Hi
I am configuring the Early watch alert for my ECC system, I am facing couple of issue in it.
Soultion manager version 7 with SP14.
1. not able to see Setup EWA tab in Solution setting under Solution directory
2. I am not able to activate system under CCMS Monitoring of EWA in solution setting under solution directory, it does not give any error.
3. I dont see "Early watch Alert" service option when i try to create service under solution monitoring -> EarlyWatch alert -> create new service session
Also like to know the difference between Early watch alert for solution and EarlyWatch alert. In my one of the solution i can see both option and allowing me to create the same.
Regards,

Hi Rajesh,
Have you setup your Solman system as a master system in the remote ECC system in SDCCN? i am still struggling to understand and get EWA working but i have managed to get EWA report for my ECC test system but not Solman itself.
Have a look in SMSY to see if your systems are in a green box, if they are then monitoring is activated for that system then you should be able to see that system in DSWP when scheduling EWA processing.
Also have a look at OSS Note 1257308 - FAQ: Using EarlyWatch Alert. there is a PDF file which shows how to setup EWA according to best practice.
regards,
Mandeep

Similar Messages

  • CTS+ Configuration for Transporting non-ABAP objects in Portal Landscape using solution manage 7.1 sp8

    Hi,
    Currently we have cts+ already configured for our portal systems in our landscape through solution manager 7.0.
    Recently we had setup a new solution manager 7.1 and need to perform cts+ configuration using this new solution manager 7.1 as we are planning to remove our old solution manager 7.0 very soon.
    We are using NWDI system for transporting our portal transports.
    Please help me with steps on how to configure cts+ using solution manager 7.1 using NWDI.

    Hi Naveen,
    Please find given below BBPCRM & SAP_BW version..
    BBPCRM     500     0013     SAPKU50013     BBPCRM     BBP/CRM Supp. Pack.
    SAP_BW     701     0003     SAPKW70103     SAP Business Warehouse     Component Supp. Pkg.
    This problem is not only with  Bussiness process tab (T-Code: Solution_manage) also System monitoring Still i searching solution for this But once we are restarting System that time this problem is not occuring but after some time system is giving this DUMP
    Regards,
    Suresh

  • Question about setup ewa in solution manager 4.0

    Hi
    I tried to setup ewa in solution manager 4.0, but when I clicked on the "setup EarlyWatch alert", it told me that:
    the Service is not available, Fehlercode:ICF-NF-http-c:000-u:SAPSYS-l:D-i:saptux04_SM4_04-v:0-s:403-r:Forbidden
    HTTP 403 - Forbidden
    any one can help me?
    best regards

    Hello,
    You will have to activate the service first in transaction SICF.
    SAP recommends to do so via the the SAP Solution Manager IMG following the respective IMG path:
    <i>SAP Solution Manager Implementation Guide -> SAP Solution Manager -> Confiugration -> Basic Settings -> Standard Configuration of Basis Settings -> Solution Manager -> Activate Solution Manager Services</i>
    Enhanced configuration of SAP EarlyWatch Alert (Service: /sap/bc/webdynpro/sap/dswp_rating_4_monitoring)
    This application is fairly new and contained in SAP Solution Manager 4.0 SP12 onwards. Information on the respective functionality can be found right here in the SAP Solution Manager SP News:
    http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000538663&_SCENARIO=01100035870000000202&_OBJECT=011000358700000478802007E
    I hope this helps to solve your issue.
    Regards,
    Doreen

  • What are configurations required on Solution Manager 7.0

    Dear Sir,
    I have asked to my Implementation Partner to implement Solution Manager with following details.
    Maintenance Optimizer Configuration, Usage, Hands on and Training. Patching using Solution Manager.
    a. Configuration Maintenance Optimizer
    b. Installation of Software Lifecycle Manager u2013 SLM
    c. Software Logistics Controller u2013 SLC
    d. SLD Registration
    e. Configuration for Transport Directory
    f. Support Package Manager u2013 SPAM (Specially on SM)
    g. Java Support Package Manager u2013 JSPM (Specially on SM)
    h. Usage of MO and Demo
    i. EWA Scheduling Using SM.
    j. EWA Recommendations Implementation
    Please let me know If I am forgeting any thing or needs to be configured for smooth running of our setup. What are thing to be configured??
    Please also let me give a brief(in addition to notes) about Usage of SLC, SLM, SLD, Transport Directory and How it will help in transport management system.
    Is it possible to apply patches from Solution Manager to all systems?
    Regards
    Dharmendra

