JIT and Forecast delivery

Hi Gurus,
Got a question on sales scheduling agreements schedule lines. Our customer sends 10 weeks of forecast delivery schedules and 2 weeks of JIT deliveries. which one of these two are passed to MD04?
Assuming only forecast delivery schedules are seen in MD04:
Assuming customer sends forecast delivery schedule for week2 as 50. but in JIT deliveries he only sent 40 for that week. if only forecast deliveries are see in md04, then my forecast and planning quantity is 50 , but actually my JIT delivery is only 40. AM I producing 10 extra? that means my planning is wrong?

925,
so in system it will show on 3/21 monday
I guess this means that you are entering using a Day format rather than Week format.
You have answered you own question already.  If the online SAP help, which you have read and reasonably paraphrased, is not clear enough to make you understand this, I cannot help you.
JIT horizon is 3/23, Forecast is for 3/21. 
As I stated before, even though it may in your mind represent a week's demand, it is still for one day.  There is no bucketing, nor time-based disaggregation, nor consumption.  It is just a scheduling agreement.
You wrote
am using MRP indicator D. that means within jit horizon, consider my jit quanity for requirements. and after jit horizon consider my forecast delivery schedules as requirements.
.  This is a reasonable paraphrase of the SAP online help.  Do you believe this?
Forecast schedule is for 3/21.  NOT for W 12/2011.  This is before the JIT horizon, isn't it?  What do you think will happen to the forecast schedule, looking at the last 'rules' you just wrote? and as stated in the SAP help that you read?
Now you want to enter JIT schedules. 21/22/23/24/25/26.  JIT horizon is 23.  24/25/26 are after JIT horizon.  What do you think will happen, based on the 'rules' you just wrote? 
I feel my time is being wasted when you keep asking me these questions, already having the answers explicitly stated in SAP oinline help.  Since you do not have access to a system, this cannot be a support issue, it is a evidently a matter of idle curiosity for you.  I therefore believe I will will move onto other forum questions, where there is a possibility that the questioners will get some business benefit from my answers.
Best Regards,
DB49

Similar Messages

  • About selecting Scheduling Agreement and Forecast delivery schedule

    Hi Experts,
    i want to write a Report, with 2 parameters for the selection : Sold-to-party and Period
    For this Sold-to-party/Period, I want to list all scheduling agreement + Forecast delivery schedule.
    I already found the Function SD_VBEP_READ_WITH_VBELN to read all Forecast delivery schedule lines using Sales Doc.No. , but how can I select all Scheduling Agreement for the Period ?
    Regards,
    David

    Solution:
    by selecting data from table VEPVG (Delivery Due Index) and using function SD_VBEP_READ_WITH_VBELN for each SD Document.
    Regards,
    David

  • JIT and Forecast Schedules

    Hello Experts,
    We are using Scheduling Agreement with Release documentation. The creation profile is having the following details
                             Aggregation horizon
    JIT Shcudule        Dialy Aggregation - 60days
    Forecaset Sch    Monthly Aggregation - 365 days
    Now we maintained demand on monthly basis in MD61 Say
    Oct '09: 100     Feb: 140
    Nov'09  : 110   Mar '10: 150
    Dec '09: 120  Apr'10: 160
    Jan '10: 130  May '10:170 till Sep'10: 210
    Created Scheduling aggreement with creation profile, Maintained the SA details in Source List. Now on MRP execution(on 28th Oct '09), the following are observations
    1  For the month of Oct'09 system created PR (not schedule line)
    2 For the month of Nov, Dec, Jan : JIT Schedule is created with delivery dates spanning monthly once
    3 In the Forecast release also, it is observed that for each month starting from Nonv '09 to Oct'09, schedule lines are created
    Can you please tell me
    1 How come PR is created for first month. If we need to create schedule line for the first month also,is any setting needed
    2 Eventhough dialy aggregation is 60 days for JIT, the scheule lines for Nov, Dec & Jan also created. Any views on this
    3 In Forecast Schedule Release, it is showing the schedule lines right from Nov'09. How come it is covering the schedule line period covered in JIT also.
    Request you to provide your inputs please
    Thank you,
    Best Regards,
    Ramakrishna Mangena

