IS Public Sector and IS U

Hi Experts,
  I want to you know if we can install IS-Utilities on the same ECC instance where IS Public sector is already running?
Thanks,
SB.

Hi,
As far as I know, you can only have one active industry extension in a system.
SFW5 will not allow you to activate more than one industry solution : if the industry solution for public sector is already active, I believe you will not be able to activate the IS-Utilities.
You will need to install separate systems for activating each Industry extensions separately.
Enterprise Extensions (components which start with EA-) are usually compatible with Industry Solutions (components which start with IS-). It is only possible to activate one Industry Solution but additionaly several Enterprise Extensions can be activated.
I hope it helps,
Hélène

Similar Messages

  • Projects vs. Public Sector

    Users need to add Projects into Planning.  I know they can if they create a Application Type "Projects Financial Planning"...
    The problem is we are developing a "Public Sector" Application Type.
    What are the ways I can move metadata, "new Projects", in the "Projects" application to the Public Sector cube?
    Thanks,
    PR

    Hi PR,
    Can't you have both Public Sector and Projects Financial Planning as separate apps and then let the data flow between apps using Map Reporting Application?  UC Berkeley owns PSBP and we have anoter plan type that PSBP data flows into.  M2 Dynamic and UCB did couple of presentations at ODTUG in the last couple of years.  I uploaded last year's presentation into Dropbox.  You might find it useful.  Here is the link:  https://www.dropbox.com/s/ehz3b5kuzaklsd4/ttymczak.enterprisepublic.pdf
    Cheers,
    Mehmet

  • Public Sector uptake of "Packaged Applications"

    I work for Oracle Public Sector and the question came up recently with some colleagues about how many customers are using the APEX Packaged Applications. If you are a United States or Canadian Public Sector (Government) customer and are using any of these applications, can you reply to this thread or send an email to [email protected] with any of the info you feel comfortable sharing such as:
    <ul>
    <li>Customer Name</li>
    <li>Application Name</li>
    <li>Brief description of how you are using</li>
    </ul>
    or any other info you feel you want to share. I will not publicize this information without your written permission. If you are interested in sharing your story on OTN, I'm happy to help make that happen as well.
    Thanks,
    Tyler

    Hi All,
    I have looked at the Packaged Applications.
    I declined to use them because they would require quite a bit of modification to meet my needs.
    I find it faster and more reliable to code small utility applications from scratch so that my clients get exactly what they need; no more and no less.
    APEX is awesome at pumping out these utility applications quickly and cheaply with acceptable quality.
    Hope this helps.
    Cheers
    Patrick Cimolini

  • Collective Bills in Public Sector contractual accounting?

    Hello dear experts,
    We are implementing the FM with Public sector Module (Campus Management/FICA). Our customer requires to have collective bills for groups of students.
    This means that a company is going to pay for a group of students their tuition. If this company does not pay the collective bill, the students in the collective bill should then be blocked to continue studying in the next semester until the collective bill is paid.
    We went to the transaction FQEVENTS to add to the event 0063 the Module FKK_COLL_BILL_CREATE_0063. The documentation we found said that this is a prerequisite to use collective bills.
    Even though we have fulfill this prerequisite when we are trying to access FPCB the system send is sending us the next message.
    This function has not been released
    Message no. FMCA1023
    Diagnosis
    You have selected a function that is not supported by the component Public Sector Contract Accounting.
    System Response
    The function cannot be executed.
    My question is can the Collective Bill function be use with Public Sector contractual accounting?
    If so, what else are we missing?
    We have tried by adding functions to the events 2222 and 2220, but not luck yet.
    Thank you for any help

    Hi ,
    I´m so sorry but this transaction FPCB is necessary for using the collective bill but
    unfortunalety it has not been released for Public Sector and the whole collective bill can not used for Public sector.
    Hope this information help you.
    Regards,