    Dharmendra,
    There are many features with Solution Manager EHP1 SP 04.  See if you ask them to upgrade to latest level.
    Also following more features are available.  Depending on your company and your requirement you could configure it.
    - System Monitoring via central auto alert
    - System Availability monitoring (CCMSPING)
    - Central system administration
    - DBA Cockpit
    - CPH (Central Performance History)
    - Job Management
    - Project Administration
    and many more things are available.  Go through Link: [www.service.sap.com/solutionmanager] for more information
    Thanks,
    Digesh Joshi

  • Mail configuration in SAP SOLUTION MANAGER 7.1

    Hi All,
    I am working on SMTP (Mail)Configuration in SAP Solution Manager 7.1. And our mail host is GOOGLE APPS.
    Does any one had configured mail in SAP for hosted on GOOGLE APPS? 
    Does SAP will support this as it is external (mail) server?
    I read note 455140, related notes and configured accordingly.
    Steps I followed:
    1. parameters maintained:
    icm/server_port_2 = PROT=SMTP,PORT=25000,TIMEOUT=180
    is/SMTP/virt_host_0 = *:25000;
    2. User maintained: Dialog user with S_A.SCON profile with user address as username@<companyname>.com
    3.Client Assignment: (SICF): a. Host Data:Profile Parameter Number: is/SMTP/virt_host_0
    b. Service data: Client 100, user: username, password: ***, language: EN.
    c. Handler List: CL_SMTP_EXT_SAPCONNECT in the first position
    Saved Changes n Activated.
    4.SAPconnect administration (SCOT):
    a. Default domain: <companyname>.com
    b. Nodes: SMTP Under node:
    Mail Host: smtp.gmail.com
    Mail Port: 25 and also tried 587
    In Internet Address Area: *
    5.Scheduled periodic Job with SAP&CONNECTALL variant
    6. telnet <HOSTNAME> 25000 is successful
    In both cases I am getting error as:
    No delivery to ishan.sangai@<companyname>.com, authentication required
    Message no. XS853
    Diagnosis
    The message was processed successfully in the SAP system. The mail server that is supposed to receive the message for further processing requires authentication. The SAP system does not support this procedure. As a result, the message was not delivered to recipient ishan.sangai@<companyname>.com.
    Information from External System
    _530 5.7.0 Must issue a STARTTLS command first. p1admin@<companyname>.com
    Procedure
    The administration settings must be changed. The specified mail server must not request authentication.
    7. I tried to telnet smtp.gmail.com 25 and 587 also
    I am getting following output:
    220 mx.google.com ESMTP ds5sm2193379ibb.5
    HELO <HOSTNAME>
    250 mx.google.com at your service
    HELO <companyname>.com
    250 mx.google.com at your service
    MAIL FROM solman_admin@<companyname>.com ENVID=12345
    530 5.7.0 Must issue a STARTTLS command first. ds5sm2193379ibb.5
    Does we need to talk with Google Apps provider for any modifications to be made for this.
    if yes, which changes should I request them?
    Please help me to solve this problem.
    Please provide links,guides.notes etc. for this scenario
    Thanks & Regards,
    Ishan

    Hi we are configuring Google SMTP getting below error..
    No delivery to xxx.com, authentication required
    Message no. XS856
    Diagnosis
    The message was processed successfully in the SAP system. The mail server that is to receive the message for further processing requires authentication. Probably there is no logon data specified in the SAPconnect configuration.
    Information from external system (if available)
    smtp.gmail.com:587
    530 5.7.0 Must issue a STARTTLS command first. i91sm11178241qgd.25 - gsmtp
    Procedure
    Enter the logon data in the SAPconnect node.
    Using Gmail SMTP server using "smtp.gmail.com" with port 587
    Please advise.
    Regards,
    Sudarshan

