J1IFQ Reconcialation of subcon challan

Dear All,
We are encountering the Problem During Reconcilation of Quantity in Subcontracting cycle Received in Multiple GR.
The Following steps are followed,
1. We have created a Subcontract PO with BOM Explosion.
2. The Required Components are issued through MB1B.
3. Subcontract Challan Raised in J1IF01.
4. We created the Goods Receipt for the Processed Material and Document Posted.
5. In Transation J1IFQ, We have entered Material Document Number (Issued qty) and Challan Number and Executed.
6. Top of the Screen Material Document Details with Open Quantity are Displayed.There were two Line items displayed with Movement type 541.The Consumed Quantities were not shown
7. Bottom of the Screen the Challan details were displayed with Challan Quantity.
8. When we check the Allocation it gives an Message saying that"Material XXXXXXXXXX is not assigned fully, short by XX.XXX KG".
Kindly Give us Your Valuable Input In order to Solve the Problem.
Please correct the above process
Regards,
Zeeshu

Hi,
For reconsiling follow the below procedure.
Use
Once a subcontractor has processed your materials and returned them to you, you match the items in the challan against those that have been returned.
Prerequisites
You have posted the goods receipt (or any other material document) for the returned goods.
Procedure
From the SAP Easy Access screen, choose Indirect Taxes ® Procurement ® Subcontracting ® Subcontracting Challans ® Reconcile Quantity.
Enter the following data:
In the Material Doc. and Mat. Doc. Year fields, enter the number of the goods receipt document and the year in which it was created.
In the table below, enter the challan numbers and the years in which they were created.
If the material document is a goods receipt document with movement type 101, you can enter the challans that were not captured when the goods receipt was posted. However, if all the relevant challans were entered during goods receipt, they need not be entered here
Choose  Reconcile.
A new screen appears. At the top is the information about the goods receipt (or other document); at the bottom is the information from the challans that you have entered.
Specify which challans the materials in the goods receipt originated from:
If you have sent a subcontractor a number of different challans, all containing the same material, you can automatically specify that the materials should come from the oldest challans first, by choosing .
Otherwise, for each challan, enter manually the quantity of materials has been returned, and choose  to refresh the display.
Once you have accounted for all the materials in the goods receipt, save the challan.
Result
The system changes the challans' status as follows:
If you have accounted for all of the materials in a challan, the system sets its status to Fully Reconciled. In this case, you can complete the challan.
If you have accounted for only some of the materials, it sets the status to Assigned. In this case, you must assign the remaining quantity of materials to another goods receipt later on.
Scrap generated is assigned to a challan only if the percentage component scrap is specified in the bill of material for the parent material and this bill of material is assigned to the subcontracting purchase order.
Pls go thru the link for more details
http://help.sap.com/saphelp_erp60_sp/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm
reg
Durga
*assign points if the info is useful

Similar Messages

  • 57f4 subcon challan

    Hi Gurus,
    During the process the subcon challans's  status is automatically changing to 'complete'  even though no one has used tcode J1IF13. What can be the reason,  please  advice....
    Regards,
    kumar

    hi friend
    he same occured in our client place also.
    But we have projected to SAP for OSS.
    Still SAP india people working on this .
    So for time being , u have to check your program with ABAP
    Thanks
    SAP_MM

  • Reconciliation of Challans !!

    Hi Friends
    We are doing subcontracting cycle with "recursive BOM"
    Now while reconciling in J1IFQ we are getting this error - "Material XYZ is not assigned fully, short by 1.000 EA - Message no. 8I574"
    Any idea what could be the reason?
    P.S - We are not facing this error if we follow normal BOM where mother and child material are different.
    Thank You..

    hi
    plz check the quanty u have provided and the qty u r receiving
    J1IFQ Reconcialation of subcon challan
    regards
    kunal

  • Excise Group in subcontracting challan

    hi experts
    while creating subcontracting challan  nothing displayed in Excise Group
    can u anybody explain how make excise group for singapore
    thanks
    ganesh

