Issue with BOM Status in MRP Run

Dear All,
I have a BOM structure and BOM status as attached below.
In this case, system is generating the PR's for all three components correctly while i run MRP (MD51). But when i convert planned order to production order for "Assembly" & "BOM", it is coping the components for Assembly correctly but not for "BOM".
If i maintain the BOM status as "4" for "BOM", then the components are copied into Production Order but i am getting double PR's as the BOM is exploding two times.
As per my requirement BOM should be exploded only one time ie. for "Assembly" and component should be come in Planned order for "BOM".
Please tell me where is the problem..
Regards,
Rao

Dear Rao,
assembly and Bom have the same type of production order?
In the production order type which application is contained? PP01?
You should check the explosion setting in the profile order and the setting of application of the Bom.
if you can send me screen shot of the planned order of the Bom (components details).
Thanks
Daniele 

Similar Messages

  • Alternative BOM problem in MRP run

    Hello Experts,
    We have two BOM for one material.Now I want to use BOM-1 for MRP run & BOM-2 for subcontracting.I have maintined following settings.
    1) Production version.
    2) BOM explosion selection method in MRP4 -2
    3) Assign PV in inforecord for subcontracting.
    4) Assign PV in MD61 in schedule line .
    But when I run MRP it still consider subcontracting BOM.Have I missed any setting?
    Kindly guide.Thanks you.

    Hi, Follow the below process,
    1.Enter the BOM selection method as 2 in the MRP4 view of the material master.
    2.In case if you have not assigned the production version in MD61 against the PIR's under schedule line
    tab key (in the top menu click on settings and prod version ,then you can assign the prod version which
    you need to pick during the MRP run),the system always picksup the first production version during
    MRP run even if all the prod versions contains the same validity dates and lot sizes.
    3.If you are not willing to assign the prod version in MD61 ,but the system should consider the second
    prod version for MRP run means,then set the locked status for the first prod.version.
    4.When run MRP via MD02 or MD50 in the simulation mode.(i.e w/o giving tick in simulation mode).
    Click on Save,You will get a pop screen,
    Now click on the continue icon, Then go to Plaining Results: Individual lines screen.where you will get Plan order on which when double click you will get pop screen below,where you have Planned order no,quantity,plant,storage location,and version.
    Now here you can select the required version,and it will become firmed. This BOM will be used in the order now. Try it.

  • BOM selection during MRP running

    Hi,
       I have a question about BOM selection during MRP running...
       I have three production version and all of them are valid at the same time..I get a problem "no BOM data seletion" during MRP
    running..I suspect it is due to that I have three production version and MRP didn't know take which one..Can anyone tell me
    where can i config it or what's wrong with it in my situation?
       btw,BOM usage and stats are correct .so is the router data..since MRP is running well if i only have one PV..thanks..

    Hi Monst,
    Looking at the screenshots you uploaded, it seems that the validity of each of the production version is from 7.12.2011 to 1.12.2012.
    Please check whether for Planned order no. 36659 alternative BOM no. 1 is getting selected (Since BOM selection ID is 2).
    For planned order nos. 36660, 36661 and 36662, the start date is perhaps before 7.12.2011 and end date as we can see lies in the validity period of production version. Hence, neither of the alternatives of the BOM is getting selected.
    For verifying the above logic, please make the BOM selection method as 3 (selection only by production version) and run the MRP. I think MRP will get terminated in this case since no BOM will be chosen for first planned order.
    Just in case u need to select the BOM for planned orders, you can manually enter the production version no. in the planned order change mode.
    Please tell if this helps and revert back.
    Regards,
    Chetan.

  • BOM Display in CS11/CS12 with BOM status "3"

    Hi,
    Just wanted to know if it is possible to display BOM using CS11/CS12 with BOM status "3"- Active with history requirement.
    Your quick reply is appreciated.
    Thanks
    Nitin
    Edited by: Nitin Pandhare on Jun 16, 2011 10:16 AM

    No, it doesn't display the BOM in CS11/CS12 which has BOM status '3' (Active with history requirement). It always give an error message " The BOM is not effective on current date" though the BOM exists in the system and has the history within the validity period. If you try, it also gives the same error message even if the BOM status is Inactive (2').  I guess it works only for the BOM, which has status "1" (Active).
    May I request you to try at your end as well and let me know.
    Thanks for your help and sharing your views.
    Regards,
    Nitin

  • Is anyone else having issues with their I Phone 5 running ios 6.1?

