Isue of material to cost center

Gurus,
Whenever i want to issue material to Maintenance order ,i want to issue material to cost center only using 201 instead of 261.How can set this?

Hi!
You can create reservation in two ways either separate reservation from t code MB21 or else from order (maintenance, production, sales or network).
What is the difference, in both cases reservation is created?
difference is when reservation is generated through order you can settle cost to more than one cost center. However, through MB21 you can settle cost to only one cost center.
Still if you want to settle cost to more than one cost center at the time of creation of reservation or goods issue than you will have to go for enhancement. Please coordinate with your MM and FI consultants.
Regards,
Vaibhav Mishra
Edited by: Mishra_Vaibhav on Apr 27, 2010 10:36 AM
Edited by: Mishra_Vaibhav on Apr 27, 2010 10:39 AM

Similar Messages

  • Return material from cost center

    Dear All,
    Return material from cost center:- xx, Material:- yyy qty z Pc in inventory. create sales order for delivery.
    They are materiel in prototype in R&D for customer loan
    What is the Process that has to be follows in SAP for this can some explain.
    sapuser

    hi
    is it possible do more description
    regards
    R.T

  • Procedure for return material from cost center

    Is there any other Movement Type to return material from Cost Center except Cancellation of Goods Issue ?

    Hi
    I think no option other than cancellation.
    You can try the the below scenario.
    Try to receive the material into GR blocked stock using 103 if you want to use the material release it by 105
    If you want to return then use movement type 124.
    Hope it helps
    Thanks/karthik

  • Link between Material Plant & Cost Center

    Dear all ,
    Whr can i get the report ,
    Material Plant & Cost Center ?
    Rgds
    Raja

    Hi,
    Please check the following thread - http://scn.sap.com/thread/1713880
    Hopefully all your answers will be answered in this thread!!!
    Cheers!!
    Dhawal Mehta

  • Reservation of material for cost center .

    Explanation:
    Material u2018Mat1u2019 Stock is 50 pieces. Reservation for the date 13.08.08 is 5 pieces.
    Reservation for the date 14.08.08 is 15 pieces (i.e Manual reservation done in MB21 for particular cost center.)
    Now the total reservation is 20 pieces.
    So System should not issue the material more than 30 pieces ( i.e 50 - 20 = 30. ).
    But in current status it is allowing to issue more than 30 pieces.
    Q) By User exit is it possible to restrict issue quantity against reservation.

    IN SPRO set dynamic availabity check

  • Movement Type for GR to Post material in COST center

    Hi ...
    Do I need to use 101 Movement type even to  Post Material into consumption...
    or
    in simple words if i have account category "K" in Purchase Order then which Movement type I should select to prepare GR and do I need to use same MIGO transaction.
    Regards/SANDEEP

    Hi,
    Basically <b>101 Movement type</b> would mean that the Goods are being received into the enterprise (could be a Warehouse,Cost Center or a Logical Storage location).
    <b>Migo</b> is  a transaction which enables to document the Goods Receipt and henec this needs a reference document which could be a PO ,Production Order etc,.
    In the normal Goods Receipt into a Warehouse against a PO the Goods are valuated(Inventorised in Physical & Financial Terms).
    In the case of the goods received against a PO for cost center the value is directly posted into the <b>Consumption account</b> instead of the <b>Stock account</b> in case of the  former
    I hope the above is sufficient.
    Thanks & Regards,
    Nagarajan

  • Create Material with cost center

    Dear SAP Gurus,
    I want to create new materials with specific cost center but I do not know how can this be done. Is it possible for someonw to help me...?
    This is MM or more CO module?
    kind regards
    Oliver F

    Hi,
    Materials are not linked to cost centres. Whenever, you issue a material, you can select the relevant cost centre in the time of the goods issue.
    Regards,
    Eli

  • Material-resource-cost center list

    Dear Friends
    where can i get the list of the Materils related to resourcese +  costcenter .
    which materils are using the costcenter with resource name i  want to know.
    Please let me know.
    Regards,
    srihari.M

    Hi Srihari,
    There is no standard report available to link material, resource and cost center.
    Like Vishal said u have to use the tables and link them through T-Cose SQVI and assign it to a Z tcode.
    Regards
    Suri

  • Material and cost center

    Hi,
    May I know where is material kept?
    As I understand, only when consumption of materail, it is debited to cost center. So before consume, the material is in inventory.
    I would like to know if in inventory, then it is not belong to any cost center? then why in profit center?
    thanks

    Newphama Calesta wrote:
    hi,
    > thanks.
    >
    > 1 Anyway, is it possible that we debit cost center when the material is consumed in the cost center?
    >
    > 2 What about direct labour cost? It is coming from the cost center where the worker is reported. so how can we relate direct labour and cost center?
    >
    >
    > 3
    > Sorry, I do not understand the statement in bold.
    > Need your help to explain a bit.
    >
    > Profit center is a responsibility area within an organisation which is required to show its own return on investment. For this purpose we require a balance sheet as well as profit and loss account for each profit center.
    >
    > thanks
    Hello
    1) Yes it is possible to debit cost center when the material is consumed in the cost center. An example of this is consumables which are consumed against cost centers with movement type 201. This is because these materials are not part of the BOM and pretty in nature.
    2) Whenever wages and salaries are booked the relevant cost centers are debited. Here the wages account is debited (so also cost center) and bank/wages payable account is credited. When we do actual production we charge direct labour to Manufacturing orders as an activity. This is only a CO entry where the cost center is credited and the manufacturing order is debited.
    3) Profit center is a responsibility area means the person who is managing the profit center is not only responsible for the profit but also responsible for the return on investment. Investment means total of current and fixed assets - liabilities. There may be two profit centers say A and B with investments of 1000 USD and 5000 USD. Both make a profit of 200 USD. So when we see the ROI then A is much better then B.
    So to find the total assets which includes stock, we need to maintain them profit center wise. This is the reason why the profit center field is available in material master.
    Hope this clarifies your doubt.
    Sangram

  • ME51N for consumable Material through COST CENTER

    Hi all
    I got the ERROR : <b>Create Acc. 400000 for 19.09.2007 as a cost element in controlling area 1000</b>.
    This error came when i was creating PR for consumable material i.e. Tcode ME51N
    Help me solve this Problem
    Pradeep

    Hi Pradeep,
    You are creating PR for consumable material with account assignment as K probably
    your account 40000 is not defined as cost element in controlling you will assogn a cost center for your account
    You can do so in FS00 By assigning a cost center to your G/L and declaring it as cost element in controlling but better to do the same in consultation with FICO
    Regards
    Diwakar
    reward if useful

  • Cost center material to Stock material

    Dear All,
    Wishing all a Happy Sankranthi,
    We procured pc material for cost center (i.e Without material number - PR,PO,GRN and GI for 1 pc done). Later out of 2 pcs 1 pc issued and remaining 1 pc want to consider as stock material against a material code newly created. Can any one suggest how to take it as stock material, any movement or etc.
    Regards,

    Transaction code MB1C or MIGO (Goods receipt , other)
    Use mvt type 561to post to Unresticted stock,
    Use mvt type 563 Topost to QI stock,
    Use mvt type 565 post to Blocked stock,
    Else Use MIGO Goods receipt other movement type 501
    Reward if useful
    Regards
    SE
    Edited by: SAP Enjoy on Jan 14, 2008 5:19 PM
    Edited by: SAP Enjoy on Jan 14, 2008 5:50 PM

  • Table for Material-Cost center-Settlement Rule_REM product cost collecter

    I want to generate a report to see for particular material which cost center and which settlement rule is available.
    If we go in Product cost collecter (PCC) there we have an option to see settlement rule under header tab, I want to fetch that data for material as selection parameter, can anyone suggest how to get the data as,
    Material        Cost Center        Settlement Rule
    Thank you.
    Regards,
    Deven

    Hi,
    pleasefind tables related with cost.
                          TKA01               Controlling areas
                         TKA02               Controlling area assignment
                         KEKO               Product-costing header
         KEPH               Cost components for cost of goods manuf.
         KALO               Costing objects
         KANZ               Sales order items - costing objects
         Cost center master data
                        CSKS               Cost Center Master Data
                        CSKT               Cost center texts
                        CRCO               Assignment of Work Center to Cost Center
                        COSP               CO Object: Cost Totals for External Postings
                        COEP               CO Object: Line Items (by Period)
    .     COBK               CO Object: Document header
         COST               CO Object: Price Totals
    Regards
    SANIL

  • Material Transfer from cost center to storage location

    Dear Experts,
    Can anyone please tell me what is the movement type for transfer posting of material from Cost center to storage location?
    We have bought materials for certain cost centers, but we didn't use all our materials and we would like to put it again in our stock.
    Can anyone help me for this issue?
    thanks in advance,
    regards,
    Ahmed.

