Is there any difference in developing OSB project by OEPE or OSB console?

As there are 2 ways to develop OSB project, OEPE or Console. What's the difference? Is there anything need to consider between these 2 ways? Thanks.

It depends on various factors as others have pointed out. OEPE is preferred specifically by developers as the weblogic server does not have to be started to complete your design. Secondly, since mostly it is a shared workspace among developers and OEPE has connectivity with Teamprise or SVN or other versioning systems that OSB Console cannot offer. It has a graphical mode to create transformations using XQuery as well which is not there in OSB.
Yet there are other things that OEPE is incapable of, for example - Creating Customization Files, Creating SLA Alerts and such.
It is really your call as to which one to use. But technically, the finished component, be it a proxy service or a business service, is the same, whether you create it on OSB Console or OEPE.

Similar Messages

  • Is there any difference in an android .apk file developed with flex/flash?

    Is there any difference in an android .apk file developed with flash compared to one developed with flex?
    I just made a test application and the textinput reaction time is way too slow. I used Flash to build it.

    Thank for the response.
    What I actually wanted know though was if there is a difference between an android app developed with falsh cs5 compared to an app developed with flash builder 4.

  • Is there any difference in oracle database and forms database

    i want to know is there any difference in oracle database and forms 6i database
    ,if i import some file through oracle database then same data will exist in forms database or not
    thanks

    Oracle Forms is a Rapid Application Development (RAD) tool not a database. With Forms, you connect to an Oracle database to query and display data from the database as well as insert new or update existing data. Consequently, if exists in the database - you should be able to display it in a Form.
    Craig...

  • Is there any difference in SAP 4.7 and ECC 5.0

    Dear,
    Is there any difference in SAP 4.7 and ECC 5.0...
    Thanx & Regards,
    Mohammad Nabi

    Hi,
    Check this out
    Hi I'm providing the ECC 6.0 functionality if you knows the
    4.7EE the difference is as follows:
    ECC 6.0 New GL Functionality
    1.Activate the New General Ledger Accounting by a single
    click on the clock icon
    2.You will reach to change view "activation of New GL A/cg"
    detail screen and tick the checkbox and save.
    3. After activation of New General Ledger Accounting, you
    exit the IMG screen when you re-enter, you find that a new
    node is added Financial Accounting (New)
    4.After activation of New General Ledger Accounting; a new
    sub node appears in the IMG structure.
    This sub node is Define Segment
    The menu path is:
    SAP Customizing IMG ---> Enterprise Structure -
    >
    Definition --> Financial Accounting --> Define Segment
    In this IMG activity, you define your segments.
    If you then define your profit centers, you can enter an
    associated segment in the master record of a profit center.
    The segment is then derived from the assigned profit center
    during posting.
    5. Activation has created a new field in Profit Center
    Master Record: the SEGMENT
    6.Leading and Non- Leading Ledgers
    In General Ledger Accounting, you can use several Ledgers
    in parallel. This allows you to produce financial
    statements according to different accounting principles. A
    ledger uses several dimensions from the totals table it is
    based upon. When defining Ledgers, one must be defined as
    the Leading Ledger. The Leading Ledger is based on the same
    accounting principles as that of the consolidated financial
    statements. It is integrated with all subsidiary ledgers
    and is updated in all company codes. This means that it is
    automatically assigned to all company codes. In each
    company code, the Leading Ledger receives exactly the same
    settings that apply to that company code : the currencies,
    the fiscal year variant and posting period variant .
    You must designate one of your ledgers as the Leading
    Ledger. It is not possible to designate more than one
    ledger as the leading ledger.
    The menu path is:
    SAP Customizing IMG -
    > Financial Accounting (New) -
    >
    Financial Accounting Basic Settings (New) -
    > Ledgers ---
    -> Ledger -
    > Define Ledgers for General Ledger
    Accounting
    Clicking on the checkbox identifies one of your ledgers as
    the Leading Ledger.
    7. Activation of Non Leading Ledgers
    Non Leading Ledgers are parallel ledgers to the Leading
    Ledger . They can be based on local accounting principle,
    for example. You have to activate a non- Leading Ledger for
    individual company codes. Non- Leading Ledgers can have
    different fiscal year variants and posting period variants
    per company code to the Leading Ledger of this company
    code.
    The menu path is :
    SAP Customizing IMG -
    > Financial Accounting ( New ) -
    > Financial Accounting Basic Settings (New) -
    > Ledgers -
    ---> Ledger -
    > Define and Activate Non --Leading
    Ledgers
    8.Assign scenarios to ledgers
    A Scenario combines Customizing settings from different
    business views. Each business view specifies which posting
    data is transferred from different application components
    in General Ledger Accounting, such as cost Center update or
    Profit Center update .You assign the desired scenarios to
    your ledgers. For each ledger, you define which fields are
    filled with posting data from other application components.
    SAP delivers a number of scenarios in the standard system.
    It is not possible to create additional scenarios.
    The menu path is:
    SAP Customizing IMG -
    > Financial Accounting (New) -
    > Financial Accounting Basic Settings (New) -
    > Ledgers -
    --->Fields -
    > Display Scenarios for General Ledger
    Accounting.
    9. Cost of sales accounting
    Cost of sales accounting is a way to create a profit and
    loss statement (P&L) for a company by comparing the
    revenues to the costs or expenses incurred to obtain these
    revenues.
    The expenses are mainly divided by functional area such as:
    Manufacturing
    Administration
    Sales
    Research and Development
    We can activate Cost of Sales Accounting by the following
    menu path :
    SAP Customizing IMG -
    > Financial Accounting ( New ) -
    -> Financial Accounting Basic Settings (New) -
    >
    Ledgers ->Ledger---> Activate Cost of Sales Accounting
    Offsetting Account Report ECC 5.0
    Offsetting account report for vendors in ECC 5.0 is
    possible after implementing the OSS Note 1034354
    Reward if helpful.
    Regards
    Ravi

