Issue in committing material for production order

Hi, we are facing an error situation that when we try to release production order there came an issue that few component committed quantity is less than required quantity. When we check the stock of the components they were having enough stock to consider for this production order.
What could be the other reasons or cause for this situation. Can any one suggest for the correction action.
would reservation cause this problem when i check the component availability overview it has ATP 0.   will it cause this.
When i look in to the system there were several Orders that were in CRT state that were using same components as used in the current order under discussion.
Edited by: kkr_chandran66 on Jan 6, 2011 3:16 AM

Hi All
Even MD04 also seems to be showing as if the material is available.  Pl. see the data against 13/12 hereunder.
06.01.2011     Stock                                                            6,370/      6,370
08.12.2010     Ord.DS     4604767106/00100                         80-/     6,290
09.12.2010     OrdRes     420252                         2,740-/     3,550
13.12.2010     OrdRes     420268                         3,420-/     130
availability overview CO09 shows as follows for the component:
13.12.2010     OrdRes     Totals record     3,420-(receipt/req)       0(confirmed)
13.12.2010     OrdRes     420268                          3,420-(receipt/req)        0(confirmed)                       0(ATP quantity)
scope of check:
to include
purchase order
include dependent requirements
sales requirements
deliveries
include shipment notifications
all reservations
check releases for transport orders only
take all productions orders into account.
With this scenario what can i do get it working.
Edited by: kkr_chandran66 on Jan 6, 2011 6:46 AM
Edited by: kkr_chandran66 on Jan 6, 2011 6:59 AM
Edited by: kkr_chandran66 on Jan 6, 2011 7:00 AM

Similar Messages

  • Excess material for production order

    Hi,
    I have issue in SAP, a particular  production order unexpectedly propose very high material usage. Let's say, that actual usage per production order is 10pcs only, but SAP propose to use 15pcs.
    Please help me to understand what need to be check.
    Thanks,
    Richard

    Hi Suman,
    From your message i could understand that you are trying to create a production order for Finished materail.
    Now if semifinished material is not available in stock, then you need to Confirm/GR its relevant production order.
    If you are just testing some scenario, then you can use txn "MB1C" movement type "561" to increase the stock of the semifinished.
    Generally goods issue is done with referance to Production order/Reservation,this would not allow additional issue. However unplanned issue is possible with just referance to order. This would affect the order cost and the cost difference is likely to get settled to Material.
    Hope this helps..
    Regards,
    Prasobh.
    Reward your points if this was helpful

  • RE: Goods issue posting through Migo for Production Order

    I have released the production order, when I want to post the goods issue through migo to the concerned order I am getting error saying that material "No components exist but there was stock in the storage location for unresticted use.
    I have checked through MMbe transaction.

    Are there components in the Production Order? If yes, is the reservation created and movement allowed for the reservation?
    Lakshman

  • Goods Issue Control & confirmation control for Production Order.

    Dear ALL,
    Please let me know how to control,
    1) Unauthorised consumption of component quantities in excess of quantity defined in BOM?
    2) Posting of Confirmation (At operation Level) against production order for which no components have been issue?
    3) Posting of goods receipt against production order for which no components have been issued or no confirmations have been posted?
    4) Posting of goods reversal quantity in excess to issued quantity.
    Regards,

    Prashant,
    Not all the requirements you mentioned can be controlled in Standard SAP system. For some of the requirements you could configure User status (Tcode :BS02).
    exmaple :
    Posting of Confirmation (At operation Level) against production order for which no components have been issue?
    SET user status XX on Business  transaction : Release that forbids CONF.
    SET another user status YY on Business transaction : Goods movement that allows confirmation.
    With this kind of tricky user status you can control/prevent some transactions in production order till certain transactions are done.
    I know this is not the ideal solution but I have used it for various purposes to meet certain business needs.
    Hope this helps you.
    Thanks,
    Ram

  • Issue/Bug in reservation for production order

    Hello,
    We have a bug with the reservations for a production order, which in turn is causing a problem with clearing a cogi error. I have a COGI error for material 123 in plant A.they are trying to remove 14,312 lbs that was confirmed to production order 1000123. According to the error message the production order only has 6,400 lbs that can be removed. in CO14 my material 123 show two quantities in different batch 14,312 and 6,400. In Reservations shows only 6,400 as being consumed. this amount should be 20,712 (14,312 + 6,400). The reservation did not get updated correctly. Why this happen? How could we correct this RESERVATION to add up 14,312 in my material 123)?
    Please give me feedback ASAP, need help.
    Thanks and Regards,
    JJ

    Hello,
    thanks for the answer you have given me..
    as to make sure, does it is safe to delete the error? even that it tells that RE qty moved exceeded by 7.912 lb? it so weird how come was the reservation was complete since when they raised it it just 6,400 it shows? how could i make sure that document goods movement for my production order as mr. pradeep told me to do? what should i do?
    thus when deleting the error in COGI, it will change the my material in CO14 COMPLETED and have QTY WIDTHDRAWN and will be encluded in the same RESERVATION NUMBER?
    Anyone please revert back to me.
    Thanks
    JJ
    Edited by: John Jay Palisoc on Jul 22, 2008 7:08 AM
    Edited by: John Jay Palisoc on Jul 22, 2008 8:02 AM

  • Consumption acct of materia which issue to maint. ord. and production order

    Hi all,
    I have one problem with the cost report for maintenance orders.
    I have one material code, such as we call A.
    Mat. A is issued to production order and also maintenance order.
    For production order, consumption account is 123
    For maintenance order, consumption account is 456
    I have defined new movement type for issuing to Maintenance order is ZB1
    in OBYC:
          GBB - VRB --> 123
          ZB1  --> 456
    So for accounting purpose, I can slit these consumption accounts
    However, when  I go to maintenance order cost reports, systems slit these cost into 2 line
    Material  A        Acct. Cons 123        Plan cost 100        Actual cost 0
    Material   A        Acct. Cons  456       Plan cost 0            Actual cost 120
    How can I group into  1 line ?
    Edited by: Emily Nguyen on Jun 2, 2009 12:15 PM

    Hi Emily
    In OBYC you can configure GL accounts per valuation class.
    You cannot configure Movement type wise. Each General modifier is linked with movement types.
    We cannot give two consumption accounts for one valuation class in VBR.
    Run your plan cost again.
    Thanks
    Kiran A

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • Excess Issue of Material against Production Order

    Hi
    For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order.  How can it be controlled.
    Regards
    Madhesh Kumar

    Hi Madhesh,
    there are many loop holes to issue excess stock against production order
    so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
    Thanks
    Bala

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Revision number for Header material in Production order.

    I have maintained Revision number in material mster  for Header material in Production order and also for components.
    1)Revision number for Header material in Production order is not appearing in AFKO table against production order.
    2)Revision number for components in Production order is not appearing in RESB table against reservation.
    Any settings for that please guide.

    Hi,
    Revision number generation is using ECM only possible. Are you using the ECM with revision levels. Check this.
    Regards,
    V. Suresh

  • Function modul for a material  throufh production order

    hi,
    Is there any function modul available in SAP for production order for a material
    ie passing input as production order to get the material no and production order date .

    Hi ..
       No ya these 4 func.modul is not in 4.6c can you pl send a right fun.mod. for 4.6 c ver.  so that i can use it.
    regards,
    Lakshman

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM