ITS Integration with ECC 6.0

Hi
we are doing upgrade from 4.6c to ECC 6.0. It is technical upgrade. In SAP HR, we are using ESS timesheet entry (CATW). Now during upgrade we are facing problem in using ESS timesheet as we are using ITS server and SAP ECC 6.0 does not support ITS anymore. As the result the system doesn't allow to enter time data and save it through ESS, the error message it gives is "No Posted Data for 5_CPR_EXTID 5( Include LCATS_ITSF10)" but if we enter time in SAP directly then it is working fine.

Replying to this old post hoping for some answers.
We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
Thanks,
Doug

Similar Messages

  • Brief discussion on SAP XI and its' Integration with SAP MDM.

    Hi,
    I have never worked on SAP XI.
    I am discussing it on brief, please give your valuable replies.
    SAP XI consists of System Landascape Directory(SLD).
    SLD Consists of Business System and Techinical System.
    Technical System contains all information about the software
    component. The Business System consists of Inbound and Outbound Business
    System which are used as logical names for data transfer.
    There is communication Channel for Receiver and Sender Business System and n agreement
    is signed between Sender and Receiver.
    Outbound Interface defined for Business System Outbound and Techical System associated
    with the Business System,
    Inbound Interface defined for Business System Inbound and Techical System associated
    with the Business System.
    In SAP NetWeaver XI Integration Directory, we have defined the Integration Scenarios,
    Actions, Interface Objects, Mapping Objects, Adapters Objects.
    Mapping Object defines the Structure and Value Mapping.
    Adapter Objects defines the Adapter program which implements RFC Adapter, FTP Adapter logic.
    FTP Adapter is used for XI-MDM Communication.
    RFC Adapter is used for XI-ECC Communication.
    Integration Repository: Both Outbound and Inbound Interfaces are Mapped with Value mapping and
    Structure Mapping inside Integration Repository.
    The File Adapter takes the File from the Outbound port of MDM System
    and sends it as IDOC to Receiver Business System.
    Value Mapping must be done between Sender and Receiver interfaces.
    Value Mapping is done by XSLT or Java based program.
    SAP NetWeaver XI Integration Server at runtime:
    Message Split, Interface Determination, Receiver Identifaction, Mapping, Techincal Routing
    and Call Adapter Proccess are done.
    In SAP XI 3.0 and MDM 5.5:
    Step 1: Create busines system as service.
    Step 2: Create communication channel for each business service. If the system can communicate
    through different channels, then create all possible channel types if necessary.
    Step 3: Create receiver agreement between the systems.
    Step 4: Interface determination:
    - Here you see for the first time the software component mentioned;
    there are some special requirements regarding this software component in relation to the customizing ID mapping.
    - To modify this software component, the customer needs to copy the SAP standard delivered software component
    into its own namespace. The customer is able to modify to create archives
    for the customized ID mapping.
    Receiver determination.
    Configure an FTP Server on the MDS.
    Create a send folder for outbound messages using outbound port(s) for
    remote systems(s).
    Create receive folder inbound messages using inbound port(s) for remote systems.
    This ia all about concept of SAP XI Infractsture and its' Integration with SAP MDM 5.5.
    Regards
    Kaushik Banerjee

    Hi Kaushik,
    You must be aware of File types that MDM Import Manager can Import i.e. we have XML, Excel etc. Now there are two transactions to extract data from R3
    1. MDMGX -
             - For lookup table extraction
             - Output in XML format which MDM can import without using XI.
              - FTP can be configured to put the file in the desired folder which will be then picked by Import Server.
    2. MDM_CLNT_EXTR -
              - For Main table records.
              - Output is in Idoc format which MDM doesn't understand hence we need XI in between which converts Idoc file received from R3 into XML which can then be imported using Import Manager or Import Server. For this we need to implement XI Scenario that consists of Source System, Receiver System, Type of Data etc.
    Just a basic understanding...
    Regards,
    Jitesh Talreja

  • How is the integration with ECC in SRM 7.0??

    Hi,
    Working with SRM 5.0 or 5.5  the use of XI for integration with ECC is not mandatory because when we send any document from ECC to SRM like requisitions (to convert them in shopping cards) or when we send any document from SRM to ECC like shopping cards, PO´s, contracts,  we only use the RFC´s and the abap programs.
    Is the same behavior with SRM 7.0?????
    Could the integration from SRM 7 with ECC 6 work with RFC´S without XI or for this vertions is XI mandatory?????
    Thanks

    SRM70 is closely integrated with XI for transferring docs between ECC and SRM.  SAP introduces eSOA tech nology with SRM70 and hence all documents like PR from ECC to SRM, Central Contract from SRM to ECC, PO creation (Classic), etc uses this techn ology.
    Thanks,
    Jagadish

  • CRM 3.0 integration with ECC 6.0

    Hi all, I wanted to confirm if CRM 3.0 can be integrated with ECC 6.0
    If yes, then which support pack,etc. will be applicable and what all issues could be encountered in integration?
    Thanks in advance.

