Issue during Me53N -- switch to change mode

Hi Experts,
I use MEREQ001 to add new fields on the customer tab.
I check during the process the fields and set to required and input a.s.o.
f.e.
If sy-tcode eq ME52N or ME51N.
        IF screen-name EQ 'CI_EBANDB-ZZ_ABTL'.
          screen-input = 1.
          screen-required = 1.
        ENDIF.
Works fine except one issue.
The user starts tc me53n and click on the pencil to switch from display in change mode.
The problem now is that sy-tcode is still ME53N and I don´t if there is a field which know that I´m now in change mode.
Try to find something in SYST but I´m not sure.
These two field are changing the value during the process.
sy-modno
sy-oncom
what field should I use? Or is there a field I can use instead?
Any Ideas?
Thanks
Alex

wrong forum - sorry

Similar Messages

  • Issue relinking after switching to Proxy Mode

    So I'm 80% through a music video, and things are gettings a bit "jumpy"!
    I'm told my FCPX that some frames dropped out because the hard drive was too slow, so I switched over to Proxy Mode.
    Suddenly, all the clips in the event library and the timeline go red. When I try to reconnect them, nothing happens. The clips will come back if I switch back to the optimized media pref.
    Is this normal? I have 11gb of ram on a 8-core mac pro... didn't have this issue until I upgraded to 10.0.3

    OK, sorry to come back to this, but I'm working on another project now that has become a bit jumpy.
    When I tried to transcode the media for Proxie, it tells me that I have not got enough room on my hard drive. All the project files and events are stored on the same drive which has 317gb free. The original footage file is 36.72gb...
    Surly this is enough?

  • Restrictions in change mode

    Hello experts!
    I have to modify an Z report. When I switch to change mode, appears the text in gray, and the edit, replace insert buttons, the same buttons when you try to edit an standard program.
    But in program atributes, the editor lock is uncheched !!! This is amazing. This program is a copy of an standard program.
    Pls help me to edit this program in the ordinary way, because I need to do a lot changes.
    Thanks in advance
    Pablo

    Hi,
    You can switch off modification assistance.
    menubar - edit - Modifications operations - Switch off Assistance.
    thnx,
    Ags.

  • HT204266 iPad works except I cannot access anything at the App Store (Also I have 'no service' in the top left corner that will not change even if I switch the airplane mode on/off)

    Recently, my iPad has stopped allowing any functions to be performed in the App Store. I can access but cannot update or acquire any apps.
    The rest of the iPad appears to be working other than the 'no service' in the topleft corner. I tried to change that by switching the airplane mode on/off with no luck.

    Hi wiremaker,
    If you are having issues accessing the App Store, possibly due to the No Service issue, you may find the following articles helpful (the second is aimed at iPhones, but should also apply to cellular iPads):
    Apple Support: Can't connect to the iTunes Store
    http://support.apple.com/kb/ts1368
    iPhone: Troubleshooting No Service
    http://support.apple.com/kb/ts4429
    Regards,
    - Brenden

  • My classic video ipod won't switch back to regular video mode after using it on an elliptical. The port still allows me to charge and works on the elliptical and treadmill but it will no longer change modes to allow me to watch my shows on the ipod screen

    My classic video ipod won't switch back to regular video mode after using it on an elliptical. The port still allows me to charge and works on the elliptical and treadmill but it will no longer change modes to allow me to watch my shows on the ipod screen

    From the iPod's Main Menu choose Videos -> Settings and make sure TV Out is set to Off.
    Otherwise, try a hard reset as well.  To do this, press and hold both the Select (Center) and Menu buttons together long enough for the Apple logo to appear.
    B-rock

  • How to Grey out the field "tracking number" during change mode in the order

    HI Expert,
    How to grey out the Tracking number (AFVGD-BEDNR) at Order -> Operation tab -> external tab ->tracking number.
    during creation IW31 = not grey out and allow entry.
    for change mode IW32 = grey out
    if i set grey out at config OIOPD, it will grey out even during creation mode.
    Please advise
    Thanks
    Regards

    Hi
    I think Using field selection it is not possible to make as display ,kindly check with screen or transaction variant -SHD0
    regards
    thyagarajan