    As stated above:  Is anyone else having issues with their I Phone 5 running ios 6.1?
    I am having issues with the WiFi connection to my AT&T router and voice recognition.
    It wont make post to Facebook half of the time. It is lacking the option to post videos to Facebook, only to mail, message, and You Tube. And finally the voice recognition messes up what it types in both Siri and messages.

    Not having any of those.

  • Purchase order status in MRP run

    Hi Gurus,
    I have a doubt in MRP run.
    While doing the MRP run, can there be any open PO s or is it mandatory to close them.
    Can you also please suggest me on how to run the MRP.

    Hi,
    MRP Run
    Purpose
    The Material Requirements Planning (MRP) function enables you to plan material requirements for complex manufacturing processes. You use the MRP Wizard to create and run MRP scenarios. The MRP Wizard generates recommendations for the production and purchasing orders required to produce the final product on time and in the required quantity. You then use these recommendations to create production and purchase orders in the Order Recommendation Report.
    The order recommendation cannot be issued for requirements that happened in the past (before the present day). Since the purchasing or production process cannot be completed in time, the MRP does not mix the real past data with new recommendations for the same period.
    Prerequisites
    ●     You have defined the
    ○     Planning system
    ○     Procurement method
    ○     Order mutliple
    ○     Minimum order
    ○     Lead time
    See also: Item Master Data, Planning Data Tab.
    ●     You have set the time interval between orders. See also: Define Inventory Cycles.
    ●     You have defined the appropriate items as non-production bills of materials (if required). See  also: Item Master Data, General Tab.
    ●     You have defined default warehouses. See also: Define Warehouses.
    ●     You have defined forecasts. See also: Forecasts.
    ●     You have selected the Consume Forecast option to make the system exclude existing sales orders from the forecast. If this is not selected, the forecast considers existing sales orders as an additional requirement. See also: Sales Order.
    ●     You have set the planning definitions. If you chose Consume Forecast, you have defined the consumption method, days forward and days backward. See also: General Settings, Inventory Tab.
    Process Flow
           1.      Start the MRP Wizard.
           2.      Create a new MRP scenario or select an existing one. (See also: MRP Wizard: Select New or Existing Scenario.)
           3.      Define the parameters for your scenario, such as the planning horizon and item details.
    You also choose your display preferences. (See also: MRP Wizard: Scenario Details.)
           4.      Define the data sources for requirements that you want to include in your MRP scenario.
    For example, you define whether you want to consider the existing stock or the minimum stock level. You can also include a predefined forecast. (See also: MRP Wizard: Data Source.)
           5.      Save the scenario or run it.
    After you run the scenario, the system displays the MRP Results.
    If there are red figures in the result table, solve the problem and re-run the MRP.
           6.      Analyze the MRP results. You can display the final stock quantity before the MRP run or after it.
           7.      Save the recommendations and exit the MRP Wizard.
    Result
    After completing the MRP Wizard, you still need to create the purchase and production orders in accordance with the MRP recommendations. See also: Order Recommendation Report.
    Hope this will help.
    Reward Point if helpful
    Thanks,
    Raja

  • MD04 issue with BOM Material

    HI
    We have a scenario where Sales order is Created with BOM Material. Sales order has been saved, delivered and Billed.
    But still the BOM Material is shown in MD04, we tried running the Correction program SDRQCR21, but still the BOM Material shown in MD04.
    Can anyone help on this issue.
    Thanks

    hi,
    please check,
    whether TECO has been done for production order from PP perspective.
    after this the requriment from MD04 should disappear and finally refresh it.
    you are requested to search the FORUM sir.
    regarsds,
    balajia

  • Issue with Consumption based Planning( MRP )

    Hello Experts,
    I have a requirement in my client to run CBP for Spares.
    There is no issue till MRP run.
    Background
    MRP runs every night for Plant and new proposals in the form of PR are generated as per requirements.
    After MRP run user wants to puts in Cost centre through MD06 in respective PRs generated .
    The requirement is as follows
    1) In MD06 the user wants to list only those items for which freshly created PRs last night are there.He will put in Cost centre one by one and mark the processing indicator.
    2) Next day again MRP runs for the same materials and new PRs might not have generated but the material line item still appears on MD06 list for processing . This is unnecessary and should be avoided .
    or
    3) If we get a indicator suggesting for these PR costcentre has been put and for these Costcentre has to be put.
    Please let me know if we can use the input parameters or exception msgs/lights or find function to my advantage.
    Thanks,
    Anup

    Just make sure that you firm all those that you add CC (it should be automatic). Then system will not change them next run, and you can ask to see only not firmed (firmed already have CC).