  • Activating Program Management for Public Sector

    Hello everyone,
    We are currently implementing an E-Governance solution for a municipal corporation, in SAP. Our licenses include ECC 6.0 and SAP CRM 2007. Additionally, we have purchased a single component of SAP for Public Sector, namely Program Management for Public Sector, which is enabled by SAP CRM.
    We have tried extensively to find out detailed information about this solution (Program Management for Public Sector), however besides a few lines of general information, not much else is available publicly.
    We request to provide us information on how to activate Program Management for Public Sector, and if possible to guide us on where to obtain valid documentation.
    Any asistance in this regard wil be much appreciated.
    Regards,
    Shiv Sahgal

    Hi, you can get information under CRM component, have a look at SAP help portal, CRM for industries -> Public Sector
    http://help.sap.com/saphelp_crmscen70/helpdata/en/4a/9eb12521864ff0a82cdc2a373d5d89/frameset.htm
    Or in the help portal under SAP Business Suite -> SAP Customer Relationship Management, you will find relevant documentation regarding your CRM release.
    Regards
    César

  • Public sector Vs private sector

    Hi,
    Could any one please let me know the differences in public sector and private sector.

    Hi,
    Question is not very clear. but i will try to explain from SAP angle
    In SAP perspective, in Public sector funds Budget and budget monitoring is very important.
    Use of Funds management module is more for Public sector . Everything will be earmarked and it is not allowed to cross the earmarked funds(basically budget figures)
    Private sector concentrates more on profitablity and is flexible
    It is difficult to implement in Public sector compared to Proivate sector
    Assign points if useful
    Sunoj

  • Oracle enterprise planning and budgeting and public sector budgeting

    What is the difference between Oracle Enterprise Planning and Budgeting and oracle public sector budgeting
    early response is requested please

    Have you checked these docs?
    Implementing Oracle Enterprise Planning and Budgeting (R12.ZPB.A) [ID 412329.1]
    Using the Excel Add In with Oracle Enterprise Planning and Budgeting (R12.ZPB.A) [ID 412327.1]
    Implementing Oracle Enterprise Planning and Budgeting (R11i.ZPB.B) with Oracle General Ledger [ID 356471.1]
    Oracle Enterprise Planning and Budgeting Release Notes, Release 12.1.1 [ID 811206.1]
    Oracle Enterprise Planning and Budgeting Release Notes, Release 12.1.2 [ID 970886.1]
    Oracle Enterprise Planning and Budgeting Release Notes for Release 12.1.3 [ID 1173834.1]
    Thanks,
    Hussein

  • TE40s for Loans and Public Sector Budgeting modules

    Hi Experts,
    Would be appreciated, if anyone share the TE040s for Loans and Public Sector Budgeting Modules..
    Thanks and Regards,
    Srini M

    Hi Frank,
    Thanks for your reply, could you please help me any test script or functional flow document for Public Sector budgeting.
    Thanks
    Rajesh

  • Public Webinar: OPA for Licensing and Permitting Applications in Public Sector

    All,
    You may be interested in the following public webinar, to be held on January 29.
    Best,
    Peter Still
    Executive Director, Policy Management and Strategic Decisioning, Oracle
    1/29 Introducing an Oracle e-License and e-Permit Wizard
    Making it easy to do business with government
    Wednesday, January 29 | 11:00 am PT / 2:00 pm ET
    REGISTER NOW
    Due to complex local government license and permit rules, citizens often find it difficult to start a business or to build or extend a property. Meanwhile, cities and counties are more reliant than ever on license and permit revenue to fund their operations. They also need to ensure public health and safety in areas that include food preparation, use of hazardous materials, and other areas of professional regulation.
    To combat these challenges, cities and counties are focusing on ways to better advise citizens and drive new economic development.
    Oracle’s e-Licensing and e-Permitting Citizen Service Solution:
    Reduces citizens’ and businesses’ confusion about the licenses and permits they are required to hold
    Alleviates governments’ concerns about lost revenue and public safety risks due to non-compliance
    Creates a cross-channel approach to promote business and professional license/permit programs
    Enables a “one stop” portal where citizens can seek personalized, real-time, automated advice, about the licenses/permits they require, with personalized fee calculations
    Provides an easy-to-use interface that can link to existing back-end license/permit application processes
    Join us on Wednesday, January 29th at 11am PT/2pm ET for a webinar which will showcase the interactive and highly personalized citizen service approach that Oracle offers for licensing and permitting applications, focusing on the dynamic advice capabilities of Oracle Policy Automation.
    The webinar will discuss real-world licensing and permitting scenarios and will include a government case study.
      REGISTER NOW
    Copyright © 2013, Oracle. All rights reserved.
    Contact Us | Legal Notices and Terms of Use | Privacy Statement
    Oracle Corporation - Worldwide Headquarters, 500 Oracle Parkway, OPL - E-mail Services, Redwood Shores, CA 94065, United States
    Your privacy is important to us. You can login to your account to update your e-mail subscriptions or you can opt-out of all Oracle Marketing e-mails at any time.
    Please note that opting-out of Marketing communications does not affect your receipt of important business communications related to your current relationship with Oracle such as Security Updates, Event Registration notices, Account Management and Support/Service communications.