  • Is there any difference in quality between mp4 and m4v?

    Is there any difference in quality between mp4 and m4v? I am figuring out how best to save old VCR files. Is the 264 category the best?

    So, what would that software be? Anything that I mentioned, e.g., iMovie? Any Video Converter?
    I'm a Mac user so I want files that play "natively" in QT X, QT 7, QL, iPod Touch, iPhone, iPad, and/or TV players. This means I want the H.264/AAC compressed data in MOV, MP4, or M4V file containers. I can use QT 7 Pro, MPEG Streamclip, and /or QT X to move MPEG-4/AAC compressed data to MOV file containers, MPEG Streamclip to movie M4V and MOV MPEG-4/AAC data to MP4 file containers, and Subler to move MP4 or MOV MPEG-4 AVC/AAC/AC3/Chapter data to M4V file containers. This is strictly a simple "copy" operation and no recompression of data is involved. (I.e., the quality is not changed.)
    iMovie is a video editor and it forces an export conversion of your project once completed which can degrade quality. Have never used the Any Video Converter so I don't know if it has an audio and/or video "passthrough" feature for data already in a compatible compression formats. If it doesn't then any conversion it makes has the potential to degrade video content.
    As to AVI, this is a legacy file container abandoned by Microsoft a dozen years ago in favor of their modernized WMV compression format/file type products. Compared to MKV, AVI is an outmoded/out-of-date container which I don't recommend you use unless you are a glutton for punishment. However, if you must use it, then you might try the AvidMux app. It can "copy" compatible content to a number of file container types—including AVI and MKV. Just don't blame me if its use creates more problems than it solves on current Mac systems.

  • Is there any tool for developing Postscript code ?

    Hi Friends,
    Is there any tool for developing Postscript code ? (or)
    Is there any IDE for Postscript ? (or)
    Thanks & Regards,
    Navaneeth Sivappan

    Hi Navaneeth,
    > is there any tool for developing Postscript code ?
    An interpreter (GS or Dist), an ascii text editor and your PS skills ;-)
    > is there any IDE for Postscript ?
    Take a look in this Sourceforge project...
    http://sourceforge.net/projects/wxghostscript/
    ...is a Ghostscript debugger.
    MaRC anToni Malagarriga i Picas
    T·(34)938721642 | (34)667517069
    (][ www.femfum.com
    PostScript&PDF Tool Developers
    Desenvolupadors d'Eines PostScript i PDF

  • Is there any way to fix a project recorded in the wrong resolution without redoing?

    Is there any way to resize a project once it has been recorded so that it fits on the screen?  The person who recorded the project set the resolution at 1280 X 774 pixels and it's too large to see the entire project on the screen...you have to keep panning back and forth.  I am hoping we don't have to have him rerecord the entire project.

    Hi there
    Try clicking Project > Rescale and scaling the project to be a smaller size.
    Note that you probably want to leave the "Maintain aspect ratio" option selected (you are welcome Lilybiri )
    Additionally, note that rescaling will inevitably result in a loss of fidelity. Things just begin to fuzzy up when you do that. The degree to which it suffers is in direct proportion to how much scaling you wish to do.
    As a final note, you only really want to ever rescale a project once. So if you aren't sure about the final outcome, click File > Save As and rescale. Look at it. LIke it? Terrific! Keep it! Don't like it so much? Scrap it and open the original again. Then again click File > Save As...
    Rinse and repeat as necessary... Rick
    Helpful and Handy Links
    Captivate Wish Form/Bug Reporting Form
    Adobe Certified Captivate Training
    SorcerStone Blog
    Captivate eBooks

  • Is there any difference between R/3 4.7 version and ECC 5.0????