  • Project Management using Solution Manager

    Hi,
    We are trying to use solution Manager for managing our IT projects - specifically for SAP projects.
    We browsed through the existing functionalities that are available and are not able to get info on the following:
    ___Project Admin tab for Roadmaps :_ __ In the transaction RMMAIN, we are able to define the scope of the activities at each phase and assign team members and track the status of the activity / task.
    However we do not have the tab for tracking the planned start date / end date and the actual start / end dates. Similar is the case for efforts.
    So not sure how to track these?
    Integration of Roadmaps and Blueprints : Once we have defined the project and assigned the Roadmap, we have all the activities that need to be tracked. In addition in transaction SOLAR01 / SOLAR02, we can define the scope and configurations which in itself are a kind of sub projects to be embedded withing the Blueprint and realization phases respectively of the main Projetc Plan.
    How to link these Blueprint specific plan and the realization related plan to the main project plan created out of the Roadmap chosen and to track them as one single project?
    Synchronization wih ms project : I see only the option to download the plan as an mpp file. But is there any option to upload mpp as well so that the project can be tracked using mpp and synchronized with Solution manager at frequent intervals?
    Your answers would definitely be helping us a lot and would be greatly appreciated.
    thanks in advance.
    regards,
    suresh velan

    Hi Suresh,
    Solution Manager is a Project Management tool. But it is not for Project Planning. If you want to do Project Planning also from the SolMan system, then you have to enable cProjects component of SolMan.
    Synchronization between your MS Project and cProjects is possible. But synchronization between SolMan's RoadMap/Blueprint and MS Project is not possible.
    In RoadMap, you can capture and track the status of all phase-wise activities as to what is their status. Here capturing date details is not possible.
    In Blueprint/Configuration you can capture and keep track of the individual object's blueprinting and configuration activities. Here you can capture the planned/actual start/end dates for each object.
    As I said earlier, Solution Manager provides lot of Project Management features, but Project Planning is not possible. For that we have to start using cProjects component in SolMan.
    Hope it helps.
    best regds,
    Alagammai.

  • Can i use Solution manager ADS for ECC6 ABAP

    Dear All,
              We have landscape of ECC6 ABAP (Dev, Qua, Prd), can i install and configure ADS on Solution manager(ABAP+JAVA) and connect all Dev , qua and prd to same solution manger for Adobe interactive forms. is it possible ?
    for production environment?.
    Regards
    Vinay

    Hello!
    This was already discussed. E.g. here ADS install in Solution Manager.
    While it is technically possible (to connect several systems to one ADS) it is not recommended for productive environment for some reasons (security, stability, performance and easy of maintenance). I say you can use you ADS on SolMan for DEV, QAS and number of your training/demo systems, but install separate J2EE with ADS instance (better on separate server) for productive use. You can then check ADS updates/patches on SolMan first without breaking productive system and only then (if successful) update productive.
    Regards,
    Petr Perstnev

  • EWA on solution manager - short dumps

    Hi there
    I've setup EWA on solution manager for Remote System BWQ, all test etc went fine, but as soon as I start service processing on solman to retrieve the data, a short dump is create as follows:
    Short text
        Syntax error in program "RDSVASAEA_ROOT_____________049 ".
    Error in the ABAP Application Program
    The current ABAP program "SAPLDSVAS_PROC" had to be terminated because it has
    come across a statement that unfortunately cannot be executed.
    The following syntax error occurred in program "RDSVASAEA_ROOT_____________049
      " in include "RDSVASAEA_ROOT_____________049 " in
    line 87:
    "INCLUDE report "/1CAGTF/IF_LOGFUNC_000393" not found."
    The include has been created and last changed by:
    Created by: "SAP "
    Last changed by: "SAP "
    Error in the ABAP Application Program
    The current ABAP program "SAPLDSVAS_PROC" had to be terminated because it has
    come across a statement that unfortunately cannot be executed.
    could anyone please assist me with this.
    Regards,
    Stephan

