In these, you can find configuration guides. Look at
Building Materials
http://help.sap.com/bp_bm604/BM_US/html/index.htm
Fabricated Metals
http://help.sap.com/bp_fm604/FM_US/html/index.htm
for a start
Regards,
DB49

Similar Messages

  • What is difference between SAP R3 And SAP IS Mills Product

    HI Friends
    What is difference between SAP R3 And SAP IS Mills Product
    What are the futures are availables in IS MIlls
    Regards

    Hi,
    SAP R/3 is the central enterprise version. It is not specifically designed for any inducstry sectors and it can cater many of the industry types.
    Is is developed for specific industries an for SMB's (small and medium business). It will have components specifically for the industry.
    The SAP Mill Products component adds sector-specific functionality to an ERP system to satisfy the complex requirements of mill industries (e.g. metal, wood, paper, textiles, construction materials, and cable sectors).
    These industry segments differ from others primarily in that the materials used have a large number of characteristics and variants. The materials in the segments listed above are also predominantly area-based (e.g. paper, textiles, plastic film) or length-based (e.g. cables, piping). Account must be taken of these material characteristics throughout the entire supply chain.
    To cater for the particularities of these industry segments, SAP Mill Products features processes and functions that cover the entire supply-chain cycle – from product design and configuration, through planning, order processing, capacity planning and production, to final delivery. Additional functions are available in costing and inventory management. SAP Mill Products are also integrated into Quality Management, Financial Accounting, and Controlling.
    Prase

  • What are the solutions offered to handle length based or mill products?

    We are on 11.5.10. Current version treats beams as each, we have 30 feet beams, 20 feet beams etc.
    We do not want to set-up different items for each length of beam.
    We need ability to tell we have 10 pieces of 26 feet beams in inventory.
    Currently we can only tell we have 260 feet of beams.
    Current solution treats it discretley. We need ability to sell length based items, receive length based items, do inventory management based on length based items.
    a) What are the solutions offered by Oracle in latest releases for Length based products or for Mill products.
    b) If there are any solutions offered by Oracle to handle length based or mill products, can these be back ported to Oracle 11.5.10?

    At the time of entering orders, item inquiry, receiving, inventory transfers etc...You can enter the lot attributes during receiving because you create a new lot number.
    On Item onhand inquiry, you can enter lot context and lot attributes to limit your search to specific lots.
    You may have to write personalizations on other screens.
    Hope this helps,
    Sandeep Gandhi

  • Activation of Discrete Industries and Mill Products in existing IDES system

    Dear Sir,
    I want to activate Discrete Industries and Mill Products in my existing IDES system (EHP4 FOR SAP ERP 6.0 / NW7.01)
    Can some one help me with what steps i need to follow.
    Also does it will effect the existing data in IDES....?
    Thanks in advance .
    Regards

    Hi Sunnny,
    Thanks for your reply.
    as i checked in IDES , facility to activate the addtional packages are there.
    with transaction SFW5, i can select the required package and activate it.
    but during this process system is giving some warning,
    *Note, that not all Business Function Sets or Business Functions provided with SAP ECC 6.0,might be covered by the respective customers' license and maintenance agreement. Use of and access to said software components provided with SAP ECC 6.0 may be subject to additional fees and conditions as stated in SAP's then current list of prices and conditions.
    Caution: When you activate an industry solution, this results on the following restrictions on your system. Note that you cannot generally combine one industry solution with other industry solutions or add-ons. Furthermore, an activated industry solution cannot be deactivated. The release strategy note for the desired industry solution can be found in note 838003. The release strategy note contains a reference to the installation note. Read the note on installing/activating the industry solution before beginning activation*
    so i want to know what will happen if i click I agree for this warning message.
    just by following this process its possible to activate the required bussiness function...?
    Thanks
    Regards

  • Content for  SAP Mill Products

    Hi there
    does anybody know as of when SAP plans to have a Business Content for SAP Mill Products available?
    Thanks and regards
    Gerald

    There is none and nothing planned yet by SAP...

  • Reg:Multiple item header concept in Mill Products

    Dear experts,
    I need to understand the multiple item header concept in Mill products.
    Could you please share some documents if anyone has implemented.
    Is this functionallity available in standard ECC or it is a seperate licenced version.
    If it is available could you please guide me with the necessary configuaration required.
    I need this process for metal sheet cutting process. Where multiple semifinished parys are recievedin single order.
    Regards,
    Daya.

    Hi Daya,
    the multi item order concept is the technical foundation for various solutions in the context of mill products, like the trim order created through the trim optimization interface in APO, or the combined order in in IS-MP or similar industry specific special cases.
    What would you need to know specifically and for what kind of process?
    There are already a number of use cases realized and available in standard SAP ERP with the IS-MP extension.
    You may want to take a look at the PP section of the IS-MP help at:
    SAP Mill Products - SAP Library
    Anything around order combination, multi item order and co-products is related to this topic.
    Best regards,
    Stefan

  • Any solutions offered by Oracle to handle length based or mill products?

