Hi,
  I am facing issue while filling the setup table for Quality management datasource.
  Error message:
  No summarization result is selected,
  Message no. MCEX105
Thanks,
Ram

Hi Ram,
I hope you are using the same tcode - Go to Txn OLIQBW
give the Name of run and execute in Background.
I hope you done the same thing, if not please let me know
Regards,
Kiran

Similar Messages

  • Error while filling set up table SD-Billing Documents - Perform Setup

    Hello friends,
    while filling set up table of SD-Billing Documents - Perform Setup
    i am getting error 'TSV_TNEW_PAGE_ALLOC_FAILED' . i am executing this job in background process . Please suggest me a solution .
    Regards
    Nilesh Vakil

    Hi,
    Try some other LO extractor in RSA3 to check if you get the same error.
    If you dont then it may not be system memory issue, check if thr is some user exit written for the extractor.The problem could be in the user exit whr the internal table may get overflown and lead to the page overfloen dump.
    If this is also not the case try reducing the packet size.
    Let me know if the issue is resolved.
    Regards,
    Ashwin

  • Issue while filling Inventory setup tables.

    Hi,
    Here we are facing a critical issue, while filling Inventory setup tables, we have done BX setup successfully. Not able complete BF and UM because of performance issues.
    We filled 40% of BF and UM, since we dont have system downtime and stoped the setup at that movement. Shall we do BF & UM setup without R/3 system downtime. Is there any other way we can fill the BF, UM setup tables.
    Your help is really appreaciated.
    Thanks
    BK

    Hi BK,
    Ideally you need the downtime when doing the setup for current and previous period as these are the only open ones where you can expect changes to happen due to user postings. What selection did you give when doing the set up? One idea is to break up the set up job so that each job loads for a week and then run the jobs in parallel. This would work for BF and then for UM of course you need to run it per company code. Are you using on ODS in your data model?

  • Problem about fill set up table

    Hi all,
    I got a problem when I run the fill set up table for sales billing data source. what I did is:
    first delete the setup table then oli9bw->type in a sales document no.(as I only want this order data), then give a run name, last execute, but I got the message as follow:
    Data source 2LIS_13_VDITM contains data still to be transferred
    Could you pls explain what this means, and what should I do to solve the problem
    Thanks

    Set up table definition
    Setup table is store the historical data, where as the delta records are updated in delta queue not to set up table.
    So once historical data is loaded you can delete the contents of the set up table.
    name is extract sturcture of your data source + setup
    also data is taken from setup table when an init / full/ full repair load is done.
    so in order to take ur records from the table delete the setup table(LBWG) and initialize it with ur records.
    You can find the contents SE16
    Filling set up tables
    transac LBWG
    + SBIW -> Logistics -> Managing Transfer Information Structures-> Setup of Statistical Data-> Application-Specific Setup of Statistical Data
    set up tables
    Set up tables
    Set up tables
    view of set up tables data in se11??????????
    Set Up tables..
    lo: delete set up tables: DOUBT
    LBWQ is the extraction queue and RSA7 is delta queue. Data is sent to delta queue from extraction queue through collective job scheduled in transaction LBWE.
    when we want to extract the data using LO Cockpit, the data will be come to the extraction queue first and from there it will processed to the delta queue. SO lbwq works as a outbound queue.
    If the update mode is Unserialised V3 then as soon as the document is posted it comes update table which you can see in Tr. Code SM13. After the jonb is scheduled the records come to RSA7 i.e delta queue from which BW pulls the data
    If you use u201CQueued Deltau201Dupdate method then the data moves to Extraction queue(LBWQ). Then run Collective update to move the data from LBWQ into Delta Queue (RSA7). Then schedule the data using the infopackage by selecting Delta Load in the update tab.
    So in If you are going to do Setup table filling, delete the data from LBWQ.
    The usage of Extraction queue(LBWQ) comes in to picture in delta loading. But actually system starts collecting the data (whenever there is document creation in R/3) after activating the EXtraction structure.
    Steps to Be Performed
    We know that there are 4 types of delta extraction that are available in LO. If you use u201CQueued Deltau201Dupdate method then the data moves to Extraction queue(LBWQ). Then run Collective update to move the data from LBWQ into Delta Queue (RSA7). Then schedule the data using the infopackage by selecting Delta Load in the update tab.
    Here is Roberto's weblog:
    /people/sap.user72/blog/2005/02/14/logistic-cockpit--when-you-need-more--first-option-enhance-it
    /people/sap.user72/blog/2004/12/16/logistic-cockpit-delta-mechanism--episode-one-v3-update-the-145serializer146
    /people/sap.user72/blog/2005/01/19/logistic-cockpit-delta-mechanism--episode-three-the-new-update-methods
    check this out...
    LBWQ - T code is for what?
    Ttransaction LBWQ
    What is LBWQ?
    Assign points if it helps
    Hope it helps
    regards
    Bala