    Hi All,
    I have looked at the Packaged Applications.
    I declined to use them because they would require quite a bit of modification to meet my needs.
    I find it faster and more reliable to code small utility applications from scratch so that my clients get exactly what they need; no more and no less.
    APEX is awesome at pumping out these utility applications quickly and cheaply with acceptable quality.
    Hope this helps.
    Cheers
    Patrick Cimolini

  • Http 404 error while opening Siebel Public Sector Web Client

    Hello Experts
    I recently migrated to siebel web client and tools 8.2.2 from 8.2. However the issue that i have been facing now is that when i open my client i get HTTP 404 Not Found- The Web Page cannot be found.
    Things that i have done to configure:
    1. Enabled ActiveX settings-Settings as given in http://www.siebeloracle.com/accessing-oracle-siebel-8-1-using-windows-7-ie8-works-on-32-bit-os/
    2. EnableFQDN: FALSE, FQDN: Commented.
    3. My ODBC and public sector cfg have been configured as per need.
    Strangely what i have encountered is that: sometimes of 1 out 30 trials, when my client opens up [P(opening client)->0 i.e. Probability is close to 0] the port number is 8081 whereas in other instances it is 8080 which i guess is by default.
    URL: http://localhost:8080/start.swe
    I have tried reinstalling the client but still i face the same issue.
    Kindly help me out with this issue.
    Regards
    KT

    Hi,
    I see that its not a problem with the installation but some problem with the port 8080. I feel some other application is running by default on that port. So, everytime whenever I have to launch Siebel Web client, I have to launch 2 instances. (8080 and 8081). So, the instance which launches on port 8081 + works fine.
    I see this process to be time consuming as I have to wait for 2 instances to open up. Hence, is there any way to define the default launch of the port when the client opens up?
    Thanks and Regards
    KT
    Edited by: 1005486 on May 13, 2013 12:01 AM

  • Creation of Public Sector Planning application fails for LDAP user

    The environment is on Windows 2008 R2 & EPM 11.1.2.2.302 of Planning. The creation of "general" planning applications works fine, regardless of the method of creation, Native User/LDAP User or Classic/EPMA. The creation of Public Sector Planning application using Classic Administration fails when using an LDAP user.
    It works when using a Native User. It also works fine if EPMA is used, for both Native as well as LDAP users.
    Our developers are not comfortable with EPMA yet, so want/need the ability to create the applications using Classic Administration.
    Looking at the Planning sysout log, the only error message indicates a timeout with Calculation Manager:
    Calc manager rules initialization failed. Please load and deploy the rules from Calc Manager UI
    ERROR:Error while loading rules in Calc Manager. <HTML><HEAD><TITLE>Weblogic Bridge Message</TITLE></HEAD> <BODY><H2>Failure of server APACHE bridge:</H2><P><hr>No backend server available for connection: timed out after 10 seconds or idempotent set to OFF or method not idempotent.<hr> </BODY></HTML>
    Calculation Manager itself seems to be working fine.
    Any suggestions/thoughts anyone?
    Thanks,
    Andy

    Hi Vivek,
    The LDAP port is open to all the servers in the environment. LDAP users have no issues logging in to any of the tools that they have access to.
    I think it has something to do with how Classic Planning passes the security token to Calculation Manager for an LDAP user. For a "general" Planning app, there is no evidence of such a transfer, because the Rules are created after the app has been created. And there the user logs in directly to Calculation Manager to create the rules.
    When using EPM Architect, it would lead to reason that such a token is also passed, however, that mechanism does not seem to have any trouble.
    This is the first time I am using a pre-packaged application like PSB, and have so far worked with only with "general" Planning apps. Wanted to see if anyone else has created PSB apps using external users successfully, so I can trade environment notes and may be come to a cause/solution.
    Thanks,
    Andy

  • What are the minimum SAP processes for public sector ?.