  • Change flag deactivaion for PO output message type during change mode

    Hello All,
    WE are using automatic message output determination functionality for PO output type. This output type has been configured for creation and change mode under Fine tuning.
    Two output type are configured, for example ZAAA is output type for ALE and output type ZBBB for  archiving.
    Here  archiving functionality is used to transfer attachment from ERP system to SUS supplier portal as a pdf file. This is done via enhancement and the attachment transfer is working fine.
    During creation mode both the output types are determined and successfully processed and as a result attachment is transferred to supplier portal which is absolutely correct. In the attachment all PO line item can be seen which works well.
    Now I change the PO and add a new PO line item, system automatically default both the output type for change mode and upon saving both the output type are successfully processed.
    Now here is the problem in change mode only the added PO line item is sent as an attachment to the supplier portal. Here the requirement is see all the PO line items including the once which were newly added.
    Solution is if we uncheck the change flag for output type ZBBB during change mode then all the PO line item can be seen under the new attachment with new version.
    Please let us know how this functionality can be acheived ... is there an user exit available.
    We have a work around where we are running a background job every 3 mins and based on the last successfully processed message for output type ZAAA we are attaching first output type ZBBBfor archiving the changes and then ZAAA for sending the changes along with attachment to Supplier portal.However this solution is a temporary one , we need a concrete solution for this.
    Please advise.
    Thanks,
    Yatin

    Hello All,
    Thanks for the reply,
    But we cannot modify the existing print program as this print program is being used in different countries also.
    We already know a solution that during change mode if we remove the change flag from output type ZBBB then all the PO line items along with the recent changes can be seen under the attachment under supplier portal.
    The question comes now, how do we automate this processu2026 Is there any standard progam or user exit available.
    Manually, if you add a message type ZBBB in ME22N tranasction for creation mode then all PO line item with recent changes get transferred but we need to automate this process for create and change PO transaction.
    Thanks,
    Yatendra

  • Unable to switch Central System Administration into Change Mode

    Hi,
    I am bit rusty on the Solution Manager - Central System Administration.
    While experimenting with my Solman system I did the following.
    1. Logged into Solman and started transaction Solution_Manager
    2. Switched to the Solution that has been configured and then followed Operations Setup->Solution Monitoring -> System Administration -> Central System Administration for <My System> (here my system is the system I wish to monitor).
    3. After following the navigation to the selected item as described in step 2, I selected the menu items Session Components->Complete.
    4. After this action of selecting the Complete session from the menu, my Central System Administration for <My System> is continuously showing Display Mode.
    I am unable to switch back the system to Change Mode.
    Am I missing something ? What needs to be done ?
    Regards,
    Siddhesh

    Siddhesh Ghag wrote:>
    >
    > 3. After following the navigation to the selected item as described in step 2, I selected the menu items Session Components->Complete.
    >
    > Regards,
    > Siddhesh
    This was the wrong step. By setting the Session Component to "Complete", no further changes are allowed (and you receive a pop-up).
    The procedure to reopen the session component is not documented for customers. Please create a customer message on SV-SMG-MON-CSA, open the service connection and provide logon information.
    You might state my name in the message, I will then assist the message processor.
    Best regards,
    Ruediger Stoecker

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Assertion Failed with switching between editing mode of table view

    I'm writing an app that can switching between edit mode of a table view
    - in edit mode a new line appear at the bottom
    - out edit mode this line will disappear
    I used insertRowsAtIndexPath and deleteRowsAtIndexPath to achieve this effect, but then during testing, if I switching edit mode too frequently, I got an assertion failure
    Assertion failed: (cache->size >= g->size), function evictglyph_entry_fromcache, file Fonts/CGFontCache.c, line 836.
    It seems someone has also encountered this before, but I have found no solution yet. Anyone know how to fix it or work around it?

    Hi,
    Please check if you have entries on the table RSTRANRULE with:
    GROUPID   =  'space'
    GROUPTYPE =  'space' or 'S'
    REF_RULE  <> 'space'
    If there are inconsistent entries in the RSTRANRULE table such as:
           TRANID         *
           OBJVERS        *
           RULEID         *
           SEQNR          *
           GROUPID        00
           GROUPTYPE      space  or  GROUPTYPE    'S'
           RULETYPE       space
           REF RULE       *
    Delete these entries from the table.
    Activate the affected transformations.
    More info check the note 998730.
    9987300-ASSERTION_FAILED when calling or changing groups, group 00.
    Thanks,
    Walter Oliveira.