  • How to fill set up tables with out missing the delta records

    Hi,
    I would like fill set up tables in the productioon system of apllication of logistics.
    Can you please guide me how do we perform.?
    What are points to be considered?
    Because,when i start the filling  set up table by 10.AM if there are any posting at 10:05,10:06....like that
    how can collect them i.e will i miss any records in second delta run?What setps to be taken care?
    Thanks in advance
    Naresh.

    Hi.
    You can fill the set-up tables during normal operation hours ,if you load the data into ODS and the update queue is 'Queued delta' .Downtime is needed to avoid the duplicates .But if you use  'Direct delta' you miss the delta documents. Hence it is better to go for downtime approach for this case.
    Initially your delta records will be stored in the extraction queue and then when you run the collective job, records will be moved into delta queue. You can run the collective job (LBWE) anytime after the init run.If you need a daily delta ,then schedule this job before the delta loading. You can schedule this job either hrly or daily .This will move your records into delta queue. At the time of delta loading ,all your delta queue records will be moved into BW .
    Thanks.

  • 2LIS_11_VAHDR - Filling set up tables chanceled

    Hello,
    I set up a new cube. Here filling set-up tables of application 11 is necessary.
    The job chanceled. Error message:
    Error converting quantity: unit KG numerator 0 denominator 0 (doc. 75555833)
    Is there a possibility to start from the point where it failed or is a complete new start
    (delete of set-up tables of area 11) necessary?
    In the corresponding set-up tables I don't see the doc.-numbers.
    Than

    Hello,
    thanks for you input!!!! It was very helpful.
    As I understand - ALL documents must be correct in order to fill the set-up table.
    Over the weekend I scheduled the job again - chanceled after 24 hours.
    I set the no. of records to be ignored = 999.999. Nevertheless the job failed.
    Question: Is there a way to find out how many douments are wrong? I assumed in the job-log....but here was only a doc. number.
    By the way - it's all in production system.
    Any idea how I can proceed? ...time slot for weekend on the system is already reserved.

  • Multiple background jobs to fill set-up tables in LO

    Hi,
    Can we schedule multiple background jobs for filling the same set-up table concurrently - obviously with non-overlapping selections.
    ex: one background job for filling order# 1000 to 100,000
         one background job for filling order#100,001 to 200,000
    Both jobs running at same time.
    Thanks,
    Anita S.

    Hi Anitha,
    Yes we can Schedule Multiple Setup Jobs for the same Application wiht the Diff Ranges of selections.
    It is possible and i have tried in our project.
    Egg:-
    We did a Reload of some doc that were missing in BI.
    Did selective deletion of those corrupted data in some Data targetsand filled the Setup tables wiht those selection conditions (in our case 10 diff selection).
    We ran this jobs in Background simultaniously when all the jobes finished we have ran the Full Repair Requests of those 10 selections to those respective data targets.
    Hope this gives you enough clarity.........!!!
    Best Regards,
    VNK.

