IS Retal ECC EHP6 Upgrade Material not Article

Hi
I am busy testing our ECC EHP6 upgrade in an IS Retail System.
I have noticed the system is now referring to Material and no longer Article (MB51, MM41/2/3 even the W10T menu shows material and not article)
My developer has suggested I go to SE93 to change the transaction description from Material to Article.
This does not seem correct
Has anyone experienced this before?
Do you have a solution?
Thanks
Rory

Hi Rory:
You need to apply Retail Text after every upgrade.
Please take note of the following:
SAP Note 897714 - Activating Retail Short Text Replacement
SAP Note 904437 - Some short texts contain std terms instead of retail terms
- Paul
Paul R. Gendreau Jr,
SAP Retail, Inc.

Similar Messages

  • ECC 5.0 to ECC 6.0 EHP6 upgrade

    Hi All,
    We have planned to upgrade ecc 5.0 to ecc 6.0 ehp6 upgrade.
    Can we upgrade direct ecc6.0 ehp6 using SUM tool ?
    Any one have idea Please let me know.
    Regards,
    Arun.

    Hi Arun,
    You cannot Upgrade directly to ehp6  because your operating system  & database will not support for ehp6 as per PAM.
    your target release ERP EHP6 : OS -win 2008 : Oracle 11 g
    find below steps
    Phase 1
    1. Apply latest patches to win 2003 server.
    2. Apply latest oracle patches to your current release
    3. Upgrade your SAP from ECC5 to EHP5
    Phase 2
    1. Upgrade your OS from WIN 2003 To 2008
    2. Upgrade Oracle from 10 to 11 ( you can upgrade this first phase also)
    3. Upgrade ehp5 to ehp6
    Thanks
    Siva

  • After upgrading from 4.6C to ECC 6.0 templates not working in smartform

    Hello,
    After upgrading from 4.6C to ECC 6.0 templates not working properly in smartform, although value is flowing to the point the template is getting called and inside the template there are text elements where placeholders are kept to display the value, when the print is taken there are no values being displayed by the text elements.
    Please note - Text elements doesnot have any conditions present in the condition tabstrip.
    Thanks,
    Abhishek

    Hi,
    After the upgrade, you will have to do the security upgrade.
    Please follow these steps.
    1. Go To SU25
    2. Run step 2A to 2D.
    3. In step 2C, you shall get the list of all the affected roles.
    Click on first role. It will take you to authorizations of that role. Click on the "New" tab there to find the new objects added to the role after the upgrade.
    Note: You can open the same role in the unupgraded system to check.
    4. Provide the access to the required authorization objects.
    5. Disable the unwanted authorization objects.
    6. Generate the profile.
    7. Follow the same steps for all the affected roles listed.
    Please note that you will have a list of new objects added.You need to maintain them inorder to avoid any access issues.
    8. After step 2C, complete 2D.
    Regards,
    Imran

  • New Development project  in the middle of  ECC EHP7 upgrade project

    Hi All,
    We are performing ECC EHP7 upgrade project in our project system landscape and i have already started Dev system upgrade.Suddenly our development team wants to perform new project  which required to install add-on product from third party application. Installing new add-on will require us to regenerate stack.xml file right? if that is the case  do we need to perform re upgrade to Dev right?. As per my knowledge this is not recommended to perform parallel project with upgrade project.
    Is there any  best practice or recommended method to perform multiple projects with upgrade project at the same time.
    Thanks,
    Raghu

    Hi Raghu,
    First here i would like to suggest you & your development team i.e during an upgrade project dual maintenance is required as per SUM guide,as per SUM guide you need to maintain parallel systems to perform regular activities, for same you could refer SUM guides and follow the standard procedures.
    Installing new add-on will require us to regenerate stack.xml file right?
    Yes you need to regenerate the stack.xml file .
    if that is the case  do we need to perform re upgrade to Dev right?
    If you are under upgrade phase no need to perform re upgrade,required add on can be installed after completion of an upgrade as per availability for EHP7.
    Try to avoid perform multiple projects with upgrade project .
    Regards,
    Gaurav

