Hi ,
jstart process in PI - java is running with more than 90% utilisation CPU utilisation.
But when i check  jsmon the jstart PID is something else.can there be more than one jstart processes running.
And how to correct this high CPU utilisation of the that particular jstart process.
Regards,
balaji.R

Hi Balaji,
To analyze this kind of issue you should follow note 742395.
It is quite simple to detect what is causing the high cpu:
1. Find the thread that is consuming the CPU (in the note you can see how to do it for all the OS)
2. Take a thread dump in the JVM.
Now you just need to find in the thread dump you took from the JVM the thread and see what he was doing in the thread dump.
In this way you can search this thread for notes to see if it is a bug or something like that and fix it.
I hope it helps.
Thanks,
Anderson

Similar Messages

  • User Defined Activity "hangs" Process Flow if it runs for more than 10mins

    I have been using OWB (10g r2) for a while and have used "User Defined" activities in production process flows successfully before.
    However my problem now is that the activity (shell command) I want to perform, takes more than 10 minutes to complete. If I run the process flow with a parameter that generates a shell command that executes in two or three minutes, the process flow continues past the sucessfully executed user defined activity to the next activity.
    BUT
    If I run the same process flow (without modification or even redeployment) with a different parameter , the user defined acivity sucessfully executes (after about 11 minutes or so) but the process flow , doesnt seem to know that it is finished and just says it is still executing.
    my "user defined" activity has
    COMMAND: /usr/bin/ksh
    PARAMETER_LIST bound to a variable which is set earlier in the process flow.
    RESULT_CODE:
    SCRIPT :
    SUCESS_THRESHOLD : 0
    by examining (RUNTIME CONTROL CENTER SCHEMA).all_rt_audit_execution_params
    I can see that the variable contents assigned to RESULT_CODE look like this
    '/usr/bin/rsh -n WINSRV1 dtsrun /usa /ppw /S WINSQLSRV /N JOBNAME_SHORT'
    or this
    '/usr/bin/rsh -n WINSRV1 dtsrun /usa /ppw /S WINSQLSRV /N JOBNAME_LONG'
    I put the -n in because I thought that may have been the problem, but I think its more likely that there is come sort of ".properties" in a runtime file that needs to be set to control the "timeout" of user defined activities.
    (like in Runtime.properties
    property.RuntimePlatform.0.NativeExecution.Shell.security_constraint = NATIVE_JAVA
    except maybe
    .........Nativeexecution.timeout = .....?????
    Has anybody had a problem like this? Found a document describing available configuration properties for PF activites?
    Can anyone help?

    I have been using OWB (10g r2) for a while and have used "User Defined" activities in production process flows successfully before.
    However my problem now is that the activity (shell command) I want to perform, takes more than 10 minutes to complete. If I run the process flow with a parameter that generates a shell command that executes in two or three minutes, the process flow continues past the sucessfully executed user defined activity to the next activity.
    BUT
    If I run the same process flow (without modification or even redeployment) with a different parameter , the user defined acivity sucessfully executes (after about 11 minutes or so) but the process flow , doesnt seem to know that it is finished and just says it is still executing.
    my "user defined" activity has
    COMMAND: /usr/bin/ksh
    PARAMETER_LIST bound to a variable which is set earlier in the process flow.
    RESULT_CODE:
    SCRIPT :
    SUCESS_THRESHOLD : 0
    by examining (RUNTIME CONTROL CENTER SCHEMA).all_rt_audit_execution_params
    I can see that the variable contents assigned to RESULT_CODE look like this
    '/usr/bin/rsh -n WINSRV1 dtsrun /usa /ppw /S WINSQLSRV /N JOBNAME_SHORT'
    or this
    '/usr/bin/rsh -n WINSRV1 dtsrun /usa /ppw /S WINSQLSRV /N JOBNAME_LONG'
    I put the -n in because I thought that may have been the problem, but I think its more likely that there is come sort of ".properties" in a runtime file that needs to be set to control the "timeout" of user defined activities.
    (like in Runtime.properties
    property.RuntimePlatform.0.NativeExecution.Shell.security_constraint = NATIVE_JAVA
    except maybe
    .........Nativeexecution.timeout = .....?????
    Has anybody had a problem like this? Found a document describing available configuration properties for PF activites?
    Can anyone help?