  • Error while filling set up tables for 2LIS_11  data sources

    hello All ,
    I tried to fill setup tables for 2LIS_11 data sources in OLI7BW , but the job RMCVENUA is getting cancelled. below is the Job Log ,
    Job started
    Step 001 started (program RMCVNEUA, variant &0000000000005, )
    Start of order processing
    Error determining rate: foreign curr. local curr. INR date 10.09.2008 (doc. 1)
    Job cancelled
    Is there any setting required in R3 side before filling setup tables of SD ?
    I am able to fill the setup tables for 2LIS_05 ( Notifications) successfully.
    Regards ,
    Amol Kulkarni
    Edited by: Amol Kulkarni on Dec 4, 2008 3:59 AM
    Edited by: Amol Kulkarni on Dec 4, 2008 4:00 AM

    Hi,
    one of the sales document currencies is not maintained properly in the system and therefore its failing.
    you need to correct those documents before filling the set up tables.
    Either you can chose the option fault document toleration limit to 1000...so that 1000 records wrong records can be tolerated or you have to crrect it first before filling up the set up tables.
    This will generally happen in test systems.... but very rare in production...so try to maintain currrency again in the system.
    generally you will see the sales doc number in the error for which its failing.
    May be at the time of filling some óne was working on some sales document and tried it save it.
    correct that doc and fill the set up tables again.
    Thanks
    Ajeet

  • Restart init after filling set up tables

    hi,
    I already filled sd billing set up tables and completed a successfull init load. i guess i made a mistake and pulled all conditions data from r/3 at once. now i have the data successfully in psa but the problem is further updating psa data to ods is taking to much time. so i want to delete this init and split the loads. would this be a problem for set up tables? any suggestions to solve this problem is greatly appreciated..

    i have like 20 millions of billing condition data and i have loaded only 2 million of it so far in a week.
    i have only the start routinebelow, and two currency conversion routines in the update rules (conversion to group and local currency). but i have these same routines (even more) for the other ods's (invoices, orders, etc.) and i updated 2-3 millions records frpm psa to ods in few hours.
      clear: i_comp_code[],
             i_comp_code[].
      clear: i_material,
             i_material[].
      select * from /bi0/pmaterial into table i_material
        for all entries in DATA_PACKAGE
        where material = DATA_PACKAGE-material
          and objvers  = 'A'.
      sort i_material.
      select * from /bi0/pcomp_code into table i_comp_code
        for all entries in DATA_PACKAGE
        where comp_code  = DATA_PACKAGE-comp_code
          and objvers    = 'A'.
      sort i_comp_code.
      delete DATA_PACKAGE where kstat eq 'X'.

  • Error while filling set up table for Inventory

    Hi,
       While filling up setup table for Inventory, 2lis_03_bf, i get an error, Plant F041 doesnot exist. I am trying to fillup the table without any selections. Can anyone please suggest me a solution.
    Thanks,
    Praveen

    Please check the following link:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/f83be790-0201-0010-4fb0-98bd7c01e328
    Hope it helps you.

  • T-Code to Fill Set Up Table

    Hi Experts,
    Can I have list of T-codes which are used to Fill Setup table for Differnt Applications.
    Thanks,
    DV

    OLI0 C Plant Maintenance Master Data      
    OLI1 INVCO Stat. Setup: Material Movemts      
    OLI1BW     INVCO Stat. Setup: Material Movemts
    OLI2 INVCO Stat.Setup: Stor. Loc. Stocks     
    OLI2BW     INVCO Stat.Setup: Stor. Loc. Stocks
    OLI3 PURCHIS Statistical Setup      
    OLI3BW     Reorg.PURCHIS extract structures BW
    OLI4 SFIS Statistical Setup      
    OLI4BW     Reorganized PPIS Extract Structures
    OLI5 PMIS Statistical Setup      
    OLI6 Periodic stock qty - Storage locatn      
    OLI7 SIS Statistical Setup: Orders      
    OLI7BW     Reorganized VIS Ext. Struct. Order
    OLI8 Set Up SIS for Deliveries      
    OLI8BW     Reorganized VIS Ext. Struct. Del.
    OLI9 SIS Statistical Setup: Billing Docs      
    OLI9BW Reorganized VIS Extr. Struct. Bill.      
    OLIA C Maintenance Processing      
    OLIB PURCHIS: StatUpdateHeader Doc Level     
    OLID SIS: Stat. Setup - Sales Activities      
    OLIE Statistical Setup - TIS: Shipments      
    OLIF PPIS: Setup-RepetitiveManufacturing     
    OLIFBW Reorganized Prod. Extract Structure      
    OLIIBW Reorg. of PM Info System for BW      
    OLIM Periodic stock qty - Plant      
    OLIP C Plant Maintenance Planning      
    OLIQ Reorganization of QM info system      
    OLIQBW Reconstruct QM Infosystem for BW      
    OLIS LIS in the IMG      
    OLISBW Reorg. of CS Info System for BW      
    OLIX Stat. Setup: Copy/Delete Versions      
    OLIZ INVCO Stat.Setup:Invoice Verificatn     
    OLIZBW     INVCO Stat.Setup:Invoice Verificatn