  • EHP6 Upgrade - MAIN_SHDRUN/DDIC_UPG

    Hello,
    I am performing EHP6 upgrade and I am kinda stuck in pre-processing phase. I am getting the following error message.
           Last error code set: RFC login to system SID ashost ip nr 06 gwhost host gwservice sapgw06 failed with code 1 key RFC_COMMUNICATION_FAILURE:
    SAPup. log file has the below message
    CURRENTPHASE MAIN_SHDRUN/DDIC_UPG
    ...started at 20140806142416
    # INFO: Nothing has been done in this phase.
    ..timestimes self: 2.080/0.410 usr/sys, children 1.390/0.690 usr/sys.
    ..finished at 20140806142539 with status SUCCEEDED.
    # Error message set: 'RRFC login to system SID ashost ip nr 06 gwhost host gwservice sapgw06 failed with code 1 key RFC_COMMUNICATION_FAILURE:
    LOCATION    CPIC (TCP/IP) on local host with Unicode
    ERROR       partner '172.17.60.165:3306' not reached
    TIME        Wed Aug  6 14:25:39 2014
    RELEASE     721
    COMPONENT   NI (network interface)
    VERSION     40
    RC          -10
    MODULE      nixxi.cpp
    LINE        2895
    DETAIL      NiPConnect: 172.17.60.165:3306
    SYSTEM CALL connect
    ERRNO       239
    ERRNO TEXT  Connection refused
    COUNTER     18
    ...begin dialog at 20140806142541
    What amuse me is that, I don't find executable's for starting the shadow instance under . /SUMdirectory/ abap/bin/ directory. startshd and stopshd files are missing.
    I used the command sapcontrol  -nr 06  -function Start to start my shadow instance and its started, but I am still getting the same error if I continue the phase.
    I am doubting if the kernel is having any issue but I am unable to crack it.
    Any help would be great.
    Regards
    Hari

    Hello RB,
    Thanks a lot.
    I was thinking that startshd is just like sapstartsrv..as part of a kernel .
    Thanks for your timely help.
    Regards
    Hari

  • SAP Query in ECC 6 Upgradation

    Hi All ,
    I am working in an ECC 6 Upgradation project , upgrading from 4.6 C to ECC 6.
    Somebody told me , Query cann't be coppied from 4.6 C to ECC 6.
    Is it true ? If so what is the alternative ?
    Thanks in advance.
    Regards
    Srikanta

    Hi Srikanta,
    U didnt need to re-copy all the queries. When you upgrade from 4.6, the new version of sap does not default to the correct query area. You merely need to point it to the correct one. Just set a parameter against you own user data called AQW and leave the parameter value blank.
    Take a look at OOS note 672784.
    You can transport queries between systems in SQ02 (by using the lorry button) or run report RSAQR3TR.
    You download the infosets, queries etc into a file and load them into whichever system you wish.
    Hope it will be useful.
    Regards,
    Lakshman.

  • EHP6 upgrade with PI in the landscape

    Hi All,
    I realize all documentation say that you must always keep your PI boxes at the highest levels in your landscape.
    I know oss note 1043047 and 954820 speak to this.
    I'm just became part of a project that over looked this. We are planning a EHP6 upgrade.
    This will bring in NW 731 stack right?
    Our PI is old at NW 7.11
    The SLD on the PI's are to the latest versions.
    The project to migrate to PO is coming after ehp6.
    Again this was all planned before I came on board.
    Any thoughts of what to expect? I still believe it should work fine until we get to the upgrade.
    If not, can anyone explain technically why not?

    You should under all circumstances perform a test upgrade, on a sandbox system first.
    The theory of the upgrade is one thing, the problems of doing it for real are a quiet different matter.
    You can see the changes (including what new kernel version will be installed), when reviewing the stack calculation report as done by MOPz (SolMan Maintenance Optimizer).
    It will tell you exactly what software component gets replaced with what other version.
    Also consider the impact on development, and if you have a multi-system landscape, you gotta plane in which sequence to upgrade what server.
    Last not least, consider performance impact and downtime.
    I have seen PI systems so (over)utilized that they literally "cooked the hardware" they were running on.
    Putting the added strain of performing an upgrade on such a system, might be the straw that breaks the camel's back.
    That is why sandbox testing is so essential here.