    Hi,
    First ensure following;
    Configuration: -
    - Go to SPRO > Logistics - General > Tax on Goods Movements > India > Account Determination > Specify Excise Accounts per Excise Transaction > Here maintain as following;
    ETT  Subtrn Typ DC ind Acct name
    57FC            CR     PLABED
    57FC            CR     RG23BED
    57FC            CR     RG23ECS
    57FC            DR     CLEAR
    57FC 01         CR     PLABED
    57FC 01         CR     RG23AT1
    57FC 01         CR     RG23BED
    57FC 01         CR     RG23ECS
    57FC 01         DR     CLEAR
    57NR            CR     CLEAR
    57NR            CR     PLABED
    57NR            CR     RG23BED
    57NR            CR     RG23ECS
    57NR            DR     REVERS
    57NR 01         CR     CLEAR
    57NR 01         CR     PLABED
    57NR 01         CR     RG23BED
    57NR 01         CR     RG23ECS
    57NR 01         DR     REVERS
    - And then go to SPRO > Logistics - General > Tax on Goods Movements > India > Account Determination > Specify G/L Accounts per Excise Transaction > Here do Account Determination for the above combination and Excise Group
    Apart from above also do following configuration for Subcontracting;
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes
    Here maintain following;
    Excise Group         XX
    Excise TT            57FC
    Subtransaction Type  01
    Subtran Type Text   57FC CHALLAN
    Subc. Period        180
    Rate-subcontracting
    Mvt Grp Issues      0001
    Mvt Grp Receipt     0002
    Filter Non exise
    EI Items            10
    No. range no.       01
    ***. Val. /Exc Inv
    Subcon Output Type  J1IF
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups
    Here maintain following
    MVT. Grp. MvT S
    0001      101 O
    0001      541 O
    0002      542
    0002      542 O
    0002      543 O
    - J1I9 - maintain No range for object "J_1I57FC" for series group
    Then follow the below process;
    Subcontracting without Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    - Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    - Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement}
    - Reconciliation of Subcontracting Challan (J1IFQ)
    - Completion of Subcontracting Challan (J1IF13)
    - Generation of Annexure IV (J1IFR)
    Master Data
    - MM01- Material Masters for Components and FG
    - XK01 - Vendor Master (Subcontractor)
    - CS01 - BOM for FG
    - ME11 - Purchase Inforecord for Subcontracting

  • Sub contract challan

    hi guys
    1.Sub Con PO craeted
    2.MB1B 541 goods transferd with ref to PO
    3. J1if01 with ref to Mat doc
    4. GR MB01with ref to PO
    its shwoing one dialog box
    where 2 tabs 1 is excise invoice & 2nd is sub con challan
    in sub con challan tab
    when am entering SC challan number & year
    its showing error as
    Challan material is different from material document
    Message no. 8I572
    5. GR for PO w/o giving subcon challan
    6. J1ifq reconsile subcon challan
    in this if am enetering subcon challan no & year its accepting
    for GR 101 materail doc.
    here my Q is y this subcon challans are not accepting in step no 4
    y its accepting in step no 6
    SAP STD practise is i should enter subcon challans in step no 4 only
    can any one clarify me
    thanks
    nani
    am not enetring any thing in excise invoice tab

    Hi,
    To get Excise tab & SC challan at MIGO, pls check SC related settings
    1)Customizing setting SPRO>Log Gen>Tax on goods..>India>Account determination>Specify Excise Accounts per Excise Transaction/Specify G/L Accounts per Excise Transaction
    2)Customizing setting SPRO>Log Gen>Tax on goods..>India>Business Transaction>SC>Subcontracting Attributes
    3)J1ID details(especially SC tick for mat & chapter id combination)
    if setting in all above areas are correct then you should get it.
    Regds

  • Excise modvat accounts error during creation of 57FC challan.