  • Filling of set up tables for Full and Delta updates

    Dear Gurus,
    How do I go about filling the set up tables if I want to load historical data to BW using LO **** pit when set up table is running on delta ?
    I want to know how many set up tables will be there for each data source, Because if set up table is running on delta and using the same table I want to load historical data also then will I have to delete and fill set up tables or there will be a separate set up table for full upload and delta ?
    If we have multiple set up tables for one data source then in the T-code OLI*Bw, where * -> App logistics num, so to fill I just say OLI6BW, then which set up table it is going to refer.
    Clarify my doubt and get rewarded with plenty of points.
    Regards
    Mohan

    Hi,
    Filling up the set up tables depends on the datasource.
    there are different T-codes for the respective extract structures
    OLIIBW transaction PM data
    OLI1BW INVCO Stat. Setup: Material Movemts
    OLI2BW INVCO Stat. Setup: Stor. Loc. Stocks
    OLI3BW Reorg.PURCHIS BW Extract Structures
    OLI4BW Reorg. PPIS Extract Structures
    OLI7BW Reorg. of VIS Extr. Struct.: Order
    OLI8BW Reorg. VIS Extr. Str.: Delivery
    OLI9BW Reorg. VIS Extr. Str.: Invoices
    OLIABW Setup: BW agency business
    OLIFBW Reorg. Rep. Manuf. Extr. Structs
    OLIIBW Reorg. of PM Info System for BW
    OLIQBW QM Infosystem Reorganization for BW
    OLISBW Reorg. of CS Info System for BW
    OLIZBW INVCO Setup: Invoice Verification
    OLI7BW is the tcode for Sales Order.
    Hope this solves Ur issue....
    Assign points if helpful..
    Rgs,
    I.R.K

  • Issue in filling setup table - 04 datasources

    Dear All,
       I am facing issue in filling the setup table for 04 datasources, when I execute the setup table without any selection, it is not showing any message saying that filled successfully or something when I cross checked inRSA3 it is showing 0 record please help me in resolving this.
    Thanks,
    Hari

    Hi Venkat,
    Is this problem for all areas in LO?If yes then follow as below or if not check log.
    Check with PP team whether they have created the data in the system.I hope there is wrong in the procedure.Might be you are checking in the development system of r/3.I hope your client is also mainataining separate cient for Data and that client will be cross-client.
    Ex : 100 is dvelop client where you will activate DS. AND 200 WILL be test client. Here you have to setup.
    Regards
    Ram.

  • Regarding set up table filling in R3 prod system

    Hi Expert,
    When I fill set-up table for Billing LIS data-source . It is taking lot of time, All though  Data-volume is very less (Around 1 Lakh) .
    It is taken almost 50000 sec and still running .
    Please help.
    Thanks
    Devesh Varshney

    Hi,
    Prod system will be busy during your set up tables filling time.
    Try to check ECC system load burden and fill set up tables data when system have required free application servers(SM50/51). Even try to fill set up tables in background.
    if possible, use selections and fill set up tables.
    Thanks.

  • Regarding SET UP table filling

    Hi All
    I have a small doubt,
    Why do we need to fill the set up table when there is not user activity in the source system?
    Is this going to lock the application tables like vbak, vbap, vbuk etc,.,?
    what happends if i run the statistical run when the users are active in the system?
    I want to do set up fill for orders starting from 2005 to July 2009.
    When is the best time?
    regards
    Janardhan KUmar K

    Hi,
    Prod system will be busy during your set up tables filling time.
    Try to check ECC system load burden and fill set up tables data when system have required free application servers(SM50/51). Even try to fill set up tables in background.
    if possible, use selections and fill set up tables.
    Thanks.