Issues in ECC 6.0 upgrade

Hello,
We are doing an upgrade from SAP 4.7 to ECC 6.0. In step 2C of SU25 we get a large number of roles in "RED". How do we identify if any additions or changes have happened to these roles. Please help
Many thanks
Vijaya

Hello Vijayalakshmi,
pls use the search function in this forum (for instance <SU25> returns 11 hits, for instance this one: https://forums.sdn.sap.com/click.jspa?searchID=13818484&messageID=5409652
> How do we identify if any additions or changes have happened to these roles. Please help
>
Well, if the roles are listed in SU25/2c, then there have been changes to that roles. In normal cases the SU24 values for the contained transactions have been changed or the transactions themeselves got changed/removed/replaced.
The documentation for SU25 is quite good and gives some valuable information too.
I hope this gives you a starting point for your upgrade project.
Last tipp: it is not a good ideay, to skip SU25 after the upgrade. Sooner or later you will have to perform this task to avoid losts of reclamations regarding missing authorizations from your users.
b.rgds, Bernhard

Similar Messages

  • Font issue in ECC 6.0 upgrade

    can any one please tell me
    regarding the font issues in SAP SCRIPT some of them fonts are not upgrading in ECC 6.0 VERSION as in 4 and 5 version.
    please suggest me to solve this problem.
    please help me its urgent.

    in this case u have to check the syntax of ur driver program, 2. have to check the NACE settings for output type and Medium also.
    Regards
    Peram

  • Screens not working in ECC 6 after upgradation from 4.6c.

    Hi,
    The custom developed screens which where developed in 4.6c version is not working properly in ECC 6 after upgradation.Do i have to make any more changes for this .? If anyone have an idea please help me in this issue.The custom developed things are an extended functionality we have done to r/3.
    Regards,
    jinesh kumar c.

    Hi,
    Check the Transportatation Logs in STMS for the programs/screens and check whether they are successfully tranported or not?
    Because some times we get Dynpro errors for transportation of the screens.
    Reward if useful.
    regards,
    Anji

  • Error in WBS Element Hierarchy load after ECC 6.0 Upgrade

    Hi All,
    After ECC 6.0 Upgrade in R/3, we are doing test load in a Test server. While doing, we have encountered an issue with 0WBS_ELEMENT Hierarchy load. The message in the monitor is like below.
    "Node ID 00014240 has not been included in the hierarchy
    Message no. RH207"
    When I run the same hierarchy in another system which is not upgraded , it works fine.
    Anybody has faced similar kind of issues and can throw some light on this issue?
    Thanks,
    Mohan

    Try activating the Heirarchy in R/3 and re-trigger the load, error is very specific to structure of the hierarchy. there is a possibility that this Hierarcy could have got inconsistent after the upgrade.
    Thanks,
    Amit

  • Open Dataset for input in BINARY MODE not working after ECC 6.0 upgrade

    Hi All,
    Our requirement is to download an XML file from the application server and there is a customized program to download these files.
    This program uses the statement,  Open dataset ...for input in BINARY MODE
    and it works perfect for 4.7. There were no issues. But, after the upgrade to ECC 6.0 this does not work.
    When the data is read in ECC 6.0 , it is shown in some special characters and it could not be opened with XML editor and the file is not completely downloaded. I read through the forum and tried the following statement as well,
    Open dataset....for input in LEGACY BINARY MODE.
    After this statement, there were no special characters, but there is a blank space introduced before every character.
    Example : TEST(actual)
                      T E S T (After the legacy binary mode)
    Could you please let me know if there is any solution to rectify this problem. Appreciate your help.
    Thanks a million.
    Edited by: Manikd on May 12, 2011 3:52 PM

    But this program was already using BINARY MODE and after upgrade this is not working. I know, it may work in TEXT MODE. However, I cannot change the whole program to TEXT mode now.

