Issue whilel transporting from production system to quality system
Hi All,
I am facing issue in process chain when I transport it from production system to quality system. Process chain is related to deleting PSA logs. When transported to quality system object_type and object_name fields in display variant becomes blank. In production system it is showing 8ZXXX_CA, it should become 8ZXXX_HA in quality system.
Thanks for your help.
Regards,
Shankar
Hi,
sorry it was frm dev system to quality system, not prod to quality.
Regards,
Shankar
Similar Messages
-
Transporting issue from Developement System to Quality System
Hello Experts,
We are facing a problem in which address details in developement system are getting displayed and when the same code is transported to the quality system then the address fields are not getting displayed.
While debugging we found out that there is a variable which is calling the view (responsible for displaying address fields) in the developement system but the same view is not called in the Quality System.
We tried all sorts of backtracking but could not find where the variable is getting the values from.
Kindly Guide.
Regards
Sanket Jain
Edited by: Jain Sanket on Mar 22, 2011 3:57 PMHi BW Star,
I am transporting a process chain for deleting ODS change log from dev system to quality system. It is working fine in the dev system, but when transported to quality system, its process variants becomes empty for all the included ods change log delete steps. object_type and object_name field in variant becomes empty.
Thanks for your help.
Regards,
Shankar -
Transport planning book from Production to Dev/ Test system
Hi APO Gurus,
I need clarity for below mentioned point u2013
I have a correct planning book in production system. I have a different structure in testing as well as in quality system. I want to transport planning book with all data views and macrou2019s associated with it to development system (or in test system).
How to do this? Please elaborate with details
Thanks in advance.I did the transport from Production to Dev client using TSOBJ last week. Basis team helped in connecting Prod and Dev clients.
Everyting went ok except selection IDs. When I check 'with selection transport' in TSOBJ, it ends up in short dump saying Timed Out in reading SQL table /sapapo/sdpsetde. We increased the system profile parameter "rdisp/max_wprun_time" from 1800 seconds to 3600 seconds. It still timed out with same message. So, I created the transport without selection IDs and it worked.
Next, I downloaded the only required selection IDs (total 498) from the DP Planning Area in Production client to excel spreadsheet using table /sapapo/TS_SELKO. Then created another transport using TSOBJ.....this time I used the 'Transport of Selections' section for Selection IDs and used single value selection from drop down, uploaded the IDs from clipboard option. That worked.
Although my problem is solved....but by any chance, has anyone encountered that TSOBJ Timed out? Is there any OSS note for this?
-Sachin -
Transports from Dev System to Quality System, Objects copied in Local reque
Hi All,
I am doing transports from Dev Box to Quality Box, while collecting the objects , some required objects got collected in a local request(9xxxxxx) and some got collected in Work bench request(9yyyyyy), Now I want to add , the objects collected in the local request to the work bench request to have a single work bench request i.e 9yyyyyy for transport , with all the objects of the local request 9xxxxxx and already collected objects in work bench request 9yyyyyy,
Please provide the solution for the situation
Thanks in advance
suitable answers will be awarded
PrasadHi,
1.First see that your workbench request has a different target system than the ones pointed to by the development class/package of the objects you are trying to assign.
or,
The objects are not assigned to correct development class/package.
2. When we try to create a workbench request, we will see only the request and that is fine.
3.Now, release the local request containing your objects.
4.Include the local transport objects to the new workbench request (Ctrl + F11).
and release and transport the workbench request.
Pls assaign the points if it is useful.
Regards,
Raghavendra Rao.Kolli. -
Transport Table K9RPEF1000006 from Production Server to Quality Server
Dear Friends,
I am performing client export/import activity and I have exported the Production Client with SAP Profile SAP_CUSX but when we checked log then It shows the table K9RPEF1000006 is available on production server but not available in quality server.So I have two queries ,( i) how can we create tranport request for this sap standard table (ii) How can we transport/move table from production client to quality client.
Regards,
AdyaHi Adya,
You will need to create a transport manually using SE03 or SE09 ...
R3TR TABL will transport technical settings for the table.
R3TR TABU will transport table contents.
Best regards,
Derrick Hurley
Development Workbench -
Error While transporting Crystal Reports from BW DEV to Quality System
Hi.
I have developed a crystal report using the SAP menu. We saved the report to SAP BW dev server using the SAP menu and published it to BOE.
Now i want to transport my Crystal report to Quality system, I followed the same mechanism to transport crystal report which are aplied to other BW objects, but when i am trying to transport its giving me a short dump error:
The error appears something like this:
Error in the ABAP Application Program
The Current ABAP program u201CSAPLRSCR_CEu201D had to be terminated because it has come across a statement that unfortunately cannot be executed.
