Kanban: in-house production. relation kanban - replenishment order

Dear Experts,
We are investigating the posibilities of using kanban for in-house production. We work with production orders. I have set the test system so it works with classic Kanban and a replenishment strategy that will create PP production ordres.
The system works OK. When the KANBAn is set to EMPTY (in the kanban board for instance) , a replenishment element is generated. The relation is 1 KANBAN - 1 Production order.
Is it possible to "assign" two KANBANS to a single replenishment element (productio order in my case)? In some cases two or more kanbans will be emptied at the same time (in the KANBAN board for instance), and this would reduce the "noise" in the system.
Somehow in the documentation "PP-KANBAN" manual, inside "KANBAN control. in-house production" some other option to reduce the amount of production orders is mentioned, but not very clearly explained how to do this.
Thanks for your answers,
Arturo

Hello,
Your question is not clear to give correct feedback. Do you want to wprk with multiple KANBANS with production orders?
I am not understanding about the sentence "reduce the amount of production orders"
If you want to work work minimum production orders then you can automate the KANBAN replinishment through MRP.
Raegards
TAJUDDIN

Similar Messages

  • KANBAN In Production still Generate Discrete Orders

    Hello...
    We are using KANBAN for In house Production, we define a new type of Order for this process.
    We have the problem that the MRP is generating automatically the discrete production orders, and the KANBAN order do the technicall complete, so we have to reopen our KANBAN order and do technicall complete the production orders that MRP generate.
    What we miss in configuration? how I can solve this issue?

    Hi,
    Will you explain the problem detail?
    In the control cycle select the strategy as production order with MRP.
    So when you create kanban production order system will consume the MRP generated production order.
    Regards,
    Vijay

  • Kanban Replenishment Strategy with Reporting Points

    I am trying to implement a SAP kanban system with repetitive manufacturing using reporting points.  My problem is that when I change the status from empty to full I get error RM086 - GR with backflush not for reporting point logic with automatic GR option.  I get this error regardless of control key (auto GR or not auto GR) setting on the routing.  I reading SAP help on the subject; I see there is a page discussing replenishment strategy with reporting points which would infer that there should be a strategy with a similar name in configuration for replinishment strategies for in-house prodution.  We are on ECC 6.0 and this option is not available in our system.    What am I missing???

    Hi,
    As you are using In House production Replenishment Strategy , You must define Replenishment strategy for reporting points in Configuration as below:
    SPRO->Production>KANBAN>Replenishment Strategies>Define In-house Production Strategies>Working With Reporting Points Replenishment strategy you need to define.
    Then assigned this defined strategy in KANBAN Control Cycle in PKMC-->Replenishment Strategy->
    Choose In-house Production Radio Button and in front of that select the above defined replenishment strategy to work with reporting points.
    Hope this helps.
    Regards,
    Tejas

  • Kanban replenishment with WM

    I am using Kanban replenishment with strategy stock transfer from a WM managed storage location(strategy 0006).If I put the Kanban status to empty,I am able to generate Transfer requirement.I converted the TR to TO and confirmed the TO.I am able to move the stock from say storage type R01 to 150, but the stock transfer was not happening from the WM storage location to Kanban storage location.I had maintained supply area and control cycle.Also in WM -PP interface ,for Kanban WM movement type 350 was assigned to ware house and storage type.Also maintained storage location control in WM ,for the ware house and storage type(150) and kanban storage location IM movement type 311 is assigned.Combine post.changes is unchecked.What are the other settings to be made to have automatic transfer with mvt type 311 as soon as TO is confirmed?
    Thanks
    jay

    Also  you can try the following
    1>Within this customizing, there is the option to notify an user id that the goods movement  has failed. If you have set up the mail control then you can check at the mailbox if there is any mail explaining why the goods movement has failed
    2>check transaction SMQ1 under queue name WMIM* to see if there are any blocked queues. If there are any failed processes, these can be cleared from the blocked queue in transaction SMQ1. (this is because many subsequent processes in WM like auto TO creation is controlled by qrfc and if the rfc queue is blocked the subsequent process will not occur)

  • Process order scheduling based on in-house production time.