    Hi
    1 How come PR is created for first month. If we need to create schedule line for the first month also,is any setting needed
    Check the MRP control parameters and make it as 3- Planned order in Create Purch req.
    2 Eventhough dialy aggregation is 60 days for JIT, the scheule lines for Nov, Dec & Jan also created. Any views on this.
    Schedule line will be created based on the demand you have maintained it will not follow the aggregation. Aggregation of scheduled quantities determines the periods for which the schedule line quantities of a schedule line agreement item are to be consolidated
    3 In Forecast Schedule Release, it is showing the schedule lines right from Nov'09. How come it is covering the schedule line period covered in JIT also.
    Check whether you have maintained no aggregation till Novembed for the JIT scedule. Suppose if you maintained no aggreagation till 15th of November then Forecast will start from Nov 15th onwards.
    Since you are using both Forecast / JIT , Forecast schedule also will start aggregating the sceduled qty along with JIT. You can control this via tolerance check.
    Hope it helps
    Thanks/Karthik

  • Replacement of FORECAST DELIVERY DATE with DATE OF FIRST RECEIPT

    Please help me in my scenario below and post your valuable comments-
    My Scenario is like -
    For example, In REPORT, For the item 10 of the order 4700035361 our FIRST RECEIPT DATE is in march (14/03/2011) and FORECAST DELIVERY DATE is in december (30/12/2011). This purchase order item was completely received.
    Requirement is like---
    Associated cube is ZCUIMP01.
    (1) The evolution will consist of replace the FORECAST DELIVERY DATE with FIRST RECEIPT DATE of the item.
    (2) The period (Fiscper and Fiscyear) will also be modified.
    (3) Hence the calculation of the YTD will take into account the order and its receipt date.
    (4) The adjustment of the history will be necessary for the year 2011.
    Can anyone suggest, from where i should start my analysis (Should it be Infocube level??).
    What will be the approach to fulfill all the above mentioned requirement (Should we think about Remodeling concept for creating new data model, if yes then how to do?).
    Please reply asap, it will be great help for me.
    My advance thanks to you.
    Thanks & Regards
    Rupali Singh

    Hi Rupali,
    As I understand there is a business change that you need to justify in our report. Unfortunately your explanation of the design has a considerable gap to visualize. In any case, if you need help on to how to approach such a change -
    1. Understand the business change, its purpose and its imapct on your current design and the report.
    2. Understanding the purpose is very important since you will then be able to find workarounds, redesign as per the change required.
    3. Start from the query and check if your replacement of characterisitics with new characteristics can be obtained using functions like Replacement path, attributes, customer exits, etc. Changing a query/creating a new report on the existing model is the most feasible option.
    4. If not, try exploring option to keep the design untouched, and creating a new InfoObject/DSO like structure to capture the date modifications, etc which then can be used on a MultiProvider.
    Hope the above helps!
    Regards,
    Kunal Gandhi

  • Forecast delivery schedules and JIT deliveries

    Hi Gurus,
    Got a question on sales scheduling agreements schedule lines. Our customer sends 10 weeks of forecast delivery schedules and 2 weeks of JIT deliveries. which one of these two are passed to MD04?
    Assuming only forecast delivery schedules are seen in MD04:
    Assuming customer sends forecast delivery schedule for week2 as 50. but in JIT deliveries he only sent 40 for that week. if only forecast deliveries are see in md04, then my forecast and planning quantity is 50 , but actually my JIT delivery is only 40.  AM I  producing 10 extra? that  means my planning is wrong?

