Is there a Scheduled Wake up (similar to Scheduled Start Up?

I recently decide to let Backup run in the wee hours, so set them for 3, 3:15, and 3:30am.
I don't shut down at night; I let the computer sleep (either via the Apple menu or automatically if I don't use it for 2 hours). While it's sleeping, of course, the backups won't run -- they wait until wake-up.
So in the Energy Saving part of System Preferences, I set AutoStart for 2:55 am, and Auto Sleep for 3:45 am.
AutoStart does execute, but the Mac immediately goes back to sleep. I guess AutoStart doesn't overide sleep mode, since the computer is actually running.
Is there a way to schedule an auto-wake from sleep? I can't find an AutoWake function.
(I did try trashing the com.apple.AutoWake.plist and com.apple.PowerManagement.plist files, then restarting, to no avail. I've also searched the forums -- if it's there, I can't find it!)
Thanks for any advice.

Thanks for the info, John.
Unfortunately though, the Lacie product won't work for me, as it doesn't do backups over a network. Since I live in a hurricane-prone area, I really like the ease, simplicity, and security of the off-site backup to the dot-Mac servers. (Nawwww, I'm not paranoid! But I was within 20 miles of 3 hurricanes a couple of years ago.)
Just for fun, I've set both the Scheduled Start and a Backup for 3:00 exactly. I'm hoping the backup will get started before the Mac goes back to sleep. Otherwise, yeah, I'll have to let it happen during the day. It's no big deal either way -- just thought I'd give it a shot!
Jim

Similar Messages

  • Is there a replacement plug in similar to the "Variations" command that was aborted in CS6

    Is there a replacement plug in similar to the "Variations" command that was thoughtlessly aborted in CS6... ANYTHING SIMILAR AT ALL.
    I know what all you "pros" will say, but I have been using it since it was created and I like it

    I don't think there is at this point, since cs6 can't be run in the 32 bit mode and adobe hasn't ported the variations filter to 64 bit on the mac side.

  • Is there a "pointer arrow" or similar feature in iMovie HD?

    Is there a "pointer arrow" or similar feature in iMovie HD that can be used to highlight a specific object (in this case a person) in iMovie HD? My son is making a soccer highlight video of himself for college coaches, and we would like to, in some way, point him out in movie clips so coaches will know which player he is of all the players on the clip.

    Doug,
    You're using iMovie HD, right?
    If that's the case Gee Three makes a plugin called Whiteboard that might be what you're looking for.
    It's part of their Slick Volume 6. You'll have to buy the whole package to get it.
    http://www.geethree.com/slick/galleries/s6demopages/s6whiteboard2.html
    There is also Movie Canvas from cf/x which can be purchased individually.
    http://www.imovieplugins.com/plugs/moviecanvas.html
    Note: These plugins will work with iMovie HD but not iMovie '08 or '09.
    Matt

  • Is there a "pointer arrow" or similar feature in Final Cut Express HD?

    Is there a "pointer arrow" or similar feature in Final Cut Express HD? We would like to point out my son (on the soccer field) in a soccer video we are preparing for college coaches? Thanks!

    If you email me I can email you a free pack of around 100 effects, one of which is an excellent arrow generator.

  • Is there an instant messaging app similar to blackberry messanger?

    is there an instant messaging app similar to blackberry messanger

    Not yet... iOS 5 will contain a similar application for iOS devices.

  • Are there any photo editing programs similar to the ipad

    Are there any photo editing programs similar to the ipad?

    Never used an ipad.  Why not try the iPhoto forum area?

  • What security products are suggested for scrubbing rootkits from a Mac? There are good articles on similar repair for PCs and it makes me want to see if I can save this machine. It's in forensic recovery right now so I myself have not done anything yet.

    What security products are suggested for scrubbing rootkits from a Mac? There are good articles on similar repairs for other makes online. I would like to investigate whether a machine can be truly scrubbed or if it's best to retire it. I haven't done anything yet as it is a candidate for more extensive forensic recovery.
    Also, I am not sure if various malicious spoofing and cloaking tricks (making Wi-Fi appear off when it is on, hiding unauthorized sharing/remote access, falsifying System Preferences preference panes, etc.) are resolved by a thorough drive erase or are more similar to APTs?
    Finally, is there any emerging information regarding APT hiding places other than the recovery partition? I have heard mention of the EFI, for example, but it seems unproven and unlikely. Some people have also mentioned the RAM.
    This is an upsetting topic to some people, including me, so I appreciate circumspect, measured responses. Thanks! And don't try to answer all my questions if you really just want to comment or answer one. All thoughts are appreciated.

