Hi
There is some issue with while building OLAP cubes.
I have created OLAP cube then successfully cube has builded. When i add resource level custom field which has lookup tables values in ASSIGNMENT CUBE then getting cube failure meesage.
I deleted and recreated custom field and lookup table but no luck
Below error message from manage queue jobs
General
CBS message processor failed:
CBSOlapProcessingFailure (17004) - Failed to process the Analysis Services database <DB NAME> on the 10.3.66.12 server. Error: OLE DB error: OLE DB or ODBC error:
Warning: Null value is eliminated by an aggregate or other SET operation.; 01003. Errors in the OLAP storage engine: An error occurred while processing
the 'Assignment Timephased' partition of the 'Assignment Timephased' measure group for the 'Assignment Timephased' cube from the <DB NAME> database.
Internal error: The operation terminated unsuccessfully. Server: Details: id='17004' name='CBSOlapProcessingFailure' uid='f2dea43a-eeea-4704-9996-dc0e074cf5c8'
QueueMessageBody='Setting UID=afb5c521-2669-4242-b9f4-116f892e70f5
ASServerName=10.3.66.12 ASDBName=<DB NAME> ASExtraNetAddress= RangeChoice=0 PastNum=1 PastUnit=0 NextNum=1 NextUnit=0 FromDate=02/27/2015 02:10:15
ToDate=02/27/2015 02:10:15 HighPriority=True' Error='Failed to process the Analysis Services <DB NAME> on the 10.3.66.12 server. Error:
OLE DB error: OLE DB or ODBC error: Warning: Null value is eliminated by an aggregate or other SET operation.; 01003. Errors in the OLAP storage engine: An error
occurred while processing the 'Assignment Timephased' partition of the 'Assignment Timephased' measure group for the 'Assignment Timephased' cube from the
<DB NAME> database. Internal
Queue:
GeneralQueueJobFailed (26000) - CBSRequest.CBSQueueMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='b7162f77-9fb5-49d2-8ff5-8dd63cc1d1d3'
JobUID='76837d02-d0c6-4bf8-9628-8cec4d3addd8' ComputerName='WebServer2010' GroupType='CBSRequest' MessageType='CBSQueueMessage' MessageId='2' Stage=''.
Help me to resolve the issue
Regards
Santosh
Is the SQL Server and Analysis Server are running on different servers and not on default ports?
If yes, then check if the same alias’s name added in Project Server is added on the Analysis Server.
Cheers! Happy troubleshooting !!! Dinesh S. Rai - MSFT Enterprise Project Management Please click Mark As Answer; if a post solves your problem or Vote As Helpful if a post has been useful to you. This can be beneficial to other community members reading
the thread.
Similar Messages
-
Getting the "401 : Unauthorized" exception with bulk edit tool in Project Server 2010
Hi all,
We are using the Bulkedit tool in our Project server 2010 environment.
When users click the button "bulk edit projects" from the ribbon, it is giving the error with a correlation id.
I checked the id in uls logs and find that it is giving the below message.
Does anyone know why we are getting this error ?
Best Regards
Anil Kumar AlladiHi Paul,
Thanks for your reply.
The loopbackcheck was already disabled. The users who are accessing the url from the client machines also getting this error.
Best Regards
Anil Kumar Alladi -
Falied "Configure OLAP cubes for Project Web App" in Project Server 2013
Hi
I'm trying to use the PS2013's capability for generate SSAS Cubes; but after I execute
the steps described on “Configure OLAP cubes for Project Web App (http://technet.microsoft.com/en-us/library/jj943761.asp)” the only thing
achieved is that the state being "Processing…" and the log:
===== Initiating OLAP database build process =====
[10/11/2013 2:48 PM] Cube build request message has been added to the Project Server queue
When I check the jobs, the one who is associated with the cube creation is on "Succeeded" state but the OLAP database is never created. There is no evidence I think on the Sharepoint log.
