[JHS10.1.3]About production version released date
Current JHS10.1.3 preview version cannot be used in production and we have to begin a new project now.
It's really a dilemma in choosing which version to use.
If possible, can we know the estimated JHS10.1.3 production released date ?
That will help us in project time control in the future no matter which version we will use.
Thank you.
Eron and others,
We are getting real close, but are not ready yet. The current schedule is to release the production version end of July, and we are very confident we will make that deadline.
Note that we will continue to upload latest builds to the cso.oracle.com, so you can already start development with 10.1.3 Preview.
Steven Davelaar,
Jheadstart Team.
Similar Messages
-
Hi,,,
can any one give me information about the essbase version release dates or years,
like essbase 5.0, 6.0, 6.2, 6.5, 7.0 .7.X
thanks in advanceHi Suresh,
I don't know exact release dates of all versions. But as far as i can remember hyperion released 7.X (Aggregate Storage Option) in 2004, which was a great advancement.
hope this helps. -
BAPI/Function module for production version tab data of MRP4 view(MM01).
Hi,
I have to upload production version tab data of MRP4 view(MM01).Please suggest a function moduleor bapi for the same.
Thanks.
Edited by: sanu debu on May 6, 2009 3:24 PM>
sanu debu wrote:
> Hi,
> I have to upload production version tab data of MRP4 view(MM01).Please suggest a function moduleor bapi for the same.
>
> Thanks.
>
> Edited by: sanu debu on May 6, 2009 3:24 PM
BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA -
About Apex4.0 release date
Hi gurus,
I'm aware that maybe there's no an official APEX 4 release date but I'm interested on when is expected to be released. So... could you give us some directions about when can we install APEX 4 on our servers?
Thanks in advance. U have done great work with this tool,
DaniI have no idea about the exact release date but I think it will be released before the next ODTUG:
http://www.odtugkaleidoscope.com/
Denes Kubicek
http://deneskubicek.blogspot.com/
http://www.opal-consulting.de/training
http://apex.oracle.com/pls/otn/f?p=31517:1
http://www.amazon.de/Oracle-APEX-XE-Praxis/dp/3826655494
------------------------------------------------------------------- -
Hi,
This is not entirely on topic, but its about the most appropriate forum I could find!
I am looking for information on the exact release dates (to the day) for previous versions of Java, up to and including 1.5.0_u14. Can anyone point me to an authorative (preferable a Sun official page) source of this information? I have tried searching the Sun site but can't find this information.
Regards,
AdrianGoogle - wow what a great tool - thanks for the tip.
I am looking for dates for releases including minor versions, up to 1.5.0_u14 as I said in my post. I have searched of the Sun site using both the internal Sun search tool and also Google, but can't find readily this info. Hence my post to the forum.
If anyone has any idea where I might find this information, that would be great.
Edited by: AdrianFitz on Nov 27, 2007 1:24 AM -
Sap r/3 versions release dates
hi guys,
can any one tell me the exact date of sap r/3 and netweaver released.
all the versions from r/3 4.6 to ecc 6.0.
thanks
kevinSAP R/3 Enterprise Release 4.0B
Release Date June 1998
SAP R/3 Enterprise Release 4.5B
Release Date March 1999
SAP R/3 Enterprise Release 4.6C
December 1999
SAP R/3 Enterprise Release 4.6C
April 2001
SAP R/3 and R/3 Enterprise 4.70 SR1
Release Date March - December 2003
ERP Central Component
Release 5.0 SR1
Release Date August 2005
ERP Central Component
Online Update April 2007
Release 6.0 SR1 SP08
Release Date June 2006
SAP enhancement package 1 for SAP ERP 6.0
Release Date December 2006
ERP Central Component
Release SAP enhancement package 2 for SAP ERP 6.0
Release Date July 2007
SAP NetWeaver 2004 (SPS 20)
File Type HTML (PlainHTML)
Release Date May 2007
Knowledge Center for SAP NetWeaver 7.0 (2004s)Support Package Stack 13, September 2007
SAP NetWeaver Mobile 7.1 SPS 02
Release Date July 2007
Source :http://help.sap.com/ -
Iphone 5 unlocked version release date
Is there any planned release date for the unlocked or GSM version Iphone5? And if so, what are the estimated prices for each version?
I'm sure there's a planned release, and we've not been informed of it. Check the Apple website for updates.
-
Next version release date?
Hi,
When will the next Teaming version (3.0 ?) available?
If there any release date known? Or announced?
THX
AndreWatch out for an announcement in early November!
-
New OSX version release date - worth postponing purchase?
I was wondering if there is any information on the date of release of new version (10.5) of OSX? Thought it could be worth postponing purchase of new imac g5, if the date is 1-2 months away.
Thank you in advance.I agree with Dave. Buy a computer now if you really need one and enjoy it! There is always something different, or better, around the corner. You could always "wait" for the next big thing, and never actually make a purchase.
Late next year is when 10.5 should come out, and it is something I look forward to along with the Intel based Macs. But I needed a comuter now since the logic board on my old iBook died, so it was time to buy. I could have limped along with an old PC for awhile, but decided to get what I really wanted, and start enjoying it.
Hopefully 10.5 will be more than worth the purchase price when it arrives. -
CC versions release date?
I heard CC versions were going to be available for CC members on June 17th. Where do I go to download them?
Everything is downloaded via the Adobe Application Manager, a utlity installed on every Cloud member's computer.
Open the AAM and download the CC versions. -
ISSUE:regarding production version tab of MRP4 of data transfer using BD10
Hi all,
This is regarding production version tab of MRP4 of data transfer using ALE idoc (BD10).
When i transfer the data using BD10 the production version is received at receiving end through segment
but not created in MRP4 view tab.An error is coming as-
"You wanted to maintain the master record of the material AB_06.04.09(2). However, it is already being processed by the user EBGABAP and is therefore locked."