    Hi,
    I am creating a subcontracting challan (57FC) vide transaction J1IF01. I have maintained the below mentioned Excise Accounts per Excise Transaction:
    57FC CR Credit PLABED PLA BED account
    57FC CR Credit PLAECS PLA ECS Account
    57FC CR Credit PLANCD PLA NCCD Account
    57FC CR Credit RG23AT1 RG 23 AT1 Account
    57FC CR Credit RG23BED RG 23 BED account
    57FC CR Credit RG23ECS RG 23 ECS Account
    57FC DR Debit CLEAR CENVAT clearing account
    57FC 1 CR Credit PLABED PLA BED account
    57FC 1 CR Credit PLAECS PLA ECS Account
    57FC 1 CR Credit PLANCD PLA NCCD Account
    57FC 1 CR Credit RG23BED RG 23 BED account
    57FC 1 CR Credit RG23ECS RG 23 ECS Account
    57FC 1 CR Credit RG23NCD RG 23 NCCD Account
    57FC 1 DR Debit CLEAR CENVAT clearing account
    But I am still Getting the Error, u201CExcise modvat accounts not defined for 57FC transaction and 21 excise group: Message no. 8I402u201D.
    Can somebody help?

    Hello,
    Check below given
    In SPRO > Logicstics general > Tax on goods movement > India > Account determination > Specify Excise Accounts per Excise Transaction > Here maintain ETT "57FC" with Subtrans Type "01"
    And go to SPRO > Logicstics general > Tax on goods movement > India > Account determination > Specify G/L Accounts per Excise Transaction > Here maintain GL Accounts for ETT "57FC", Excise Group "G1" with Subtrans Type "01"
    Then try creating Subcon Challan in J1IF01  then check i hope you will not get the error message.
    Regards
    Mahesh Naik.

  • How to short close the Subcontract challan and PO

    Hi,
    We have create one subcontract PO for quantity 100 nos for finish goods, for each finish good 1 quanity of raw material is required
    Subcontrat PO   for quaity   100 nos,
    Transfer RM                         100 Nos
    finish good received                       80 NOs
    RM received as faulty to be Scrap  20 Nos
    now we dont want to send the 20 RM back to vendor and get the finish good, we want to short close the all  by receving only 80 nos  now how to close this.
    regards,
    zafar

    Hi,
    Reconciliation of Subcontracting Challan (J1IFQ)
    Completion of Subcontracting Challan (J1IF13)
    Generation of Annexure IV (J1IFR)
    [http://help.sap.com/bp_mediav1600/Media_US/HTML/Scenarios/V3J_MED_Scen_EN_US.htm]
    Regards
    Kailas Ugale

  • Reference of Subcontract challan at MIGO

    Dear all,
    Where I have to give the Reference of the Subcontract challan of Child Material sent to the Vendor at the time of Goods Reciept for the Parent Material with MVT 101
    Please help
    Regards
    Venkat

    Dear Manjunath,
    I selected refer Subcon challan in Excise Invoice
    After press on Check button it is asking for Challan no,but no field was there in the Excise invoce tab to enter the challan number
    Is there any configuration changes for this?
    Thanks
    Venkat

  • Subcontracting Challan Reconciliation

    Hi,
    I am facing a problem during reconciliation of Multiple Subcontracting Challan with respect to Material document Number.In the initial screen i am referring to challans but after i execute it the challan is automatically changed to the first Challan i had refered.
    After Execution
                System is changing both the challan numbers. Please do provide me some solution for reconciliation of multiple challan for same (GRN) material Document.
    Thanks in Advance

    Is there any issue if you do J1IFQ partially ie. challan 81 first and then challan 82.
    Also refer these two notes relevant for multiple challan J1IFQ.
    1627982 - Error 8A-327 while partial challan item qty
    reconciliation
    and
    1305772 - Error 8I575: J1IFQ -reconciliation of subcontracting
    challan
    Regards
    Binoy

