Issue Relating to Power Cost in Daily Product Costing

Hi,
We are doing daily product costing. Here we want to allocate the power units of service to production cost centers proportionately on daily basis. Can anyone tell me is there any option in SAP and we need to go for development.

hi,
Power usage or cost can be apportioned only monthly wise not possible on daily basis. U can run the distribution or assessment cycle only for month wise, but not on daily basis.
Regards,
Sreekanth

Similar Messages

  • Daily Product Cost

    Hi,
    Is it possible to get a daily product cost. Can any one explain me the implications for getting daily product cost from PP point of view and also CO point of view. Whether Repetitive manufacturing solves this issue? Please reply immediately.
    Regards
    Prashanth

    Hi Ashok,
    I am asking is it possible to get daily product cost report. What are implications or difficulties in getting daily product cost report from CO point of view. From CO point of view we need to settle the production orders daily where settlemet is a monthly activity and also the allocations. I request you to tell me what are implications in doing the daily product costing to arrive at daily product cost report.
    Regards
    Prashanth

  • Allocation of cost from service cost center  to production cost center

    Dear sir ,
    Will I use to distribute the cost from service department to production department  and that cost centers also using for activity planing will get currect result in product costing ?

    Hello,
    Can you clarify what you want to do ?
    Allocation of cost from service cost centers to production cost centers can be done with the help of Assessment / Distribution cycles and you can do a activity planning using the same costs as well. The steps for activity planning would be as under:
    1. Create primary cost planning in the service and production cost centers (KP06)
    2. Create activity planning in the production cost centers (KP26) without any rate
    3. Run assessment / distribution cycles to transfer cost from the service cost centers to production cost centers (KSUB / KSVB), in case you are not transferring based on activity quantity then also do SKF planning in KP46
    4. Run plan cost splitting in case you have more then one activity type (do config for splitting structure beforehand) (KSS4)
    5.  Calculate Plan price for the production cost center activity types (KSPI)
    BR // SG

  • Costing Report summarized production cost by Finished Goods Material

    Dear Expert,
    I am looking for a report that can summarized the production cost in production order by Finished Goods Material Number.
    or a report that can show me the cost components incurred related to a Finished Goods Material.
    Can any expert enlighten me? please help.
    Thanks a lot.

    Hi
    I would recommend the product drilldown reports in KKO0...
    For this you will have to do settings in OKN0 (Asisgn a Cost Comp Structure and specify the Product Group)
    After this, execute KKRV to collect the summarized data and then you can use KKO0 reports
    It gives cost of production as per the Cost Comp Str and also the product no, product group, Prod Order etc
    Regards
    Ajay M

  • Target Cost Verion in Product Cost

    Hi,
    I'm not able to create Target Cost Version (1,2,3.....) in variance Calculation pertaining to Product Costing.
    I'm getting this message:
    Version 1000 1 not intended to be used as the target cost version
    Message no. KQ243
    Diagnosis
    The specified target cost version has not been flagged in central version maintenance as suitable for variance calculation.
    Procedure
    1. Check the entries in the central version table.
    2. If appropriate, flag the version as suitable for variance calculation.
    Please help & guide urgently.
    Regards,
    Viki
    [email protected]

    Try running a variance analysis, and see if it civd you an error message. typically this occurs when a SCE estimate was created after the process/production order was created. So check the dates of the two orders that you have, and compare with the date of the SCE CREATION.

  • Raw Material Costing with Overhead, Product Cost Planning

    Hi,
    I have an issue applying overhead to purchased raw materials. We need to apply this overhead for only a certain materials. So, I have defined a overhead key/overhead Group, and assigned the group in the material master of the raw material. The overhead is 2% freight on raw material costs.
    In the std.costing variant, I have assigned the costing sheet under Overhead on material components tab of the corresponding valuation variant. I have also included the Freight OH in the cost component structure.
    However, when I run the costing with CK11N for the raw material, it is showing only the raw material cost, not the overhead.
    What could be the problem?
    I appreciate your help.
    Thanks,
    Ram

    Is the overhead rate a percentage type or quantity based?
    Have you maintained both actual and plan rates (1 & 2) under define % based OH rates or Qty based OH rates accordingly?
    Does the validity date (in define OH rates )cover the date of costing?
    Is the Costing sheet assigned to the valuation variant at plant level?
    Is the OH base in the costing sheet includes the cost element of the raw material?