    Hi All,
      Is there any difference between R/3 4.7 version and ECC 5.0 for the transaction RSA5.
    Regards,
    Andy

    Andy
    Functionality wise I didn't see any difference other than new datasources in ECC5.0
    Thnaks
    Sat

  • Is there any way to package a project to move it to another computer?

    I've got FCE4 projects on one computer but I need to be able to open and work on them on my MBP as well. Currently, I've got the projects in Dropbox, but when I open them, the source media files all need to be reconnected.
    I guess I could painstakingly hunt for them all one by one. Any file I have imported into FCE I keep in the same folder, but files created by iMovie and FCE [like sequence files] I have no idea where they are.
    Is there any way to package the project, like you can in InDesign? That software packages all related files into 1 folder so you always have them.
    Thaks for the help!

    I am using an external scratch disk, but there's not a lot in each project's folder. I need a way to pull everything a project uses and place it in 1 folder so I can move it to another machine. I have everything I've imported...it's just links to iMovie files [I exported rough cuts to xml, then imported into FCE4. I'm not sure why FCE4 is looking for the original iMovie file...] and sequence files that I need to be able to find.
    I was really hoping for some kind of automated function, like packaging in InDesign...

  • Is there any difference running W7Pro 64 bit and 32 bit for Adobe Acorbat 9 Pro Extended

    My primary system runs Windows 7 Pro 64 bit system. My other system runs a 32 bit system.  I would like to buy Adobe Acrobat 9 Pro Extended. Is there any difference with running it on either systems? Or will one version work on both the 64 bit and 32 bit systems.

    It would work on both systems, but you no longer can buy Acrobat 9...
    Mylenium

  • Is there any difference of the Downloading speed of Folio if i'm in Enterprise or Professional Editi

    Hi Adobe,
    I have compared the downloading time between Adobe Multi-Viewer and Zinio App(also hosting digital magazine), I found out that it is so much faster in Zinio.
    Are there any difference of the downloading speed if let's say the I'm in Enterprise or in Professional edition?
    Thank you for the response!

    There is no speed throttling that I’m aware of.
    Bob

  • Is there any difference viewer software for reports??

    Hi,
    Is there any difference viewer software for viewing differences between two oracle reports??
    Thanks for ur suggestions!
    Madhu

    Any version control software, like CVS, allows for line-to-line comparison of different versions of the same file. The problem with reports is that to understand differences you need to save the reports in human readable format that can be REX-file.

  • Are there any differences?

    Are there any differences? on Ipod Video bought in USA and Europe? or are they just the same?
    Ive heard that some people have problem with ipods in europe with the pal system when they bought it in USA.
    Regards Kim

    The only difference I would think there would be between iPods sold here or in Europe is the default option for video out display. So, if you buy your iPod in Europe, and you want to display something from your iPod on a TV in the US, you would just have to change and option. Here is an article that goes over that a bit:
    http://docs.info.apple.com/article.html?artnum=300250

  • Is there any difference in Oracle 9i SQL Loader and Oracle 10g SQL Loader

    Hi
    Can anyone tell me whether is there any difference in Oracle 9i SQL Loader and Oracle 10g SQL Loader?
    I am upgrading the 9i db to 10g and wanted to run the 9i SQL Loader control files on upgraded 10g db. So please let me know is there any difference which I need to consider any modifications in the control files..
    Thank you in advance
    Adi

    answered

  • Is there any difference

    Is there any difference in committing in a FORALL loop and from a FOR loop.????

    Peeyush wrote:
    sir i was reading the articles in asktom.com and when I was going through a document one person mentioned that there are difference in commit in for and forall statements but I am not able to figure it out that's why I wanted to know where the difference actually lies in commit statements in for and forall..And the answer is that you CANNOT commit in a FORALL statement. As alreayd pointed out a FORALL statement is literally a single bulk DML statement. It doesn't have a loop structure for you to put a commit inside of. You can only commit after the FORALL has happened. You can however commit inside a FOR loop, but generally speaking that would be considered bad practice. You should commit when the business logic says that it's a valid point to commit the business transaction, otherwise you could end up leaving your database in an inconsistent data state if you've committed part of a logical transaction.

Maybe you are looking for