  • GRN Qty should be less than Sub contracting Challan Qty

    Hi Friends,
    When we put Sub Contract Challn at the time of receving Sub Contract material MIGO, system should pick up challn Quty, or System should accept less qty than Challan Qty.
    Can we do the same ?
    Please help me.
    Thanks in Advance
    Yogesh

    HI,
    Yes GRN Qty should be same or less  than Sub contracting Challan Qty, system will allow you do the reconcilation with J1ifq or if the challan qty less then GRN quantity at the time system wont allow you to do the reconcilation
    Regards
    Pramod

  • Problem In Subcontract Reconillation / challan Closing

    Hi,
      I am facing problem in subcontract challna reconcillation with J1IFQ
    Subcontract PO created for Finish material 'XYZ' qty 250 Nos   one raw material 'ABC' one qty required for each finish good   but in PO   user have added 450 quanity of raw material  now for Finish product for quanity 250 three Grs made
    1 : 126
    2:   61
    3:   63
    but the consumption of Raw material in GR is showing as 227,110,114  this becomes 451  now the reconcillation is done for first two GR aganist which the raw material  assign is 227 + 110 = 337  now as only 113 qty of rm balance now we are doing reconillation for third GR system is giving error mesage 8I574
    Material 1363 is not assigned fully, short by 1.000 NO,  and it is not allowin gfor reconcillation also as the uinvocie verification is already done for the GR  so insted of reversing all how to close the challan.
    regards,
    zafar

    Dear,
    Here is my understanding, that is if you give 250 nos to subcontractor, he will process and give you 250 nos. This should be you actual PO. Hence if you do GRN for 1 Nos, then consumption at vendor end (543) will also be made for 1 Nos. But, you said your user has maintained the input qty as 450 nos. And subsequently you have also done the GRN's.
    If my understanding is correct then do the following:
    Delete the material document assignment, which you have done for the first two GRN numbers. In J1ifq.
    so that the challan balance qty and status will go back to its original position.
    Then cancel the GRN's. All the three. So that all the stocks will go back to vendor location.
    Correct the Input- ouput ratio in the purchase order as 1:1. Then do the GRN again and do the reconciliation.
    Pls revert if you need anymore clarification.
    Thanks
    VJ

  • Challan issue

    Hi expert
    For example i am sending a Air condition for repairing, for the same i need to produce a Gate pass at time removing of good.
    i want from the system to generate a gatepaas when ever any material is send out .
    for the same i need to make a report in that i can see what are material are send out for servicing.
    Regard
    Nabil

    Hello,
    You sending Air conitioner outside for repair, for repairing purpose, you paying some amount.
    Better map this in Subcontracting scenario without excise invoice.
    1) Create Subcontracting Purchase order ME21N
    2) Issue the material to vendor  ME2o
    3) Create subcontracting challan  wrt to Material document   J1IF01, use this challan as Gate pass, no need to create new one if your client agreed.
    4) Receive the Goods with ref to PO  MIGO.
    5) reconcile the challan  J1IFQ
    6) Complete the Challan  J1IF13
    7) Made Invoice for subcontracting charges  MIRO.
    If you want send the Material with apyment of duty , then
    1)create PO  ME21N
    2) Issue material to Subcontracting vendor ME2O
    3) Create Outgoing excise Invoice  J1IS  (use this as gate Pass)
    4) Receive the Goods MIGO
    5) Capture excise Invoice with ref to GR
    6) Invoice for subcontracting charges.
    If you require to create Z, then based issue material document create Z gate pass.
    Regards
    Mahesh Naik.

  • Subcontracting challan reversal

    Hi friends,
    When I am reversing (and later taking recredit) the subcon challan (57F4), no accounting doc is generated /
    Where may be the fault ? As far as I understand, the cenvat credit should be reversed here.
    Reward confirmed...