  • PL/SQL process returning message with more than 4000 chars

    In our apex application we are using a pl/sql process returning a message.
    This message should be shown to the user.
    Our problem is now, that the application items in APEX seem to be limited to 4000 chars and the message can be longer.
    We are also not able to use a collection, because we can't print the content of a collection in the "Process Success Message".
    Here is the content of a page process which is running on page load after header:
    Name - Type:     PL/SQL anonymous block
    Source - Process: :AI_TEST := p0001_pkg.get_text;
    Messages - Process Success Message: &AI_TEST.
    Image from process [https://twitter.com/OliverLemm/status/324058809138032640/photo/1/large]
    If the page is called the result is this error message:
    ORA-06502: PL/SQL: numeric or value error: character string buffer too small
    Technical Info (only visible for developers)
    is_internal_error: false
    ora_sqlcode: -6502
    ora_sqlerrm: ORA-06502: PL/SQL: numeric or value error: character string buffer too small
    component.type: APEX_APPLICATION_PAGE_PROCESS
    component.id: 16433072916569237418
    component.name: get_text
    error_backtrace:
    ORA-06512: at "APEX_040200.WWV_FLOW_PROCESS", line 100
    ORA-06512: at "APEX_040200.WWV_FLOW_PROCESS", line 141
    Edited by: Oliver L on 16.04.2013 09:17

    no an item like P0_TEST on page 0 / global page also does not help.
    But the error is not the application item / page item it's the problem that the "Process Success Message" can't handle more than 4000 chars.
    I tried to paste a string into the process success message, but the error "Error processing row. ORA-01461: can bind a LONG value only for insert into a LONG column" occured even when i filled the textarea and saved the process.
    So there's no problem with the application item or page item.
    Edited by: Oliver L on 16.04.2013 10:00

  • Error while running spatial queries on a table with more than one geometry.

    Hello,
    I'm using GeoServer with Oracle Spatial database, and this is a second time I run into some problems because we use tables with more than one geometry.
    When GeoServer renders objects with more than one geometry on the map, it creates a query where it asks for objects which one of the two geometries interacts with the query window. This type of query always fails with "End of TNS data channel" error.
    We are running Oracle Standard 11.1.0.7.0.
    Here is a small script to demonstrate the error. Could anyone confirm that they also have this type of error? Or suggest a fix?
    What this script does:
    1. Create table object1 with two geometry columns, geom1, geom2.
    2. Create metadata (projected coordinate system).
    3. Insert a row.
    4. Create spacial indices on both columns.
    5. Run a SDO_RELATE query on one column. Everything is fine.
    6. Run a SDO_RELATE query on both columns. ERROR: "End of TNS data channel"
    7. Clean.
    CREATE TABLE object1
    id NUMBER PRIMARY KEY,
    geom1 SDO_GEOMETRY,
    geom2 SDO_GEOMETRY
    INSERT INTO user_sdo_geom_metadata (table_name, column_name, srid, diminfo)
    VALUES
    'OBJECT1',
    'GEOM1',
    2180,
    SDO_DIM_ARRAY
    SDO_DIM_ELEMENT('X', 400000, 700000, 0.05),
    SDO_DIM_ELEMENT('Y', 300000, 600000, 0.05)
    INSERT INTO user_sdo_geom_metadata (table_name, column_name, srid, diminfo)
    VALUES
    'OBJECT1',
    'GEOM2',
    2180,
    SDO_DIM_ARRAY
    SDO_DIM_ELEMENT('X', 400000, 700000, 0.05),
    SDO_DIM_ELEMENT('Y', 300000, 600000, 0.05)
    INSERT INTO object1 VALUES(1, SDO_GEOMETRY(2001, 2180, SDO_POINT_TYPE(500000, 400000, NULL), NULL, NULL), SDO_GEOMETRY(2001, 2180, SDO_POINT_TYPE(550000, 450000, NULL), NULL, NULL));
    CREATE INDEX object1_geom1_sidx ON object1(geom1) INDEXTYPE IS MDSYS.SPATIAL_INDEX;
    CREATE INDEX object1_geom2_sidx ON object1(geom2) INDEXTYPE IS MDSYS.SPATIAL_INDEX;
    SELECT *
    FROM object1
    WHERE
    SDO_RELATE("GEOM1", SDO_GEOMETRY(2001, 2180, SDO_POINT_TYPE(500000, 400000, NULL), NULL, NULL), 'MASK=ANYINTERACT') = 'TRUE';
    SELECT *
    FROM object1
    WHERE
    SDO_RELATE("GEOM1", SDO_GEOMETRY(2001, 2180, SDO_POINT_TYPE(500000, 400000, NULL), NULL, NULL), 'MASK=ANYINTERACT') = 'TRUE' OR
    SDO_RELATE("GEOM2", SDO_GEOMETRY(2001, 2180, SDO_POINT_TYPE(500000, 400000, NULL), NULL, NULL), 'MASK=ANYINTERACT') = 'TRUE';
    DELETE FROM user_sdo_geom_metadata WHERE table_name = 'OBJECT1';
    DROP INDEX object1_geom1_sidx;
    DROP INDEX object1_geom2_sidx;
    DROP TABLE object1;
    Thanks for help.