  • Unable to enter change mode transfer rule

    Hi,
    We are in the middle of our annual stackupgrade (from NW7.0 to NW7.01) and ran into a problem.
    While testing I noticed that loading data from three old DSOs to their related infocubes does no longer work.
    The error reported was that I needed to replicate the datasource and activate the transfer rules again. An error that occurred a lot during this stackupgrade with datasources from other systems.
    Replication of the datasource went just fine, but so far it has not been possible to re-activate the matching tranfer rules.
    I get the following error/message when trying to go into change mode of the transfer rule:
    R3TR generated, changes possible
    As a result the transferrule opens in display mode and it is not possible to change anything or re-activate the transfer rule.
    An authorization issue seems unlikely, because I get the same error with sap all and my actions have been traced without issues.
    Any suggestions?

    Hi
    Generally we do this using program
    RS_TRANSTRU_ACTIVATE_ALL
    Programe to activate Transfer Rules in BW
    use program RSDS_DATASOURCE_ACTIVATE_ALL to activate the data sources
    Regards,
    Venkatesh

  • P.O Error in Process after copying the existing item in change mode

    Hi All,
    We are in SRM 5.0 Server 550 and SP15 and are using Extended Classic Scenario.
    We are facing a peculiar issue, when an already created P.O (Free text - goods) is changed and a new line item is added either manually or by copying the existing line item and then ordering it, the P.O is going into Error in Process status.
    This is happening only when i am adding a new item (material) to the existing line item (material) but when i am adding a service line item in the change mode to the existing material line item, the P.O is getting ordered without any issue.
    I believe this is SAP bug and raised with SAP for OSS.
    Meanwhile i would be grateful if you can provide any resolution to this issue and provide any OSS note number (If one already exists).
    Regards,
    Teja

    Hi Teja
    it works fine for me.
    old po template..
    taken describe procureemnt - goods
    copy the line item
    changed qty and price
    POs created for both items in one PO since vendors are same?
    what the error message says in the application monitor or rz20 / monitor sc.?
    for me i had a contract in my pld pos.(sc).
    muthu

  • How to - only display the price of approved PO (not change mode)

    Hi,
    Following are our PO release strategy
    1. Release id : P has
        a. Released indicator (tick)
        b. Changeablity - 4
    The above setup is working fine, means still after the approval users can change all the fields. New strategy is triggered once the values are changed.
    Now the issue is business owner does not want the price, qty in change mode after approval. After approval ME22N to show
    1. Price & qty to be in display mode
    2. All other fields (except the one which affects PRICE) in  change mode.
    I tried to all the combinations, but after approval I get to see either all the fields in display mode or all in change mode.
    Is it possible to display the price related fields only for the approved PO in ME22N.
    Please advice
    Thanks,
    Raj.

    Hi Mani,
    Thanks for the fast reply.
    1. There is no ME22N - Fsel Key available.
    2. Only for the approved PO - we want the price fields in display mode.
    3. There is no restriction required for the un approved POs.
    Is there any way.
    Please reply
    Thanks
    Raj.

  • Condition Type appear twice in PO Header in Change mode

    Hi Gurus,
    I have done the following steps:
    1. I have created an import PO and added few Freight Conditions in the header, and Customs Condition in Line item
    2. I have booked a customs invoice against the PO. (MIRO posted for Planned Delivery Costs)
    3. Now when I go to the change mode of the PO, then in the header I can see same condition type twice, one with the value maintained earlier and another with value 0.
    Issue:
    I should not be seeing the condition type twice in header.
    Please help me resolve the issue as early as possible.
    Thanks in Advance.
    Regards,
    Ankush

    Hi Ankush,
    Make sure that header conditions are marked as header only and same for item condirions in m/06
    try creating a new PO after making these changes
    Reg
    Dheeraj

  • Delivery Output Type not updated automatically in change mode

    Hello,
    I am dealing with a strange problem.
    If i open delivery to change using VL02N then, output type configured for reissue is updated properly and on save ouput type is getting successfully processed also.
    Now if i open VL03N and then using change mode button on application toolbar i go to change of delivery, then output type is not getting created. The issue was figured out when i tried to open delivery from shipment and then using change button i tried to change and save delivery....
    Expectiing solution from experts.
    Thanks
    Hari

    Hi,
    May be this behaviour is due to the application in which you are opening the delivery. When you open the delivery from shipment, check the transaction code in the screen in system status. If it is VL03N, then it is correct. But if it is VT03N, then it is expected that even in change mode, the output is not triggered.  Pls check this once.
    I tried the same thing in an invoice from where i opened a SO and then went in change mode, and the otuput is getting retriggered.
    I hope teh configuration of your output is correct. Ensure that the Multiple Issuing button is ticked on, if you want yoru output type is to be triggered everytime you go in change mode.

Maybe you are looking for