Function module u201C/CRYSTAL/PUBLISH_REPORTu201D was called
With the parameter u201CI_REFRESH_FOLDER_INFOu201D.
This parameter is not defined.
This is first time i am transporting any crystal report to other bw system.
Is there any document for transporting Crystal reports, I had searched SDN but didnt got any relevant documents.
or is their any setting which need to be done in BW side.
Any help will be appriciable.
Thanks
AnishHi,
I would suggest you open a case with support so that they can look at your system. In general you should be able to transport the Crystal REports object in the same way you transport a Bex query.
ingo -
Error while transporting Crystal Report from BW dev to Quality system.
Hi.
I have developed a crystal report using the SAP menu. We saved the report to SAP BW dev server using the SAP menu and published it to BOE.
Now i want to transport my Crystal report to Quality system, I followed the same mechanism to transport crystal report which are aplied to other BW objects, but when i am trying to transport its giving me a short dump error:
The error appears something like this:
Error in the ABAP Application Program
The Current ABAP program u201CSAPLRSCR_CEu201D had to be terminated because it has come across a statement that unfortunately cannot be executed.
Function module u201C/CRYSTAL/PUBLISH_REPORTu201D was called
With the parameter u201CI_REFRESH_FOLDER_INFOu201D.
This parameter is not defined.
This is first time i am transporting any crystal report to other bw system.
Is there any document for transporting Crystal reports, I had searched SDN but didnt got any relevant documents.
or is their any setting which need to be done in BW side.
Any help will be appriciable.
Thanks
AnishHi,
I would suggest you open a case with support so that they can look at your system. In general you should be able to transport the Crystal REports object in the same way you transport a Bex query.
ingo -
Transport system - develop-quality system
Hi,
we would like automate the transport from our change requests from develop-system to quality-system.
Does anyone know if there is a possibility where a user can release change requests without an automatically transport?
Can I define it in the transport route?
Thanks
MichaelHI
GOOD
go through this link, i hope this ll help you to solve your problem.
http://help.sap.com/saphelp_nw04/helpdata/en/90/972715cd8c11d2b41400609419f767/content.htm
thanks
mrutyun^ -
Transports from none Unicode to Unicode system. Possible?
Hello,
is it possible to transports from none Unicode to Unicode system?
Any experience?
Any links?
Best regards.Hi,
We ahve upgraded to unicode but never transporetd from non unicode to unicode...
Non unicode to unicode is ok but vice versa might be will not work.
reagrds
Gopal -
Issue while calling the RFC in SAP quality system but not in SAP Dev sys
Hi,
Our scenario is FIle-RFC-File.
We are calling the RFC from XI system in Development environment. This is working fine in Development environment, but not in Quality environment.
This changes are moved/transported to Quality environment in both XI and SAP side. But we are getting the following error in Quality system:
<SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="1">
<SAP:Category>XIAdapterFramework</SAP:Category>
<SAP:Code area="MESSAGE">GENERAL</SAP:Code>
<SAP:P1 />
<SAP:P2 />
<SAP:P3 />
<SAP:P4 />
<SAP:AdditionalText><b>com.sap.aii.af.ra.ms.api.DeliveryException: error while processing message to remote system:com.sap.aii.af.rfc.core.client.RfcClientException: functiontemplate from repository was <null></b></SAP:AdditionalText>
<SAP:ApplicationFaultMessage namespace="" />
<SAP:Stack />
<SAP:Retry>M</SAP:Retry>
</SAP:Error>
Please provide the inputs, what we can check at SAP side and XI side.
We have tried to test from XI Development to SAP quality environment, but we are getting the same error message.
Waiting for the precious inputs.
Thanks,
Ramesh.Hi Ramesh,
This might be because your RFC adapter would not have been configured properly. Just do a check on it,in RWB(adapter monitoring) and activate it once more in ID.
Also check RFC comm. parameters such as host name/user id/password etc..
Also check whether your XML document is having a mismatch with your RFC XML.
Check with your payload ( from SXMB_MONI) and test it in your message mapping.
All the best!
cheers,
prashanth
P.S Please mark helpful answers -
How to reverse the transport from Production
Hi all,
by mistake I have transported the wrong order type to production. now I want to reverse it , how it can be done. my other question is what will be the effect if I directly delete that order type from production.