    Hi Animesh,
    just to be clear.
    the CRM and the backend ECC60 are communicating via  Plug -ins
    you can read more information here
    http://service.sap.com/r3-plug-in
    http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000601131&
    The other  SP level of the systems (BASIS etc.) are independent.
    Once you could conect the systems at basis level. You can begin your work at
    Application level.
    Whether you can have problems here please ask the CRM Gurus in a separate therad in other forum.
    I Hope I have answered all of your questions.
    Kind regards
    Imre Takácsi-Nagy
    Senior Support Consultant II.
    SAP Global Support Center Austria
    Netweaver WEB Application Server ABAP / JAVA

  • Integration with ECC 6 and Xcelsius

    Hi,
    I would like to know if its possible to integrate Xcelsius directly with an ECC report.
    For example, take the ALV data and 'send' it to Xcelsius in order to have an Xcelsius report.
    I know that Xcelsius has (now), built in integration with BW queries, but wonder if that is proprietary with BW, or can the concept of integrating a report from BW work in ECC?
    Please advise.
    Thanks.
    JP

    Hi,
    in case you would like to build an Xcelsius dashboard on top of ERP data you can use Crystal REports to connect to the ERP system  (see here: /people/ingo.hilgefort/blog/2008/03/23/businessobjects-and-sap-part-4) and then you can use Live Office to connect Xcelsius to a Crystal REports objects. see here:
    XC, CR and LO Part 1 of 4
    /people/ingo.hilgefort/blog/2008/10/03/businessobjects-and-sap-part-1-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 2 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-2-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 3 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-3-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 4 of 4
    /people/ingo.hilgefort/blog/2008/10/10/businessobjects-and-sap-part-4-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    In regards to an ALV - there will be an integration with Crystal Reports but not for Xcelsius and keep in mind that an ALV is a push model and is only available when the transaction is been executed.
    Ingo

  • SAP XI 2 BI Integration with ECC 6.0

    Dear all,
    we are planning to do XI integration between ECC 6.0 to BI
    1) How to Get the BI Standard data from ECC 6.0?
    2)We are planning to integrate Standard BI reports with ECC 6 0 through XI.
    Please sugget the scenario for integration between ECC 6.0 to BI through SAP XI.
    Thanks In Advance.
    Mahesh

    Hi Mahesh,
    Please go thru these links
    To push data from BW to XI, please check
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20push%20data%20into%20bw%20from%20xi.pdf
    To send data from XI to BW please check
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/integrate%20bw%20via%20xi.pdf
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40574601-ec97-2910-3cba-a0fdc10f4dce
    XI-BI Integration unsing RFC
    Pushing data from BI to XI using RFC Adapter
    https://forums.sdn.sap.com/click.jspa?searchID=17734474&messageID=5878682
    Thanks,
    Shweta

  • Steps: SNC (Supplier Network Collaboration) Integration with ECC through XI

    Hi,
    Has anyone worked on the SNC(Supplier Network Collaboration) integration with SAP ECC via SAP XI.
    Could you pls share any documentation related to this. And also could anybody tell me the setup required to go ahead with the integration.
    Thanks,
    S

    Hi Xavier,
    SNC integration with XI has predefined mappings. So ask your basis guys to download the XI content for SNC using with PI. Once they deployed you will have a builtin predefined content in XI. Within the predefined content mostly they all are xsl mappings.
    If your requirement is with the standard idocs then you can use them directly. Else if their is customization they you may need to change the mappings according to your requirements.
    Also check this help:
    http://help.sap.com/esoa_scm_snc2007/helpdata/en/index.htm
    Regards,
    ---Satish

  • Sourcing integration with ECC using PI (percentage rebate scenario)

    Hi Experts,
    Sourcing - OP 7
    ECC - configurations done for rebate conditions as mentioned in standard configuratin guide
    PI - SP02 patch 0
    We are publishing percentage rebates in Master agreement from sourcing to ECC to create Online Agreement using standard predelivered content for PI from SAP, however ECC returns error in RFC response mentioning
    No currency code found for ISO code P1 in field HEADER_CONDITION/CURRENCY_ISO
    I checked PI content & I see for % rebates, field HEADER_CONDITION/CURRENCY_ISO is always populated in PI with P1.
    What are the next steps to be done in ECC or in PI to overcome the mentioned error.
    Any pointers will be appreciated, Thanks.