    This error appears in GeoServer and SQLPLUS.
    I have set up a completly new database installation to test this error and everything works fine. I tried it again on the previous database but I still get the same error. I also tried to restart the database, but with no luck, the error is still there. I geuss something is wrong with the database installation.
    Anyone knows what could cause an error like this "End of TNS data channel"?

  • After soak test update, I get error messages repeatedly. The majority are "unfortunately, messaging has stopped", but you can replace messaging with "android os", or any other process, as it happens with more than just messaging. I have had numerous peopl

    After soak test update, I get error messages repeatedly. The majority are "unfortunately, messaging has stopped", but you can replace messaging with "android os", or any other process, as it happens with more than just messaging. I have had numerous people call and ask why I didn't reply to their texts...and I look, but have not received any new texts. YES, I have restarted phone. I have cleared data as well as cache on all apps. I have downloaded the vzw messaging app, which seems silly, since it happens with several different processes and apps, but all to no avail. I am missing texts from my employer, from my family. This did happen, but rarely, before this "soak test". It is now Kitkat version 19.6.3.obake_verizon.en.US. THIS is when I started having problems...like 50 times a day kind of problems! I have seen hundreds of posts all over the internet over the past 3 days. Does no one know how to fix this??? Shouldn't there be a way to revert phone to a pre-update state? and no, hard reset did NOT work!!!! I have been with verizon for well over 15 years, but I have not upgraded my lines and will not in July either. This is ridiculous. It's not like my games aren't working, it is my messaging and "android os"...my lifeline at work!

    kristinaf333,
    Oh no, I am sorry to hear your messages are not working since the software update. I greatlly appreciate doing all that troubleshooting to try and get the messaging application back in business. I know how much I rely on my messages so I can understand the urgency to get this resolved. Have you had a resolution ticket opened since you started experiencing issues with your messages? Does this happen with all contacts or just some? Please provide additional information to ensure we get to the bottom of this for you.
    KarenC_VZW
    Follow us on Twitter @VZWSupport

  • I am upgrading to Calendar Server 4.0 on NT with more than 9 nodes (or I already have) and my server won't start