    925,
    so in system it will show on 3/21 monday
    I guess this means that you are entering using a Day format rather than Week format.
    You have answered you own question already.  If the online SAP help, which you have read and reasonably paraphrased, is not clear enough to make you understand this, I cannot help you.
    JIT horizon is 3/23, Forecast is for 3/21. 
    As I stated before, even though it may in your mind represent a week's demand, it is still for one day.  There is no bucketing, nor time-based disaggregation, nor consumption.  It is just a scheduling agreement.
    You wrote
    am using MRP indicator D. that means within jit horizon, consider my jit quanity for requirements. and after jit horizon consider my forecast delivery schedules as requirements.
    .  This is a reasonable paraphrase of the SAP online help.  Do you believe this?
    Forecast schedule is for 3/21.  NOT for W 12/2011.  This is before the JIT horizon, isn't it?  What do you think will happen to the forecast schedule, looking at the last 'rules' you just wrote? and as stated in the SAP help that you read?
    Now you want to enter JIT schedules. 21/22/23/24/25/26.  JIT horizon is 23.  24/25/26 are after JIT horizon.  What do you think will happen, based on the 'rules' you just wrote? 
    I feel my time is being wasted when you keep asking me these questions, already having the answers explicitly stated in SAP oinline help.  Since you do not have access to a system, this cannot be a support issue, it is a evidently a matter of idle curiosity for you.  I therefore believe I will will move onto other forum questions, where there is a possibility that the questioners will get some business benefit from my answers.
    Best Regards,
    DB49

  • Forecast delivery schdule and JIT delivery schedule difference

    Hi All,
    What isthe difference between Forecast delivery schdule and JIT delivery schedule in JIT scheduling agreement (LZJ)?? 
    I am doing JIT Inbound process now. Is it necesary to update both the schedule lines(Forecast delivery schedule&JIT delivery schedule)??
    Thanks,
    Anbazhagan E

    Hello,
    Forecast Schedule updates your planning , i.e. in MD04 you could see system is planning for quantities updated in forecast schedule.
    regards,
    amol

  • Planning delivery schedule , forecast delivery schedule , JIT delivery sche

    Hi
    could any one tell me the difference  between Planning delivery schedule , forecast delivery schedule , JIT delivery schedule & their respective ways of processing delivery???????????????????????????????????????????????/

    Hello Friend,
    Planning Delivery Schedule:
    You want to plan requirements for a certain customer for the next 16 weeks. You create a planning delivery schedule on the basis of information that you have gathered in an internal planning system. A few days later, the customer sends you a forecast delivery schedule that covers only 12 weeks. You decide to generate a planning delivery schedule by copying the schedule lines from the forecast delivery schedule for those 12 weeks, splitting them into units and days that fit your production schedule. For the remaining four weeks that you require, you simply adopt schedule lines from the previous planning delivery schedule in the scheduling agreement.
    For another customer, you create a six-week planning delivery schedule on the basis of internal data. When the customer sends in a forecast delivery schedule for the same six weeks, you notice that the first four weeks of schedule lines in the customer delivery schedule are detailed enough for production, but the last two are inaccurate. You decide to copy the first four weeks of schedule lines unchanged into the new planning delivery schedule. You adopt the remaining two weeks of schedule lines from the previous planning delivery schedule, which already exists in the scheduling agreement.
    Forecast Delivery Schedule:
    For an SD scheduling agreement, a customer sends a forecast delivery schedule containing requests for individual schedule lines. On the SD side, a delivery can be created automatically from this.
    JIT Delivery Schedule:
    A release carried out at an exact point in time of quantities in a schedule line (of a delivery schedule).
    The JIT delivery schedule is way of fine tuning production for the customer and shipping for the vendor.
    The term is used predominantly in the automobile component supplier industry.
    Delivery in Forecast in done through VL10 & VL01N and Delivery through JIT is done from JITK.

  • Forecast delivery schedule lines consumption

    Hi,
    I cannot fully understand what is the logic behind the consumption of the forecast delivery schedule lines. This is how the problem can be exactly defined:
    - scheduling agreement with delivery orders (LZM)
    - JIT delivery schedules are not used and no delivery schedule is maintained... just a forecast delivery schedule
    - the whole process is manual, there is no EDI implied
    - the cumulative received quantity is updated by an ABAP development that is triggered at delivery goods issue
    The rest, happens normal - forecast schedule lines are updated weekly, the customer send pick-up sheets, a TAM delivery order is created, then delivery, GI...
    The problem: not always the MRP requirements generated by the forecast delivery schedule lines are consumed by the delivery order/GI. If the delivery orders / deliveries are made on the exact quantity of the schedule lines everything works fine. It is also ok when there are two successive delivery orders with a cumulative quantity that matches exactly the forecast line. As soon as a over-delivery is made, everything turns upside-down: older delivered schedule lines appear again in planning as if nothing was delivered until now...
    I suspect that the problem is related to the fact that the whole process is manual and updating the cumulative received quantity is not the only parameter that is counting... is it so? Or the forecast delivery schedule has to be respected 100% in terms of quantities and timing?
    I would really appreciate your help.
    Regards,
    H.