    Hi,
    This can not be done through regular transaction J1IF13. You will have to go to programming (may be with help of ABAPer), change the due date to current date & reverse the challan.
    Regards,
    Prashant Kolhatkar
    Reward Points if helpful

  • Subcontracting with CIN

    Hi,
    Wanted subcontracting configuration with CIN.
    Please help

    Hi,
    Subcontracting Process
    Subcontracting without Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    - Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    - Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement}
    - Reconciliation of Subcontracting Challan (J1IFQ)
    - Completion of Subcontracting Challan (J1IF13)
    - Generation of Annexure IV (J1IFR)
    Subcontracting under Full Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (MB1B/ME2O/MIGO)
    - Creation of Excise Invoice w.r.t. Transfer Posting Document (J1IS)
    - Capture Excise Invoice at the time of GR of Finished Goods w.r.t. Subcontracting PO (MIGO)
    - Post Excise Invoice (J1IEX)
    Master Data
    - MM01- Material Masters for Components and FG
    - XK01 - Vendor Master (Subcontractor)
    - CS01 - BOM for FG
    - ME11 - Purchase Inforecord for Subcontracting
    Note: - Excise Transactions need to be performed only if it is applicable.
    Hi,
    Refer link;
    [Subcontracting Process w/o Payment of Excise Duty|http://help.sap.com/bestpractices/BBLibrary/Documentation/J85_BPP_V2_EN_IN.doc]
    Subcontracting Process
    Subcontracting without Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    - Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    - Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement}
    - Reconciliation of Subcontracting Challan (J1IFQ)
    - Completion of Subcontracting Challan (J1IF13)
    - Generation of Annexure IV (J1IFR)
    Master Data
    - MM01- Material Masters for Components and FG
    - XK01 - Vendor Master (Subcontractor)
    - CS01 - BOM for FG
    - ME11 - Purchase Inforecord for Subcontracting
    Configuration: -
    - Go to SPRO > Logistics - General > Tax on Goods Movements > India > Account Determination > Specify Excise Accounts per Excise Transaction > Here maintain as following;
    ETT  Subtrn Typ DC ind Acct name
    57FC            CR     PLABED
    57FC            CR     RG23BED
    57FC            CR     RG23ECS
    57FC            DR     CLEAR
    57FC 01         CR     PLABED
    57FC 01         CR     RG23AT1
    57FC 01         CR     RG23BED
    57FC 01         CR     RG23ECS
    57FC 01         DR     CLEAR
    57NR            CR     CLEAR
    57NR            CR     PLABED
    57NR            CR     RG23BED
    57NR            CR     RG23ECS
    57NR            DR     REVERS
    57NR 01         CR     CLEAR
    57NR 01         CR     PLABED
    57NR 01         CR     RG23BED
    57NR 01         CR     RG23ECS
    57NR 01         DR     REVERS
    - And then go to SPRO > Logistics - General > Tax on Goods Movements > India > Account Determination > Specify G/L Accounts per Excise Transaction > Here do Account Determination for the above combination and Excise Group
    Apart from above also do following configuration for Subcontracting;
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes
    Here maintain following;
    Excise Group         XX
    Excise TT            57FC
    Subtransaction Type  01
    Subtran Type Text   57FC CHALLAN
    Subc. Period        180
    Rate-subcontracting
    Mvt Grp Issues      0001
    Mvt Grp Receipt     0002
    Filter Non exise
    EI Items            10
    No. range no.       01
    ***. Val. /Exc Inv
    Subcon Output Type  J1IF
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups
    Here maintain following
    MVT. Grp. MvT S
    0001      101 O
    0001      541 O
    0002      542
    0002      542 O
    0002      543 O
    - J1I9 - maintain No range for object "J_1I57FC" for series group

  • Sub contract migo for excise item

    Hi
    I have prepared the following documents
    1.     Subcontract Purchase order (x is parent item and y is child item)
    2.     Subcontract challan (for child item y)
    In our case supplier added some materials for producing X for that they charged ED
    I prepared migo referring Subcontract challan and subsequently I captured Excise internal Number through J1IEX (referring Migo Number & Enter the Invoice Number)
    While posting Part 2. System displayed the message Part1 is not updated.
    Kindly suggest your valuable feedback.
    Note: Otherwise tell the process of how to handle of subcontract item with excise invoice.
    Regards
    Pons