    I am upgrading to Calendar Server 4.0 on NT with more than 9 nodes
    (or I already have) and my server won't start.
    <P>
    The steps are the same whether you have already upgraded or are about to.
    <P>
    Calendar Server 4.0 on the Windows NT platform can only support up to nine
    nodes on one server, while 3.51 supported up to 14. If you have a Calendar
    Server 3.51 with more than 9 nodes that you want to upgrade to Calendar Server
    4.0, Netscape recommends that you migrate the extra nodes to another Calendar
    Server 3.51 on another Windows NT system. To accomplish this:
    <OL>
    <LI>Install Calendar Server on another Windows NT machine and configure it to
    use the same directory server as your current Calendar Server.
    <LI>Stop and backup your current Calendar Server.
    <LI>Individually zip up the node directories you want to move to the new
    server. (drive:\unsers\unison\db\Nx
    where "x" is the number of the node you want to use.)
    <LI>Stop the new Calendar Server.
    <LI>Unzip the files into the new Calendar Server in the same place as they
    were on the old server.
    <LI>Edit the unison.ini
    file on the new server to add the nodes you have just migrated.
    <LI>Edit the unison.ini
    file on the old server to remove the nodes you have moved to the new server.
    <LI>Edit the nodes.ini
    file on the old server to remove the nodes you just moved and then add them
    with the new hostname. Keep in mind that you will only be able to modify the
    node network from the old host.
    <LI>Run unidbfix -export
    on both servers for all nodes.
    <LI>Edit the remotenodes.ini
    file on both servers to reflect your node topology.
    <LI>Run unidbfix -import
    to import the changes into the node databases.
    <LI>Run unidbfix -c,
    then -f,
    then -c
    again on both servers for all the nodes.
    <LI>If you don't get any errors, run uninode -test all
    to test if your nodes connections are set properly. If they are not, <B>do not</B>
    start either of the servers; instead, fix the errors and try again.
    <LI>Start both servers.
    <LI>Log in and check to see if you can see people on remote nodes.
    <LI>Notify the users on the moved nodes of their new calendar host.
    <LI>If you did this in preparation of an upgrade, you can now run the upgrade to
    4.0 since both servers contain fewer than 9 nodes.
    </OL>

    Use Disk Utility whihc is in the Utilities Folder.
    Select your Boot Disk on the left.
    Select Verify Permissions
    If any errors the do Reapir permissions.
    You might have to repeat the process.
    see this:
    Steve

  • Service interface with more than one operation

    Hi all,
    is it possible to have a service interface with more than one operation?
    I have found this blog:
    http://www.sdn.sap.com/irj/scn/weblogs;jsessionid=(J2EE3414900)ID0209118050DB10459657028039341762End?blog=/pub/wlg/15123
    But this sentence:
    ABAP proxy (inbound/ outbound) cannot be developed out of a Service Interface having Operations with different type of messages included. If an ABAP proxy is to be developed then all the messages included should be of one type i.e. either the included messages should be Message Type, External Message, IDOC or RFC Message. This behavior can be observed when a Service Interface is created and then subjected for a check
    regards

    Hi,
    now the interface is running but I get another error in .NET.
    "The header 'Diagnostic' from the namespace 'http://sap.com/xi/XI/Message/30' was not understood by the recipient of this message, causing the message to not be processed.  This error typically indicates that the sender of this message has enabled a communication protocol that the receiver cannot process.  Please ensure that the configuration of the client's binding is consistent with the service's binding. "
    Any ideas?
    regards

  • REQUEST RUNNING FOR MORE THAN ONE DAY - HOW INVESTIGATE ABOUT THIS

    Hi Everyone ...
    As you know when you submit any request throigh concurrent manager . The request completed normal or give warning or error .
    My probelm I have request running for more than one day .but I don't know right tool how invetigate about this issue .
    I checked alert log and database lock but nothing wierd .
    We are using 11.5.10.2 with 10.2.0.4 DB .
    Thanks in advance ...
    Edited by: user12010537 on 26/09/2010 05:39 ص
    Edited by: user12010537 on 26/09/2010 05:46 ص

    Hi,
    schavali wrote:
    Use MOS Doc 735119.1 (How to Find Database Session & Process Associated with a Concurrent Program Which is Currently Running) to determine the PID of the concurrent request, then follow the steps identified in MOS Doc 1058210.6 (How to Enable SQL_TRACE for Another Session or in MTS Using Oradebug)
    enable tha trace
    Re: enable tha trace
    Thanks,
    Hussein