  • Issues with FP on old iMac running 10.6.8

    Hi,
    I'm sorry if this has been posted before, but I am having issues with installing FP on my old iMac running 10.6.8.
    It seems to go through the motions, but it doesn't appear to install properly, as some websites are blank.  Has this happened to anyone else?  Is there a possible solution?
    If I am not able to make FP 13.0 work on this computer, I may have to revert back to an older version of FP.  All my usual websites worked well on FP 12.0, but not on 13.0.  Does anyone know where I can install an older version of FP?  I looked everywhere on the website but everything forced me back to FP 13.0, and there is no way of circumventing it.
    Thank you so much for your help and attention to my dilemma.
    Kind regards,
    GrandSlam

    I had problems after updating Flash Player on my 10.6.8 too, so I went back to 11.9.900.117 and everything worked again.
    I was afraid Adobe had dropped support for 10.6 already, so I didn't do any updates after that.
    But now I think there was some incompatibility only with that particular version (I don't remember the number), because just now I've installed 13.0.0.214 and things work as desired.
    If you get into trouble with Flash Player, this is the page to go for help:
    http://helpx.adobe.com/flash-player.html

  • Does material status control MRP running?

    Hi experts
    May I just check if material status could conrol the MRP running?  LIke we setup some parts as Y0- obsolete. but we found it still could generate Pr or Plan order....
    So does material status control the MRP running? Could we let obsolete part not run by MRP?
    Thanks
    Alice

    Hi,
    In addition to Mr.Brahmankar mentioned ways, you can exclude material from MRP run by selecting Procurement Type as No Procurement in MRP-2 View in Material Master.
    Also you can select X-plant / Plant specific Material status as :
    01     Blocked for procment/whse to block materila from MRP run.
    Hope this helps.
    Revert if any doubt.
    Regards,
    Tejas

  • BOM Explosion in MRP runs for sub-contracting PO

    Hello Experts,
    We have sub- contracting Purchase order in business scenario.
    Subcontracting PO is required to be considered as demand for MRP. As I have checked PO is showing in MD04, after MRP run using transaction code
    MD02 subcontracting BOM not exploding.
    Sub contacting PO raised on “X” procurement type material, PR is required on BOM item “F” Procurement type 
    Please suggest what all special setting is required as master data & configuration data.
    Thanks in advance!!!

    Hi,
    In the header or parent material (the material that is being produced bu your subcontractor) you have to maintain the following data:
    Procurement type = F
    Special Proc Type = 30
    MRP Type = PD
    Lot Size, Minimum Lot Size, Rounding Value: Enter what is convinient for your business.
    Be sure you have a BOM (CS01)
    Create a Production version indicating the BOM (C223)
    Enter Selection Method 3 in the MRP4 view of the material master
    Create an Info Record (type Subcontracting).. (ME11)
    Create a Source List (ME01)
    Run the MRP and check MD04
    Kind Regards,
    Mariano

  • Stuffit issues with an SMB server? Running 10.7.3

    I use a MBP running 10.7.3. I need to use Stuffit to stuff things to an SMB server. Whenever I try, it gives me error #17527 (insufficient access privileges). Any idea how this could be resolved?
    We used to use an AFP version of the same server, but due to the Adobe Creative Suite issues with Lion, we had to switch to SMB to get any work done.
    Any help would be great.

    Support - Smith Micro

  • Anyone having vimeo playback issues with Safari 5.1.10 running OS 10.6.8?

