I am trying to implement a SAP kanban system with repetitive manufacturing using reporting points.  My problem is that when I change the status from empty to full I get error RM086 - GR with backflush not for reporting point logic with automatic GR option.  I get this error regardless of control key (auto GR or not auto GR) setting on the routing.  I reading SAP help on the subject; I see there is a page discussing replenishment strategy with reporting points which would infer that there should be a strategy with a similar name in configuration for replinishment strategies for in-house prodution.  We are on ECC 6.0 and this option is not available in our system.    What am I missing???

Hi,
As you are using In House production Replenishment Strategy , You must define Replenishment strategy for reporting points in Configuration as below:
SPRO->Production>KANBAN>Replenishment Strategies>Define In-house Production Strategies>Working With Reporting Points Replenishment strategy you need to define.
Then assigned this defined strategy in KANBAN Control Cycle in PKMC-->Replenishment Strategy->
Choose In-house Production Radio Button and in front of that select the above defined replenishment strategy to work with reporting points.
Hope this helps.
Regards,
Tejas

Similar Messages

  • Backflusing in REM with reporting points

    Hello everybody,
    I am making some tests with Backflushing in REM with optional reporting points and I have a doubt. This is the situation:
    - Activities: In MFBF, I select "activity backflush" and the reporting point and everything is ok, the backflushing is done correctly.
    - Components: In MFBF, I select" component backflush" or "assembly backflush" and the reporting point. If the operation in the routing has any component allocated, as the backflushing flag is marked, the goods issue is done automatically. No problem.
    - Goods receipt: In MFBF, I select "assembly backflush" and the reporting point. The operation of the reporting point has defined in its control key that a goods receipt for the confirmation is automatically posted for the order. Although this, the goods receipt is not done automatically. If instead of this I do not indicate any reporting point, the goods receipt is done automatically.
    I want to be able to make the goods receipt with reporting points, the same as the activities and the goods issues. Does anybody know if it is possible?
    Thanks and regards
    Laura

    Hi Laura,
    One question to you is when do we use this Reporting Point concept?
    It is used where Production time is considerably long time and we need to monitor the inventory at certain stages.
    In the routing, you have define with milestone confirmation, where ever you want to do the reporting point confirmation.
    Say in a routing, you have defined 4 operations with RP. Say 0040, 0080, 0110 and final operation 0180.
    You want to produce 40 quantiy.
    First when you do the backflushing using MFBF, sysstem will take you to operation 0040 - first reporting point - you can confirm 40 or less than 40 quantities.
    In second reporting point , you can confirm only quantity less than or equal to that confirmed in first reporting point.
    You can see the stock at reporting point using same trasaction MFBF or MF25.
    Hope you got it.
    Regards,
    Srini

  • Reporting Point Backflush Error

    Hi Friends,
    I have a specific question. I am using a material in which Batch Mangement is active. Now when I use MF42N as collective backflush, I enter following data
    Scene 1: Input Data in MF42N Screen
    Plant
    Posting Data & Document Date (Current Date)
    Material
    backflush Qty
    Version
    Reporting Point
    When I enter this data System posts it without asking me Batch Number though Batch Management is active in Material Master.
    Scene 2: Input Data in MF42N Screen
    Plant
    Posting Data & Document Date (Current Date)
    Material
    backflush Qty
    Version
    When I enter this data (No Reporting Point), then System gives me error as Enter Batch (Which is correct as Batch Management is Active in Material Master)
    Please tell me why system is not giving error in Scene 1 where I am not entering Batch details.
    Please let me know if you want any more details on this.