    Hi, Lincoln,
    A straightforward question. You are correct in recognizing the difference between tentative conclusion and certainty. Here are our main reasons:
    1. Incoming items noted on the console (or console sub logs) and Activity Monitor after defenses are overcome, and which are brought in by an unwelcome remote user, often have a process name and the word "kit." (Bear with me.) We soon observe the process is under attack, from terminal evidence and soon, decreased or lost functionality of the process. The terminal generally reports alteration of specific kernel behaviors. A simple example (that may or may not be accompanied by kernel changes and may simply alter permissions) is modifying Disk Utility such that key uses are unavailable. You can see how an attacker might value disabling partition views, mounting and permission repair. In retrospect, DU might not be a root alteration. I was thinking that its relation to fsck flagged it as a possible ring 0 item. I may need to know core parameters of a good example to pick strong ones.
    2. Incoming folders hidden for possible later use contained bundles of similar root kits, including some not applicable to Macs. From what I have read from reasonably credible sources, root kits are sold and traded both singly and in bundles.
    3. Root kits are a logical next choice for our attackers, as various prior techniques hindered us but did not paralyze us.
    4. One of the most authoritative articles I found was about PCs not Macs. I noted the assertion, undocumented, that an estimated one million computers are infected by root kit manipulations, and underscored that the kits can be used by people with low computer skills.
    5. MacAfee lists root kits (by description, not name) as a top pop five threat prediction in the coming year, though again, the emphasis is on PCs.
    Linc, I am trying to show a spectrum of observations and info that have shaped my thinking. To retrieve better captured evidence requires significant legwork at this time, but it is something I am willing to do if you can be patient. Understand this long attack has been like a natural disaster to us.
    I have not linked a few articles of interest because I forget if that's allowed. If so, I'd be glad to.
    After reviewing this partial answer, you may form another hypothesis. If so, please share it. I am comfortable with my position but not clinging to it.
    Thanks for your interest. Looking forward to your thoughts.
    Oh, yeah: some material is out for analysis, so we should have credible opinions pretty soon. Not positive exactly when.

  • Return the scheduled start date from one task to a custom field for all tasks

    Hi all
    I am trying populate an entire custom task date field with the scheduled start date of one of the tasks. I thought the easiest way would be to:
    1) identify the date I need with a custom task flag field set to 'yes'
    2) create a formula to look for the 'yes' flag in that field and populate the custom task date field with it.
    This worked only for the task where the flag was set to yes (task #36) and the rest of the 49 tasks returned an error message. I'm unsure of how to set this up so that the date with the 'yes' flag populates in this column on
    all 50 tasks.
    This would also need to scale for situations where there were more or less than 50 tasks.
    Thanks in advance...
    Using MSP 2010 Pro   

    ShelleyBrodie,
    That's because the syntax of your formula isn't quite what you intend. The correct syntax is:
    IIf( expression, truepart, falsepart )
    For your case that converts to:
    IIf([Flag1],[Scheduled Start],{not sure what you want for the false part but I assume is is not Scheduled Start})
    Note, the "Yes" for Flag1 is implied, so the first part (i.e. Scheduled Start) is the truepart, but you don't give a value for the falsepart (i.e in both cases your formula is looking for Flag1 to be "yes". Let's say you want the Date1
    field to have the Scheduled Start date if Flag1 is "yes" and to have today's date if Flag1 is "no". Then the formula will be:
    IIf([Flag1],[Scheduled Start],[Current Date])
    However, As I indicated in my previous response, you won't be able to do what you described in your initial post by using a formula. Are you now trying to do something different?
    John

  • Task Scheduled Start Date with RAPI

    Task Scheduled Start Date with RAPI
    Is it possible to have a scheduled start date for a task in a service that is generated by RAPI, and, which does not have any authorizations/reviews? RAPI seems to throw the request into the service delivery moment without calculating the tasks even if I supply a date onload (in a field for the task start date to use). It works fine if there are authorizations or reviews, which is expected, but I can't get it to work without them. Thanks!