  • ECC 6.0 UPGRADE - BW 3.10

    We are planning to upgrade our source system from 4.6C to ECC 6.0.  We are on BW 3.10 ( But planning to upgrade to BI 7.0 once after ECC 6.0 upgrade)
    Would like to know,
    1. Do we need apply any plug-in requirements to accommodate the ECC 6.0 compatibility?
    2. Will the existing BW 3.10 work without any issue with ECC 6.0?
    ( We are not going to do any change with new Business content available with ECC 6.0)
    3. What are the other precautions, we need to take in order to work BW 3.10 with ECC 6.0?
    Advance Thanks.

    refer replies here:
    Re: ECC 6.0 Upgrade with BW 3.5

  • ECC 6.0 Upgrade from 4.7 - EDI Interfaces

    Hi Gurus,
    Need your inputs on what are the precautions to be taken during ECC 6.0 Upgrade related to EDI Interfaces.  with SAP upgrading from 4.7 to ECC 6.0, do you see any precautions need to be taken considering the middle ware involvement.  Also, is there any changes in IDOC Structures in ECC 6.0 which my cause issues related mapping with middleware.
    Please suggest.
    Thanks & Regards,
    C.L. Narasimhan "CLN"

    Hi,
    generally, a release upgrade, delivers new idoc/message types or new releases of existing idoc/message types.
    So, taking this in mind, you shouldn't have problems for the mapping of the messages, because the versions of the basic idoc, once released, cannot be changed.
    You might have some application problems related to the inbound interfaces, but this is part of the game...the testing phase will highlight whether the problem exists.
    A known problem is that the upgrade removes all the customer specific entries in the system table EDIFCT.
    Further details are provided in the OSS note [https://service.sap.com/sap/support/notes/865142]
    Regards,
    Andrea

  • Exchange SBS2003: Email that is deleted in Outlook 2010 is not deleted on iPhone 4, or marked read after upgrading to 6.0.1.  Win 7 64bit.  2 Other users in our office with iPhone 4 and iPhone 4s aren't having this issue.  They didn't upgrade to 6.0.1.

    Exchange SBS2003: Email that is deleted in Outlook 2010 is not deleted on iPhone 4, or marked read after upgrading to 6.0.1.  Win 7 64bit.  2 other users in our office with iPhone 4 and iPhone 4s aren't having this issue.  They didn't upgrade to 6.0.1 though.  Mail that is deleted or read on the iPhone 4 is deleted or marked read in Outlook 2010.  So it's a one-way problem.

    Exchange SBS2003: Email that is deleted in Outlook 2010 is not deleted on iPhone 4, or marked read after upgrading to 6.0.1.  Win 7 64bit.  2 other users in our office with iPhone 4 and iPhone 4s aren't having this issue.  They didn't upgrade to 6.0.1 though.  Mail that is deleted or read on the iPhone 4 is deleted or marked read in Outlook 2010.  So it's a one-way problem.

  • SAP R/3 4.6 C to ECC 6.0 Upgrade using CU &UC method- Unicode conversion

    Basis Gurus
       I am working on upgrade from R/3 4.6C to ECC 6.0.
    ECC 6.0 upgrade completed( still in non Unicode).  Now I am in the process of Unicode conversion.
    I have used following methods for the upgrade.
    1. Combined Upgrade & Unicode conversion(CU & UC)
    2. Resource minimized( as I am doing it in Sandbox).
      As I understand I need to perform the DB export and Import now for the unicode conversion.
      According to the Upgrade document, First I need to run Export using R3load in ECC6.0(Non unicode)
      and then install Unicode system and import the same data file.
      My understanding was, when I choose, Resource minimized, I need to run Export and import
      in the same system.
      Can you please help me , whether I need another Unicode system for import ??
    Graham

    Hi,
    Dont get confused with upg strategy and unicode conversion.
    In general Upgrade strategy (either downtime-minimized/resource minimized)
    In unicode conversion you have export/import(exp/imp) of data concept
    In CU&UC approach you have to do in a streach to complete migrate from old release to new realease ECC 6.00.
    Using database independent (sapinst only) or Using database dependent (migration monitor or Distribution monitor)
    It can be done in 2 ways.
    If you dont have addtional server for unicode conversion
           1)you can either do exp on same hardware and take bakup and do import using the exp dump.
           2)Do exp on one server and prepare your target empty database on another server and complete imp of data.
    Hope this is clear.
    Regards,
    Vamshi.