    Also please clarify whether delivery schedule lines in ME38 (even it is created automatically), in Planning time fence, will get affected by MRP run.

  • Importance of Forecast Delivery Schedules in SD scheduling agreements

    Hi ALL,
    I would just like to consult you a scenario that I'm facing.
    When I create a JIT scheduling agreement, even though that schedule lines are maintained for the JIT delivery schedule tab, if the Forecast delivery schedule tab has no schedule lines, the NET value of the document will be zero.
    Can you explain the Logic behind this?
    Also, why am I not allowed to create an outbound delivery and invoice if the Forecast Delivery schedule tab has no schedule lines?
    I know that the document will be incomplete without the net value, but why is it even though schedule lines are created in the JIT tab?
    Please help me with this.
    Thanks in advance guys!

    This is what I found out in an SAP “Knowledge Base Article" (1472965), indicating that there has to be requirements in the forecast delivery schedule in order for the schedujle agreement line item to not be considered incomplete for price.
    https://websmp230.sap-ag.de/sap/support/notes/convert2pdf/002007204200000153012010?sap-language=EN
    Resolution
    l You have to enter schedule lines for the forecast delivery schedule
    l The VBAP-NETWR is calculated based on forecast delivery schedule and not according to the JIT delivery schedule
    Regards,
    Jeff

  • Creation of forecast delivery in Sceduling agreement

    Hi experts,
    I would like to know if it is possible to create a forecast delivery line in scheduling agreement using IDOCs. The scheduling agreement is already existing but it has no forecast delivery line. If it is possible, kindly give me the basic type, message type and the fields to be populated with what data.
    Thanks in advance,
    Lalyn

    The actual scenarois is this:
    I am getting AUFNR(prodcutoin order),LGNUM(whs number) ....etc from XI system. I hav to use this data and have to create an Inbound delivery from expected GR in EWM and POST GR in EWM and Creation of Whs task in EWM again.
    The transaction to create the inbound delivery from expected GR is /SCWM/GRPI (GR Preparation: From Production).
    we do not have any BAPI or FM in EWM to acheive this. Pleas help me in resolving the issue.

  • Forecast delivery schedules incorrect cumulative release quantity.

    Hi Gurus,
    We implemented the standard LZM - Scheduling agreement with delivery orders solution for component suppliers.
    The entire SAP standard configuration activated and the functionality is working correct.
    u2022     Scheduling agreement type LZM  / Item category LZMA / Schedule line category  L2
    u2022     Order Type TAM  / / Item category TAMA / Schedule line category  CP
    Example:
    Scheduling agreement forecast delivery schedule for 1000 units./ Md04 show SchAgr of 1000 units
    Delivery order for 250 units (MD04 Shows Order for 250 units and SchAgr for 750 Units)
    Created delivery for the order (MD04 shows Deliv. For 250 units SchAgr for 750 Units)
    Goods issue the delivery / MD04 shows the SchAgr for 750 units.
    *Issue:*
    When we update the Cumulative quantity received by the customer it is summing up with the forecast quantity (double counting the shipped quantity).
    When the Cumulative quantity received by the customer updated to remove the in-transit quantity, the forecast is adding by 250 units and   MD04 shows SchAgr for 1000 units.
    Thanks & Regards
    Suresh

    Hi Suresh
    The *** issued qty gets updated when the PGI for the delivery happens. There is a field called *** received by customer and it gets updated when customer sends the *** back in the 830 or 862 as the case may be.
    The difference between the *** issued and the *** recieved is always shown in transit.
    If you do not want the schedule line to be opened up, then in *** recd change it to the *** issued or ideal option is populate the last delivery PGI'd on the delivery number field next to *** recd field. Hope this helps and let me know if you need any more informataion
    Regards

  • Difference between Scheduling agreement delivery schedule and PO delivery s

    Dear All,
    Please tell the difference between the Scheduling agreement delivey schedule and PO delivery schdule.
    In PO itself, we can give the delivery schedule.
    Then what is the purpose of making scheduling agreement and maintain schedule in ME38?
    Regards