    Hello!
    I have following problem. My SAP system is configured in that way that process oedrs are schedulled based on times saved in master recipies. When I input data to in-house production time in master data for materials and make new process order, this time is not
    taken into account.
    Where I have to change configuration to use in-house production time from material master data to make scheduling process orders.
    Regards
    Bogdan

    Dear
    Process Order /Production Order scheduling ( Lead Time Scheduling )  based on the Operation timings in the routing not based on the Material Master In house Production Time in Work Scheduling View .
    If you are loking for Basic Date Scheduling then it will happend based on material master , scheduling margin key  at material master level .
    It depends the selection of Schedueling indicator while excetion of MRP in MD02 .
    In case of Process order specifically , you need  to schedule the Master Recipe and check whether operations are getting scheduled, if it is not then you need to first the problem, which may be because of wrong "Forumla" or paramater assigned in resource or the resource is not maintained for Finite scheduling (capacity header).
    Master reciepe can be schedule in the change transaction C202, and from menu you would find the option to schedule the recipe .
    Also  check the OPU3/OPU5-Define scheduling parametres wether scheuling , adjust scheduling , scheuling type , logs all are in place .
    Check and revert
    Regards
    JH

  • In-house production of asset through process order

    Dear Experts,
    We are procuring  raw material and doing in house production for this raw material.
    The process i followed is :
    we created a new order type and assigned settelement profile for asset under contruction
    while creating prod order it is asking for settlement rule
    which is correct and we gave the aset number there and 100% settlement
    my doubt is system does not allow to settle the order until it has status of delivered or teco ..
    if we make the grn from production and aslo settle to asset double entry will be passed to asset in balance sheet ..
    how can we directly settle only to asset instead of doing grn from prod
    Please let me know how to overcome this situation. A quick response is highly appreciated.
    Thnx
    Srinivas

    Hi Srinivas
    The Header Material of the Production Order should be a Non Valuated Material i.e. the material for which the Prod Order is created should be a Non Valuated Material...
    Even if you do the GR, the same will be non valuated and hence have no value...
    Once the process is complete, you need to settle the same to the Asset.... Hence, there will be NO double accounting...
    Even if your Material is not Non Valuated, you need not worry.. Since you have assigned Asset No in the settlement rule, this means the GR will be Non Valuated, though the Materila might be valuated.... So, in any case, there wont be double accounting
    Just settle the Prod Order to Asset and it will be done!
    Br, Ajay M

  • Relation between Sales order and Production order

    Hi,
    In Make to stock scenario how the relation between Sales order and production order are related.In which table we will get the related fields (expect AUFK,VBAK,AUFO).
    warm regards,
    Surendar reddy.

    The relation between sales order and prodution order  is as follows.
    Pass AUFNR to AFKO/AFPO  Get AUFPL.
    Pass AUFPL to AFVC Get BANFN.
    Pass BANFn to EBAN Get EBELN.
    Hope this works .
    Cheers,
    Lakshmi Prasanna Gandham

  • Relation For Product/Warranty/Acc.Indicator/Order

    Hi Experts,
    My problem is..i am not able to get a relation for a service transaction the relation of tht order,product and warranty...
    i am assiging the account indicator in the warranty tab and saving the order...now i need to pick the value of product and based on account indicator..then then finally proceed for vendor claim..
    In short, i need a relationship between the product,accountindicator and order.
    Pls help me at ur earliest..its urgent..
    Thanks,
    SA.

    i have used this table /1BEA/CRMB_DLI for my scenario..
    hope in later stage others can use too..
    here the input has to be the product guid.
    thanks.
    SA