  • Problems deploying Windows 7 x64 computers with more than 8GB RAM

    SCCM 2012 R2 CU1
    Windows 7 x64
    We have a weird problem after upgrading from SP1 to R2 CU1. We have built a Windows 7 64 bit image with the latest updates (currently September 2014 updates). It deploys fine to all computers. But after some days – don’t know exactly – guess after 4-7 days
    - we start getting errors on computers with more than 8 GB of RAM. The errors just start out of the blue. We didn't change TS, image or driver package.
    The error shows in 3 different ways – depending of the computer model.
    1) BSOD – STOP 0x000000F4. Disk error.
    2) Task Sequence error 0x87D00269 when installing the first Application in TS. The error seems to have something to do with Management Point not found.
    3) Task Sequence simply stops after installing CMclient. No errors - it simply stops.
    For instance we get the BSOD on the Lenovo ThinkCentre M93p. But on the ThinkCentre M83 we get the TS error 0x87D00269. M93p and M83 uses the same driver package. They consequently  fail every time after the error has begun. If we reduce (remove physically)
    the memory to max. 8GB of RAM, they successfully run the Task Sequence.  We get the above errors on both Lenovo and HP machines with more than 8GB. 
    I made a copy of the production TS and started testing. I created a new driver package for M93p/M83. It contains only the NIC drivers. Now M93p an M83 successfully finishes the TS. Adding sata or chipset or MEI/SOL drivers to the package I get the 0x87D00269
    error on both m93p and M83. At least not the BSOD on the M93p ;-)
    Tried setting  SMSTSMPListRequestTimeout to 180 in the TS. Also tried putting in a 5 minute break before installing the first Application in the TS. Also tried putting in SMSMP=mp1.mydomain in the installation properties for the CMclient. It is still
    the same problem.
    Investigating the smsts.log on a computer with the 0x87D00269 error.
    Policy Evaluation failed, hr=0x87d00269 InstallApplication
    25-09-2014 08:59:59 3020 (0x0BCC)
    Setting TSEnv variable 'SMSTSAppPolicyEvaluationJobID__ScopeId_654E40B7-FC55-4213-B807-B97383283607/Application_d9eea5a0-0660-43e6-94b8-13983890bae2'=''InstallApplication 25-09-2014 08:59:59 3020 (0x0BCC)
    EvaluationJob complete InstallApplication25-09-2014 08:59:59 3020 (0x0BCC)
    MP list missing in WMI, sending message to location service to retrieve MP list and retrying. InstallApplication 25-09-2014 08:59:59 3020 (0x0BCC)
    m_hResult, HRESULT=87d00269 (e:\qfe\nts\sms\client\osdeployment\installapplication\installapplication.cpp,1080) InstallApplication
    25-09-2014 08:59:59 3020 (0x0BCC)
    Step 2 out of 2 complete InstallApplication 25-09-2014 08:59:59 3020 (0x0BCC)
    Install application action failed: 'SCIENCE PC Guide'. Error Code 0x87d00269 InstallApplication 25-09-2014 08:59:59 3020 (0x0BCC)
    Sending error status message InstallApplication 25-09-2014 08:59:59 3020 (0x0BCC)
     Setting URL = http://mp1.mydomain, Ports = 80,443, CRL = false InstallApplication 25-09-2014 08:59:59 3020 (0x0BCC)
    Investegating the 0x87D00269 error on the siteservers Status Messages Queries is weird.
    Install Static Applications failed, hr=0x87d00269. The operating system reported error 617: You have attempted to change your password to one that you have used in the past. The policy of your user account does not allow this. Please select a password that
    you have not previously used.
    Hopefully this is a bug in translating the errorcodes? Just to be sure I checked all the SCCM serviceaccounts and none of them have expired passwords.  And again why only on computers with more than 8GB RAM.
    Anyone else had problems rolling computers with more than 8GB og RAM?
    Why does this happens after a few days? To begin with, it runs just perfect and then starts failing on all machines with more than 8GB. Without a change in TS, image and driverpackage. We have seen this pattern for the last 3 month after
    updating our image with the latest Windows Updates. It all started after updating from SP1 to R2 CU1.
    Why does it only affect machines with more than 8GB RAM?
    How to get rid of the 0x87D00269 error?
    Seems to be somehow related to driver installation mechanism in SCCM in combination with Windows 7 64 bit, +8GB RAM and SCCM 2012 R2 CU1 or perhaps just R2.
    Any help or hints would be appreciated!
    Thanks
    Anders

    We have the same workaround, using a x64 boot image resolved all our issues with WinPE 5.0.
    Machines with >4GB of RAM
    Lenovo ThinkPad T540p failed applying drivers with 80040005
    Black screen/white cursor issues intermittently
    No updates from Microsoft, they are still looking through the logs, but we have updated our boot images and all is well now. Our case it still open with Microsoft, they are researching the logs.
    Daniel Ratliff | http://www.PotentEngineer.com

  • Tables with more than one cell with a high number of rowspan (ej. 619). This cell can not be print in a page and it must be cut. But I don't know how  indesign can do this action.