  • Ki235 Error When PGI After Ehp6 Upgrade

    Hello
    What would cause KI235 error when PGI after ehp6 upgrade? We are upgrading to ehp6 and are receiving this error when PGIing delivery. It only does this in the upgraded client and not in non-upgraded client. The automatic account assignments match exactly in both clients and are not missing or incorrect.
    Also check OKB9 setting it is perfectly ok.
    Please advise,
    Thanks,
    Themba

    This is a repetitive issue and have you searched the forum before posting?
    G. Lakshmipathi

  • ABAP activities during EHP6 Upgrade

    Hi All,
    During EHP6, upgrade apart from SPDD, SPAU & UCCHECK adjustments, obsolete FMs - WS_UPLOAD, UPLOAD, WS_DOWNLOAD & DOWNLOAD should be replaced with the latest one from Z-programs.
    What are the other ABAP activities & obsolete FMs that should be taken care for Z-developments in the system during EHP6 upgarde?

    Dear Munish,
    PF the SS as below. It is asking to do the ASU/Upgrade. .......One more thing From where i can see what will be the minimum SP of ECC 6.0 to Upgrade to Ehp6 ..
    Regards
    RK

  • My FaceTime with the new software upgrade is not working

    My FaceTime with the new software upgrade is not working.how do I fix this

    Using FaceTime http://support.apple.com/kb/ht4319
    Troubleshooting FaceTime http://support.apple.com/kb/TS3367
    The Complete Guide to FaceTime + iMessage: Setup, Use, and Troubleshooting
    http://tinyurl.com/a7odey8
    Troubleshooting FaceTime and iMessage activation
    http://support.apple.com/kb/TS4268
    iOS: FaceTime is 'Unable to verify email because it is in use'
    http://support.apple.com/kb/TS3510
    Using FaceTime and iMessage behind a firewall
    http://support.apple.com/kb/HT4245
    iOS: About Messages
    http://support.apple.com/kb/HT3529
    Set up iMessage
    http://www.apple.com/ca/ios/messages/
    iOS 6 and OS X Mountain Lion: Link your phone number and Apple ID for use with FaceTime and iMessage
    http://support.apple.com/kb/HT5538
    How to Set Up & Use iMessage on iPhone, iPad, & iPod touch with iOS
    http://osxdaily.com/2011/10/18/set-up-imessage-on-iphone-ipad-ipod-touch-with-io s-5/
    Troubleshooting Messages
    http://support.apple.com/kb/TS2755
    Troubleshooting iMessage Issues: Some Useful Tips You Should Try
    http://www.igeeksblog.com/troubleshooting-imessage-issues/
    Setting Up Multiple iOS Devices for iMessage and Facetime
    http://macmost.com/setting-up-multiple-ios-devices-for-messages-and-facetime.htm l
    FaceTime and iMessage not accepting Apple ID password
    http://www.ilounge.com/index.php/articles/comments/facetime-and-imessage-not-acc epting-apple-id-password/
    FaceTime, Game Center, Messages: Troubleshooting sign in issues
    http://support.apple.com/kb/TS3970
    Unable to use FaceTime and iMessage with my apple ID
    https://discussions.apple.com/thread/4649373?tstart=90
    How to Block Someone on FaceTime
    http://www.ehow.com/how_10033185_block-someone-facetime.html
    My Facetime Doesn't Ring
    https://discussions.apple.com/message/19087457
    Send an iMessage as a Text Message Instead with a Quick Tap & Hold
    http://osxdaily.com/2012/11/18/send-imessage-as-text-message/
    To send messages to non-Apple devices, check out the TextFree app https://itunes.apple.com/us/app/text-free-textfree-sms-real/id399355755?mt=8
    How to Send SMS from iPad
    http://www.iskysoft.com/apple-ipad/send-sms-from-ipad.html
    You can check the status of the FaceTime/iMessage servers at this link.
    http://www.apple.com/support/systemstatus/
     Cheers, Tom

  • To upgrade or not - opinions appreciated

    Hello all,
    I purchased my first Mac in March 2007, it came with Tigersand I'm still using Tiger 10.4.11 It's solid as a rock, never problems with the OS or Macbook Pro. I passed up the upgrade to Leopard because I was not on Tiger very long and thought - why upgrade ?
    Now Snow Leopard is out - Tiger is still supported... The main reason why I was going to upgrade is because it's a 64 Bit OS - run quicker, and I will upgrade my memory for the 1GB I have to 4GB.
    I'm not a "power user", I use the Mac for email, heavy calendar usage for appointments, Internet, Open Office, I use Parallels, and I have a Me account to sync my Macbook Pro with my I-Phone.
    Do you recommend upgrading - or wait until Apple stops support on Tiger ?
    Also ---- I read ---- where I can use the "upgrade" version, even though I have Tiger, it's an "honor" system - anybody try this on Tiger ?
    Thanks,
    Bob