    Dear  Expert
    I would understand that SAP Public Sector - Business Process has the following key:
    Shared Services
    Human Capital Management
    Government Purchases
    Formulation of Public Sector Accounting and Budget
    Social Services
    Social Security
    Government Programs
    Tax and Revenue Management
    Public Safety
    Organizational Management
    Organizational Support
    For an implementation in SAP Public Sector, I found  several solutions are:
    - Solutions - SAP Business Suite
    - Software SAP Customer Relationship Management
    - Software ERP SAP
    - SAP Product Lifecycle Management
    - SAP Supply Chain Management
    - SAP Supplier Relationship Management
    If we select SAP ERP Software. From the above processes. ¿Is it correct to have at least the formulation of Public Sector Accounting and implemented budget? or ¿Is it OK to implement all processes for the public sector? I'm  very confusing ...
    Please,  could you explain SAP Procurement public sector solutions? or do you have a link on this advice?
    All recommendations are welcome.
    Thank you very much for your support and recommendations
    Dear SAP
      SAP Sector Público –  Tiene los siguientes   Procesos de Negocios :
    Servicios Compartidos
    Gestión del Capital Humano
    Compras de Gobierno
    Formulación de Contabilidad del Sector Público y Presupuesto
    Servicios Sociales
    Seguridad Social
    Programas de Gobierno
    Impuestos e Ingresos de Gestión
    Seguridad Pública
    Gestión Organizacional
    Apoyo Organizacional
    Para una implementación.  SAP Sector Público tienen varias soluciones y son:
    - Soluciones - SAP Business Suite
    - Software SAP Customer Relationship Management
    - Software ERP SAP
    - SAP Product Lifecycle Management
    - SAP Supply Chain Management
    - SAP Supplier Relationship Management
    Si seleccionamos SAP ERP Software. De los procesos mencionados anteriormente. ¿Es correcto,  tener por lo menos el proceso de formulación de Contabilidad del Sector Público y Presupuesto implementado? o ¿Debería ponerse en práctica  o implantarse todos los procesos  del sector público?
    Por favor, ¿podría explicar Adquisiciones SAP para soluciones del sector público?
    Todas sus recomendaciones serán bienvenidas.
    Muchas gracias por su apoyo y recomendaciones

    Dear,
    I found this information and it is good:
    Procurement for Public Sector - Public Sector - SCN Wiki
    PPS -Procurement for Public Sector- enhancements - Supplier Relationship Management - SCN Wikiii
    La solución SAP Procurement for Public Sector (SAP PPS)
       Características generales son:
       La fase de preparación
       La fase de licitación
       La fase de ejecución del contrato
    El valor de la solución SAP Procurement for  Public Sector (SAP PPS) - SRM 7.0-based PPS Architecture
    1. Solución completa para todo el ciclo de vida de una contratación
    publica, como la gestión de pliegos.
    2. Gestión de contratos eficaz para garantizar mas transparencia,control y auditabilidad.
    3. Integración con Contabilidad presupuestaria (Funds Management)
    4. Posibilidad de gestionar contrataciones más complejas electrónicamente.
    5. Simplificar la arquitectura de sistemas y reducir así el coste de integración. SAP PPS - Firma digital.
    6. Menos modificaciones funcionales en proyectos de implantación.
    Thanks

  • Activation of Public sector management

    we are using ECC6 on our project. the project is based on Phase wise approach. Funds management was not active in Phase 1. but know when we activate public sector management (PSM) the system overwrites the Ledger values in FI. and ask to define new Ledgers
    can any one suggest and help.