Regards
KumarHello Akumar,
basically you have 2 options:
1) restore your system to a point in time just prior to the import of the request;
2) goto your DEV system, correct the order type change, create a new transport request and transport it to production. It'll overwrite the defective one. (you can also retrieve a previous version of this object via Version Management and create a change request from it)
It's highly not recommended to perform any kind of alteration directly on production (like deleting these orders) since you have a control mechanism (via TMS) to control de modifications and adjustments. Moreover you can have unpredictable behavior if this objects are used by other objects. Please don't do it to avoid making thins even worse.
I hope this helps.
Best regards,
Tomas Black -
BEx Query to be transported from Production to Development
Hi All,
We have got an unusual scenario in which we have to import/transport few Bex queries from Production to Development environment. I understand this is not a best practice, but any one suggest the way to implement the same.
Thanks,
JayHi Jay,
For every transport which moves a transport route is configured in transaction STMS (Transport Management System). Ideally it is Dev --> Qal --> Prod. Usually we do not have access to this transaction as Basis Team Configures this route. Check once in transaction STMS (if you have access) that whether the route Prod --> Dev is configured or not (i doubt it would be).
In that case you can raise a request to Basis to configure this route for this exceptional case, if they agree then Transports can be moved via this new configured route.
Regards
Raj -
How to transport changes done in dev system to quality system.
HI ALL,
Can any one give the procedure to transport the changes done to a parameter group in Dev syystem to Quality system through solution manager.
Thanks & Regards,
Virinchi.Hi,
once you saved all objects in TRtransport requests then goto SE01 or SE09 or SE10 seelct u r TR .in the seleted TR release sub task of the TR thn the main one.
SE09 and transport connection
if you need some docs on transport
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3010ba90-0201-0010-2896-e58547c6757e
http://help.sap.com/saphelp_nw2004s/helpdata/en/0b/5ee7377a98c17fe10000009b38f842/frameset.htm
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e883de94-0501-0010-7d95-de5ffa503a86
http://help.sap.com/saphelp_nw2004s/helpdata/en/b5/1d733b73a8f706e10000000a11402f/frameset.htm
http://help.sap.com/saphelp_nw2004s/helpdata/en/57/38e1824eb711d182bf0000e829fbfe/frameset.htm
Re: Transport Organizer---
transport query (bex objects)
http://help.sap.com/saphelp_nw2004s/helpdata/en/38/5ee7377a98c17fe10000009b38f842/frameset.htm
hope this helps.
Note if u founds useful reward points
mahesh -
Error in importing Business system in Quality System
Hi
We are currently on PI 7.1 EHP1 and SLD Setting on CIM 1.5 and CR 5.0 in XIA(Quality System) while XID (Developement) has CIM 1.6 and CR 4.5.We are having local SLD for XID and XIA both.
We are trying to import the buisness system BS_CATALOG_REC in our Quality(XIA) which was created in our developement system(XID).While trying to do so we are getting the error as below while trying to import using CTS+ as well as from file system level(import/export option in Integration Builder)
=================================================================================
CTS Import Service - Version 0.94 04.04.2008
========================================================================
Deploy Web service destination = CTSDEPLOY
Directory = /usr/sap/trans/data
SDM Deploy URL =
SLD Deploy URL =
XI Deploy URL = http://st2777.uname.telecom.co.nz:52400
Start import with id:8021281385D31DEFBCC0F3EF281C9FB9
DeployProxy (patch level:0) called with followingparameters:
Deployable(0)
Deployable-Type:1
Deployable-Id:80144FF9C93B1DDFBCC0EDC64DC68BD6
Deployable-TransportContainerId:XIDK900018
Deployable-ContentLocator:/usr/sap/trans/data/XIDK900018/6d1af3e0f20711dfb8e000144ff9c93b
Property(0)
Property-key:TARGETSYSTEMID Property-value:XIA
Begin CommunicationData-Type[0]:1
CommunicationData-Address:http://st2777.uname.telecom.co.nz:52400/dir
CommunicationData-Host:st2777.uname.telecom.co.nz
CommunicationData-Port:52400
CommunicationData-User:'filled'
CommunicationData-Password:'filled'
Importing archive:6d1af3e0f20711dfb8e000144ff9c93b
com.sap.aii.ibtransportclient.XiTransportException: caused by: ClientServerException exception:Impo
>>>rt failed because of business system transfer of object Communication Component BS_Catalog_REC: O
>>>bligatory transport target for business system BS_Catalog_REC not found in System Landscape Director
>>>y caused by: com.sap.aii.ib.core.transport.api.PostprocessingException: Import failed because of bus
>>>iness system transfer of object Communication Component BS_Catalog_REC: Obligatory transport targ
>>>et for business system BS_Catalog_REC not found inSystem Landscape Directory caused by: com.sap.aii
>>>.util.hmi.api.HmiMethodFault: caused by: ClientServerException exception:Import failed because of b
>>>usiness system transfer of object Communication Component BS_Catalog_REC: Obligatory transport ta
>>>rget for business system BS_Catalog_REC not foundin System Landscape Directory caused by: com.sap.a
>>>ii.ib.core.transport.api.PostprocessingException:Import failed because of business system transfer
>>>of object Communication Component BS_Catalog_REC: Obligatory transport target for business system
>>>BS_Catalog_REC not found in System Landscape Directory
End CommunicationData-Type[0]:1
End import with returncode:'8'
Deployment
End date and time : 20101117180041
Ended with return code: ===> 8 <===
*These are options we tried in DEV*
In Developement (XID) we tried creating the business groups
TEST_DEV
TEST_QA
TEST_PRD
Whn we try to assign buisness system to the above 3 groups,All systems in our XID are by default getting assigned to TEST_DEV Group and we are unable to give the target for business system (BS_CATALOG_REC) in target tab in PI 7.1 EHP1.