    Hi,
    Difference between Scheduling agreement and PO is while PO is a legal document whatever the delivery schedules you mention in PO, you are liable to pay for the entire qty in case of cancellation
    In case of scheduling agreement, we have Firm Zone and Tradeoff Zone to provide some cushion against paying for the entire qty you have ordered
    Firm zone: (go-ahead for production)
    If the date of a schedule line lies within the firm zone, the vendor has the go-ahead to produce the relevant quantity with the assurance that the orderer will bear any and all material and production costs associated with the scheduled quantity in the event of subsequent cancellation by the latter.
    Trade-off zone: (go-ahead for procurement of input materials)
    If the date of a schedule line lies within the trade-off zone, the vendor has the go-ahead to purchase any input materials necessary to produce the scheduled quantity. The orderer will recompense him in full for such outlay (but not for any other production costs) in the event that he should subsequently cancel the scheduled quantity.
    Schedule lines that lie beyond the firm and trade-off zones fall within the planning zone (forecast zone) and are for rough guidance only, being without any commitment on the part of the orderer.
    In case of PO if you want to cancel the order, you are liable to pay for the entire quantity, while in case of Scheduling agreement if you want to cancel the schedule and if the days fall in Firm zone or trade off zone or planning zone you have to pay only for raw materials or assembled products according to the above description
    Regards
    Venkat

  • Problems in GR for forecast delivery schedule

    Hi all,
    Whenever i try to post GR for forecast delivery schedule the systeme proposes a quantity equals to 0 evev though i sent the form to the vendor(using trans me9e &me9l).
    Anubody knows why?

    Hi Moshe,
    If you are using your scheduling agreement type LPA(with document).Check wheather you have released the FC schedule in ME38.In the delivery schedule>edit>generate forecast schedule.
    Then only you will get your message output in ME9E and MIGO.
    regards
    venkadesh

  • Schedule agreement-JIT and creation profile (are necessary to maintain)

    Hi Friends ,
    I am doing schedule line agreement in this way.
    1) Create SA agrement -ME31L
    2) Maintain schedule lines -ME38
    3) MIGO-
    4)MIRO
    That is working.
    A ) But then why it is necessary to maintain in material master under purchasing tab- JIT
    and
    B) in vendor master -Creation profile
    Please can u explain me A and B
    Regards,
    Mahesh.

    Hi Mahesh,
    Maintaining JIT in material master is necessary only if you wish to Use JIT scheduling agreement schedule lines, if you are fine with only FRC schedule line, then you don't need to update this field. This is a control on the material level, like you know if a certain material can't be managed on a JIT level then you will not use it, so JIT agreements can't be created for it.
    I don't feel Creation Profile is mandatory for vendor master, because you can opt to enter the creation profile in the Scheduling agreement additional data. Creation profile basically has a lot of control function, here isthe abstract from SAP Help
    The creation profile determines:
        Which event triggers the creation of a scheduling agreement release (changes involving the lines of the overall schedule and/or the reaching of the next transmission date)
        How the delivery dates are shown (aggregation and release horizon)
        Whether Backlogs and Immediate Requirements are determined and shown in the scheduling agreement (SA) release
        Whether a tolerance check is carried out for SA releases that are created due to changes to the overall delivery schedule in the system
    Regards
    Chandra Shekhar

  • Difference :Automatic Reorder Point Planning and Forecast based palning ?

    Dear MM Guru's,
    As we See in throtical Concepts that
    Automatic Reorder point planning and Forcast Based Planning Used the prevuious Historical Data.
    Please explain what is difference Between them.
    regards,
    A. S.