    Hi
    So i tried to implement the above mentioned notes, but to update the solution manager stack, i have to use maintenance optimizer to approve the stack...
    I have added solution manager 7.0 to the solution overview, and can select it from 'Plan Maintenance' window.. but as soon as i try and go to the second step, another short dump is created.
    Runtime Errors         UNCAUGHT_EXCEPTION
    Exception              CX_SOCM_NOT_IMPLEMENTED
    Date and Time          13.06.2008 09:25:45
    |Short text                                                                                |
    |    An exception occurred that was not caught.                                                    |
    |What happened?                                                                                |
    |    The exception 'CX_SOCM_NOT_IMPLEMENTED' was raised, but it was not caught                     |
    |     anywhere along                                                                               |
    |    the call hierarchy.                                                                           |
    |                                                                                |
    |    Since exceptions represent error situations and this error was not                            |
    |    adequately responded to, the running ABAP program                                             |
    |     'CL_CHM1_CHANGE_REQU_INSTANCE==CP' has to be                                                 |
    |    terminated.                                                                                |
    i then looked at Notes:
    Note 851496 - Exception: CX_SOCM_NOT_IMPLEMENTED missing implementation
    Note 849690 - BC Set Change Management
    But none of them seem relevant to our SOLMAN.

  • How to monitor BI & PI using Solution Manager 4.0

    Hi, we have installed Netweaver 04S SR2 SP11 BI & PI components. We want to use Solution Manager 4.0 to setup monitoring for these 2 systems. Any guide or documentation will be greatly appreciated.
    Thanks in advance.
    Arshish

    Hi Arshish,
         To setup monitoring you will first have to include these systems in the system landscape of SAP solution Manager 4.0 in transaction SMSY.
    The steps in the order are :
    1. Create Server ( Server name ,IP and Fully qulaified Host name)
    2.Create Database  (Give the database you are using)
    3.Then you have to create the system itself. and give the information as required.You will be able to do it when you will go through it.
    Then you have to generate the RFC's from solution manager to satellite systems and back.These RFC's have to be trusted.Assign role SAP_S_RFCACL or profile S_RFCACL  to the users in SOLMAN as well as satellite system.
    Follow these steps and create a Logical component for the system that you have added.
    Follow these steps first.More information can be found out on
    service.sap.com\solutionmanager
    or you can look for the RKT'S on service marketplace.If you need any furthur assistance do reply back.
    please award points if found helpful
    Best Regards
    Amit

  • Is it a must to use Solution manager for ECC 6.0 upgrade

    Is it a must to use Solution Manager for ECC 6.0 (FICO & HR) upgrade? I am told Solution Manager is required only if it has ABAP and JAVA stacks, or involves Enhancement Packages; and could be optional if it is only ECC 6.0 with ABAP stacks.

    Hi,
    I'm having a difficult time finding some guidance for setting up our R/3 Enterprise system in solman properly, so that I can create the upgrade XML file required to go directly to ERP 6.0 EHP4. 
    I've set up the R/3 system fine, but when i create a maintenance transaction i cannot for the life of me figure out how to tell it I want to go from r/3 to ERP6 ehp4.
    Any docs out there for this?
    Thanks!
    I figured it out... i had to add the R/3 Enterprise logical components to my system landscape.  After that I was able to select R/3 as the initial data in the maintenance transaction and then the system i wanted to upgrade, and then the option to upgrade.
    Never mind!
    Edited by: Tom Janes on Sep 9, 2009 12:52 AM

  • How to Use Solution Manager to collect Status Reports from Consultants

    Hi,
          I am planning to use Solution Manager for collecting the weekly status reports from my consultants and maintain it as a repository . Please let me know the best way of doing this in SOLMAN. There should be mailing options too.
    BR,
    Raj

    Hi Rajasan,
    to be able to meet this requirement, you need to set up plan working load in admin tab for your resource,  they need to update actual data based on the work completion, you will get status of work,
    if you require email, you need to set-up scot, then develop a program with execution scheduling
    please check and revert
    Anil

  • How to use solution manager in upgrade projects

    Hi,
    How to utilize/use the solution manager in upgrade project like R/3,BW,CRM or entire landscape.
    if we are upgrading the r/3 4.6c to ecc6 and bw3.5 to bi7.0 how to use the solution manager
    please help and thanks in advance.
    Edited by: MAHIPAL REDDY on Jan 1, 2009 1:28 PM

    Hi,
    Check [this document|https://websmp208.sap-ag.de/~sapdownload/011000358700002696532005E/310_320_SOLMAN_URMP_EN.doc]. This will help you to proceed further.
    This is a detailed documentation on using Solution Manager for your upgrade project.
    This will solve your problem.
    [This Pdf |https://websmp208.sap-ag.de/~sapdownload/011000358700000208052007E/Upgrade_FAQ_SolMan_70.pdf]of FAQs on upgrade project is rich in information.
    Feel free to revert back.
    --Ragu
    Edited by: Raguraman C on Jan 3, 2009 5:27 PM

  • CCMS is used for system monitoring , why should we use solution manage ?