    We are on 11.5.10. Current version treats beams as each, we have 30 feet beams, 20 feet beams etc.
    We do not want to set-up different items for each length of beam.
    We need ability to tell we have 10 pieces of 26 feet beams in inventory.
    Currently we can only tell we have 260 feet of beams.
    Current solution treats it discretley. We need ability to sell length based items, receive length based items, do inventory management based on length based items.
    a) What are the solutions offered by Oracle in latest releases for Length based products or for Mill products.
    b) If there are any solutions offered by Oracle to handle length based or mill products, can these be back ported to Oracle 11.5.10?

    Please do not create duplicate posts across the forums -- What are the solutions offered to handle length based or mill products?

  • SAP Mill Products!

    Hello all,
    I am starting a upgrade from 4.6c CS to ECC 6.0 DIMP. Does anyone have any documentation about ECC 6.0 DIMP?
    Thanks in advance,
    Adelmo R Silva

    Hi,
    [SAP ECC-DIMP and SAP DBM|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/d0cee822-8d16-2a10-9b99-83e017ac1952]
    [Security Guide for SAP for Mill Products|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/005c36a1-9516-2a10-34a7-e1ca04acf762]
    [SAP Industry Solution - SAP for Aerospace and Defense|help.sap.com/content/documentation/industry/docu_is_aero.htm]
    [SAP ECC DIMP 5.0|help.sap.com/content/documentation/industry/index.htm]
    Reward if helpful.
    Thanks and Regards,
    Naveen Dasari.

  • Order combination(mill product) to be used in normal production environment

    Hello All,
    Can you please tell me whether we use can use order combination fuction from Mill products in normal manufacturing environment. if so can any one tell me what are the seeting we have to do. When i am trying to do it is giving me a error on the controlling side. Any help will be much appreciated.

    Jags,
    If you are talking about capacity calculation while creating/releasing the production order, then that can be stopped through Config settings for the checking control (OPJK). In this tick the "No Avail check" under Capacity availability section for 1 and 2 business function.
    Try this and revert back.
    Swapnil

  • SCM Extended Manufacturing for Mill Products?

    Hi SCM Experts,
    Our customer ask me about  SCM Extended Manufacturing for Mill Products, i've just had some information via the link!
    "http://www50.sap.com/businessmaps/96F6CB484C6E48709F6ACEA454A3962C.htm
    So, Could you tell me more details about functionality or Sub-components (detail products) of "SCM Extended Manufacturing for Mill Products "
    Thanks for your support,
    Viettq.

    Hi Viettq,
    I hope the below link will give you full picture of your requirement
    http://www.sap.com/industries/millproducts/cable_wire.epx
    Please confirm.
    Regards
    R. Senthil Mareeswaran.

  • Mill products to SCM5.0

    Hi All,
             How to transfer ATP Customizing data into SCM 5.0 from Mill products?
             Using CFM1 and CFM2. Please give me detail.It is urgent Issue.
             Please help me.
    Thank you,
    Durga

    Hello,
    In DIMP (SAP R/3 - Mill Product system), You must have activated the function in Customizing of Sales and Distribution at Basic Functions --> Availability Check and Transfer of Requirements --> Availability Check
    Once it is doen in CFM1 transaction
    In the Material Independent Objects Area of CFM1 select the ATP Customizing.
    It is one time activity.
    Once it is selected using Core Interface functionality ATP Customization will get transfer to SCM 5.0.
    We are assuming here that basic required setting of the Core Interface has been done in R/3 as well as in SCM 5.0.

  • Problem ./sapinst when install IDES MILL PRODUCTS 2009

    Hi all
    Server HP
    CPU Intel
    OS : RHEL 4 Update 7  32bit
    java version "1.4.2_12"
    Java(TM) 2 Runtime Environment, Standard Edition (build 1.4.2_12-b03)
    Java HotSpot(TM) Client VM (build 1.4.2_12-b03, mixed mode)
    Previously, I had installed on this server includes ECC 6.0, NetWeaver 7.0, IDES-CWM....etc. All of them is OK when start scripts ./sapinst
    But when i install IDES MP 2009 in this server and i have a problem below :
    When start scripts ./sapinst
    [==============================] / extracting...  done!
    guiengine: call to bind() for socket 21200 3 failed . Address already in use
    Starting GUIServer using:
      SAPinst port  : 21201
      GUIServer port: 21211
      HTTP port     : 4238
      GUI autostart : on
      GUI mode      : normal
      command       : /tmp/sapinst_exe.4530.1263558546/jre/bin/java -Xmx256M -Dsap.env.var.javahome=SAPINST_JRE_HOME -cp /tmp/sapinst_exe.4530.1263558546/JAR/instgui.jar SDTGui sapinst host=localhost port=21201 -nolock
       : [16386] 19:29:09 ***ERROR (heapManager.cpp:244): HeapManager::create_heaps: Could not create heap manager mutex
       : [16386] 19:29:09 ***ERROR (controls.cpp:248): Controls::init: Could not create heaps
       : [16386] 19:29:09 ***ERROR (jvmEnv.cpp:441): VMCOs::init: Initialization of the control area failed
       : [16386] 19:29:09 ***ERROR (thread.cpp:3007): VMCOs::init failed
    Could not create the Java virtual machine.
    init: retrieving account information for group sapinst...
    init: retrieving account information done.
    load resource pool /mount/51037301_IDES_Installation_Master/IM_LINUX_I386/resourcepool.xml
    guiengine: No GUI server connected; waiting for a connection on host sapsed, port 21201 to continue with the installation
    Thanks for your advice