    First, I agree with Tom Gewecke that the performance improvement in Snow Leopard are very noticeable -- at least for me, this has been true on each of the Macs I have upgraded from Leopard to Snow Leopard. However, I have not upgraded a Mac that supports Tiger to Snow Leopard, so keep that in mind.
    Perhaps more importantly, I can't live without the new features of Leopard vs. Tiger now that I have gotten used to using them -- they increase my performance dramatically, & that is where I think the big gains are. Snow Leopard adds a few new features to the OS too, & I'm starting to appreciate them as well. (For instance, I regularly use the new built in text substitution feature to automatically expand unique abbreviations into whole words or phrases -- I never have to type out "Snow Leopard" or "Disk Utility" in these forums but instead just type "@SL" or "@DU" & they are automatically expanded for me.) You mention that you are a heavy calendar user, so you might find Snow Leopard's improved support for WebDAV in iCal useful -- since I run a local WebDAV server for use with iCal, I noticed this immediately.
    Secondly, it is not true that there are only a few 64 bit apps available. Almost all the bundled apps that come with Snow Leopard like Safari & especially Finder are both 64 & 32 bit capable. Since you indicate you have a Core Two Duo CPU in your Mac, Snow Leopard will load the 64 bit code & you should see a substantial increase in responsiveness for these familiar apps. However, note that you do not need to upgrade to Snow Leopard to use 4 GB of RAM -- both Tiger & Leopard support that as well. The difference is that Snow Leopard can support more than 2 GB +per application+, but you will rarely if ever need that much for any common app you are likely to run.
    Thirdly, I would never advise anyone to violate anybody's software license agreements; however, do not confuse Apple's marketing material with the Snow Leopard EULA. The $29 U.S. retail product is not an "upgrade" version & in fact is exactly like (& comes with exactly the same EULA) as the OS product in the Box Set, which is just 3 products boxed together & sold at a modest discount vs. the price of each item bought separately. Some users don't seem to understand that because of this, if Tiger users were violating the EULA by using the $29 version, they would be doing the same by using the same Snow Leopard disc with the same EULA in the Box Set. Obviously, this is not true.
    Part of the confusion about this is because there is an "upgrade" product, but it is not sold at retail & is clearly marked as such. Just make sure you avoid it & buy a retail Snow Leopard product & this will not apply to you.
    So, my answer to the upgrade or not question is a resounding "yes!" Just be sure to buy an appropriate Snow Leopard product & to back up at least your user files before applying it. (Cloning the startup drive is better but not absolutely necessary.) Also be prepared to update third party apps, since some may need revision to work with Snow Leopard, & try to avoid any hacks or "enhancers" to the OS as much as possible, since these things are almost always OS version specific & can cause all sorts of problems when the OS changes.

  • My MobleMe calendar upgrade does not recognize that OS X6.3 has been installed and sees the old OS. What to do?

    My MobleMe calendar upgrade does not recognize that OS X6.3 has been installed and sees the old OS. What to do?

    visard229,
    Numerous Apple support articles state that "Mac OS X v10.6.4 Snow Leopard is recommended for all users."
    Why do you think that 10.6.3 will work with the MobileMe calendar?

  • 4.6c to ECC 6 upgrade - Mass activation program RADMASG0

    During 4.6c to ECC 6 upgrade - when we try to use Mass activation program - RADMASG0 - how to remove warnings in a single shot ?
    When I am giving some 6 table names as input for activation (under 'DIRECT OBJECTS' in Program RADMASG0 ),after execution i am getting the warning for all the three programs. (same warnings)
    How to clear this.....whether i have to go one by one. If so then what is the use of this program ?
    regards,
    N. Prasanna kumar.

    Hi,
    What Message you are getting.
    One suggestion is that going one by one is most suitable.  Other wise  you will not able to detect the errors.
    With regards,
    Sumodh.P

  • What level of certification is required for ECC 6 upgrades?