  • One Material with two Different In-House Production Days

    Dear Experts,
    We have 1 semi-finished material (HALB) that is common to two different locations (production version) with two different in-house Production days.  How can we separate the 2 different in- house prod. days for this specific material? Could we setup in the production version? if not, could you give us an advice.
    Ex:
    JDXZ011111 with Prod. version I000 = 3 days
    JDXZ011111 with Prod. version X000 = 1 day
    We are hoping for your help..
    Thank you.
    Regards,
    Marnelli

    Dear Mamelli,
    1.You cannot maintain  the in-house production time in the production version.
    2.In-house production time in days can be maintained in MRP2 view.
    3.If Lead time scheduling is carried out at the time of MRP run then the system uses the in-house time for the calcualtion onf basic
    start and end dates.Based on the routing data the system proposes the production start and end time.
    4.Generally exception messages 64     Production finish after order finish
    63     Production start before order start are  shown after MRP run.
    5.If basic scheduling is carried out then the system proposes only the basic dates.
    Regards
    S Mangalraj

  • In-house production time in MRP2 View

    Hi, Please advise what to mention in in-house production days field in mrp2 view, whether we need to mention the time required to  produce 1 part or any qty? please advise.

    Hi,
    Nice qns... but the answer would be a simple computation from the system. When it is lot-size independent, system just reads the value from IHPT, there is no calculation as such.
    But when it is lot size dependent, the system will compute the IHPT based on the values populated in the Lot-size dependent section of work-scheduling view.
    I would suggest instead of me writing a whole lot of stuff, take a material in your sandbox & do a simple test with a single operation routing. In the work center maintain formulas for Setup, Operation & in your routing maintain the hours for activities setup & machine. Now in the routing itself click on Extras - Scheduling - Schedule & do the scheduling. Click on Scheduling results you will get the details. Now update the material master.
    Now create the production order for different quantity & notice the difference in dates. This will clarify your doubt as to how system would know.
    Revert if you face any issues.
    Regards,
    Vivek

  • Need to show data related to Process order request , BOM in a smart form

    Hi,
    I need to show data related to
    •     Process order request
    •     BoM
    Now in selection screen we are entering the followings.
    Manufacturing  Plant ,MRP Controller, Production scheduler, Order type , Order , Material, Sales order, WBS Element,Release,Scheduled start, Scheduled finish ,Selection profile.
    how to get 1> Process Order number,Produced Material,Material Description,Print date,Narcotics indicator , Quantity produced , Phase number , Phase description ,Resource description,Standard value  to show in a request form.
      2> Item category ,Component code,Component description , Component quantity ,Component Unit of measure ,BoM base quantity.
    Please help me how to get those values , what should be the aaproach , how to write the select quiry.
    Thanks

    Hi
    To get BOM details, do the following:
    1. Use the material number and goto Article to BOM link table (MAST) to get STLNR (BOM).
    2. With this STLNR, goto STPO table (where STLNR is the key field).  Here you will get all the BOM details like components (IDNRK), UoM (MEINS) etc....
    Hope this helps.
    THanks
    Vijay
    <b>PLZ REWARD POINTS IF HELPFUL</b>

  • In house production time in material master .

    Dear All ,
    What will happen if i do not enter ( keep blank ) the inhouse production time in MRP 2 view ?
    Where i am using routing for all inhouse produced material . all the scheduling parameter are correct as per routing considered .
    i have checked the scheduling in routing for these material , scheduling appearing correctly . So this is supposed to be copied as it is in the planned order --> prodn order ( it is happening ) .
    So if i do not use in house production time field in MRP2 what will happen ?
    Pl guide

    Hi,
    It is the time to produce a product in a plant in no.of days.
    In-house production time:
    Specifies the time in workdays needed to produce the material in-house.
    In-house production time is independent of the order quantity.
    Use:
    The system requires the in-house production time to determine the planned dates for planned orders in materials planning.
    Procedure
    You can define work scheduling times in the material master record in one of two ways:
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, tear down, processing, and inter operation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    Production Planning and Control (PP)
    The time required to produce the material in your plant.
    You can enter the in-house production time depending on the order quantity or independent of the order quantity. It is calculated by adding the lead times of all operations, the float before production, and the float after production.
    I hope it helps you. Any queries please revert me back.
    Regards,
    Madhu.G