    Fascinating. As a workaround could you try throwing in a dummy authorization? For example, externalize it with ServiceLink dummy and autocomplete adapters, or keep it internal, but conditional with a condition that would always be false.

  • Basic start and finish dates vs scheduled start and finish dates in work order

    Hi Friends,
    I have observed  that whenever releasing the work order,irresepective of number of operations in the work order, system generating scheduling start and finish dates are same, however after releasing the Work order and by adding another operation in the work order, immediately scheduling end date equaling to Basic finish date (i.e.: Basic start and finish dates are equal to Schedule start and finish dates).
    Can any body please explain why this is heppening
    Please find the screen shots.
    After adding one more operation in the operation list and save the Work order,then Basic start and finish dates are equal to schedule start and finish dates.
    Regards,
    Srinika

    Srinika
    There are many things that affect the order scheduling:
    IMG setting - scheduling parameters
    Work centre settings
    Operation values e.g. work, duration, operation control key settings
    Calendars
    Etc
    So one possible interpretation of the above data is that the initial order operations have no work assigned, or the operation control keys don't require scheduling, or the work centres arn't set up correctly.
    Then you add a new operation which does appear to work.
    Please supply a screen-shot of the operation tab.
    PeteA

  • Start/Finish vs Schedule Start/Finish vs Actual Start/Finish

    Hi,
    I'm new to MSP 2013 and I'm confused on the way MSP handles Start/Finish dates. While I understand the rational of it adjusting the schedule so you see how actual dates impact the schedule, I find it confusing that there are multiple columns with different
    labels performing the same function?
    "Scheduled Start" would lead you to believe this is your initial planned start date and remains static while "Actual Start" would be, well, the Actual Start date. So one value by definition would be different than the other, yet when any
    of these dates, "Scheduled Start", "Actual Start", or "Start" are changed, they all change to the same value.
    My questions are:
    Why do the "Scheduled Start", "Actual
    Start", and "Start" dates all change to the "Actual Date" when entered?
    Is there a scheduling technique or purpose for this to work this way?
    Also, since the "Scheduled Start" date changes, how does MSP 2013 handle Earned Value?
           Since Earned Value calculations rely on your Planned Value which would be based on the Budgeted Cost of Work Scheduled          and the Earned Value which is
    the Budgeted Cost of Work Performed vs. the Actual Cost of the Work Performed at "a point          in time," how could it provide a reliable figure if the scheduled date is moving? Is it using the "Baseline Start/Finish"?
    I hope you can answer this for me or direct me to a resource that can. Thank you for your consideration.
    Marc      

    Marc,
    When Project was first released there were only two basic start field, Start and Actual Start (in addition of course to the Baseline Start field and a few others). With the release of Project 2010, a manual scheduling mode was introduced. That's when things
    got a little more confusing. Instead of leaving the Start date as is, the Start field was converted to a text field and the old Start field was renamed as Scheduled Start. When in auto-schedule mode, both Start and Scheduled Start are exactly the same.
    Now to answer your questions. To keep it simple, let's assume you are using auto-scheduling.
    1. In order to keep the schedule dynamics intact, it is necessary to update the Start field to agree with what really happened, namely with the Actual Start date. If you do not enter anything into the Actual Start field, Project automatically assumes the
    task started as scheduled, on the Start date.
    2, Yes, Project does its scheduling based on the current plan which is represented by start, finish and other data. Once the project starts, that current plan must be updated so the actual date values come into play. As noted in the lead in paragraph, Scheduled
    Start and Start are the same for auto-scheduled tasks.
    3. Earned value is based on the actual values and the saved baseline data. The "point in time" you refer to is the timescaled data as of the status date.
    Hopefully, this clear up at least some of your confusion.
    John

  • My 3rd generation ipad even though my battery is at 100 % the screen goes black after sitting for more than 15 mins. The only way to get it to come is by resetting the ipad. Is there a fix for this. It all started after the last two updates.

    my 3rd generation ipad even though my battery is at 100 % the screen goes black after sitting for more than 15 mins. The only way to get it to come is by resetting the ipad. Is there a fix for this. It all started after the last two updates.