    Tables with more than one cell with a high number of rowspan (ej. 619). This cell can not be print in a page and it must be cut. But I don’t know how  indesign can do this action.

    set the wake-on lan on the main computer
    The laptop's too far away from the router to be connected by ethernet. It's all wifi.
    No separate server app on the laptop, it's all samba
    The files are on a windows laptop and a hard drive hooked up to the windows laptop. The windows share server is pants, so I'd need some sort of third party server running. Maybe you weren't suggesting to use Samba to connect to the windows share though?
    I'm glad that you've all understood my ramblings and taken and interest, thanks The way I see it, I can't be the only netbook user these days looking for this kind of convenience, and I certainly won't be once chrome and moblin hit the market.
    Last edited by saft (2010-03-18 20:38:08)

  • Can a user facetime with more than one user at a time

    I can use facetime with Macbook and connect to another Macbook user on another WIFI network... I was wondering if one can facetime with more than one user at a time?

    ellis911 wrote:
    I can use facetime with Macbook and connect to another Macbook user on another WIFI network... I was wondering if one can facetime with more than one user at a time?
    Only if you have more than one device running FaceTime at your end.
    Mac Pro Quad Core (Early 2009) 2.93Ghz Mac OS X (10.6.5); MacBook Pro (13 inch, Mid 2009) 2.26GHz (10.6.5)
    LED Cinema Display; G4 PowerBook 1.67GHz (10.4.11); iBookSE 366MHz (10.3.9); External iSight; iPod4touch4.2.1

  • Case structure with more than 200 cases, slower lab view app

    Problem Description :
    i am currently making a vi which compose of a simple case structures, a case structure with more than 200 cases, what i noticed is that the more i added cases the slower the labview reacts, it takes time for me to route wire on each of the cases.
    i dont know if there are any setting in the labview environment that i can increase the buffer size? i dont know... but its getting slow (only on the
    vi with more cases in a case structure)
    mytestautomation.com
    ...unleashed the power, explore and share ideas on power supply testing
    nissanskyline.org
    ...your alternative nissan skyline information site

    Can you clarify what you mean by "slow". Does it run more slowly or does it feel sluggish during editing?
    Could you attach the actual VI?
     Overall, I agree with the notion of local variable overuse. For example, you read the same local variable twice in the same case. Is there a need for this? Is there a chance that it varies between the two reads? Typically, you would place the terminal in front of the case structure and wire to all the locations where you need the value. This ensures that the data is consistent. Still, this should not cause any slowdown problem.
    (On a sidenote, the code in the upper left corner is inefficient. You convert the same data to lower case with each iteration, so you might want to place this before the loop and do it only once (well, if you are lucky, LabVIEW will fold the operation, but still....). Also your "index array" operation can be replaced by autoidenxing of the 2D array on the outer loop boundary.)
    LabVIEW Champion . Do more with less code and in less time .