For notice:
10/11/2013 14:36:24.41 w3wp.exe (0x1A70) 0x1848
Project Server Analysis Cube Building
8ida Information Standard Information:PSI Entry Point: Project User: PROJECTSERVER\system Correlation Id: 0cea4e03-a432-e311-9401-001cc094718e PWA Site
URL: http://<server-name>/sites/Walkthroughs SA Name: Project Server Service Application PSError: NoError (0) Cube build request was placed on the Project Server Queue. afaf4b9c-57d6-7004-2661-c95edeacab11
10/11/2013 14:36:24.43 w3wp.exe (0x1A70) 0x1848
Project Server Analysis Cube Building
8swo Medium PWA:http://<server-name>/sites/Walkthroughs, ServiceApp:Project Server Service Application,
User:PROJECTSERVER\system, PSI: [CBS] Status message: Cube build request message has been added to the Project Server queue,
LogLevelManager Warning-ulsID:0x3873776F has no entities explicitly specified. afaf4b9c-57d6-7004-2661-c95edeacab11Seems like an error occurred during site collection provisioning with the project server features. The provisioning process was interrupted from a system error and doesn't recovered after system restart.
I just created and provisioned a new site collection and everything is working now.
===== Initiating OLAP database build process =====
[10/16/2013 5:57 PM] Cube build request message has been added to the Project Server queue
===== Verifying and running pre-build server event handler =====
[10/16/2013 5:57 PM] Verifying and running pre-build server event handler
===== Determining database and OLAP database structure =====
[10/16/2013 5:57 PM] Cube build initialization started
===== Building database and cubes =====
[10/16/2013 5:57 PM] Cube build session started
===== Verifying and running post-build server event handler =====
[10/16/2013 5:58 PM] Verifying and running post-build server event handler
===== Processing OLAP database =====
[10/16/2013 5:58 PM] Process OLAP database session started
===== Verifying and running post-process server event handler =====
[10/16/2013 5:59 PM] Verifying and running post-process server event handler
===== Process Completed =====
[10/16/2013 5:59 PM] Cube build request completed successfully. -
Project Server 2010 - Issue with correct recording of timesheet actual hours with decimals
We have Project Server 2010 and are using the timesheet functionality for recording resource times/costs in the schedules.
It has come to light only recently, that for one user, suddenly the times she is entering are not being summed up correctly. An image of her timesheet and the manage timesheet screens are shown below. Note she entered 9.5 hrs but the total that
appears in the manage timesheet screen is 9.514hrs.
If you look at the history of the previous weeks as well, the weird change toi the total hours has occurred in the previous 4 weeks as well. I have no idea why this has started happening and am not aware of any change to the resource's details (apart
from a change to her hourly rate).
Has anyone experienced this before?
Thanks
PeterWe have this issue and are past the patch that discussed decimal rounding (April 2014, though it was more related to the application of resource rates). This seems different from that noted rounding problem.
We have at least three users (out of 625) that have this problem every week and it isn't always the same users. If we re-enter the time and zero fill the cells for the problem task it will fix it.
It is almost like when a user deletes a value that it is leaving residual numbers in the field.
Our 2010 server version below which is through Sept 2014 CU:
14.0.7132.5000
Any help on this would be appreciated.
Thanks! -
Unable open Project details or a project from PWA Project server 2010 with Alias name
Hi,
I am unable to open the Projects from Project center with the Alias name with the server name i am able to open the projects, version is project server 2010,
My system is ABC.DC.IN alias name i have given is DEF.AD.COM
With the system name i can able access PWA and all are working fine.
As i have observed with alias name i can able to login to pwa and all the server setting approval center all are working fine but only in the project center i am not able to open the projects (http://DEF.AD.COM/pwa/ProjectDrillDown.aspx .xxxx)
its is coming in the below of the ie.
But with Alias name these are the issues i am facing,
1.when longing with alias name its asking two times for user name and password
2.when i click on a project from project center its taking some time and asking for user name and password after i enter user name and password "PAGE cannot displayed" error i am getting.
can any one Help me.
vijay kommireddiHi Eric,
Thanks for your Reply.
As you said i have added in Manged Path as (Testpwa/projects.aspx as <Wildcard inclusion>) But still problem is there it is asking user
name password again if click on any project in project center and and showing page cannot be displayed error.
This is url its is showing in the below of the IE ( http://def.ad.com/testpwa/projectdrilldown.aspx?ProjUid=e28c6d43-85b6-478d-9542-2961cc81a69e)
I have observed one more thing if click on Project
details then only this issue is coming project schedule and project information
is also opening with Alias name.