I logged in as-EBGABAP
Please help me resolve the issue.
Thanks
Edited by: sanu debu on May 6, 2009 11:08 AM
Edited by: sanu debu on May 6, 2009 11:09 AM
Edited by: sanu debu on May 6, 2009 11:11 AM>
sanu debu wrote:
> Hi,
> I have to upload production version tab data of MRP4 view(MM01).Please suggest a function moduleor bapi for the same.
>
> Thanks.
>
> Edited by: sanu debu on May 6, 2009 3:24 PM
BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA -
MRP Run with production version.
Hi Experts;
I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
Is it possible to cover safety stock with alternative BOM.
Please help..
Thanks,
MalkaHello Malka,
For your issue,,
As per other expert suggested you can block the first production version but if in future you want use first production then,,
In these case you maintain production version in many way
Ex.
1. Lot size .(if production version using for specific lot)
Maintain the Lot for both production version, so Production version 1 lot completed system take second production version.
2. Production version validity date (If production version using for specific period )
In this case after completion of 1. Production version period system take second one
3. Manually selection of production version (If multiple production version and all have same condition)
Whenever you convert the planned order to production order, one pop up come and ask for manually selection for Production version, for this you go to OPL8 and select the Manually production version
I hope this information cover your all requirement, No need to go with quota arrangement
Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
Regards
Umesh Mali -
Production version for different periode
Hello Expert,
I have a requirement like below please suggest some solution
One of my finished material having two alternative BOM say 1 and 2 and I have a requirement in MD61 for 500 pcs in current month and another requirmnet in next month for 1000 pcs
Now the when we run MRP I want system should take alternative bom 1 for current month requirement(500 pcs) and system need to take alternative bom 2 for next month requirement(1000 pcs)
Any body have any idea about this solution with less master data maintenance for user
Thanks in Advance
Abu fathimaHi,
You can resolve your issue by two ways , either using lot size procedure or using validity period.
Case I:- Using Lot size
You can use lot size procedure in production version in material master MRP 4 view. Kindly note that selection method should be
3
Selection only by production version
1. Lot size 0 -500 lot quantity select first BOM in production version
2. Lot size 501 - 9999 or 501 - 1000 quantity select second alternative BOM
This will be used for every time production process.
Case II:- Using Validity period
If you are using this scenario for specific period then you can use this option of validity. Validity can be applied at different level like BOM validity or production version validity date in your case.
a)If you have use validity start date of second BOM from next month then it will not explode in current month for MRP to achieve this use selection method in MRP4 view in material master as follows
1
Selection by explosion date
b) You can also restrict selection of BOM for specific period using production version validity
Start validity of second production version from second month to avoid selection in current month MRP.
To achieve this use selection method in MRP4 view in material master as follows
3
Selection only by production version
Hope you will get brief idea of selection correct BOM in MRP.
Apart from this there are various different method depends on business scenarios you can adopt your best. For more details of other method see following
Correct BOM selection in multiple BOMS for same FG Product for the same month
Hope above explanation will help you to resolve your issue.
Regards,
Shyam -
Hi Gurus,
is there a report that can give information about production versions. The fields at a minimum that i'm looking for are production version, material, text, alternate BOM, product line, Group, plant, valid from, lock, task list type, valid to, Bom usage
Thanks
AnushaAnusha,
To my knowlede you cannot export it to Spread sheet from C223. If you need to download, then you can take it by table browser transaction SE16 from table MKAL.
1. Execute transaction SE16.
2. Input table as MKAL. Input the selection critera and also set the output fields and then execute.
3. You would be able to export this output to Spread sheet.
Regards,
Prasobh -
Production version is not getting created using ALE-IDOC
Hi all,
Am using BD10 to transfer the material from sending to receving system.All the views are geting sent successfuly accept the production version tab data of MRP4 view.The segment is available in the standard IDOC.But prodction TAB is not getting created at receving system .Please help to resolve this issue.
Thank you.Hi Sanu,
BD10 Send Material..
the reason might be Production tab is not created is the segment is not a mandatory..
and the data is not populating for that fields.
if the segment is not madatorty and data is not available for the fields in the segment ..the prodction TAB will not be created ..
Regards,
Prabhudas
Maybe you are looking for
-
Dynamic crystal report generation - issues with column headings
Hi All,<br> I'm trying to generate a crystal report dynamically based on a "result set" data(Query: select REPORT_ID, REPORT_NAME, REPORT_DESC, RPT_FILE_NAME, LOCATION from IRS_REPORT_DETAILS). I'm able to generate the report run time, But the report
-
"root element is missing" - UTF-8
I have 2 identical files, except they are stored in ISO-8859-1 and UTF-8. "Test ansii.xml": <?xml version="1.0" encoding="ISO-8859-1"?><e></e> "Test utf8.xml": <?xml version="1.0" encoding="UTF-8"?><e></e> When I look at them in Internet Explorer the
-
We bought a Dynex 32inch LCD 720 TV today. Hooked it up to dish receiver and getting white hortizonal lines in the background that flicker somewhat, Very distracting....The color isn't that great either, not as sharp as our other lcd tv. What could b
-
Problem with displaying data's in a chart
I have a main VI (Hovedprogram) and 5 VI's (Ferdigprogram temp tur , Ferdigprogram temp retur, Ferdigprogram nivå, Ferdigprogram temp i fyr and Ferdigprogram trykk)who starts when I start the main VI. I want to display data for last 15 seconds, last
-
Hi guys I'm have a broblem with my final cut pro x I'm been working on my project which is a bit long only like 80 minutes. now I can't opened in my projects, I don't why and also my sofware is running slowly. plz I need your help