    Hello Jeet,
    I would suggest to check first that in both your SAP ERP and SAP Sourcing an ISO Code P1 for percentage exists. Further I would check if a rebate with an absolute amount works fine (also create multiple amounts and check if a scale is created in ERP, just to ensure that it works in general). E.g. check if the price condition/condition type exists and is configured correctly in ERP.
    If that all looks good you might want to check the ERP transaction BBP_ES_ANALYZE. I recently created a SDN blog about some tips and tricks, it also explains this transaction, please see ERP integration with SAP Sourcing – tips and tricks Maybe the error message(s) in this transaction will help you to better understand what is going on.
    Hopes that will help you
    Markus

  • Pro/E integration with ECC 6.0

    I want to integrate Pro/E with ECC 6.0 in order to transfer/exchange engineering data such as materials, BOMs, engineering changes, documents, etc.
    Does anyone know of Pro/E functionality or a 3rd party product that does this sort of thing?
    Kind regards,
    Rex L. Farris

    A direct interface is developed by .riess GmbH and SAP.  It is SAP certified and supported by SAP.
    For more information,
    Go to <a href="http://service.sap.com/plm">http://service.sap.com/plm</a>
    Life-Cycle Process Support -> Product Development -> Integration -> MCAD Integration -> Pro/ENGINEER

  • C4C integration with ECC 5.0

    Guru,
    My company is looking for implementing cloud for customer, but our backend system is running on ECC 5.0.
    SAP had strongly recommended us to upgrade our ECC before implementing C4C project.
    Through some reading, it seems that integration prerequisite is ECC has to be version 5.0
    Or there is any workaround to integrate (standard integration) C4C to ECC 5.0 through HCI? Like by applying or enhancing standard iflow that released for ECC 6.0?
    Thanks.
    Cheers,
    Jim

    Not sure where you have read that ECC 5.0 would be supported. The official SAP position is summarised in the table below. You can clearly see that some functionalities even depends on what EHP level you are at with ECC 6.0.
    SAP PI and HCI leverage the same iFlow content.

  • CRM2007 integration with ECC 5.0

    Hi All,
    Will appreciate if someone can send a document or link that can help me with ECC5.0 and CRM 2007
    Regards,
    Suren

    this is copied from the installation guide
    Prepare an OLTP Backend System:
    n SAP R/3 or R/3 Enterprise systems as well as ECC 5.0
    systems require the R/3 Plug-In 2004.1 with at least
    SP10.
    See SAP Note 704564 (R/3 plug-in:PI 2004.1
    installation/delta upgrade) and SAP Service Marketplace at
    http://service.sap.com/r3-plug-in
    n As of SAP ECC 6.0, the R/3 Plug-In is no longer
    required. New and extended interfaces for integrating
    SAP ECC 6.0 are directly contained in SAP ECC 6.0.
    [SAP ERP 6.0 <Technology> on <Operating System>: Database
    then it should be done as with any OLTP system.
    I've done a connection to a R/3 Enterprise 4.7 system and that worked fine.
    Follow the Best Practices documenation and you will be fine!
    http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm

  • Supplier Registration in ESourcing  ( Vendor integration with ECC or MDM )

    Hi All,
      SAP ESourcing has the functionality of Supplier Registration.  As per the functionality, Supplier will provide all the required information in the registration form. The Supplier form will go for approval to the Buyer / Purchaser. Once approved, the supplier will considered for RFx event. My questions are :
    1 :Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system  with ECC so that system will automatically create new vendor in ECC.
    2 : Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) .
    Please through some pointer on this ?
    Regards,
    Kalandi

    Hi Kalandi
    For your first question, if you deploy standard integration package provided by SAP  for e sourcing-ECC integration, you can replicate approved e sourcing vendor to ECC using  standard script (I think script name is  "Publish to ECC" ).
    In case you prefer a custom option,you can write a customized script to get a flat file (.CSV) download of  e sourcing vendor whcih can be used to update ECC
    As far as OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) is concerned, there is no standard solution provided by SAP but again since it is possible to get a CSV export of vendor field, it can be used to update MDM as well
    Hope this helps!
    Regards
    Mudit Saini
    Edited by: Mudit_UCB on Jun 28, 2011 1:20 PM

