Is there a wider need for an industrial spec, hard cased, scratch and bump resistant iPad and iPhone? (one that is more robust to outdoors and an engineering environment.

Is there a wider need for an industrial spec, hard cased, scratch and bump resistant iPad and iPhone? (ones that are more robust in the outdoors and an engineering environment.) With the acceptance of app based problem solving in industry, the only obstacle to purchasing apple products seems to be their emphasis on providing an asthetic product that looks cool. Industry however, needs something that is harder wearing, splashproof/showerproof, work in the cold and dirt and is fully wipeable. If such an apple product existed I believe they would move units.

I use the ipad in a hydrometallurgical plant.  Lots of dust, harsh chemicals, and where equipment come to die.
I've used laptops/ tablet pcs.  All having a very bad problem of sucking in air to cool the computer.  The slight acid mist in the air corrodes the contacts in the computer and they last ~ 4 months. 
I have moved on to using a ipad currently in a glorified zip lock bag from the internet that has been working for the last year.   I haven't dropped it yet so that's great.  Most of my applications are done in a virtualized environment where i connect in to using RDP. 
It works flawlessly.  When the zip lock bag i'm usign gets too scratched up to read easily, I just replace the 10$ bag. 
I do want another case.  I am waiting on the lifeproof case coming out for the ipad2.  Shockproof, dustproof, and waterproof.   Much classier than my zip lock bag solution.
Within my plant, there is 4 ipads.  
they have fit the bill so far.  Only downfall of ipad for our windows enterprise system is the lack of sharepoint browsing natively within the ipad.  I can do it with RDP but come on. . .

Similar Messages

Maybe you are looking for

  • Issue in bank reconciliation

    Hi I have an issue in manual bank reco. We have a scenario in which there is a cheque bounce in the account. The system is generating entry for cheque issue using T Type IN01 Bank Subledger Dr            Main bank Cr However, for T Type IN02, system

  • Calendar is creating an extra event when the event spans the week view end of week to beginning of next week.

    When I create an event in Calendar that goes from Saturday to Sunday, like my work shift that starts at 5:30 pm and ends at 3:30 am the next day, the event gets duplicated onto the next day but is seen as a single event. So if I delete the one on Sun

  • CcmEval Scheduled task not being created with "Access Denied" error 0x80070005 only on XP machines

    Before coming on here I checked out http://social.technet.microsoft.com/Forums/en-US/ddbfe6c3-ee54-4b2a-a3a7-a6515d974f76/client-check-failed-on-xpserver-2003-systems-onlyccmeval-is-not-being-scheduled?forum=configmanagerdeployment (GPO to allow sche

  • Images ingestion

    Is there a way to tell to Bridge put an underscore or a dash between date (like year_month_day) importing photos from memory card? Thank you Marco

  • 2 Prices for same material

    Dear All Is it possible to maintain 2 prices for same material.this is the requirement from our client  the base price some times has 2 values based on the price on which the product is purchased from supplier. Can we maintain the credit limit at shi