  • Sub Contract (operations) Cost Capturing in Product cost

    Hi Guys,
    I have a problem in  cost capturing for sub contract opertaions.
    Scenario is : I am working on product Costing. I want to caputure the cost of various product for various opeations, this I achived through activty type. But my problem is some of operations (for making the product) has been given to outsourcing through open PO and the payment to contractor is paying by unit rate(price rates are different for different operations).
    Could anybody explain me the process or settings required to capture the cost of the product which my client is paying to outsource contractor.
    Regards
    Srinivas

    Hi,
    1. Please define that particular activity as external operation in routing
    2. Flag it as subcontracting
    3. Assign a Material Info record to this operation.  Because the cost is picked up from Material info record in this scenario.
    Just talk to your PP folks.  They will definitely will guide you in Routing settings in this regard
    Please award points suitably
    Best Regards
    Surya

  • "Costing Date To" Product Cost

    Hi Gurus,
    I have a problem about product cost.
    Can it extend the "Costing Date To" without recalculating a CCST?
    Thanks
    Nik

    Hi
    No ways to do that.. you need to recalculate
    br, Ajay M

  • OpenGL? After Effects Issue / Related to Power Surge?

    Hello.
    I had a power surge that killed the power supply on my Quad 2.5GHZ G5. I got that fixed at the Apple Store, but since getting it back I was getting errors with OpenGL in After Effects. I had to disable it to get faster previews of what I was doing. I have very little understanding of what the OpenGL plug-in does or how it relates to my monitor, but could that power surge have affected this and caused this problem? Hopefully there is enough info here to offer me some guidance.
    Thanks in advance.

    This may be a specific case of a combination of the graphics card, your RT.X100 and the Matrox CoDecs. I suppose you went with the Parhelia to ensure maximum compatibility to ensure maximum compatibility with the other Matrox stuff and now it's biting you in your behind. I really do think that it's an issue with either Pixel Bender probing the card and not "exiting gracefully" when it finds it incompatible or MediaCore trying to manage your Matrox CoDecs when it isn't supposed to... If you are feeling adventurous, you could try to re-install the system without the video hardware and CoDecs, just the Parhelia and see how AE CS4 behaves, but of course that's just as undesirable. You could also try creating different hardware profiles (via your device manager), but usually, once a system is "polluted" with offending components, this does not bring the desired betterment...
    Mylenium

  • Wireless weird issue related to power supply

    Hello,
    I have been having some issues from time to time with my wireless connection from my MBP to my router . Distance is out of the question since the router is very close to the desk where the mbp stands.
    At first i thought it was the router, since its a cheap one. But tonight i had another issue. I just couldnt connect to the router , getting a Connection Timeout error. I looked up a little on google, saw somewhere someone saying something about unplugging all usbs, power source etc. So i unplugged the power cable from the MBP , and voila! it connected. Very strange, i dont know why this should cause an issue...but thats just half of it. As i was mentioning at the beggining of the post, from time to time i had some issues with the wireless connection from the MBP to the router, the issues were bad connectivity. I was testing it via TERMINAL -> ping router_ip ...and getting like 60% or more loss. Since tonight i was 99% sure it was the router's fault, but tonight i thought to try something at one time when the issues surfaced again: i unplugged the power cable from the MBP and..suprise suprise, no more packet losses on the PING results...and i tested...plugged the power cable , PING returning losses (and of course, web pages loading like crap)..unplugg => all fixed.
    I dont know what to make out of this...the mbp is new, about 2 months, 17 inch model, 2.8 ghz...Maybe anyone knows anything or had the same issues?

    I am having a similar but mirror image of your problem: my network connection keeps dropping out ONLY when on battery power. If I stream music from the Time Capsule router, the connection is solid. If I check the Airport connection in the menu bar, it will return (briefly). When MBP is on AC power, all is good.
    I suspect a software problem, perhaps a plist item somewhere is corrupted but where should I look? I migrated all my network settings from a clone of my old MBP which exhibited the same symptoms.
    Maybe I will start a new user account just to see if problem is there also.......