My farm version is 14.0.7015.1000
Vijay Kommireddi -
Project Server 2010 Web services access with Client Certificate Authentication
We switched our SharePoint/Project Server 2010 farm to use client certificate authentication with Active Directory Federation Services (AD FS) 2.0, which is working without issue. We have some administrative Project Server Interface (PSI)
web service applications that no longer connect to server with the new authentication configuration. Our custom applications are using the WCF interface to access the public web services.
Please let us know if it is possible to authenticate with AD FS 2.0 and then call
Project Server web services. Any help or coding examples would be greatly appreciated.what is the error occurred when the custom PSI app connects?
can you upload the ULS logs here for research?
What is the user account format you specified in the code for authentication?
For proper authorization, the “user logon account” in PWA for the user needs to be changed from domain\username to the claims token (e.g.
'I:0#.w|mybusinessdomain\ewmccarty').
It requires you to manually call the UpnLogon method of
“Claims to Windows Token Service”. if (Thread.CurrentPrincipal.Identity is ClaimsIdentity)
{ var identity = (ClaimsIdentity)Thread.CurrentPrincipal.Identity; }
if (Thread.CurrentPrincipal.Identity is ClaimsIdentity)
var identity = (ClaimsIdentity)Thread.CurrentPrincipal.Identity;
Than you need to extract UPN-Claim from the identity.
Upload the verbose log if possible.
Did you see this?
http://msdn.microsoft.com/en-us/library/ff181538(v=office.14).aspx
Cheers. Happy troubleshooting !!! Sriram E - MSFT Enterprise Project Management -
Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication
Hi,
Here is the situation :
One master project with three sub projects.
Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
Sub projects got no sub projects nor links between projects.
The owner of the master project got read rights through projects permissions on sub projects.
Sub projects are link in "read only".
We applied Project Server 2010 SP2 last week end and the issue appeared monday.
Here are the symptoms :
When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
With 2 sub projects, the error may occur.
With 3 sub projects, the error always occurs.
With admin rights, the error doesn't occur.
Here is the error :
ID : 20010 (0x4E2A)
Description : You don't have required permissions to perform the action (Average traduction)
Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
Thanks for your time !Fylim --
If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects. Because you said that the PM needs to set links in all three projects, this means that
the PM will be editing all three projects. In order to edit the three projects, the PM must have Read/Write access to all three. Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission.
Make sense?
Regarding SP2, I am not aware that this would change anything, but I could be wrong. The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
projects that he/she needs to edit with cross-project links. Hope this helps.
Dale A. Howard [MVP] -
Project Server 2010 compatibility with IE11 and Windows 8.1
Hi All!
Maybe a silly question since compatibility is always asked about older versions, but here is my question:
Is Project Server 2010 compatible with IE11 and Windows 8.1?
I personnaly tested with IE11 and it seems to be ok. All views and pages can be opened with IE11.
But what about windows 8.1?
Has Microsoft done any communication about this?
Thanks in advance for your helps.
Guillaume.
Guillaume Rouyre - MBA, MCP, MCTSI am seeing a minor issue with the timesheet grid after users are upgraded from IE8 to IE11.
We are using Project Server 2010 with SP1 and Oct 2013 CU.
When some users (using IE11) switches between filters or views in the Timesheet page, the grid shrinks making to content un readable. The only way to get it back is to refresh the page. After a refresh, the grid returns to normal size, but the pane
divider is too far to the left and always must be dragged to the right in order to see the task names in the left grid. -
Any Problem Running Office 2010 SP2 with Project Server 2010 SP1?
We are running Project Server 2010 SP1 April 2013 CU and the desktop clients have now been upgraded to SP2 October 13 CU. We are having issues with projects in local cache showing as checked out when they are not actually checked out on the server. I was
wondering if it is problematic to run the desktop client on a newer service pack than the server and if it could cause this type of issue?Hello, Aaron.
The answer is YES, you'll probably have some issues.
I would recommend:
Downgrade clients to match Server's version
Upgrade Server to SP2+October '13 CU
And my preferred:
Upgrade Server and clients to SP2 + '14 April CU -
Issue in Custom Filter in PWA of Ms Project Server 2010
Hi,
i am facing an issue on setting a cutom filter in the Project Center view of PWA. I am setting a custom filter and it works fine.
Projects are filtered as per the filter. However, on selecting the filter for editing, I get a message viz. "Failure. There was an error processing the request".
