Issue Return stock to other plant for repair

Hi All,
I have customer return stock in one plant A returned through return sales delivery. after PGR, the return stock is raised by that quantity in that plant A. now, I want to transfer this material to another plant R where the repair will take place on that material. is it possible to do this without converting this stock to un-restricted?  It should be issued and received as Blocked or Return stock only in the receiving plant.
I tried transfer posting with movement type 455 and it does this but there within a single transaction, issue and receipt takes place which is not acceptable to client. minimum two transaction of actual goods issue and goods receipt are required so that the stock in transit is traceable. let me know if this is possible.
I have already gone through number of threads but could not resolve it. OSS note 430074 and 489543 as well.
Thanks,
Binita

Hi There
We can have the work around through minor enhancement, for this have to create the Locations(Say R* in both the plants, STO- Order type ZUB, Prod Order Type-ZRM) and these locations, you can make is as a not relevant to MRP through config,, So that these stock will not be considered for the MRP/Availability check,,
And can have the restriction that Transfer shd happen between R* location (R* to non R* Error, However it is you can have one golden loc to send the material to any locations- R* or Non R, since once the rework done you have to send to customer) and same applicable for the order/PO doc types (for ZUB/ZRM orders Issue and rec locations shd be from/to R, if non R* through error msg)
Through this you can control the movement of customer returns,, i dont think from Blocked to Blocked you can do STO and receive the materials and process it till send back to the customer,,
The above said process i used in my proj, it was successful, if it is ok for your business you can utilize,,,
Thanks
Senthil

Similar Messages

  • Which movement type use for return stock form one plant to other plant  in

    HI friends i am working on STO PROCESS
    i need to transfer return stock from one plant to other plant as a return stock i am using Mvt type 455
    but system shows  following error
    Update control of movement type is incorrect (entry 455 X X _ L)
    Message no. M7226
    Diagnosis
    The system could not find entry 455 X X _ L in any of the movement type control tables.
    Procedure
    Cancel current processing.
    Contact your system administrator.
    Action to be taken by the system administrator
    Check in Customizing for Inventory Management under Copy, Change Movement Types whether the entry is contained in the Update control view for the movement type.
    If the entry is missing, proceed as follows:
    For standard movement types, this means that the given process is not supported using the present data combination. Do not create any entries without prior arrangement with your SAP consultant. Otherwise, incorrect postings may result.
    For customer-defined movement types (beginning with 9, X, Y, or Z), this may mean that they have not been fully defined. Delete the movement type and re-create it by copying a standard movement type.
    thanks in advance

    Hello,
         I think there is a standard STO movement type you can use. But I can't remember. Why don't you try to find it and test if it fit your requirement?
         There are some information for your reference. Please check on website:
    http://www.sap-img.com/materials/difference-for-stock-transfer-and-transfer-posting.htm
    Using STO without delivery: 
      doc.type: UB
      GI:351, GR:101
      STO with delivery:
      GI:641, GR:101
      delivery type:NL
      STO with delivery and billing:
      GI:643, GR:101
      delivery type:NLCC , billing type:IV
         And if you want to use the way to return the goods replenishment, try to flag the return checkbox while you create purchase order item. Of course, corresponding configuration is required.

  • Transfering Subcon stocks to Other Plant of same vendor

    HI i need your help.
    We are transfering to a new company code, new plant.
    On old plant we have materials issued to vendor for subcon.
    Is there a way to transfer those stocks to other plant of same vendor?
    Can you also help me on this process (subcon)
    to send the materials in vendor i have to create subcon PO first,
    then transfer the materials of the assembly to vendor using what tcode and what movement type?
    Im new to this..
    regards,
    Najah

    Hello
    Here both Plant are under same company code, no need to configure the clearing accounts.
    During transfer posting ,
    The inventory value of the plant (valaution area) Transaction event BSX will be reduced and same will posted in the stock account BSX of the other plant.
    Entries will be :
    Example    
                            Valuation class          Value     G/L account
    Plant 1   BSX              3000                 -XXXX    300000 
    Plant 2   BSX              3000                 +XXXX   300000
    If both plants are in different company codes, then clearing accounts will comes into picture when you transfer post with 301 'O'.
    Warm regards
    Ramakrishna