    Since upgrading to Safari 5.1.10 for snow leopard I've notice play back issues with some of my video's posted on vimeo. Video pops up or down in brighteness and contrast and in one case goes all pixelated for one shot and back to normal after that.
    http://www.marcosdurian.com/Five_Hours_South.html
    @ aprox: 02:07-02:11 (brightness/contrast pop) & 03:38-03:41 (sever pixelation)
    http://www.marcosdurian.com/Narrative.html     (Northbay - the first clip)
    @ aprox 00:28-00:50 (brightness/contrast pops)
    The video files playback normal in FireFox, Safari 6.0.5 on 13" Macbook pro. Also plays normal on iPhone 5 w/ ios 6. The files also playback normal on the vimeo website when viewed as flash player but when switched to HTML5 Player the issue is back.
    Please advise.
    thx

    I looked at the first one - I see the same behaviour  here on 5.1.10
    When viewed in Safari, the vimeo iframe code is defaulting to 'HD'  from the several HTML5 versions of video available - the oddness around 3.38 (screenshot below) is visible on that version in any browser, or even if downloaded & played in quicktime. Firefox defaults to Flash, here anyway. Switching 'HD' off in the player, loads a different file, without the problems.
    I haven't looked in Safari 6 - but it's presumably using a different file.
    Vimeo's conversion seems to have slipped up.

  • Issues with Shared Variables in Systems Running for Extended Periods of Time

    I am designing a large SCADA system using LabVIEW DSC and cRIOs. My plan is to use shared variables to communicate the majority of the information across my network (much like "tags" in a normal SCADA system).
    I'm wondering if anyone has experienced issues (connection failures, etc...) with shared variables running on systems for months (both real-time and windows based PCs) without the cRIO or PC being restarted/redeploying the variables. What is the stability of the Shared Variable Engine over extended periods of time?
    Thank you for the input.
    --CLD--
    LV 6.1, 8.6.1, 2011 SP1, 2012 SP1

    I have a system with 2 cRIO's each with Ethercat extension chassis.  Each cRIO hosts ~100 NSV's and is running the scan engine at 40 Hz.
    Each cRIO is coupled to a HMI that has front panel control bindings to NSV's hosted on the cRIO as well as a windows hosted mirror library (used for citadel db logging) that is also bound to the cRIO NSV library.  The cRIO's have monay months of contiguous run time without reboot and I closely monitor cpu and memory usage and also rt performance metrics and will log faults if there are any such events.  I also use NSV's for messaging from the HMI to the cRIO for such things as setting zero offset values and deploying configuration parameters.  My overall findings are that the SV engine and the PSP are stable and efficient (especially NSV<->NSV and NSV<->HMI binding)

  • BOM explosion while MRP run

    hi all
    I have a FERT for which raw materials are assigned in the BOM. but while running MRP, the BOM is not being exploded and the list doesnt show the raw materials.
    I have checked in the Overall maintenance of the plant parameters in MRP in SPRO and the required paramenters are maintained.The scenario is MTS - strategy 10.but still the BOM is not exploded.
    Could anyone solve my query
    Thank you in advance
    chandra

    Hi Chandra,
    Could you please check if there was an exception message "50 or 52"? If so then it can be beacuse for the BOM explosion date system is not able to get a BOM.
    If there were no exception messages then check in MRP4 view of the FERT material for dependent requirement defination. This should be blank.
    Hope this helps..
    Regards,
    Prasobh
    Reward your points if this was helpful.

Maybe you are looking for

  • SERVICE UPDATE - Verizon using FIOS customer data to sell Online ads?

    Dear Valued Customer,                                                                                                                   en español Your privacy is an important priority at Verizon.  We want to let you know that Verizon will soon parti

  • From address in Mail

    Using Mail in Mavericks.  I have a complicated spelling to my last name and to make life easier for recipients of my email, I use a simpler spelling of my name on the <From> in email. I use Mail, iMap accounts on an iMac and a MacBook Pro. Emails sen

  • When making a book, one of my photos selected appears only on the flap, how can I get it to be in the book also?

    1.  When making a book using Iphoto, one of my photos selected appears only on the back flap, how can I get it to be in the book also? I added an extra page thinking that would help, didn't!  2.  It says that you can photos anytime, can I add a photo

  • Flash Builder 4 standalone on win7 64bit is broken after update

    Today Adobe Updater promted that there are updates for Adobe Flash Builder 4 and Photoshop CS5. The update downloaded and installed without any errors and Photoshop is still working fine for me. But when I open Flash Builder I get a bunch of error me

  • Hiding store procedure body

    Hi Sir, We have written a lot of the stored procedures in the database. Is there any way that we can hide the stored procedures body from allowing other people from viewing the source code? Please advise. Thanks.