I am looking for pointers and guidance to resolve this issue. Any helpin this regard will be appreciated.Hi,
Evenif you already checked this out, it is likely to be a security issue. This functionality is managed by permissions in PWA server settings and not in the Central Admin.
Check this article :
http://msprojectnow.com/Blog/tabid/142/entryid/556/Enabling-Task-Sheet-functionality-to-Add-Yourself-to-a-Task-in-Project-Server-2010-PWA.aspx
Check if you're not belonging to multiple categories that might have the given permission disabled.
Hope this helps,
Guillaume Rouyre, MBA, MCP, MCTS | -
Issue with Information broadcasting and pre-cal server in SAP BI
Hi Experts,
I have issue with information Broadcasting and Pre-cal server. I have a worrkbook whcih runs from information broadcasting in pre-cal server. Workbook is desinged on single query and workbook contains visual basic code. workbook has a variable which is controlled by Control query in information broadcasting.
I have 20 employees every month I need to send workbook via e-mail from information broadcasting. The problem is sometimes all 20 employees will recieve e-mails and sometimes not. I identified there is something wrong in workbook or in pre-cal server.
because after workbook calculation in pre-cal server is not pushing to SOST so there is something wrong in workbook or in pre-cal server.
I closely observed pre-cal server front end log. There are few operations performing on workbook in pre-cal server
like Open workbook, Calculate workbook, Save woorkbook and close workbook. In success case pre-cal sever is performing all the operations but in failure case pre-cal server is missing Close workbook case.
Below log In pulled from pre-cal server
Can you please tell what could be the problem.
Successful job
3/11/2011 9:29:46 AM (3) -> RS_PREC_LAUNCH_EXCEL i nvoked in thread 3 and job 'BIBCAST4L4EIS7TOR5BWG0
2PCUG9ZPPP'. nvoked in thread 3 and job 'BIBCAST4L4EIS7TOR5BWG0
3/11/2011 9:29:46 AM (3) -> InitConnection in thre ad 3
3/11/2011 9:29:46 AM (3) -> Trying to open "C:\Pro gram Files\Common Files\SAP Shared\BW\BExAnalyzer.
xla" gram Files\Common Files\SAP Shared\BW\BExAnalyzer.
3/11/2011 9:30:18 AM (4) -> RS_PREC_GET_SERVER_STA TUS invoked.
3/11/2011 9:30:18 AM (4) -> RS_PREC_GET_SERVER_STA TUS finished
3/11/2011 9:30:35 AM (3) -> Using Version 7100.4.1 200.35 of BExAnalyzer.xla
3/11/2011 9:30:35 AM (3) -> PID of Excel process: "2504"
3/11/2011 9:30:35 AM (3) -> EndOfInitConnection in thread 3
3/11/2011 9:30:35 AM (3) -> RS_PREC_LAUNCH_EXCEL f inished
3/11/2011 9:30:36 AM (0) -> Calculation Request 91 1A35ED029D4D79DD7A000200000000 received for job 'B
IBCAST4L4EIS7TOR5BWG02PCUG9ZPPP'. 1A35ED029D4D79DD7A000200000000 received for job 'B
3/11/2011 9:30:52 AM (6) -> RS_PREC_GET_SERVER_STA TUS invoked.
3/11/2011 9:30:52 AM (6) -> RS_PREC_GET_SERVER_STA TUS finished
3/11/2011 9:31:22 AM (0) -> Opening workbook: C:\W INDOWS\TEMP\BW\Analyzer\Workbooks\SAPBEXPRECMML4NN
DVLYAPC2SYIC7F1AAIO_0.xls INDOWS\TEMP\BW\Analyzer\Workbooks\SAPBEXPRECMML4NN
3/11/2011 9:31:43 AM (0) -> Refresh BExAnalyzer.xl a!MenuRefreshPrecalc returned with 1.
3/11/2011 9:31:43 AM (0) -> Calculated workbook C: \WINDOWS\TEMP\BW\Analyzer\Workbooks
SAPBEXPRECMML
4NNDVLYAPC2SYIC7F1AAIO_0.xls saved. \WINDOWS\TEMP\BW\Analyzer\Workbooks
SAPBEXPRECMML
3/11/2011 9:31:43 AM (0) -> Calculated workbook C: \WINDOWS\TEMP\BW\Analyzer\Workbooks
SAPBEXPRECMML
4NNDVLYAPC2SYIC7F1AAIO_0.xls closed. \WINDOWS\TEMP\BW\Analyzer\Workbooks
SAPBEXPRECMML
3/11/2011 9:31:44 AM (0) -> Excel based operations finished.