  • Costing  include inhose production cost and subcontractign cost

    Dear Friends,
    my requirement is my material is producing house and giving subcontracting so cost should include in house cost and subcontracting cost also , is it possible? please tell me how to do , what is parameter is required.
    Regards,
    Nagesh

    Dear friends,
    in material master in mrp2 we have maintained procurement "X", here if we maintain -special procument -30, it will take only sub contracting cost, it is removed, it will take inhouse cost, i removed 30, while using PP02 in routing it showing error that is maintain purchase info record but we have maintain sub contracting purchase info recored - why it is not taking in routing
    we want to calculate internal and external cost in cost estimate.
    reg
    nagesh

  • Archiving cost centre and product costing

    Dear Experts,
    we are going to implement for our client archiving the controlling data.
    so I am looking for material and expertise views and advises to proceed further.
    so can you help me that where do I start in this reagard.
    Thank you for your help
    thanks,
    Anil

    hi
    you can get the best practices for COPA from help.sap.com select the best practices and select the country and it will give you the building block

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar

  • Product cost by period process

    Hello
    Gurus,
    Can anybody please explain the process of product cost by period, eventhough i searched but i did'nt get clear picture.
    Please help in this because i have interview
    Thanks

    Dear Kavya,
    1.Product cost by period is used in a REM scenario - Repetitive Manufacturing.
    2.Here a product cost collector is created for the material + each production version combination.
    3.All the costs(activity posting,Goods issue,goods receipt) are captured in the product cost collector of the respetive material.
    4.Each product cost collector has an order number and based on this variance calcualtion and settlement can be done according
    to the business scenario.
    5.This type of costing can be used for a continous production like cement industry,steel manufacturing(dealing with furnace).
    6.Here along with the costing part there are certain other shop floor control parameters to choose or select this scenario or a
    Discrete scenario(where Production order's are used).
    7.In a REM scenario confirmation will be made against a planned order or even with out any planned order.
    Regards
    S Mangalraj

  • REM Product cost collectors and Production version

    Hi All,
    Can some one pls let me know
    What are the product cost collectors in REM and how to create the product cost collectors ?
    What is the production version and the difference between production version and controlling version?
    Thanks & Regards,
    Bujji

    Dear Bujji,
    A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
    [Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    [Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    A production version determines the various production techniques that can be used to produce a material. It defines the following information:
    Alternative BOM for a BOM explosion
    Task list type, task list group, and group counter for assignment to task lists
    Lot-size restrictions and period of validity
    A material can have one or more production versions.
    It can be defined in the Material Master (txn MM02) in one of the following views:
    MRP 4
    Work Scheduling
    Costing 1
    The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
    BR,
    Antje

Maybe you are looking for

  • Creating/replacing a file in a directory, without a prompt or error

    I am attempting to do something fairly simple in LabView but it seems that there must be an easier or more elegant way than the way I am doing it.  I have the main .vi running in c:\programs and it calls another .vi in the same directory.  In this su

  • Love my Zen Nano P

    Ordered my Nano Plus from Buy.com and it arri'ved in 3 days. It was so cheap that I expect Creative is coming out with its own Nanokiller, but I gave away my 4GB Sansa and 'downgraded' to GB on the Zen Nano. Here's why: The Nano has a clip and an arm

  • 8.1.7 migration 32 - 64 bit

    Hi, if anyone knows this error, please give me some help. The following errors occured during migrating from 32 to 64 bit in 8.1.7. OS is AIX 4.3.3. Please send me an email too, for any solutions are urgent ([email protected]) Installer finished succ

  • Exporting Active directory users to excel with conditions

    I'm trying to export AD users with selected fields out to a spreadsheet, with the condition that the employeeid field is greater than 99999.    I found a VBScript elsewhere on this site that does everything i need, even filtering on the employeeid fi

  • Pci card w/usb question

    hey there anyone have any idea where i could get a pci card w/usb connection for a power mac 9600 233 running os9.1 its for a good friend of mine any suggestions would be much appreciated thanks