Issue in Release strategy for PO while adding intermediate rel code/Strateg

Hi Experts,
we have Existing release code 10,20,30,40,50 & 60. Now, we tried to add an intermediate Release Code(say 25)  & release strategy(say R3) in existing release set up for PO.
And NO pre-requisite is defined ; final release by the last rel code.
However, the system shows release possible by 30 & 40 for last release strategy also. It`s showing the alternate release as release possible.
Pls throw some light on resolving the issue....
Regards,
Ganesh S....

Thanks Ajit.
I mean the release should get afftected only after release 60. (i.e. final approver) That`s the way it`s been working.
Now, while I tried adding 1 more rel code in between ; it`s afftecting the release with (20+40) instead of the intended 60.
BR,
Ganesh

Similar Messages

  • Retriggering Release strategy for PR with Document Type, Company Code and Price Range as Characaterstics

    Hi Friends,
    I have a issue to fix. The issue is releated to PR.
    There are some PR's in the system which has wrong release strategy picked up or wrong approvers picked up due to some congif change. now that the config changes are rectified correctly, we need to find a solution to correct the PR's which got affected due this.
    I have to retrigger the release strategy for all the affected PR's.
    The characterstics which we have consider for release strategy is Document Type, Company Code and Price Range.
    Can anyone suggest how can we retrigger the PR in bulk or individual to all the affected PR's, so that it picks up correct release strategy as per new config changes.
    Regards,
    Manjunath K

    Hi,
    Refer the discussion to triggers release again on release code addition/change in release strategy.
    release code is changed on PR release strategy - old PR can´t be approved
    Regards,
    Biju K

  • Redetermine release strategy for purchasing requisitions

    Hi Guys,
    How can I redetermine the release strategy for purchasing requisions when changes on the costcenter (EBKN-KOSTL)  are done -
    I know that it will be redermined when I add the costcenter as charateristics in customizing for release strategy but thats not an option
    I also tried to add coding in userexit for changing the communication strategy (Include ZXM06U13) but this exit doesn't provide information of the document number and position (EBAN, EBKN ..) so I can't find out if changes have been made
    I spend several hours trying to find solutions for this issue but no working results so far ..
    I hope you can help me on that
    TIA
    Manuel

    Hi,
    Note that EBKN will have entries corresponding to a PR only when it is        
    saved or checked, so KOSTL will not have any values for a PR which is under              
    creation. You should always use fields from structure CEBAN while             
    creating characteristics for Requisition release procedure as it              
    contains most of the relevant data about a PR under creation/change.
    I would advice you to check the note 365604.
    Please also check the changeability indicator in the customizing:
    transaction OLME -> Purchase Requisitions -> Release Procedure -> Procedure with Classification -> Set Up Procedure with Classification -> Release indicator -> check the detail screen for settings.
    Please check additionally the possible values for your characteristic cost centre (transaction CT04).
    Regards,
    Edit

  • Release strategy for GR?

    Hi,
    My company has requirement that GR should be subject to approval process before it can be posted. As far as I know there is no standard functionality in SAP for this (at least in ECC, as in SRM there is one).
    Has anyone encounter this before? And how you deal with this? I have tried to persuade the user to drop this, but the problem is they already have this functionality in their legacy (which is custom made web based application), so it is pretty hard to argue with them in this area.
    Any help will be appreciated.
    Best regard