Failure job
3/10/2011 10:22:58 AM (1) -> RS_PREC_LAUNCH_EXCEL invoked in thread 1 and job 'BIBCAST4L41566ZBZDN2N
TGJR0462ZFX'. invoked in thread 1 and job 'BIBCAST4L41566ZBZDN2N
3/10/2011 10:22:58 AM (1) -> InitConnection in thr ead 1
3/10/2011 10:22:58 AM (1) -> Trying to open "C:\Pr ogram Files\Common Files\SAP Shared\BW\BExAnalyzer
.xla" ogram Files\Common Files\SAP Shared\BW\BExAnalyzer
3/10/2011 10:23:20 AM (3) -> RS_PREC_GET_SERVER_ST ATUS invoked.
3/10/2011 10:23:20 AM (3) -> RS_PREC_GET_SERVER_ST ATUS finished
3/10/2011 10:23:44 AM (1) -> Using Version 7100.4. 1200.35 of BExAnalyzer.xla
3/10/2011 10:23:44 AM (1) -> PID of Excel process: "2544"
3/10/2011 10:23:44 AM (1) -> EndOfInitConnection i n thread 1
3/10/2011 10:23:44 AM (1) -> RS_PREC_LAUNCH_EXCEL finished
3/10/2011 10:23:44 AM (5) -> Calculation Request 9 11A35ED02654D789871000900000000 received for job '
BIBCAST4L41566ZBZDN2NTGJR0462ZFX'. 11A35ED02654D789871000900000000 received for job '
3/10/2011 10:24:27 AM (0) -> RS_PREC_GET_SERVER_ST ATUS invoked.
3/10/2011 10:24:27 AM (0) -> RS_PREC_GET_SERVER_ST ATUS finished
3/10/2011 10:24:31 AM (5) -> Opening workbook: C:\ WINDOWS\TEMP\BW\Analyzer\Workbooks\SAPBEXPRECQB2VE
A8O8D8FBHYCR4HVB5UI8_0.xls WINDOWS\TEMP\BW\Analyzer\Workbooks\SAPBEXPRECQB2VE
3/10/2011 10:24:52 AM (5) -> Refresh BExAnalyzer.x la!MenuRefreshPrecalc returned with 1.
3/10/2011 10:24:52 AM (5) -> Calculated workbook C :\WINDOWS\TEMP\BW\Analyzer\Workbooks
SAPBEXPRECQB
2VEA8O8D8FBHYCR4HVB5UI8_0.xls saved. :\WINDOWS\TEMP\BW\Analyzer\Workbooks
SAPBEXPRECQB
Thanks in advance
NarendraHi Ravikanth,
Thank you very much for the reply
I went into RSPRECADMIN and clicked on 'Display Current Queue'. There we have 3 sections
1) Queue Overview of Open Precalculations
I can see this section is always blank after running IB also
2) Queue Overview of Current Precalculations
In this section I can see an entry after running IB and duration is changing. but some time workbook in this section will never processed but the duration column is changing may be something is happening at this stage.
If the entry is not proccessed in this section and IB SM37 job will never end. I manually cancelled the job from SM50.
Don't why the workbook is taking long time and will never end even though I cancelled the SM37 IB job.
3) Queue Overview of Proccessed Error-Free Precalculations
All the error free workbooks which means all pre-cal server completed workbook calculation and sent to SOST.
I manually ran the workbook for all the 20 employees I can't find any pop-up message (earlier we have pop-up windows appearing because of VB code and when report returns no data and we fixed the pop-up issues)
Can you please help me further to trace the error.
Thank you
Narendra -
Project Server 2010 Business Intelligence performance issue
Hello,
We've setup a Project Server 2010 Business intelligence center and everything seems to be working fine.
The next day when users attempt to open Sample reports an error occurs that when we apply the "refresh all Data connections" a couple of times everything works fine.
How do we ensure that this strange issue of "fake un-related" errors are not occuring for users.