    Hi everyone,
    I'm already a ceritifed SAP technology consultant (up to NW2004), however need to update my certification for ECC 6 (netweaver 7).
    What is the appropriate exam to sit (eg associate or professional) to be allowed to perform productive SAP ECC 6 upgrades?
    Thanks
    Shaun

    Hi everyone,
    Major update on the "do you need to be certified" topic ...
    I finally got a reply from SAP Education regarding two queries I had regarding what level of certification was required as a basis "guy" to perform production SAP installations and upgrades.
    SAP Education wrote:
    You don't need to be certified to do installations. In reality, customers will have much more comfort having an install done by someone who is certified rather than someone who isnu2019t, but ultimately itu2019s the customeru2019s call.
    I then asked if this was applicable for SAP upgrades also ...
    SAP Education wrote:
    Hi Shaun,
    Indeed it is.
    Best of luck!
    I then went on to clarify that their is no support implications for customers who don't you certified Basis personel to perform their upgrades/installs:
    Shaun wrote:
    So your saying that although itu2019s preferable to be certified ... you donu2019t have to be, and there is no impact to the support provided by SAP?
    SAP Education wrote:
    Ultimately, SAP cannot mandate for individuals (excluding those employed by SAP) or SAP Partners to be certified to work on projects. However, customers and partners will employ the consultants to work on the projects, from what we have seen recently customers and partners are now asking for SAP certified consultants to work on implementation and upgrade projects.
    Thus we suggest to have an advantage to be employed on future SAP projects that you are certified in the solution you will be working on, or upgrading to.
    Example: If you are looking to work on an upgrade from CRM 5.0 to CRM 7.0 the customer would look for certified consultants in CRM 7.0
    So it is solely up to you if you wish to certify yourself in the latest release of the solution you are working in.
    I then rang SAP education and had a very pleasant discussion with one of the ladies there.  She went on to explain that the requirement for certification really became an optional thing a few years back.  SAP was no longer in a position not to support customers regardless of who they use to perform their upgrades/installs since a customer continues to pay their yearly maintenance costs - thus SAP is obligated to provide support.

  • The latest upgrade is not compatible. it says error run platform 17.0.1 is not compatible with min version 17.0 max version 17.0

    the latest upgrade is not compatible and is not allowing me to open firefox. the error message says run error platform 17.0.1 is not compatible with min version >17.0 max version <17.0

    hello paisley157, this error might be caused by security programs such as zone alarm - please temporarily disable those programs for the following procedure:
    *download the full firefox setup file from getfirefox.com
    *uninstall firefox on the machine (but don't chose to delete your custom files & settings in the uninstaller!)
    *manually delete all remaining files in the firefox program folder, which usually resides in ''C:\Program Files (x86)\Mozilla Firefox\''
    *reinstall firefox

Maybe you are looking for

  • Problem adding a filter to Recordset

    Hi, I have added a record set to a page, and it works fine. Then I add a filter to the record set so I can work with the record stipulated by the URL parameter, and it stops working. Here is the code that is added without a filter: mysql_select_db($d

  • Can w use rsync for Business Continuity for Oracle Applications Release12 ?

    Hi , One of our customer has implemented Oracle EBS R12 (12.0.6) on HP-UX (IA). Database Tier on a Two Node Oracle Database 10g R2 RAC Application Tier on Two Node using Shared APPL_TOP with Load Balancer. They want to implement DR site using Oracle

  • NEEDING HELP-curve 9300-photo uploading on bbm

    Hi everyone i am new to the forums and neding some help with my curve please!!! i got my contract with 3 mobile out in july, and got the curve, i have been able to upload 1 picture via bbm to a friend and now it wont let me everything is there to sen

  • Change Request Management for Implementation Project

    Hello gurus! I have a problem with execution change request in implementation project. I have created Implementation project and task list for him."Change request management" is active for this project. I can create document Change Request, but I can

  • Disable the Server Manager popup in Unattended.xml for Windows 2008 R2 is not working

     I have made entry into Unattended file to stop the popup of Server Manager during first starup of windows 2008 R2.  However it is not working out, but Disable Initial OCnfiguration task window is working fine.  Below is my Unattended.xml file: <unat