    CCMS is used for system monitoring , why should we use solution manage ?
    Whats the relationship between CCMS system and SolMan?
    Thank you .

    hi,
    I just want to ask a question. At our client we have solution manager and CCMS. There is data in CCMS I can extract, it is loading on BW side ok the same number of recs,  but the problem on CCMS cubes says there are the same number of record in the cube and also showing as the data is ready for the reporting. But when I run the report and view the data as listcube it is empty. 
    ANy of you have the situation like this cube say it has the data but when do th BEX or infocube contents the cube is empty nothing in there. The same thing is happening with hourly, 15 minute and daily cubes.
    Anyhelp on this matter is appreciated

  • How to create a "blueprint" using solution manager?!!

    I have been asked to create a 'blueprint" using solution manager!! I have absolutely no clue how this can be achieved using solution manager!! Please guide me on what is to be done.Would appreciate if you donot give me links of help.sap as the same is not making sense to me.
    I have to create a blueprint for 20 countries of SAP reports available for FICO. Some of these reports are country specific while others are generic.

    Hi Suchita,
         You can create blueprint document using SOLAR01 transcation, provided you must have included all the organizational data, business process, master data,,
    Follow the path
    transaction SOLAR01->Business Blueprint-> Generate Blueprint
    You must have created a solution and a project assigned to that solution also.
    further clarifications feel to post the query
    regards
    Naveen
    Edited by: Naveen kumar Palanichamy on Jan 2, 2008 7:16 AM

  • Why use Solution Manager?

    Hi,
    I wonder if you can help.  We have been advised to install Solution Manager in order to manage the upgrade from 4.6c to ECC 5.0, but have also heard conflicting advice that states that this is not necessary and is an overhead.
    Can anyone advise if SolMan is worth installing and what the benefits are of running the upgrade through this vs using normal methods.
    Many thanks.
    Sean

    Hi,
    Wel solution manager is an awesome project tracking tool.
    Say for e.g it will generate reports for the overall testing using which you will be able to know who is testing what is testing and how much testing is compeleted.
    It stores all the log for automatic test cases whether ECATT or External (mercury QTP).
    I have written several blogs on testing and ecatt and qtp integration can view the same on sdn.
    In addition to above if you use solution manager you can get accelerate roadmap documents and also provide you reports which can show you the current progress of your project with time and dates.
    Provide e-learning and also can use solution manager as document management system.
    If you are not going to use the same,You are missing all above.Decision is your's.
    Please reward points if it helps.

Maybe you are looking for

  • Kensington Entertainment Dock 500 [Connect iPod to TV]

    I got an Kensington Entertainment Dock 500 and I have succesful conected it to my TV, but... I wounder if I can se the menus in some sort of way? no I can't do that =( and it is a bit hard to change song/video when your sitting in the soffa and the i

  • IR : Change value in row after link column click?

    Hi I have an interactive report where I'm trying to create 2 link columns. The first is the report's default and has an "edit" icon. I've added a 2nd link column "Retry" where when it is clicked I'd like to change the value in the 3rd column to "Y".

  • ITunes is locking-up

    iTunes locks-up shortly after the application opens. It appears that it is locking up as soon as the iStore is attempting to resume, or start a downlaod that is awaiting. Have tried re-installling several times. Anyone else experiencing this issue? D

  • Error in fn8x loan management

    loan management : following error is reflected in fn8x. No flow types exist for CoCd MCGM, prod.type 33B and appl.function 400 No flow types exist for CoCd MCGM, prod.type 33B and appl.function 401 No flow types exist for CoCd MCGM, prod.type 33B and

  • ICloud not signing/connecting in?

    I have installed the ICloud control pannel on my PC however, when I put in my credentials, it doesn't connect. All there is this spinning loading circle thing that never connects. Can anyone help me? And I'm sure that my ICloud account works.