Once the BI is accessed by a few people then the reports seem to work the first time otherwise if you are the first one running them in the morning you have to retry 4 to 5 times for the excel spreadsheet to show up?Hello Claude
While there is a list to things to double check when configuring Secure Store, I think the first thing I will do is "Set Credentials". The password may be been changed or if several attempts to using the account is tried, it may have gotten
locked out.
CHeers!
Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
Website http://www.WhartonComputer.com
Blog http://MyProjectExpert.com contains my field notes and SQL queries -
Problem with the% deviation from Project Server 2010 field
hello
I have a problem with the% deviation from Project Server 2010 field.
Within a file or project, this project contains tasks.
Each task has completed the field% deviation.
Within the row "Summary" in the field of% deviation does not perform the sum of all fields of tasks.
Only occurs on certain projects, these projects have the view of PR Progress Report
Anyone know happens?
thank you very muchHi
Sorry, I'll be more specific now.
Within the field% deviation. Your settings in PWA is:
The formula for field% Deviation:
Str (IIf ([Job baseline] = 0; IIf ([Working] = 0, 0, 100); IIf ([Working] = 0; -100; Int (100 * ([Job] - [Work Online base]) / [Working baseline])))) + "%"
Under the heading rows Calculation Summary:
> Use formula.
Within the field Allocation Calculation of rows:
> It is labeled the "Apply unless you manually specify".
The field [Job] and field [Job baseline] are fields Pack project server.
The error is in project, in the list of tasks.
In the top row, this row summary makes the sum of the ranks of the tasks of the file.
But in my case only in the summary field the same value appears in the tasks.
In all the cells in column% deviation appears the same value.
I hope it helps.
thank you very much -
How to : Configure Project Server 2010 to work with Exchange Server 2013
Hi everybody. I have a problem. I did integration success project server 2010 with exchange server 2010. But now my customer use exchange server 2013. So my question is "Have a way to integration project server 2010 with exchange server 2013 ?"
I haven't seen any document with Project 2010 and Exchange 2013. You could still try the old document with Project 2010 and Exchange 2010.
http://technet.microsoft.com/en-us/library/ff468700(v=office.14).aspx
It might just work.
Thanks Gaurav Wason MCITP, PMP -
Project Server 2010 failover environment with Database SQL Mirroring
Hello,
We have prod and failover environment. Failover environment created by using farm backup and restore of prod.
my question is : Can we do SQL Mirroring (from prod to failover) of 5 databases (4 PS databases and content db) to keep both the environment in sync. Will this process work in the case of Project
Server 2010. i am in doubt due to timestamp and GUID in config DB.
Also will this process is supportable.
Any help much appreciated.
ThanksHello MOhit2020,
I haven't done this type of failover, but I think you would need to setup all your SharePoint and project databases to use a SQL Alias to point to your production databases. When and if your production databases failed, you would update
your SQL Alias to point to the mirror location.
The other nice feature about having SQL Alias setup in SharePoint, is that in the future, if you switch to another SQL Server, the SQL alias makes it easier to handle.
Cheers!
Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
Website http://www.WhartonComputer.com
Blog http://MyProjectExpert.com contains my field notes and SQL queries
Maybe you are looking for
-
Gnome: Add custom command to Removable Media application
I'm trying to setup cvlc to run a DVD when inserted into the drive. I created a cvlc.desktop so it is seen when I go to to the Removable Media menu but it doesn't work because a custom command is required. How do I configure it so that one can be r
-
Dear All, I am fresher in ABAP working for a University, where we want to upload security deposit for each student. We do it manually through F-22 (Enter Customer Invoice), for this we have created a LSMW but not able to upload any data. Import metho
-
Downgrade to Adobe Reader 9.2
From 9.3.2 to 9. 2
-
Can you edit the RTF layout manually WITHOUT using wizards?
Hi, In Oracle Reports we can edit the layout in the layout editor. I.e. we can add fields, repeating frames and drag the objects to any position we want. Can you do the same in BIP, instead of using a wizard? Is it recommended? Or should we always on
-
Renaming and transferring quick time.mov files
I record video with my digital camera and load it from the SD card, to my Toshiba laptop that runs Vista as it's operating system. I used to be able to rename the files with ease, but now I can not at all. I select the file I want to rename, click en