  • Stock transfer between plants for split valuated materials

    Hi,
    I'm doing a stock transfer between plants without STO.
    The FG's are split valuated,which are transferred from central warehouse to other warehouse at different states.
    I'm trying to use mvt type 303 and 305 to transfer the FG.
    But getting error "Use one-step procedure for transfer posting to mat. subj. to valuation".
    Please suggest how to achieve the requirement.
    Is it possible to make 303 mvt type document to be parked and posted.
    Regards,
    Venkatesh

    << Moderator message - Cut and paste response from Error when doing two step transfer between Plants with split valuation removed and points unassigned. Plagiarism is not allowed in SCN >>
    Refer below link with same issue discussed,
    [two step transfer with split valuation |Canu00B4t use two step transfer with split valuation ?]
    Edited by: Rob Burbank on Feb 3, 2012 11:30 AM

  • Message regarding Stock in other Plants

    Hi friends,
    I have come across the following  requirement to meet .
    When a PR or PO will be raised for one or more than one material if stock is there in the particular Plant or any other Plant in the Company code there should be a warning message that stock (quantity) exist in these Plants .Accordingly the user will think of raising the PR or PO.
    Is it possible and if so what is to be done.
    Dhruba

    Hi,
    System will not issue any Warning Message for this but Availability check can be carried out during PR and PO Creation;
    Go to SPRO > MM > Purchasing > Purchase Requisition > Set up Stock Transport Requisition > Here perform following functions;
    - Create Checking Rule
    - Define Checking Rule
    - Assign Checking Rule
    And for PO, Go to SPRO > MM > Purchasing > Purchase Order > Set up Stock Transport Order > Here perform following functions;
    - Create Checking Rule
    - Define Checking Rule
    - Assign Delivery Type and Checking Rule
    Here generally used Checking Rule is B i.e. SD Delivery
    And then in PR and PO, click menu Environment > Availability

  • How to consider the stocks of other plants in MRP run

    Hello All,
    I have a requirement in  which  A finished material which it´s planning and production is on PLANT 1 and and is transfered to plant 2 (there is no production and no planning on this plant, it is used for storage only). In that case, I would like the MRP to check the stock of finished material both in plant 1 and 2 for creating planned orders .
    I know  this can  be possible  with APO .  but is there any other way round we can do this like MRP area or scope of planning or some z developemenmts.
    Thanks in advance
    Regards
    Anupam Sharma

    Is there any stock at production plant?  Where does the goods issue to sales occur?
    If both plants can have stock and sales can occurs in both plants then it is the issue not only stock but also sales order consumption with planned independent requirement.  You need to have two BADI to do so.  First is the one you mentioned and the flexible PIR also (MD_PIR_FLEX_CONS).
    If only storage plant has stock and sales occurs here, then you may want to explore special procurement type produce in other plant and make storage plant a planning plant.  The receipt of production order at production plant will posted into storage plant directly.
    If sales occurs in storage plants, and there are stock in both plant, use special procurement type transfer from others (40 as standard).  When you run MRP, the system will check stock at storage plant first, then if shortage, create stock transfer request to production plant.  At production plant, the stock transfer request will be your demand to offset with stock there before create planned order.
    Like other comments stated previously, SAP cannot handle the multiple plants planning very well.

  • Production in other plant for finish and semifinish

    Hi Friends,
    We have following scenario:
    i)    Finish Product FP1 and Semifinish Product SF1 exist in both Plant X and Y.
    ii)   BOM for FP1 consists of SF1.
    iii)  SF1 is produced in Plant X and FP1 in Plant Y.
    iv)  Planning plant for FP1 is X.
    v)   I have tried with special procurement key 'production in other plant'.
    vi)  SF1 is produced in Plant X and GR done directly to plant Y for consumpton to FP1.
    vii) FP1 is produced in plant Y and GR done directly to plant X.
    Here instead of doing GR  directlyto the consuming plant the client wants to do Stock Transport for both SF1 and FP1.Please suggest any method to achieve this.
    Thanks in advance
    Shiva
    Edited by: Shiva Sharanappa on Apr 24, 2009 3:37 PM