    Hi Kamran,
    Hope you remember your old good friends. I cant see you on chat even??? For your problem... I suggest you to refer to SAP notes 939736 and 906397. I hope this will slove you problem.
    Let me know if your problem is solved.
    Thanks,
    Kashif Sayeed

  • Jobs for EEO-4&5 Report in public sector...

    Hi Gurus!
                   I am working for a public sector PA impl. The client wants EEO 4&5 reports for public sector. We have a standard report for that. But since the report is based on jobs, i wanted to know if the jobs for EEO are the same jobs we have in Org management? or they are different and we need to create new ones for the report exclusively in PA?
    Help urgent...
    Thanks in Advance..
    Soniya Singh

    I have the same task, I've been requested to retrieve the data hehind the report. The main query is nearly 1000 lines long with I'd say two dozen parameters ( both internal and external)
    Its been a nightmare trying to get the main query. I even used TOAD to revtrieve the SQL as the report is being run, but unfortunately you have to replace all the parameters your self.
    Its a monster.. So directing the output to Excel via XML Publisher works ? Does it give you the data in the raw format?

  • Settlements in project System for public sector.

    We are having a unique requirements for Project system.
    A Capital project will be mostly funded by Federal agency. However the capital project will end as an asset. eg, Roads, bridges etc.
    1. We want to acumulate all expenses and settle it to AUC ( IM ) and later settle as an asset. ( currently possible )
    2. However, based on the billings done to Fed agencies, the revenue is also to be identified in the project. ( should not be condisered for settlement, as it will reduce the Asset value ).
    We tried to seggregate the cost and revenues by source structures namely 10 and 20 for Cost and revenues respectively. In the settlement rule we move the cost up from WBS element to Project level. From project we move to AUC and finally to AMR.
    Our requirement is to just settle the expenses to AMR and leave the Revenues in the the project itself. However the gives a hard error that the revenue settlement should also be settled. The other option we thought about, was to settle to a cost center, but it is not advisable as the revenue will put back  the budget of that cost center/fund center.
    So my questions is .
    1. Can part settlement happen ? ( Meaning move only costs ) ?
    2. In private sector, it is possible because expenses are Cost element 1 and Revenues are 11 ( not selected for settlement except PA settlement ). However in public sector expenses and revenues are treated as Cost element 1. so how to circumvent this issue ?
    Any help or direction will be much appreciated..
    regards,
    Venkat Kota.

    I am already using the source structure to split the cost and revenues. I am also using the same settlement profile for all the requirements.
    1. lower WBS to Higher WBS.
    2. Higher WBS to AUC
    3. AUC to AMR.
    So i am not sure how i can maintain 2 settlement profiles for one project ?

Maybe you are looking for

  • Adobe Photoshop CS6 Very Slow On Rendering Type

    I have a notebook with specification as mentioned below : Lenovo Ideapad Y470P 2nd generation Intel Core i7-2670QM Processor( 2.2GHz 1333MHz 6MB) Windows 7 Ultimate x64 AMD Radeon HD 7690 2GB 8.0GB PC3-10600 DDR3 SDRAM 1333 MHz 750GB 5400 I'm using A

  • Mac book pro is stuck on installing snow leopard. won't work.

    i recently was mucking around with my mac book pro and soon found my self stcuk with the installation of the 'snow leopard mac OS X' no matter what i did it just wouldn't go away, all i wanted was for my laptop to just go back to normal and get back

  • Can't get rid of background image of toolbar buttons

    I am just a front-end developer and responsible for the front-end look of an ADF application that we are creating: We are using jDeveloper 11.1.1.4.0 (and we cannot upgrade due to being told no...so I cannot USE the skin editor which when I tried to

  • Can't send mail after AirPort update

    After I installed the latest AirPort update, I can no longer send emails through Mac Mail but I can still receive them. I can send emails if I plug my MacBook directly into the cable service router through the ethernet port. According to my ISP (Cox)

  • Sir plz help me in replacing my iphone4

    sir i am having some issues with the earphone and some time gets hanged so plz help me in replacing the iphone 4, my handset is from singapore serial no is 79*****a4s  model A1332  plz replace and upgrade to iphone 5 if it is possible already i just