    Hi,
    Reorder Point Planning: -
    Use: -
    In reorder point planning, procurement is triggered when the sum of plant stock and firmed receipts falls below the reorder point.
    Features: -
    The reorder point should cover the average material requirements expected during the replenishment lead time.
    The safety stock exists to cover both excess material consumption within the replenishment lead time and any additional requirements that may occur due to delivery delays. Therefore, the safety stock is included in the reorder level.
    The following values are important for defining the reorder point:
    - Safety stock
    - Average consumption
    - Replenishment lead time
    The following values are important for defining the safety stock:
    - Past consumption values (historical data) or future requirements
    - Vendor/production delivery timelines
    - Service level to be achieved
    - Forecast error, that is, the deviation from the expected requirements
    Manual Reorder Point Planning
    In manual reorder point planning, you define both the reorder level and the safety stock level manually in the appropriate material master.
    Automatic Reorder Point Planning
    In automatic reorder point planning, both the reorder level and the safety stock level are determined by the integrated forecasting program.
    The system uses past consumption data (historical data) to forecast future requirements. The system then uses these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is specified by the MRP controller, and the material's replenishment lead time into account, and transfers them to the material master.
    Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are continually adapted to the current consumption and delivery situation. This means that a contribution is made towards keeping stock levels low.
    Forecast-Based Planning: -
    Use: -
    Forecast-based planning is also based on material consumption. Like reorder point planning, forecast-based planning operates using historical values and forecast values and future requirements are determined via the integrated forecasting program. However, in contrast to reorder point planning, these values then form the basis of the planning run. The forecast values therefore have a direct effect in MRP as forecast requirements.
    Features: -
    The forecast, which calculates future requirements using historical data, is carried out at regular intervals. This offers the advantage that requirements, which are automatically determined, are continually adapted to suit current consumption needs. The forecast requirement is reduced by the material withdrawal so that the forecast requirement quantity that has already been produced is not included in the planning run again.
    Reducing Forecast Requirements
    - Reducing forecast requirements by consumption
    If consumption is higher than the forecast requirements in the current month, then the system also reduces future forecast requirements.
    - Reducing current forecast requirements by consumption
    If consumption is higher than the forecast requirements in the current month, then the system does not reduce future forecast requirements.
    - Average reduction of the forecast requirements
    The reduction of the forecast requirements is based on average daily consumption. Actual consumption data is not relevant.
    The system calculates the average daily requirement first using the formula forecast requirement/number of workdays in the forecast period.
    The forecast requirements are then reduced by the quantity resulting from the following formula: number of workdays worked x average daily requirements.
    Period Pattern and Forecast Periods
    You can specify the period pattern for the forecast (daily, weekly, monthly or per accounting period) and the number of periods to be included in the forecast individually for each material. It is possible, however, that the forecast period pattern is not specific enough for planning purposes. In this case, you can define per material that the forecast requirements should be divided according to a finer period pattern for planning. You can also define how many forecast periods are to be taken into account during requirements planning. The splitting indicator is defined in Customizing for MRP per plant and per period unit and is assigned to the material in the material master.
    Example: -
    For a monthly forecast, the requirements date would be set on the first workday of the month because, for planning, it is assumed that the total requirement must be available at the beginning of the period. You can then divide this monthly requirement into either daily or weekly requirements.

Maybe you are looking for

  • Can I display a PDF stored in a table on a standard screen

    I have a requirement to allow a user to be able to review a returned Adobe Interactive Form before approving the form to be process and posted to FI. I am looking to save the returned form in a ztable and then later display the form on a screen with

  • HDMI and Facetime

    I'm using an HDMI cable to connect my iPhone 4 or iPad 2 to a Samsung HD TV. Picture is fine but no audio except for the phone or iPad speakers which won't be enough for the audience I want to see and hear everything. There are work-arounds with mini

  • My email signature keeps changing?

    Hello all, I have a question regarding mail on OSX10.9. I am using Mail 7.2, and when I input a signature, it looks fine and it was working fine. However, yesterday it stopped being alligned and now it keeps moving around. I have tried creating a new

  • Updateing linux-ck-atom-headers from repo-ck: file size exceded

    I'm not sure what this error means, I have 2.9 g left on the root partition ~$ sudo pacman -S linux-ck-atom-headers resolving dependencies... looking for inter-conflicts... Targets (1): linux-ck-atom-headers-3.3.4-3 Total Download Size: 4.69 MiB Tota

  • What is best filter to decrease crowd noise from background of live band recording?

    I have a video of live musicians, the camera picked up more of the ambient crowd noise than I had expected.  Does anyone know of a good track effect that would reduce the crowd noise without compromising the music quality? Thanks, Sam