  • ECC-600 EHP4 upgrade with VIRSAHR 520 700 - PREP_EXTENSION/ADDON_QCALC

    Hi
    We are getting following error at phase PREP_EXTENSION/ADDON_QCALC in the ECC 6.0 upgrade:
    3 ETN256 You want to install the following add-on components:
    3 ETN248 Component: "VIRSAHR" rel. "520_700", Support Package
    level: "0" (component type "A")
    3 ETN248 Component: "VIRSANH" rel. "520_700", Support Package
    level: "0" (component type "A")
    2 ETN085X"2. Adding Add-on Installation Queue" " " " " " "
    3 ETN262 Calculating queue part for add-on "VIRSAHR" rel. "520_700"
    3 ETN490 Use the Add-On installation package "SAPK-523EXINVIRSAHR"
    (type &4"AOX") for Add-On &2"VIRSAHR" rel.&3"520_700"
    3 ETN245 The following import prerequisites of OCS Package "SAPK-
    523EXINVIRSAHR" have not been met:
    3 ETN264 In the (alternatively) Requirement set "01":
    3WETN491 Required software component "SAP_HR" rel."600" is not installed2WETN543 OCS package "SAPK-523EXINVIRSAHR" does not match the current
    software component vector
    1 ETN214X."**************************************************"
    We have alreacy checked note 1002147, which clearly states that we have to include SAPK-523EXINVIRSAHR in the upgrade. SAP_HR is part of the upgrade.
    We have included SAP_HR and other Support Package as per the queue generated by Solution Manager, but we did not include VIRSAHR & VIRSANH Packages until we got to this phase. We then included these support packages in eps\in directory, but we are now getting this error now.
    Any ideas?
    Regards
    Chandu

    Hi
    This is what the solution provided by SAP Support:
    Quote:
    we have finally found the problem, it's a bug in the package upload
    functionality used by the upgrade. The consequence of this bug is that
    Support Packages whose EPS files (.PAT files) have a certain string in
    the name, namely the string 0000000 after the _ and before .PAT
    extension, are not properly uploaded to the ABAP system and hence are
    not visible or known to the upgrade.
    This bug will be fixed in the next upgrade tool fix, but in the meantimeyou can use the following workaround:
    Check your EPS/in directory after the CAR/SAR Archives of the SPs are
    extracted and rename all .PAT and .ATT files, which have a name like
    *_0000000.PAT (or *_0000000.ATT), by changing the string 0000000 to
    9000000. For example, for the VIRSANH SP SAPK-52302INVIRSANH rename the
    file VS30020106486_0000000.PAT to VS30020106486_9000000.PAT
    Afterwards, the upgrade will upload the informations about the SP
    properly and the SP can be included into the upgrade.
    Files:
    31/01/2007 07:32 329 VS30020106486_0000000.ATT
    31/01/2007 07:32 554,073 VS30020106486_0000000.PAT
    If these two files are renamed to e.g.
    VS30020106486_9000000.ATT
    VS30020106486_9000000.PAT
    the affected VIRSANH SP2 is uploaded correctly by the upgrade
    functionality and the SP inclusion of the VIRSANH SPs works.
    Sorry, as of now I cannot promise you a date when the tool fix will be
    available. I have found this bug only today in the evening (german time)and will discuss this with the responsible colleagues tomorrow.
    Afterwards, I will know more...
    Unquote:
    Hope this helps. We have decided against upgrading to 530_700 as it will involve upgrading GRC system and also new version has lot of new functionalities, which we like explore it after the ECC upgrade.
    Also, I would not suggest deleting VIRSAHR as all the config and customising done for VIRSAHR will be lost.
    Regards
    Chandu
    Edited by: Chandu Cheeti on Jan 17, 2010 11:19 AM

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • Issue with VO extension after upgrading from 11i to R12