    Dear Nilesh,
    In this case I feel may be by debugging we may be able to identify why the system is allowing you to post the material along
    with batch without mentioning the reporting point without error.
    Logically it should look for both the objects like reporting point as well as batch number(provided if you have assigned a REM
    profile with reporting point and activated the batch management for the product).Is the REM profile containing the reporting point
    as mandatory or optional?
    Regards
    Mangalraj.S

  • Resetting of reporting points

    Dear Gurus,
    I am facing problem in resetting of reporting points .
    We have created product cost collector with production version but at that time REM allowed indicator is not ticked and control key is with out milestone confirmation
    Transaction are done with  reporting point 10 & reporting point 20 i have checked in table S028 & CEZP,CPZP all entries are available but in Tcode MF12  all entries are not available
    we iam try set reporting points in MF4R The production version is not available for this i have ticked REM allowed indicator & Mile stone confirmation in control key it shows in MF4R But both the reporting points with O quantity.
    As per S028 table my quantity differs in Reporting point 10 & 20
    i have backflush some qty for reporting points 10 & 20 but it consider NEW QTY for resetting OLD QTY.
    we have upgrade from 4.6 to 6.0 two years back.
    we are using Period end closing process now.
    i want to reset alI WIP of old PCC  to REL Scrap by using MF4R.
    I Have RE set all  PCC by MF4R  but this is my old PCC it creates me problem in restting
    There is any way to reduce WIP to zero in old PCC Cost collectors with out resetting reporting points
    Already we run  report KKAO
    I have checked all below notes
    SAP Note 756186 - RM402 No reporting points when creating
    production version  - available
    MFBF: Reporting point backflush
    terminates with error RM111
    Any program, Any note for to reset WIP TO zero
    Regards
    Avinash

    hi experts,
    Any one can resolve my problem
    please revert back for any clarification required
    Regards
    Avinash

  • Kanban replenishment with WM

    I am using Kanban replenishment with strategy stock transfer from a WM managed storage location(strategy 0006).If I put the Kanban status to empty,I am able to generate Transfer requirement.I converted the TR to TO and confirmed the TO.I am able to move the stock from say storage type R01 to 150, but the stock transfer was not happening from the WM storage location to Kanban storage location.I had maintained supply area and control cycle.Also in WM -PP interface ,for Kanban WM movement type 350 was assigned to ware house and storage type.Also maintained storage location control in WM ,for the ware house and storage type(150) and kanban storage location IM movement type 311 is assigned.Combine post.changes is unchecked.What are the other settings to be made to have automatic transfer with mvt type 311 as soon as TO is confirmed?
    Thanks
    jay

    Also  you can try the following
    1>Within this customizing, there is the option to notify an user id that the goods movement  has failed. If you have set up the mail control then you can check at the mailbox if there is any mail explaining why the goods movement has failed
    2>check transaction SMQ1 under queue name WMIM* to see if there are any blocked queues. If there are any failed processes, these can be cleared from the blocked queue in transaction SMQ1. (this is because many subsequent processes in WM like auto TO creation is controlled by qrfc and if the rfc queue is blocked the subsequent process will not occur)

  • REM Reporting Point line item with operation number 9999

    Dear guru,
    I run MFBF with a REM Profile that post Automatic GR and Activities.
    I have four operation in the material routing (10,20,30,40)
    For the first three operations I want to confirm them with target activities
    I define Third Operation with operation number 30 as "Reporting Point Operation"  and
    set the necessary settings for Reporting Point at Rem Profile.
    After the confirmation I check MF12 (display document log information).
    I see two reporting point line item : one for operation number 30 and one for operation number 9999
    The system update in table AFRU only operation 30.
    So I donu2019t know the activities confirmed with operation 10 and 20.
    Do you help me ?
    Thanks in advance.