    Hi,
    For Halb: DepReq in receiving plant and no receipt elements in prouducing plant.
    I am expecting also for Halb: Purchase Requisition in recieving plant(Y) and a planned order in producing plant(X) just like Fert.
    You stated you have DepReq for SFG in PlantY (receiving plant), nut MRP did not generate prourement proposal (PurReq) for it.
    In this case you should check the planning situation (e.g. whether you have sufficient stock to cover the requirement). If the procurement proposal is missing and this do not originate from the planning situation (e.g. stock level, stock like elements(STO, existing PurReq, etc.)), you should check your master data settings (e.g. MRP type) - if your master data settings are proper, MRP should generate procurement proposal (please be aware that in case of "VB" MRP type system watches the so called reorder point!).
    So, second MRP run should generate the mentioned PurReq for SFG (in PlantY) and at this moment you should get requierement in PlantX (that produces SFG). Third MRP run would generate procurement proposal (PldOrd) in PlantX.
    Please check master data (BOM, material master) settings of SFG.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Apr 26, 2009 8:50 AM
    Edited by: Csaba Szommer on Apr 26, 2009 8:50 AM

  • MRP with stocks in other plant

    Hi,
    Scenario: 5 stocking Plants + 1 Manufacturing plant under a company code.
    For a finished product, all 6 Plants have stock.
    For MRP, the demand of the finsihed product from all 6 plants is combined and fed as PIR feeding at manufacturing plant.
    Question: How to make  SAP to consider stock of all plants and generate the planned order for the difference Qty?
    E.g. PIR at Mfg plant = 100 Nos.
           Stocks at 5 Stocking plants = 50 nos
           Stocks at 1 Mfg plant          = 10 nos
    Hence on MRP run, system to generate planned order for 100 - (50+10) = 40 Nos at mfg Plant.
    Thanks

    Hi Nitin,
    SAP's planning is based on lean-manufacturing practices - i.e. you will never have stocks in excess of requirements (plus safety stock).  So, in reality, you will not need to "adjust" your production for stocks lying at stocking plants (stocks at stocking plants would be just equal to safety stock logic defined at each plant).
    Now say some demand at any of the stocking plants got cancelled, and you end up with excess stocks at that moment.  So in next MRP-run, system will delete some future STOs.  Or, if there is nothing to delete, then MRP-list will show exception message # 25, and you can decide how to move that excess stocks.
    So, in conclusion, adjustment of production, based on stocks at all 6 plants, will NOT be needed.  Just produce as per MRP proposals, and be on the lookout for exception message # 25.  (Hope you are using special procurement key for demand transfer from stocking plant to production plant).
    - Chetan

  • Considering stock in other plants' storage location

    Hi all,
    E.g. For 1 material I have stock in 2 plants A and B. Major consumption being in plant A (say 80%). So when I execute MD07 for this material with MRP controller for plant A (collective overview),  in the 'plant stock' column I would like the stock to be sum of stock in plant A and plant B. Is it possilble ?
    Regards,
    Yogesh

    Hi,
    For that you can use MD48, but it is per material. If you want such feature for multiple materials, then you will have to build a custom report (for stocks refer to table MARD). As std SAP ECC does not have this feature.
    Hope it clarifies.
    Regards,
    Vivek

  • Safety issues while using Sleepless & other software for iOS 10.7.4

    Hi All,
    I just wanted to know if it was safe to use software that lets you bypass the sleep mode on a mac book pro. Also is it safe to use software that alous you to controle the fan, ect. If it is ok then which software is best to use?

    I'm not sure why you'd want to 'bypass' sleep mode, but you can do that through Energy Saver by setting Sleep to "Never," no third-party software needed. There are applications that let you control your fans but unless you're having problems, for instance, with your fans speeding up enough to control heat I find them useless and potentially harmful - Apple does a good job of fan control and if you're having problems then it's likely a hardware or software problem that can be solved with a SMC reset.
    Clinton

  • Returning playbook for repair

    Can someone tell me what is an RMA - and where the heck do I find it?  Trying to return my nearly new playbook for repair and have had nothing but headaches.
    Thanks,

    RMA, Return Manufacture Authorization, or something  like that. It basically authorizes your return of the device.
    Call your PlayBook support number and go over the issue with the support tech and they issue the RMA.
    www.blackberry.com/playbook
    1. If any post helps you please click the below the post(s) that helped you.
    2. Please resolve your thread by marking the post "Solution?" which solved it for you!
    3. Install free BlackBerry Protect today for backups of contacts and data.
    4. Guide to Unlocking your BlackBerry & Unlock Codes
    Join our BBM Channels (Beta)
    BlackBerry Support Forums Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

  • Good receipt for job work from other plant

    Dear Experts:
    1.Material Received from Other Plant for job work with challan and how to bring the Material into Stock at receiving plant.
    The same material stock number available in this plant also.
    Regards,
    Sridhar.N

    Hi,
    You could use serial number concept or bacth managment here to separate within the material code.
    Regards