  • In house production time and delivery date on PO

    Hi Gurus,
    Can anybody please calrify the following for me? Plant A is procuring material X from PlantB via STO. The planned delivery time for the material in plant A is 21 days. The in house production time of the material in plant B is 3 days. When the STO is created, with a delivery date of 04/26/2010, based on the planned delivery time of 21 days, the material has to leave the plant B by 04/05/2010. But what what about the considertation of 3 days of inhouse production tiume in plantB. How does the inhouse production time play in picture?
    Thanks
    Anusha

    Hi
    Inhouse production time in Plant B is considered if there is a planned order or production order is created for material in plant B. If a STO is created in plant A, then system will check only planned delivery time in Plant A only. If you want some buffer, you need to use GR processing time in plant B.
    Regards
    Antony

  • In-house production time not considered in scheduling

    i have a material, with an in-house production time of 7. requirements date is today, May 23. as a sap standard, using backward scheduling, it shall see that the start day lies in the past, and should switch to forward scheduling, with May 23 as the start date, and may 30 as the finish date. however, the system only proposes a finish date of may 27. why is the system behaving this way?

    Hi,
    Please let us explain, where u have carried out  scheduling  ie  during the MRP or in Production order.
    I hope ur asking about Production order scheduling , inthat case system will not consider the Inhouse production time. Because lead time scheduling is carried in production order.
    Scheduling will be done for routing times not for In-house  production time.
    Pradeep

  • In house production time & MRP

    Dear All,
    What is in house production time? How it function during MRP run?
    Please provide some example against explanation.

    Hi,
    In house production time is a time in workdays (maintained in MRP2 view of MMR)  needed to produce the material in house. This time is either dependent / independent of the order quantity / lot size. This time is used to determine the planned dates of the planned orders in material planning. 
    The basic dates are determined only by the lot size independent in-house production time and independently from the order quantity.
    The floats are not included in the calculation of in house production time but actually form the part of in house production time.(The total floats are maintained through the inter operation time).
    Hope this will clear your doubt.
    Pavan

Maybe you are looking for

  • RE: Urgent changing values in the table VA01 items (table COntrol)

    HI, i am using the include MV45AFZZ, userexit_field_modification sub routine. when i enter any value in them items automatically that value should be copied to the next line,  can anyone guide me how to proceed witth it. Thanks & Regards Dinesh Subra

  • Upgrade to Photoshop extended cs5

    I want to upgrade from Photoshop CS5 to Photoshop EXTENDED CS5 on my Mac. The problem:  I can go through the whole installation process without any problems. But when the installation is finished and I start the software, there are no EXTENDED functi

  • Will this hard drive work in my 2009 MBP 13 inch?

    Hello, I've decided to upgrade the hard drive in my Mid 2009 MBP 13 inch to roughly a 500gb from 250gb. My friend has a 2011 MBP 13" and he just upgraded it to 1TB and has his 500gb 5400rpm SATA 2 and said I can have it. Will that hard drive work in

  • Dreamweaver cs5 and Jquery

    Hi. I was looking for "Flash Elements" on Dreamweaver cs5, so that I can use the Image Viewer to put pictures on my wesbite. There was no "Flash Elements" option in the Insert tab. I did some research and apparently I needed a jquery code. I found a

  • Simulator supports KeyPair.ALG_RSA?

    I'm working on an javacard applet with rsa algorithm. When I try to generate a keypair with the ALG_RSA, I always get an error (6F00). I used KeyPair.genKeyPair to generate a pair of RSA keys with 1024-bits long. When I tested applet source In Debug