    Hi,
    Subcontracting Process
    Subcontracting without Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    - Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    - Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement}
    - Reconciliation of Subcontracting Challan (J1IFQ)
    - Completion of Subcontracting Challan (J1IF13)
    - Generation of Annexure IV (J1IFR)
    Subcontracting under Full Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (MB1B/ME2O/MIGO)
    - Creation of Excise Invoice w.r.t. Transfer Posting Document (J1IS)
    - Capture Excise Invoice at the time of GR of Finished Goods w.r.t. Subcontracting PO (MIGO)
    - Post Excise Invoice (J1IEX)
    Master Data
    - MM01- Material Masters for Components and FG
    - XK01 - Vendor Master (Subcontractor)
    - CS01 - BOM for FG
    - ME11 - Purchase Inforecord for Subcontracting
    Note: - Excise Transactions need to be performed only if it is applicable.
    Hi,
    Refer link;
    [Subcontracting Process w/o Payment of Excise Duty|http://help.sap.com/bestpractices/BBLibrary/Documentation/J85_BPP_V2_EN_IN.doc]
    Subcontracting Process
    Subcontracting without Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    - Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    - Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement}
    - Reconciliation of Subcontracting Challan (J1IFQ)
    - Completion of Subcontracting Challan (J1IF13)
    - Generation of Annexure IV (J1IFR)
    Master Data
    - MM01- Material Masters for Components and FG
    - XK01 - Vendor Master (Subcontractor)
    - CS01 - BOM for FG
    - ME11 - Purchase Inforecord for Subcontracting
    Configuration: -
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes
    Here maintain following;
    Excise Group         XX
    Excise TT            57FC
    Subtransaction Type  01
    Subtran Type Text   57FC CHALLAN
    Subc. Period        180
    Rate-subcontracting
    Mvt Grp Issues      0001
    Mvt Grp Receipt     0002
    Filter Non exise
    EI Items            10
    No. range no.       01
    ***. Val. /Exc Inv
    Subcon Output Type  J1IF
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups
    Here maintain following
    MVT. Grp. MvT S
    0001      101 O
    0001      541 O
    0002      542
    0002      542 O
    0002      543 O
    - J1I9 - maintain No range for object "J_1I57FC" for series group

Maybe you are looking for

  • Extract a value of a fields from an internal table

    hello everyone, i need to extract a value of a fields from an internal table, the fields is in a postion "sy-tabix" that i know, so i need to pick this value without using a loop thank you.

  • Connecting battery = MacBook goes dark and to sleep

    I have a black Macbook 2.4 GHz. It was purchased refurb from the Apple store site and has recently exhibitted some strange behavior surrounding the battery. Sometimes the screen just goes dark and the MacBook goes to sleep. Usually a restart corrects

  • Directory Setup for RAC and Oracle Restart

    I have three database installations that I'd like some insight on the initial directory structure and permissions. The three installations are: 1) Prod RAC - OEL 5U2, 11.2.0.2 Grid Infrastructure, 11.2.0.2 DB EE with RAC option 2) Test RAC - OEL 5U2,

  • Problem configuring wireless bridge

    Don't know of this is the right forum, but no doubt someone will put me right if it isnt... I'm trying to get my son's hand-me-down G4 Powermac on to our home's wireless network. I bought a Belkin wireless bridge. I can log in to the router, select i

  • AS3 Preloader matching stage.stageWidth (simple)

    Hello, Experimenting with Flash as usual. Preloader's are always something that have caused me trouble. Here's what I typically use for a timeline based preloader in AS3: this.addEventListener(Event.ENTER_FRAME, loading); function loading(e:Event):vo