In DEV SLD:
In group TEST_DEV,we have assigned Buisness system BS_CATALOG_REC which is poinitng to XID Integration Server
In Group TEST_QA,we are manually creating a Buisness system,BS_CATALOG_REC_QA to which we are unable to assign the Integration Server for XIA.
In Group TEST_PRD, created theBusines system BS_CATALOG_REC_PRD and have left the integration server option "NONE"
and Tried to create target for the BS_CATALOG_REC. But i could not able to select the target system.
Can you pls guide if we need to have the entry for INTEGRATION_SERVER_XIA in our XID-Developement SLD landscape.We also have tried using "None" option,however in developement TEST_DEV buisness system target,we are not getting any values.
We have just 1 Buisness system which needs to be imported into Quality and beacuase of this we are not able to import in ID the configuration objects as can be seen in error text above.
Can anyone help !!
ThanksHello
Check the link [Configuring Groups and Transport Targets|http://help.sap.com/saphelp_nwpi71/helpdata/EN/ef/a21e3e0987760be10000000a114084/frameset.htm]
If the groups and targets are correctly configured, apply the note #1059576 - XI Directory import fails due to inconsistent SLD host names.
Regards
Mark -
Xcelsius based on BEx query. Issue when transporting from DEV to PRD
Hi all,
I am facing an issue as described below:
I created dashboard based on bex query in Query Browser. Everything is working find in DEV. Then I transport the dashboards to PRD, I also use the override settings to point from BOD-BWD to BOP-BWP, my connection changed accordingly. Everything seems ok. One day when we stop the BOD system. Dashboards in BOP are not working. Then I start BOD, everything is ok then.
The issue I got:
Internal: BOP....
External: BOD.../XcelsiusWebServices.
Is there any chance that dashboard in BOP using the BOD xcelsius web service?
I have resolved this issue by:
- Open the dashboard in BOP, then in each of the query in Query Browser, I clicked edit and click next, next until end.
- Then re-save to BOP, then it is working
For your information, I used BEx query in Query Browser only, not use BIWS.
Dashboard 4.0 SP04
BW 7.3
Does anyone face this issue before? And how you resolved it? Please kindly share with me.
Thanks,
Quan Vo.Hi Quan,
Found few points regarding this.Please check might help you.
Migration of Dashboards (using Query Panel) on BI 4.0 environment - Business Intelligence (BusinessObjects) - SCN Wiki
Regards,
Javed
Maybe you are looking for
-
Change profile name in iMessage
how do I change the profile name "jabber" on imessage?
-
CUID in Export and Import Options in Business View Manager
Post Author: palm CA Forum: Crystal Reports I am trying to import BV from one environment to another, i am using export and import option in the BVM ,every time when i make a change in BV in one environment , how can i make the changes in other envi
-
Just looking into mapviewer and wanted to add some useful functionality to my map image on a jsp. Was curious if anyone knew of our had some of the more commonly needed javascript functionality for mapping applications. 1) Coordinate display with mou
-
MotionValue502.zip cannot be opened
I downloaded this software and when I try to open it (install) I get the following message... "Cannot open file: it does not appear to be a valid archive. If you downloaded this file, try downloading it again." I tried downloading 3 times to no avail
-
Split single column into multiple column using sql /plsql
create table test (name varchar2(255); insert into test values('DH RED 20 12/10 10 2 '); insert into test values('PM STUD 20 15/10 20 29.55' ); insert into test values('LS MENTHOl FILTER ASC 18/70 60 240.66'); insert into test values('WINSTON WHIT