    Hi Peter
    I made all these things but this error still
    I have tried all the java version below, all of which have been installed and the current version of IBM
    [root@sapsed /]# alternatives --config java
    There are 4 programs which provide 'java'.
      Selection    Command
       1           /usr/lib/jvm/jre-1.4.2-gcj/bin/java
       2           /usr/java/j2sdk1.4.2_12/jre/bin/java
       3           /usr/java/j2sdk1.4.2_13/jre/bin/java
    +4           /opt/IBMJava2-142/jre/bin/java
    help me
    Edited by: myfriend280985 on Jan 16, 2010 2:20 PM

  • What are the solutions offered by Oracle to handle length based products

    We are on 11.5.10. Current version treats beams as each, we have 30 feet beams, 20 feet beams etc.
    We do not want to set-up different items for each length of beam.
    We need ability to tell we have 10 pieces of 26 feet beams in inventory.
    Currently we can only tell we have 260 feet of beams.
    Current solution treats it discretley. We need ability to sell length based items, receive length based items, do inventory management based on length based items.
    a) What are the solutions offered by Oracle in latest releases for Length based products or for Mill products.
    b) If there are any solutions offered by Oracle to handle length based or mill products, can these be back ported to Oracle 11.5.10?

    Please do not create duplicate posts across the forums -- What are the solutions offered to handle length based or mill products?

  • Great fun and productivity tool

    I don't know why Best Buy does not sell the Matrox DualHead2Go or the TripleHead2Go. IF they did they would sell many more monitors. All they would have to do is set up a few extra monitors connected to the equipment and run a few games to show multiple monitor displays of the use of the products and they would HOOK folks on them. The TripleHead2Go and DualHead2Go are used like crazy at the goverment offices I visit all the times. They increase productivity and make using multiple monitors easy without the use of docking stations or multiple video cards for desktops. Connecting multiple monitors to a single video output is much easier.
    NOPE, don't work for the company just think the product is cool and wish I could get one through BB when needed.

    Your question falls under other similar questions that I have had about BB such as--
    1. Q:  Why can't I demo an Apple machine at my local store?
         A:  Corporate thinks its a liability due to the ethnic demographic of the location--white shiney boxes with caché and stickey hands--WOOWOO, BAD JUJU!!!
    2. Q:  Why can't I buy Inkjet printable dvd/cd's instore?
         A:  Haven't figured this one out just yet.....
    You make an EXCELLENT POINT with your post regarding the multi-screen setup.  Yet every time I go into BB I am looking for something interesting, unique and useful to buy, I CAN'T FIND A D@MN THING!  Everything is "run of the mill" product wise. I'm not talking bleeding-cutting-edge here, I'm talking about something that people can REALLY USE, ENJOY, AND BE CREATIVE WITH!
    Hey BB, maybe you can learn some merchandising techniques from Tokyu Hands in Japan:  http://en.wikipedia.org/wiki/Tokyu_Hands

  • Regarding BADI's after configuring is-Mill producrs

    Hi Experts,
    In my client they configured Is-Mill products. We are trying to find BADi's for Original order batch against Goods Receipt. So, can any one know the BADi's Please give the guidance on this.
    Regards,
    Muralikrishna
    Edited by: muralipsharma on Oct 27, 2010 11:07 AM
    Edited by: muralipsharma on Oct 27, 2010 11:40 AM

    Hi,
    Any Clue for the above Post

Maybe you are looking for

  • Feed Problems, in iTunes ONLY

    My podcast has 2 RSS feeds. They both take the same data and for the first few posts worked perfectly. Now the DivX feed doesn't update anymore in iTunes. However in other RSS readers (FeedBurner, Thunderbird, Safari and Firefox) the feed is bang up-

  • Why can't I clear my history in FF9?

    Clearing recent history caused ff to lock up in FF8 so I upgraded to FF9 and it doesn't lock up, but it doesn't clear history either.

  • Why do my dvd burns fail to verify

    Several attempts to burn dvds have resulted if failures to verify. It seems to burn fine, but will not verify and tells me the disk may be unreliable. I am using Delkin Devices Archival Gold DVD-R discs. Burned at both x6 and x8. The first 6 or so bu

  • Adding Internal Hard Drive

    I have the 15" 2.4 Ghz MacBook pro with the 160GB hard drive. I am already out of room. I was wondering if I can have the apple store put in the 250 GB drive. If I can, would there be a big difference in the 5400 rpm 250GB or the 7200rpm 200GB hard d

  • Otally unable to save a download. Unable to run a download and used up all the faq suggestions

    I am unable to save or run a download. The reason being ' unable to read source code' Contact server administrator. I have used up all the suggestions in faq's and am able to download using explorer