    Hi dude:
    Once I had this problem, and was due to a wrong definition of the parameters used in the formula for calculating the activities in to the operations.
    You can chek it in the next path:
    IMG route
    Production > Basic Data > Work Center > Costing > Work Center Formulas > Define formula parameters for work centers & Define formulas for work centers
    Make sure that these parameters are correctly linked to the formulas.
    Please, let me know if this info was useful for you.
    Regards
    Omar Perea

  • GR with backflush not for reporting point logic with autom. GR option

    Dear Experts,
    While doing backflashing though MFBF we are getting following error
    "GR with backflush not for reporting point logic with autom. GR option"
    We have maintained 5 production version for this material while calling with first production version we are getting the error.
    Rate routing & BOM maintanied for the FERT material
    Thanks

    Did you check the BackFlash option are actuvated in the following places ?
    1. In the Rate routing, the backflush indicator is set in the component assignment.-CA22
    2. In the material master record, the backflush indicator has the characteristic "Always backflush".-MRP3
    3. In the material master record, the backflush indicator has the characteristic "Work center decides", the indicator being set in the work center.-CR21-Basic Data View .
    4.Goto-MM02-MRP4 View -Select the PV-Goto Details -Check particularly this production version REM Allowed or not
    5.You should use REM-Profile -0004/0003  where RP and Auto GR with RP at last Back Flashing Activated .
    6.Check Rate Routing Operation Control Key -Auto GR  with indicator Confirmation required
    Regards
    JH
    Edited by: Jiaul Haque on Jun 22, 2010 11:19 AM

  • Replenishment strategy in kanban

    Hi,
    I have created replenishment strategy for maintaining in control cycle of kanban.
    1) In house production strategy
    2) external procurement strategy
    3) stock transfer strategy.
    But while creating control cycle I couldnot view the strategy 1) and 2).
    I could see only 3rd stratgy.
    Pl. tell me what could be the reason.

    Hi
    The Problem is that the Strategy created is not allowed for storage location that is included in planning.
    Error msg no PK192
    Solution
    Change the MRP indicator for the storage location in the material master record.
    In MM02 for the material , Plant and Storage location combination  select the ind 1 for SLoc MRP indicator in MRP-4 view and chk whether the newly created Strategies are appearing in PK01 or not.
    Regards
    Brahmaji

  • Someone with enough points to report a post

    can someone with enough points please report this post
    https://discussions.apple.com/message/16308484#16308484

    David, thanks for being so vigilant, but don't worry, there are many people who read the forums and action posts, and the moderators have automated systems for detecting problem posts also. So just enjoy the forum

  • Kanban: in-house production. relation kanban - replenishment order

    Dear Experts,
    We are investigating the posibilities of using kanban for in-house production. We work with production orders. I have set the test system so it works with classic Kanban and a replenishment strategy that will create PP production ordres.
    The system works OK. When the KANBAn is set to EMPTY (in the kanban board for instance) , a replenishment element is generated. The relation is 1 KANBAN - 1 Production order.
    Is it possible to "assign" two KANBANS to a single replenishment element (productio order in my case)? In some cases two or more kanbans will be emptied at the same time (in the KANBAN board for instance), and this would reduce the "noise" in the system.
    Somehow in the documentation "PP-KANBAN" manual, inside "KANBAN control. in-house production" some other option to reduce the amount of production orders is mentioned, but not very clearly explained how to do this.
    Thanks for your answers,
    Arturo

    Hello,
    Your question is not clear to give correct feedback. Do you want to wprk with multiple KANBANS with production orders?
    I am not understanding about the sentence "reduce the amount of production orders"
    If you want to work work minimum production orders then you can automate the KANBAN replinishment through MRP.
    Raegards
    TAJUDDIN

  • PK01 Replenishment Strategy without MRP

    Dear guru ,
    i want to create a control cycle with a Replenishment Strategy without MRP.
    The material master have MRP Type ND.
    When I create a control cycle the system select strategy for  kanban control with MRP.
    I have verified that I must also enter storage location mrp indicator equal to 1 in order to select strategy control without MRP.
    If i enter storage location mrp indicator equal to blank why the system donu2019t check only material master mrp type ?
    Thanks.

    Not answered.
    Closed.

  • KANBAN External Supplier with MRP

    We have a requirement to use KANBAN for external vendors and also do forecasting for same materials using MRP.
    Does standard SAP support this?
    We are using replenishment strategy 02 ( with SA's ) but it is not working.
    Any ideas ??