  • Mrp considering other plant stock also

    hi gurujis,
            I want to run mrp for some finished products, while running mrp, it has to consider the stocks in other plants also. is there any settings for that?
         all valuable replies will be rewarded.
    thank you
    regards,
    senthil

    Hi Senthil,
    First of all I admit that my suggestion would not be as 100% per your requirement.
    It means, if you want to use the scope of planning, it must be at plant(s) level for all the materials which are relevant. ( only for some finished products it is not possible).
    I appreciate Mr. Murugesan's comments..
    Now let's come to the point.
    If you want to do planning for Multiple Plants then proceed as follows:
    1. T. Code : OM0E
    2. Planning Scope : Put 4 digit (Alphabets/numeric) & Description
    3. Double click on Sequence of plants (Left Side)
    4. Put your Plants as per sequence (As per priority wise)
       i.e System will plan for Plants in this sequence only.
    5. Use this Scope of planning in MD01 or MDBT as required.
    Planning file entries created via stock transfer are automatically taken into account in the planning run.
    This ensures that a material is also correctly planned in all plants affected even in the case of
    stock transfer processing.
    Best Regards,
    Siva
    Edited by: Siva Kumar M on Apr 2, 2008 4:37 PM

  • How to transfer customr return stock to jobwork ( reapir) vendor

    Dear All,
    Please let me know -
    Suppose i had a customer defective (customer returns)stock in my plant ( which is non valuated stock). I would like to send the same for repair/ service to outside from my plant.
    I do not want any valuation / accounting effect while sending the customer defective material outside. So please suggest me-
    How to transfer customr return stock to jobwork ( reapir) vendor ? Through which movement type ? GR MvT ?
    Waiting for reply.
    Thanks & Regards
    Mangesh

    Hi,
    You can send the material using movement type 512 in MIGO using option Goods Issue > Others. And cancel the same material document when you get the materials back from vendor after repair.
    Then follow Service Process Cycle for paying the repair charges to vendor
    1. ME21N - Create Service PO (With Item Category D and Account Assignment Category K )
    2. ML81N - Create Service Entry Sheet w.r.t. Service PO
    3. MIRO - LIV for Service Charges w.r.t. Service PO or Service Entry Sheet
    For Service Process, refer following link;
    [SAP External Service Management|http://www.sap123.com/showthread.php?t=52]

  • Production at other plant

    I have created sales order for material X. In Material BOm of X there is material y with special procurement 80 ( production from other plant ) in line item of Bom.
    When I do MRP MD01 in first plant  then system does not create planned order for material y in other plant.
    But when i do MD50 then system creates planned order in other plant.
    Also when production is completed in other plant for material Y then it does not built stock in First plant but it creates sales order stock in other plant.

    Mayuresh,
    Sorry for the very late reply. I do not think you need to built stock of Y in the first plant. You can just do good issue of Y (in stock in 2nd plant) to the production order of X (the first plant). 
    If you need to have stock of Y in first plant then you will need to manually do a plant to plant transfer posting goods movement.
    Hope this helps. If you have additional questions please come back.
    Thanks,
    Ram

Maybe you are looking for

  • Crystal Report Viewer Not viwed - Through APP Server Re-Direction

    Hello Team I have a critical problem in my organizaion for viewing the reports. Configuration that we are using: 1. Windows Server 2008 R2 2. Crystal 13 - Server Trial Version - Expiring on Aug-25th, 2014 3. Used Visual Studio 2010 - .NET 4. IIS 7.0

  • No disc burner software found

    so still trying to figure out why i can no longer burn discs and it still says no disc burner software found. here is my diagnostics Microsoft Windows 8 x64 Home Premium Edition (Build 9200) To be filled by O.E.M. To be filled by O.E.M. iTunes 12.0.1

  • How to transport Query variant used in APD

    Hello Experts, I have created 2 query variants for a query in Development system. And, these variants are being used in APD. Now, when APD is transported to next system, query variants does not exist in next system, so cannot execute APD. Please let

  • Can we attach scanned bills with Webdynpro Application?

    Hi All, My requirement is that we are proposing a solution to the client for settling medical bills. they want to submit the scanned copy with the request. Is that possible? Warm Regards Hari Sankar M

  • InCopy crashes when exporting stories

    I am using InCopy CS6 and I have tried unsuccessfully to export from Story view to PDF. I select all of the appropriate options in the PDF Export dialog box. However, when I click the Export button, I get this error message: Adobe InCopy CS6 has stop