  • Document/literal style wsdl with more than one port

    Recently I have changed wsdl style from rpc/encoded to document/literal as BPEL does not handle soapenc:arrayType. The wsdl contains 2 operations and few complex type definitions.
    In BPEL Designer I have created a process that invokes all operations defined in the wsdl, but only one of them will have some data in the response message and the other one will have an empty message. On the other hand, when I use stub generation to invoke Web Service everything is working fine.
    If I provide separate wsdl for each operation (in BPEL process I would have two partnerLinks instead of one) than it works fine.
    Does this mean that BPEL does not handle document/literal style endpoints with more than one port (operation)?
    I have tested this with the orabpel_2.0_J1_win32.exe and orabpel_2.0rc9_win32.exe. Web Services, used for this test, are deployed in Jboss 3.2.3 and axis-1_2beta3.
    WSDL used as partnerLink:
    <?xml version="1.0" encoding="UTF-8" ?>
    <wsdl:definitions targetNamespace="http://test" xmlns:apachesoap="http://xml.apache.org/xml-soap" xmlns:impl="http://test" xmlns:intf="http://test" xmlns:wsdl="http://schemas.xmlsoap.org/wsdl/" xmlns:wsdlsoap="http://schemas.xmlsoap.org/wsdl/soap/" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
    <wsdl:types>
    <schema elementFormDefault="qualified" targetNamespace="http://test" xmlns="http://www.w3.org/2001/XMLSchema">
    <complexType name="CardId">
    <sequence>
    <element name="cardType" nillable="true" type="xsd:string" />
    <element name="number" nillable="true" type="xsd:string" />
    </sequence>
    </complexType>
    <complexType name="CardIdArray">
    <sequence>
    <element maxOccurs="unbounded" name="item" nillable="true" type="impl:CardId" />
    </sequence>
    </complexType>
    <element name="getCardsReturn" type="impl:CardIdArray" />
    <complexType name="CardholderCards">
    <sequence>
    <element maxOccurs="unbounded" name="cards" nillable="true" type="impl:CardId" />
    <element name="serialNumber" nillable="true" type="xsd:string" />
    </sequence>
    </complexType>
    <element name="retrieveChReturn" type="impl:CardholderCards" />
    </schema>
    </wsdl:types>
    <wsdl:message name="retrieveChRequest" />
    <wsdl:message name="getCardsRequest" />
    <wsdl:message name="retrieveChResponse">
    <wsdl:part element="impl:retrieveChReturn" name="retrieveChReturn" />
    </wsdl:message>
    <wsdl:message name="getCardsResponse">
    <wsdl:part element="impl:getCardsReturn" name="getCardsReturn" />
    </wsdl:message>
    <wsdl:portType name="TestService">
    <wsdl:operation name="getCards">
    <wsdl:input message="impl:getCardsRequest" name="getCardsRequest" />
    <wsdl:output message="impl:getCardsResponse" name="getCardsResponse" />
    </wsdl:operation>
    <wsdl:operation name="retrieveCh">
    <wsdl:input message="impl:retrieveChRequest" name="retrieveChRequest" />
    <wsdl:output message="impl:retrieveChResponse" name="retrieveChResponse" />
    </wsdl:operation>
    </wsdl:portType>
    <wsdl:binding name="TestServiceSoapBinding" type="impl:TestService">
    <wsdlsoap:binding style="document" transport="http://schemas.xmlsoap.org/soap/http" />
    <wsdl:operation name="getCards">
    <wsdlsoap:operation soapAction="" />
    <wsdl:input name="getCardsRequest">
    <wsdlsoap:body use="literal" />
    </wsdl:input>
    <wsdl:output name="getCardsResponse">
    <wsdlsoap:body use="literal" />
    </wsdl:output>
    </wsdl:operation>
    <wsdl:operation name="retrieveCh">
    <wsdlsoap:operation soapAction="" />
    <wsdl:input name="retrieveChRequest">
    <wsdlsoap:body use="literal" />
    </wsdl:input>
    <wsdl:output name="retrieveChResponse">
    <wsdlsoap:body use="literal" />
    </wsdl:output>
    </wsdl:operation>
    </wsdl:binding>
    <wsdl:service name="TestServiceService">
    <wsdl:port binding="impl:TestServiceSoapBinding" name="TestService">
    <wsdlsoap:address location="http://localhost:8080/axis/services/TestService" />
    </wsdl:port>
    </wsdl:service>
    </wsdl:definitions>

    Hi Dragana,
    We definitely support the ability to call a web service that exposes two operations (document/literal or not).
    Glancing through your WSDL, it looks good.
    Could you please try to tunnel the second request and see 1) what data is sent to the service and 2) what data is returned by the service?
    Can you please email us a reproduceable case so that we can help troubleshoot in parallel?
    Thank you,
    Edwin
    [email protected]
    please rename .zip to .zap