    Hi Yosea,
    Yes you said is right that there is no Release strategy. And can't imagine the situation in the legacy as well for this approval process thru Release strategy while doing the GR. But there is another way of accepting the goods either partial or full using movement types, you can do so.
    My question is why do you (i.e., your client or company) want to control (through the approval process) at Goods receipt level. That makes complex and un logical as well, thats why there is an approval process comes into picture at PO (Purchase order is an external purchase document and is going out to an external party /vendor /supplier) against that they can supply the material /provide the services to the Organization/company and is required to control before issuing this perticular document called PO (i.e., work order and is required to be controlled thru Electronic release strategy in SAP) instead of manual before in legacy since there is money matter involved and needs to control over investment on Inventory /services purchases.
    But where as GR, this is an incoming document, what the meaning in controlling it through approval process. That is the way you have to conveincene the client or company.
    Ok fine. If still they want this functionality to be implemented (that is to controlling at the GR level for the goods coming in. Then there is another way to control it through receiving the stocks into different stock types using the respective movement types, but not through Release strategy such as Blocking (GR blocking), Quality stock (for checking the quanlity standards thru Quality Inspection) and then later you can move these stocks to Unrestricted use stock, so that this can be allowed to use further.
    I dont think there is a functionality in the SRM as well. As I know that you can receive the Goods in SRM through Online Desktop confirmation that too partial or full quantity, that is nothing accepting/approval for the Partial or full quantity that is received against the PO which is created wrto to respective Shopping cart. And that is how you can control the goods that are coming inside / received at Stores/WH inorder to maintain the good quality of Inventory.
    Note: Controll always suggested at the time of making agreement  (i.e., Release strategy for the PO) but not at the time of receiving the goods. Here while receiving the goods only thing that a Stores person can see tmainly is needs to check for the Quantity, Quality of the goods that are ordered, Delivery time, Mode of transport, Shipping instructions, etc. This will help them further in evaluating the vendor.
    Hence there is no logic is going for that option
    Hope it clarifies,
    Regards,
    Sapsrin

  • Release Strategy for Contract is not getting picked whereas it is ok for PO

    Dear Experts,
    I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    Kindly resolve the issue.
    Satish

    S0004830404 wrote:
    Dear Experts,
    >
    > I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    > I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    >
    > Kindly resolve the issue.
    >
    > Satish
    hi,
    use create other characteristic for value CEKKO-GNETW in this use the mk , wk values in value field and assign this characteristic to your class and save.
    Thanking you

  • Release strategy for Scheduling Agreement(SA)

    Dear Forum,
    This issue is with regards to the release strategy for Scheduling Agreement(SA)
    Until now release has only been applicable to contracts at our client site. But we now plan to introduce it for SA as well. Such a feature is available in SAP but the problem is that with the given release strategy GR is not allowed until the release is affected. The system allows you to post the delivery schedule.
    Now what I want is that after making the SA the system should not allow to make delivery schedule if release is not affected.
    We also have MRP run at client site..Kindly suggest the procedure as, how to configure it.Are der any User Exit for the same,if so please discuss..
    Warm Regards
    Nainesh
    SAP ECC 6.0

    Hi,
    What's the SA Type that was created via MRP.
    If it's LP (without release document), release will not do anything BUT
    If it's LPA (release document), then you will not be able to Post the GR until release is affected.
    Thanks.
    Scheduling Agreement can be categories as
    1) LP (without release document) and
    2) LPA (with release document)
    If use LP, you can do GR without release but with LPA, you need to release the schedule line via ME38.
    Thanks.
    NanoSAP  
    Posts: 58
    Registered: 1/5/09
    Forum Points: 6 
       Re: release strategy for Scheduling Agreement(SA)  
    Posted: Jun 26, 2009 8:32 AM    in response to: sathish.kumar           Reply 
    Dear Mr.Satish,
    Thanks a lot for your earliest reply...But my point is i want the system should not allow to make delivery schedule if release is not affected...Though schedule lines are generating through MRP run...Is is possible,by any chance...??

  • Release strategy for Return PO

    Hi,
    Can we create Release strategy for Return PO's. ?
    Regards
    Sunil

    Hi,
    The process for return PO is:
    Process:
    - Create a return PO
    - Create a outbound delivery
    - Goods issue
    Release Strategy can be created for All Document Types as Document Types being one of the determining factors for Release strategies. So under Classification data Characteristics which we maintain determine the release strategies for a Particular Purchasing documents. Actually it depends on your Business case that for what all documents you want to have a release strategy config.
    regards,
    Prashant Rathore.