    Hi Prashanth,
    It makes no sense to have both KANBAN and MRP for he same material in a plant. KANBAN is an alternative method to material requirements planning! That's why also SAP will not allow that.
    The only exception is when the material is in-house manufactured, and you want to pass dependent requirements to it's sons in the BOM via MRP planning and explosion of BOM.
    If you only need to pass to your supplier some info on future requirements, but still work operatively via KANBAN, you can try using LTP MRP for that (if planning is demand based), or just material forecast (without MRP) if planning is consumption based.
    Regards,
    Mario

  • Kanban Replenishment

    Hi
    I am creating the control cycle( Classic KANBAN ) with replenishment strategy External Source , I am not allowed to do.
    I am checking the drop menu and error message is coming no suitable replenishment strategy found.
    Please maintain the replenishment strategies in Customizing for Kanban
    It is surprising because Replenishment stratigies are maintained for the plant when I check the Customizing.
    Any help is appreciated.
    Regards
    Ankur

    Hi,
    It may be very very late to answer you, but it may be useful to other users.
    If you selected the external source strategy in the control cycle, you need to inform in the material master, in the screen MRP 4, in the field 'SLoc MRP indicator' the value '1 - Storage location stock excluded from MRP'. Make sure to access the material informing the center and Storage location, otherwise this field will not be visible.
    You do this because the kanban will act as the 'new' MRP for this material.
    Regards,
    Alejandra.

  • Problems with report builder 3.0 in SCCM 2012 R2 CU2

    Hi All
    I have problems with editing  (Using Report builder) existing reports  or creating new ones in SCCM 2012 R2 CU2
    We version of SQL we use is SQL 2008 R2 SP2
    I already asked this question in the SCCM 2012 forum but the problem is not related to SCCM but has something to do with application report builder
    I changed the registry key and edited the Microsoft.ConfigurationManagement.exe.config.xml as described in the following link
    http://blogs.technet.com/b/smartinez/archive/2012/07/03/system-center-2012-configuration-manager-create-report-don-t-work-what-do-i-do-now.aspx
    Afterwards I try to edit an report I see report builder is being downloaded and after it generates the following error “Application did not succeed. Unable to continue”
    Error details are
    Following errors were detected during this operation.
    * [22-7-2014 13:55:07] System.Deployment.Application.InvalidDeploymentException (HashValidation)
    - File, Microsoft.DataWarehouse.dll, has a different computed hash than specified in manifest.
    - Source: System.Deployment
    - Stack trace:
    at System.Deployment.Application.ComponentVerifier.VerifyFileHash(String filePath, Hash hash)
    at System.Deployment.Application.ComponentVerifier.VerifyFileHash(String filePath, HashCollection hashCollection)
    at System.Deployment.Application.ComponentVerifier.VerifyComponents()
    at
    System.Deployment.Application.DownloadManager.DownloadDependencies(SubscriptionState subState, AssemblyManifest deployManifest, AssemblyManifest appManifest, Uri sourceUriBase, String targetDirectory, String group, IDownloadNotification notification, DownloadOptions
    options)
    at System.Deployment.Application.ApplicationActivator.DownloadApplication(SubscriptionState subState, ActivationDescription actDesc, Int64 transactionId, TempDirectory& downloadTemp)
    at System.Deployment.Application.ApplicationActivator.InstallApplication(SubscriptionState& subState, ActivationDescription actDesc)
    at System.Deployment.Application.ApplicationActivator.PerformDeploymentActivation(Uri activationUri, Boolean isShortcut, String textualSubId, String deploymentProviderUrlFromExtension, BrowserSettings browserSettings, String& errorPageUrl)
    at System.Deployment.Application.ApplicationActivator.ActivateDeploymentWorker(Object state)
    And in the SmsAdminUI.log I noticed the following error
    [16, PID:4460][07/21/2014 14:11:43] :[ReportProxy] - User-specified default Reporting Point [Server1.local.nl] could not be found, [Server2.local.nl] is now the default Reporting Point.
    [1, PID:4460][07/21/2014 14:11:11] :System.InvalidOperationException\r\nThere is an error in XML document (1, 1).\r\n at System.Xml.Serialization.XmlSerializer.Deserialize(XmlReader xmlReader, String encodingStyle, XmlDeserializationEvents events)
    I removed the reporting point no luck -> I already installed report builder 3.0 local on my computer still no luck.
    I hope someone can give me some advice , I am lost with this error
    Thx in advance
    Regards
    Johan