    Hi All,
    We are facing issue with VO extension after upgrading from 11i to R12(12.1.3).
    Most of the cases we are facing issue as given below,
    oracle.apps.fnd.framework.OAException: oracle.jbo.AttributeLoadException: JBO-27022: Failed to load value at index 21 with java object of type java.lang.Boolean due to java.sql.SQLException.
    Please help me out to resolve this issue.
    Any help/suggestion will highly appreciate.
    Thanks & Regards,
    Sunita

    Hi Gyan,
    Thanks for the response.
    There is one attribute has added in VO query.
    In VO.xml file ViewAttribute definition is as given below,
    <ViewAttribute
    Name="DisplayApproveButton"
    IsUpdateable="false"
    IsQueriable="true"
    IsPersistent="false"
    Type="java.lang.Boolean"
    ColumnType="NUMBER"
    AliasName="DisplayApproveButton"
    Expression="xxh_invoice_approval_pkg.check approval(invoice_id)"
    SQLType="BIT" >
    </ViewAttribute>
    Thanks & Regards,
    Sunita

  • Join Issues After 4i to 10g Upgrade

    Hi,
    We have noticed issues with folder joins after upgrading from 4i to 10g. These joins existed and worked as expected in 4i. But after the upgrade to 10g, reports will pull all data instead of limiting to the parameters.
    For example, we have a order headers folder and invoice headers folder in a business area created from the database. The 2 folders have a join. If I create a report that pulls columns from both folders and then create parameters to limit the invoice creation date, it will pull all records from the database instead of limiting to the parameters.
    Has anyone else experienced this issue? Can someone point me to some documentation that relates to the issue?
    Any help is greatly appreciated!
    Thanks,
    Troy

    Hi Troy,
    I seem to remember that there is a difference in how 4i and 10g handle outer joins. There is also an issue associated with applying joins to different types of folders. Please send me a copy of the SQL generated from the "view SQL" function for this worksheet and I'll try to help you debug the issue. It would also be helpful if you could do this for 4i also.
    --Srinu                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • Load balancing after ECC 6.0 upgrade

    Hi
    I we this configuration on ECC 6.0 upgrade:
    SAPGUI 7.10
    SAP_BASIS  700  Patch level 15
    SAPportal ESS
    Webdispatcher Installed
    Internal ITS
    Single sign-on
    Can somebody assist as with identifying the problem with load balancing (PUBLIC) E.g. When running ESS remuneration package via the Sapportal. we have configured ITS-Based GUI Services on transaction SICF for customised ZESS_PZ11PDF service.
    When we have load balancing group on the load balancing does not work, because  I  see somebodyu2019s payslip
    but when using one app server I see my own payslip. Please help.

    Hi PR,
    Please take a look at the following link:-
    http://help.sap.com/SAPHELP_NWPI71/helpdata/EN/28/75153a1a5b4c2de10000000a114084/frameset.htm
    "You can only use the SAP message server for HTTP load distribution if 
    the browser is the direct client of the message server. If another     
    component lies between the client (browser) and the message server, (for
    example, the portal), you cannot use the message server to distribute  
    the load."                                                             
    When using the External ITS you could balance the load using the message server and logon groups. In 700 this functionality is not present if there is not a direct connection to the client (Firefox or IE). So you will have to install the webdispatcher to balance the load.
    Hope this helps
    Michael

  • Hardware requariment for ECC 6.0 upgrade from ECC 5.0

    Hello
    I am on ECC 5.0 with oracle 9.2.0.7.I need to upgrade this to ECC 6.0.
    I have already implemented MM,PP,FICO,QM and HCM.My current data base size is 900GB.This has 30GB monthly growth.
    With this ECC 6.0 upgrade i am planing to implement PM,EP.
    I know converting none Unicode system to unicode system is required some more hardware resources than the none Unicode.
    Some document says 40-60% more disk space and 35% more processing speed from current system.
    Can any one give me the correct information about the hardware requirement for ECC 5.0 to ECC 6.0 upgrade.
    Thanks
    Roshantha

    Check with the Links
    https://websmp102.sap-ag.de/sizing
    https://websmp208.sap-ag.de/quicksizer
    http://www.4soi.de/
    http://www.easymarketplace.de/
    Kanagaraja L

Maybe you are looking for