  • Error Connecting to SLD, while CC integration with ECC 6.0

    Dear All,
    I am using the CC v and from ECC IDES. I cannot connect to the SLD. It is giving an Error.
    When I try to register the Server Programs in Vis Admin and click the SET button I am getting an error "Error Adding Bundles". In the ABAP part I am getting the same error of RFC connection.
    Now from ECC when I do a SM59, and then goto TCP/IP connections, on creating this connections I cannot make them UNICODE as the R3 system is Non-Unicode. So these dont work.
    What am I supposed to do.
    Please let me know. This is very urgent and useful replies will be awarded full points.
    Thanks and Best Regards
    Chakra and Somnath

    Replying to this old post hoping for some answers.
    We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
    Thanks,
    Doug

  • Query on eRec integration with ECC (HCM)

    Hello All,
    We are using standalone eRec server on ehp4. Now my scenario is
    1) While raising the requisition request i need the Org unit to be pulled from the HR system. Currently i maintained the following switched with RFC's
    in HCM system i mainateined a witch
    1)RECFA DTCBA     ED1_200     (RFC Connection in E-Recruiting System) - RFC is created in the HR System
    (RFC type 3)
    Switches mainteined in Erec system
    2)RECFA HRRFC     CSD_130     Logical System of Connected HR System - Here i maintained RFC which is created in erec system
    Now when i create a requition in erec when i choose the Org Unit drop down I am unable to see the org units which are mainained in the HR system
    AM i missing any config or any functionality or any troubleshooting required.
    Pls guide me with you inputs
    2) Also i would like to know the data transfer of the applicant data from erec system to hr system while i do the data transfer.
    What all i need to configure for this and any prerequsitive is needed from my end.
    Plss help me on this
    Thanks & Regards
    Vijay Mohan G

    Hello Deepak,
    Thanks for sharing the Note
    When i am looking into the Note for I2 A scenario it is saying that i should maintain switches in T77SO table i.,e
    In which system should i maintain the folwwing switches i.,e in eRec system or HCM System. Pls let me know
    HRALX HRAC X Activates HR integration
    HRALX OBPON ON Activates O-BP integration
    HRALX PBPHR ON Distributes employees from
    connected HR system
    HRALX USRAC X Creates relationship to user
    RECFA HRRCF Logical system, not
    required when using XI
    technology for the data
    transfer but definitely
    required for integration in
    Organizational
    Management
    Logical system of the coupled
    HR system
    RECFA RECCE Specifies whether
    Concurrent Employment
    (CE) is active in the SAP ERecruiting
    system.
    Concurrent Employment is
    active in the SAP E-Recruiting
    system (parameter is relevant
    as of Release 604)
    RECFA DTCBA Logical system (required on
    the HR system side) , not
    required when using XI
    technology for the data
    transfer
    RFC connection to the SAP ERecruiting
    system

  • CRM 2007 integration with ECC 6.0

    Hi Friends,
    I am currently working on the CRM 2007 Web UI
    I have created the copy of existing standalone CRM client which is already having products, organization, BP created in it.
    Now I am planning to connect the CRM client with the ECC client.
    Is there any special care i need to take while connecting both the systems?
    Also while doing replication any extra care do I need to take?
    Help will be definately rewarded?
    Cheers,
    Raj

    Hi!
    Check the SAP Best Practices documents
    http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm
    There have a look at
    C71: CRM Connectivity
    B09: CRM Customizing Replication
    regarding the connection and replication
    rollo

Maybe you are looking for

  • How to create add-on of a system form in sap b1 9.0?

    Hi all, I have a problem related to the creation of a system form add-on of sap b1 9.0. I can develop some projects in visual basic, but about sap b1 add-on, I know how to package files of to install (.ard and .exe files) and I also know how to regis

  • Issue : Regarding Generation of the Quota

    Hi, i wanted to set the requirement so that new employee will only entitled to 15 paid sick leave after 3 months of services, i've configured the base entitlement as following: Seniority : 003 - 004 months (after 3 months of service) : 15 days (relat

  • Video Streaming from multiple camera to cell phone.

    I have about 5 webcams on a network in a different city.  One of these webcams I have been successful at setting up live video streaming to my cell phone. However when I tried to setup and view a second camera (same model), but  I cannot get it to su

  • Iphone 6 speaker having echoes! And camera keep freezing. Help!

    My one month old iPhone 6 having some problem. First the camera tends to lag or sometimes blackout when I want to take photo. Secondly, the speaker has echoes. Please assist. Am I eligible to exchange for a new unit?

  • Paint artifacts

    Hello I am trying to make a very simple game and so far i have been able to move some image or shape using the arrow keys. The problem i am having is with the arg-version repaint() method, the no arg method works fine. When I move the object sometime