  • Cannot reset release strategy for RFQ

    Dear SAP gurus,
    I set release procedure for RFQ. I set anyway that the changeability is 6, and the tolerance is zero. I expect that after it is released, whenever anyone is changing everything the release strategy will be reset.
    But this is not happening. In my case, the manager already approve the RFQ but the RFQ has not been sent yet. Then someone change the quantity of the RFQ, and the release strategy is not reset. When I check again I realize that changeability 6 means the release will be reset if the value is changed; while in RFQ there is no value mentioned anywhere, it means that the release strategy for RFQ will never be reset.
    Do i miss something? Is there any way to make sure that the release for RFQ is reset if someone change anything in the RFQ?
    Best regards,
    John.

    Why are you having a value based release in RFQ? And more important, why do you need release for RFQ?
    However, if you still want to go ahead with release, then you need to use the user exit for purchasing document release to achieve your objective. Please search for my earlier posts on how to reset release even on decrease of PO value. You can use the same logic for RFQ also.
    Lakshman

  • Release strategy for PREQs created from PM work order

    Hi All,
    I have an issue with determining  release strategy for purchase requisition for external services created via PM work order (iw31 transaction).
    We have activated release strategy for Purchase requisition based on the following characteristics:
    CEBAN_PLANT
    CEBAN_COST_CENTER_GROUP
    CEBAN_MANUAL
    Characteristic CEBAN_COST_CENTER_GROUP is defined via user exit based on the cost center used in the PREQ and a z table which contains all cost centers mapped to the corresponding  cost center goups.
    In the user exit we have consider to cases:
    The first one is when a purchase requisition is created with account assignment K (cost center) then system is checking the z table and determines the right cost center group.
    The second case is when a purchase requisition is created with account assignment F (internal order) then based on the order type and number the cost center in the order is defined and based on it the corresponding entry in the z table cost center group is assigned.
    The third case is when purchase requisition for services is created automatically from PM work order. In this case the PREQ is again with account assignment F, but at the time when user exit is checking the input parameters the real number of the work order does not exist and system can not defined the other parameters.
    We have defined  for this requisitions in the release strategy for characteristic CEBAN_MANUAL creation indicator " F".
    Has anybody of you defined release strategy for PREQs created out of work order before. How did you manage to trigger the release strategy?
    Best Regards,
    Desislava

    Hi,
    For PM order find the costcenter in the settlement rule of the order or else find the costcenter in the Location tab of the order.
    Consider this filed from order & write in the Z program to pick up the costcenter from there to find out the cost center group.
    Regards,
    Raj

  • Release Strategy for STO

    Hello Experts,
    We have a requirement to configure release procedure for STO scenario. Release procedure needs to be captured in STO PO's.
    We have 6 plants - A,B,C,D,E,F, and each plant is having different approving authority individually.
    When STO PO is created, it has to be approved by Issuing plant authority & receiving plant authority as well. The major concern here is for eg., approval authority for plant A can be a issuing authority at one instance & receiving authority at another instance.
    How to configure release strategy for this.
    We believe ,creating those many release strategies for all the combinations of plants  will be a hectic task & still it'll multiply with the introduction of more number of plants.
    Hence looking for a more simpler & feasible workaround/solution.
    Regards
    Mahesh.C.R

    Hi,
    you can use Supplying plant ( RESWK) and issuing plant (werks) both as characteristic and with these combination you can configue release strategy.
    Or you can use User field format character for release strategy (USRC1)as per your requirement.
    YB

  • Release strategy for manual reservations

    hi!
    Is it possible to have a Release strategy for manual reservations ? how?
    Regards,
    Rajiv Kane

    Dear,
    There is no release procedure exists for Reservations in SAP.
    1. Either remove authorizations for MB21 to the low level employees and give authorizations for CREATE / CHANGE / DELETE reservation trans to management only.
    2. Or else instruct inventory people to only make movements (issues) against the printed signed copy of reservation from the concerned manager. Only the user brings the reservation print with manager sign or seal, then only the material can be issued.
    Meantime, instruct the management to time follow goods issues reference to reservations timely.
    Regards,
    Syed Hussain.