  • Slider with more than one thumb

    Hi,
    does anybody know a slider with more than one thumb?
    The JSlider-class only provides one thumb, but I need more thumbs to displace.
    That why I posted the last question: I found one in the web but when I call the constructor, I get that error.
    Thank you all
    Katharina

    Hi,
    I also tried MThumbSlider, a.k.a. CMThumbSlider (C for
    Cougaar?), the slider with more knobs. (keywords: slider,
    knob, knobs, thumb, thumbs, more, two, three.)
    I downloaded the code from the link mentioned below,
    run the example and it worked just fine. When I tried
    to subclass the slider to add tooltips I got an exception
    from the loader:
    UIDefaults.getUI() failed: no ComponentUI class for:...
    The slider has its own package. Its constructor
    (indirectly) calls the following utility function,
    passing itself as an argument, just before calling
    JSlider.updateUI. The latter then calls UIManager.getUI,
    which fails with the exception mentioned above.
      public static void setUIName(JComponent c) {
        String key = c.getUIClassID();
        String uiClassName = (String)UIManager.get(key);
        if (uiClassName == null) {
          String componentName   = c.getClass().getName();
          int index = componentName.lastIndexOf(".") +1;
          StringBuffer sb = new StringBuffer();
          sb.append( componentName.substring(0, index) );
          String lookAndFeelName = UIManager.getLookAndFeel().getName();
          if (lookAndFeelName.startsWith("CDE/")) {
            lookAndFeelName = lookAndFeelName.substring(4,lookAndFeelName.length());
          sb.append( lookAndFeelName );
          sb.append( key );
          UIManager.put(key, sb.toString());
      }When the slider is subclassed outside of the package,
    the above results, e.g., in
    UIManager.put("MThumbSliderUI", "MetalMThumbSliderUI");thus the package name is lost. To correct such behaviour
    I changed the substring with the package name, including
    the last dot. The same goes for function createUI.
    There is another thread on this subject:
    http://forum.java.sun.com/thread.jsp?forum=57&thread=348245
    The link were I found the code is
    http://www2.gol.com/users/tame/swing/examples/JSliderExamples1.html

  • US Sales Tax Report is running for more than 10 hours

    Hi All,
    Could any one please suggest us on below issue.
    We have observed that "U.S. Sales Tax Report" Concurrent Program is running for more than 10 hours in R12 Production. The system has been upgraded from 11.5.8 to R12. Earlier in 11i, it was running for 1 hour and post upgrade its running more than 10 hours. As this program is a standard Oracle program, We are taking up this issue with Oracle support. But we wanted to know does anyone has the similar issues faced.
    Many thanks,
    Praveen

    Pl do not post duplicates - US Sales Tax Report is running for more than 10 hours

Maybe you are looking for

  • How to print selected non-adjacent pages?

    I need to print out a few hundred pages using both sides of the paper (as my printer doesn't do 2-sided). Before, in Word for Mac, I could print a large range of discontinuous uneven pages all at once (selecting a range of 1, 3, 5, etc).-- and simply

  • Itunes no longer opens with iphone

    Now running itunes 8.0.2 and iphone 2.2 - somewhere in the middle of this upgrading itunes stopped auto opening when connecting the iphone despite all the correct boxes being ticked. Antoher thread suggested reinstalling itunes - this did work - once

  • Motion 4 crashes when opening Motion 3 project

    Updated to new box and software. I have a ton of projects that were built w/ motion 3. I reuse all motions movements and effects with replacement of text & video only. When I open Motion 3 project i get the prompt "This is earlier version..." and ask

  • Bold 9900 - Error 507 - Repair not working

    Hello,  During an app update the phone crashed and now i have an error 507. When replugging the phone in the Desktop Software is asking me to repair the device. When i click this, the phone turns off but nothing happens from there. I am using a mac. 

  • Interaction Center scenario: total time when agent is "not ready"

    Hi, I have a requirement to show the total time when an agent is "not ready" in IC. I know an agent is either "ready" (to pick up calls) or "not ready". Any idea which business content handles this? Thanks!