    Hi Miss Katherine,
    1. I went through the SQL steps in the link you posted
    2. I updated the Reg Key and Microsoft.ConfigurationManagement.exe.config file with 3.0 on both the
    server and the console machine.
    3. I copied the .DLL file from your OneDrive and replaced the existing one on the server.
    4. I uninstalled and re-installed the reporting role on the server and received the 1015 in the log.
    5. I restarted the server and the client machine
    I do get a slightly different error now after using the new DLL
    Errors With Original DLL
    ERROR DETAILS
    * [9/30/2014 8:42:03 AM] System.Deployment.Application.InvalidDeploymentException (HashValidation)
    - File, Microsoft.DataWarehouse.dll, has a different computed hash than specified in manifest.
    - Source: System.DeploymentERROR DETAILS
    Errors With New DLL
    ERROR DETAILS
    Following errors were detected during this operation.
    * [9/30/2014 9:17:13 AM] System.Deployment.Application.InvalidDeploymentException (RefDefValidation)
    - Reference in the manifest does not match the identity of the downloaded assembly Microsoft.DataWarehouse.dll.
    - Source: System.Deployment

  • No data found error on Form on a Table with report

    Hi Everyone, I'm using Application Express 4.1.0.00.32 on Windows 7. I built a Form on a table with report. Earlier I was using rowid as a passing parameter but then I had to change it to primary key column from report to form.
    So in the "Fetch row process" I changed the "Items containing primary key value" and "Primary Key column" to P1004_PERSON_ID and PERSON_ID respectively. Which is my primary key.
    My Form is working exactly fine but at on point it throws "no data found error".
    I have a required date field in the form. So if the user doesn't fill in the date field and try to save the form, it throws the "Feild required error" and then when user enters date and try to save then it throws the error "No data found.". here is the snapshot... snapshot
    How can I fix this error.I'm really stuck.
    I checked debubber..it is as follows... in debughger it's still showing rowid. I don't know why. How can I fix that.
    Execution
    Message
    Level
    Graph
    0.00233
    0.00932
    S H O W: application="101" page="1004" workspace="" request="" session="123235901404364"
    4
    0.01161
    0.00102
    Language derived from: FLOW_PRIMARY_LANGUAGE, current browser language: en-us
    4
    0.01261
    0.00046
    alter session set nls_language="AMERICAN"
    4
    0.01307
    0.00042
    alter session set nls_territory="AMERICA"
    4
    0.01348
    0.00053
    NLS: CSV charset=WE8MSWIN1252
    4
    0.01401
    0.00042
    ...NLS: Set Decimal separator="."
    4
    0.01443
    0.00053
    ...NLS: Set NLS Group separator=","
    4
    0.01495
    0.00050
    ...NLS: Set g_nls_date_format="DD-MON-RR"
    4
    0.01545
    0.00051
    ...NLS: Set g_nls_timestamp_format="DD-MON-RR HH.MI.SSXFF AM"
    4
    0.01597
    0.00050
    ...NLS: Set g_nls_timestamp_tz_format="DD-MON-RR HH.MI.SSXFF AM TZR"
    4
    0.01647
    0.00079
    ...Setting session time_zone to -05:00
    4
    0.01726
    0.00046
    Setting NLS_DATE_FORMAT to application date format: DD-MON-YYYY
    4
    0.01772
    0.00060
    Setting NLS_TIMESTAMP_FORMAT to application timestamp format: DD-MON-YYYY HH24.MI.SSXFF
    4
    0.01832
    0.00092
    ...NLS: Set g_nls_date_format="DD-MON-YYYY"