    Try a Reset...
    Press and hold the Sleep/Wake button and the Home button at the same time for at least ten seconds, until the Apple logo appears. Release the Buttons.
    If no joy... Try a Restore...
    1: Connect the device to your computer and open iTunes.
    2: If the device appears in iTunes, select and click Restore on the Summary pane.
    3: If the device doesn't appear in iTunes, try using the steps in this article to force the device into recovery mode.
    From Here
    Unresponsive iPad
    http://support.apple.com/kb/TS3281

  • Schedule start & finish dates - Project Management

    All
    Will there be any implications on performance /status reporting etc if we personolise Schedule start & finish dates.
    The reason to personlise is to have Transaction Start & Finish date instead of Schedulate start & finish dates.
    Needs your inputs....
    Thanks in advance.
    Regards
    Ajith

    Marc,
    When Project was first released there were only two basic start field, Start and Actual Start (in addition of course to the Baseline Start field and a few others). With the release of Project 2010, a manual scheduling mode was introduced. That's when things
    got a little more confusing. Instead of leaving the Start date as is, the Start field was converted to a text field and the old Start field was renamed as Scheduled Start. When in auto-schedule mode, both Start and Scheduled Start are exactly the same.
    Now to answer your questions. To keep it simple, let's assume you are using auto-scheduling.
    1. In order to keep the schedule dynamics intact, it is necessary to update the Start field to agree with what really happened, namely with the Actual Start date. If you do not enter anything into the Actual Start field, Project automatically assumes the
    task started as scheduled, on the Start date.
    2, Yes, Project does its scheduling based on the current plan which is represented by start, finish and other data. Once the project starts, that current plan must be updated so the actual date values come into play. As noted in the lead in paragraph, Scheduled
    Start and Start are the same for auto-scheduled tasks.
    3. Earned value is based on the actual values and the saved baseline data. The "point in time" you refer to is the timescaled data as of the status date.
    Hopefully, this clear up at least some of your confusion.
    John

  • Is there a way to prevent iTunes from automatically starting the next playlist file on the iPad?

    Is there a way to prevent iTunes from automatically starting the next playlist file on the iPad?

    When you connect the device open iTunes and select it from the sidebar. Click on the Summary tab in the main window. Uncheck the option to automatically connect to iTunes. You will find it in the collection of options near the lower part of the window.

  • Scheduling start date and end dates

    Hello Gurus,
    I am trying to understand the schedule start date and schedule end date functionality in Plant Maintenance. I do understand the basic start and end dates. Currently I set up u201C3.Do not adjust basic dates, dep rqmts to order startu201D and set the scheduling type as u201CForwardsu201D . Please note we donu2019t do any capacity planning or leveling.
    So my question is, why the scheduling start date is defaults to the basic  start date  for forwards and scheduling finish date defaults to basic finish date for backwards ? I tried adding couple of operations and save the work order. It did not change anything in schedule dates.
    Do we really need to care about scheduling dates if we donu2019t use capacity planning ?
    Please advise
    Mahee

    Hi,
    As per priority, final dates would be calculated as we will define the duration based on the priprity. Either current date or basic date only applied to Scheduling start date.
    You can change the scheduling start date so that based on priority, final date would be calculated.
    Regards,
    Maheswaran.

Maybe you are looking for

  • Click event on SWFLoader

    Hello, In my FLEX application i have a SWFLoader where i load some wsf files that are located in others places in the web. Some of the swf files loaded contain an hyperlink associated and, when the swf file is clicked, a new web page is opened. So, i

  • Getting .mp3 and .wmv from Mac to WM 5 handheld

    I have a T-Mobile Dash with Windows Mobile 5. I have about 85 mp3's and a few .wmv video files I'd like to load onto my handheld (I have a memory chip installed)- from my Mac (which is 0S 10.3.9). Missing Sync will not link Windows Mobile 5 to OS 10.

  • Asynchronous BPEL Process called from an empty BPEL process getting lost.

    Hi I have an empty BPEL process calling an asynchronous BPEL process. The empty process is triggered by a read file activity. It finishes successfully and even calls the asynchronous process. There is no error thrown but the called asynchronous proce

  • ADS com.adobe.ProcessingException: CORBA Connectin to XMLForm failed

    When I run and fp_check_destination_service on one of my systems for ADS I am receving the following error: com.adobe.ProcessingException: CORBA Connectin to XMLForm failed, please verify the binaries are deployed to the os_libs directory.

  • Source record and Trailor record

    Hi All, I have a requirement to validate the source record count with the trailor record count. And pass value futher if matches else abort the load and generate email. I have separated header and footer info in one table and detail record to one tab