    Hi,
    1. If you bought the goods with "K" account assignment PO, you should cancel the GR (MBST or MIGO). After that you can receive the parts as stock items and post GI (MIGO + 201 / MB1A + 201) against cost center with the quantity you really used from them.
    2. If you received the goods into unrestricted stock (GR against PO with no account assignment, MIGO + 101 ) and later you posted GI for cost center (MIGO + 201 / MB1A + 201), you can do the reverse movement (no cancellation!; MIGO + 202 / MB1A + 202) and this way receive the remaining goods into stock.
    You can also use MIGO + 202 in case of point "1", but cancellation and after that GI with already consumed qty would be the exact solution I think.
    Regards,
    Csaba

  • PO report with cost center & GL account detail

    Hi Guy,
    Any body so kind to help me to find out a standrd SAP report which give the account assingnment detail about PO order line item.
    The standard SAP report ME2K give the assigned cost center but not about  the assigned GL account.
    My requirement is as following:
    PO NO  Item   Material   Quantity   Cost Center     GL Account No
    It means PO line item assinged to cost center & GL account.
    Thanks in advance.
    Rgds,
    sp sahu

    Mr Radhakrishnan & Mr MS,
    The ME2K transction only give cost center wise PO. Not give the information about the GL account assigned to the PO.
    Whereas in KSB1 report give the information about the PO for which some material document already posted. I mean to say, KSB1 include those PO which have PO histrory is present. what about those po for which no GR or IR has done. It may come in commitment report that is in KSB2.
    My requirement is a report which give information about the GL account assigned to all the PO created in the system.
    Thanks for reply.
    Regards,
    sp sahu

  • Where to assign GL Account to cost center?

    Hello Friends,
    Actually in MIGO T.C , I  am issuing the material against the cost center.Now in MIGO T.C ,  in Account Assignment tab i give the cost center and other requied data and save.And in display mode when i check that document than by default system takes the GL Account.Now my question is where we assign the G/L Account to cost center?In FS00 T.C i checked in Edit cost element for that account, there in Default account assignment , no cost center is maintained.So from where system is picking this G/L Account?
    Thanks and Regards,
    Jitendra Dilip Chauhan

    Hi Jitendra,
    This setting is made in OBYC. This actually MM & FI integration.
    You check this in OBYC.
    1.First check your valuation class in material master.
    2.Then goto OBYC.
    3. Double click on GBB transaction key
    4.This will pop up chart of account.Maintain chart of account & enter.
    5.Here you will see that GL account for combination of Genral modification VBR & Valuation class.
    VBR: for internal goods issues (for example, for cost center)
    That means whenever you do Goods issue of material  for cost center which having same valuation class,this GL account will be automatically assigned.
    Hope this clear you.
    Regards,
    Raja.
    Edited by: Raja on May 8, 2009 9:46 AM

Maybe you are looking for

  • Streaming from WiFi connected USB HD to Apple TV via iPad

    Hi I´ve searched alot of forums but could not find a really good solution to what I want (perhaps there isn´t one, or I´m too stupid to find it..). But I find it hard to believe that I´m the only one with this need.. Here´s the facts: I have a USB dr

  • EC Sales Report S_ALR_87012400

    HI Experts, I need to run the EC sales list Report S_ALR_87012400 for our goods and services monthly and quaterly and after running the report I got the total vales in right hand side of the report but I dont want to get the total value here instead

  • InDesign Pain in the A@@

    Ok I worked with Quark all of my career, now I am at a new place and Tech Supp. decided to go all Adobe CS2, I have no problems with that, love the suite, Love Photoshop, Illustrator, Flash and so on... But ID is such a pain in the ... I work Very la

  • Entity used as reference in view - how to get value programatically

    In jdeveloper, when you create a view you can mark your entity usage as "reference only" by checking the "reference" check box on the View Object Editor panel. Can someone tell me how you can access the value of this programatically (from within View

  • Adding 2 monitors to IMac

    Hey Gang. Is it possible to attach two extra monitors to the IMac 17 in 2G?