    4
    0.01924
    0.00049
    ...NLS: Set g_nls_timestamp_format="DD-MON-YYYY HH24.MI.SSXFF"
    4
    0.01973
    0.00083
    ...NLS: Set g_nls_timestamp_tz_format="DD-MON-RR HH.MI.SSXFF AM TZR"
    4
    0.02056
    0.00099
    NLS: Language=en-us
    4
    0.02154
    0.00157
    Application 101, Authentication: PLUGIN, Page Template: 5091946581246503
    4
    0.02312
    0.00065
    ...fetch session state from database
    4
    0.02377
    0.00106
    fetch items
    4
    0.02483
    0.00065
    ...fetched 103 session state items
    4
    0.02548
    0.00194
    Authentication check: NTLM (NATIVE_CUSTOM)
    4
    0.02742
    0.00188
    ...Execute Statement: begin declare begin wwv_flow.g_boolean := f_ntlm_page_sentry_parm; end; end;
    4
    0.02930
    0.00050
    ... sentry+verification success
    4
    0.02980
    0.00042
    ...Session ID 123235901404364 can be used
    4
    0.03021
    0.00114
    ...Application session: 123235901404364, user=VARMAN01
    4
    0.03135
    0.00162
    ...Check for session expiration:
    4
    0.03297
    0.00075
    Session: Fetch session header information
    4
    0.03372
    0.00113
    ...Setting session time_zone to -5:00
    4
    0.03485
    0.00080
    Branch point: Before Header
    4
    0.03565
    0.00598
    Fetch application meta data
    4
    0.04165
    0.00081
    ...metadata, fetch computations
    4
    0.04245
    0.00076
    ...metadata, fetch buttons
    4
    0.04321
    0.00086
    Setting NLS_DATE_FORMAT to application date format: DD-MON-YYYY
    4
    0.04406
    0.00058
    Setting NLS_TIMESTAMP_FORMAT to application timestamp format: DD-MON-YYYY HH24.MI.SSXFF
    4
    0.04464
    0.00049

    Just an observance... SQL is still showing the rowid instead of the P1004_PERSON_ID ??
    where "PERSON_ID" = :p_rowid;
    should it not be :
    where "PERSON_ID" = :P1004_PERSON_ID:
    thx, Bill

Maybe you are looking for

  • ASA 5505 ICMP Deny

    Hi I am facing a problem with icmp in ASA 5505, i want to block the icmp from inside to outside , but outside to inside icmp should work, here the configuration. ASA Version 8.0(5) interface Vlan1  nameif inside  security-level 100  ip address 192.16

  • Redirecting to the Home Page when clicking on close button of the Item in a list

    Hi all, I have a SPD Workflow configured in a site to show a link to the current item view form from the autogenerated mail, so that when a user clicks on the link , it gets redirected to the list item as a Viewform.aspx. on closing t hat the user wi

  • Elements 9 Organizer only imports one folder at a time

    Well I purchased Elements 9 after not being happy with the products included with my camera's. System is an i950 processor, Windows 7 Ultimate 64bit, 12 GB RAM, 120GB SSD and a 1 TB hard drive.  Basically a system that gives me no trouble with any ot

  • Please Help with Burn Error in iDVD 4.0.1

    I'm using a G5 and running OS 10.3.9. I've burned a slideshow once with no problems using iDVD over a year ago and went to try again recently (after upgrading whenever an upgrade was available) and I'm getting the following error: Errors were found d

  • SAN Device Manager port on Green X

    Hi Everyone, Can anyone explain me what is the meaning of green X on the SAN Device manager port 5? Please see details below image and cli command. I am not sure if the port is faulty or just wrong information by device manager. SANCORE-1B# sh int fc