  • Release strategy for PO and Contract

    Hi,
    I maintain characteritic for PO
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    I maintain characteristic  for contract
    Company code
    Target Value
    Doc Type
    Purchasing group
    My class consist of
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    Company code
    Target value
    Q1: Do i need to maintain ALL characteristic value when i define my release strategy for PO or Contract as some characteristic only apply to PO only or contract only?
    Q2:  What option do i have if i need to maintain all characteristic value ? leave it blank ? empty
    Currently my PO release is working fine but when i try to maintain the contract release inside the class . my PO release is not triggering . I maintained diffrent release group for both PO and Contract .
    Thank for your advice

    First of all
    For purchasing like PO,pr,contract you can able to get in ekko table.No need to maintain separate release unless if it your business requirement.Take Document type as one of the characteristics it will distinguish whether it is PO or contract.
    You have to maintain all the characteristic value then only it will trigered release.
    Check the release indicator as well.
    Hope it will help.

  • Release strategy for quantity contract

    Hi Gurus,
    In quantity contract ..  target value will not filled by the value(in header details) as it is quantityt contract.
    We may have different line items with different cost..
    my doubt is how the release strategy will be triggered for the quanityt contract and how the system will consider the whole value of the contract..
    please explain/clarify
    regards
    subbu

    Hi,
    The release strategy for the contract will work in the exact mechanism as for the PO i.e. it will be determined  based upon the total net value of the entire purchasing document.
    Cheers,
    HT

  • Release Strategy for SA/Contract/PO

    Hi friends,
    Should we have different release groups and release codes in contracting/ SA/ PO.
    Because...
    I have maintained 4 characteristics in release strategy for PO _[ Comp Co, plant, porg, total net order value].
    But i want to maintan only 2 characteristics in release strategy for contract  [plant, total net order value]
    because the same is reflecting in contract config also.
    Is it possible..please help me frnds.
    Prabhu

    Hi Prabhu,
    Unfortunately you need to maintain characteristics of all possible values for company code and plant for contractsu2019 to subject the release.
    Wish that SAP would be more flexible with release of PO, Contract and RFQ but it does not.
    Regards

  • Release strategy for Schedule lines in SD

    Hello All
    Can we create a release strategy for Schedule Lines in Scheduling Agreement? If Yes How?
    I have already maintained a release strategy for Item Level... which I want to put it for Schedule line as well....
    Thanks in advance.

    Hello,
    I think you are in the wrong forum. Please choose the right forum category and post it there.
    Matthias

Maybe you are looking for

  • Trying to install Windows 7, 64 bit on Bootcamp

    I am trying to install 64 bit Windows 7. I used the Bootcamp Assistant, followed the whole process as specified, but at an early stage it said it needed a driver for the cd/dvd drive; when I tried to give it the required driver, it said 'No drivers f

  • Polish characters displayed as #

    Hi friends, We have a portal application, where we enter polish characters in a Text editor. These are stored in a table in R3 (ECC 6.0 - Unicode environment). In the table, the polish characters are shown as rectangular boxes and are displayed as #

  • Correct black screen in apps on iPad mini?

    After upgrading to iOS 7 on my iPad mini2 I am seeing a black screen locking access to an app.  How can I correct it, the app is Words with friends.

  • SCSM 2012 request offering templates for change requests

    Good morning, i use service manager 2012 and want to publish a change request offering for web portal users to directly request for changes.  But the template i have created is not available in the 'select template' options.  The only available ones

  • CS6 Background changes in Windows 8

    My background in CS6 changes after upgrading to Windows 8.  I have checked all of my settings but can't change the constant changing from solid Gray to checkerboard.  I have the latest drivers for my video card and this is a system dedicated to imagi