KANBAN with Quota arrangement

Dear Guru,
Ist possible to use Quota arrangement in KANBAN external Procurement (Scheduling Agreement)?
If so, please advice me how to do it... i am new to KANBAN.
Regards,
Senthil

Hi Kumara,
As per my knowledge Quota Arrangement is not possible to use in KANBAN with Schedulling Agreement.
However pls find below the process steps for KANBAN WITH SCHEDULING AGREEMENT:
You can carry out KANBAN with Replenishment Strategy- External Procurement in following two ways :
1.     External procurement from Vendor to Main Stores:
Basic rules and Prerequisites:
u2022     MRP type should be u2018NDu2019 in MRP1 view of material master.
u2022     Availability check should be u201CKPu201D in MRP3 view of material master.
u2022     Material received from vendor is directly posted to unrestricted stock. Inspection at vendors place or vendoru2019s process control to ensure rejection free material. Inspection set up in Material master should be inactive.
u2022     Backflush is not required and Material is issued against a Pick List for Production Order.
Process steps:
1.     Create supply area for Main stores. TC: PK05
2.     If required, extend the material to main storage location. TC: MMSC
3.     Make the necessary changes in the material master as explained above.
4.     Create scheduling agreement. Put kanban indicator (X) in the additional data of item.
5.     Create Kanban control cycle. TC:PKMC
6.     Print the barcode. TC:PK17
7.     Set the kanban status to EMPTY by scanning the barcode. TC: PKBC. A Schedule line will be generated for the supply of material to main stores.
8.     View the demand source view. TC: PK13n
9.     When the material is received at Gate, perform goods receipt into blocked stock (movement type 103). TC: MIGO
10.     Once the material reaches Main stores scan the barcode to FULL. TC: PKBC (At the background GR with 105 movement will happen).
2.     External procurement from Vendor directly to shop:
Basic rules and Prerequisites:
u2022     MRP type should be u2018NDu2019 in MRP1 view of material master.
u2022     Availability check should be u201CKPu201D in MRP3 view of material master.
u2022     Backflush indicator is must. It can be defined in the routing or in the material master itself. If Backflush indicator is set in the material master, then the material will be backflushed through out the plant (Material issue not required against production order). However if you want the material to be backflushed only when it is used for certain products, then Backflush indicator should be set in the routing ( in the component allocation against operations).
u2022     Confirmation should be done for each operation in the production order either individually (CO11n) or collectively (CO15). Confirmation posts goods issue of components (relevant to confirmed operation/s) to production order
u2022     Maintain KN01 storage location in the field - production storage location of MRP2 view in the material master. Back flushing will take place from this location. Field - Storage location for external procurement should be KN01 in the material master.
u2022     Material received from vendor is directly posted to unrestricted stock. Inspection at vendors place or vendoru2019s process control to ensure rejection free material. Inspection set up in Material master should be inactive.
Process steps:
1.     Create supply area for kanban stores (KN01). TC: PK05
2.     Extend the material to Kanban storage location. TC: MMSC
3.     Make the necessary changes in the material master as explained above.
4.     Create scheduling agreement. Put kanban indicator (X) in the additional data of item.
5.     Create Kanban control cycle. TC:PKMC
6.     Print the barcode. TC:PK17
7.     Set the kanban status to EMPTY by scanning the barcode. TC: PKBC. A Schedule line will be generated for the supply of material to kanban store.
8.     View the demand source view. TC: PK13n
9.     When the material is received at Gate, perform goods receipt into blocked stock (movement type 103). TC: MIGO
10.     Once the material reaches shop, scan the barcode to FULL. TC: PKBC (At the background GR with 105 movement will happen).
Hope this helps.
Revert if any doubt and reward points if useful.
Regards,
Tejas

Similar Messages

  • Assign Source of Supply User Exit with Quota Arrangements in ME57 and ME56

    Hi there,
    We are using Quota Arrangements to define Vendor rebate levels and we have enabled User Exit EXIT_SAPLMEQR_001 to provide a more informative popup to replace standard Source of Supply popup as need to display current allocation quantities and % allocation fulfiled.
    This User Exit is invoked during Assign Source of Supply during PReq processing (More precisely during Assign Source of Supply in ME51n and Automatic Source of Supply in ME57 and ME56) which all works fine.
    When used in ME51n and Source of Supply Assigned and PReq saved, the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is successfully updated with the relevant amount
    When using ME56 or ME57 to Automatically Assign source of Supply via the PReq list, the User Exit is invoked correctly and on selecting Vendor and saving the PReq is update correctly, however the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is NOT updated with the relevant amount
    I have searched SAP Notes and debuged with limited success but cannot find evidence as to why this difference is happening - I assume that it has something to do with User Exit but any advice gratefully received if anyone else has experienced this issue?
    Ben

    Hello Jerry,
    source will be determine based on the following points:
    Outline Agreement
    Info record
    Quota Arrangement
    Source List
    For more information, <a href="http://help.sap.com/saphelp_47x200/helpdata/en/75/ee11b255c811d189900000e8322d00/content.htm">Click here</a>
    Hope this helps.
    Regards
    Arif Mansuri

  • While Creating PO with Quota Arrangement Quantity is not picking by % given

    HI ALL.
    created Quota arrangement with 2 vendors.
    And assigined Percentages like 30 and 70 for this.
    Created Purcahse requisition and purchase order.
    But quanity with vendor percentages is not executing.
    Regards.
    Paramesh.
    Advance Thanks.

    Hi
    Can you give more information. How you create the PR & PO manually or via MRP.
    Quota arrangement works for automatic source determination and it has the highest priority.
    Also Splitting quota is only possible with MRP.
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/75/ee116c55c811d189900000e8322d00/content.htm]
    Hope it helps
    Karthik

  • Std-Price calculation with Quote arrangement

    Hello Experts,
    I set up a quote arrangement (MEQ1) for one Material. This quote arrangement including two production version 0001 and 0002 with proc.type E, as third line I added a vendor with proc. type F.
    How can I calculate the std. price based on the proc. type F line, line should be slected by the system automatically and not based on the prod. versions (E).
    Thanks in advance
    Jörg

    Hi Ajay,
      Thanks for your inputs.  In the std costing run system is showing components as below.
    Material cost       110$
    Material overheads  10$
    Labor cost  20$
    Labor Overheads 10$
    In this Material cost 110$ , materials overheads also included(100$+10$). Why system is calculating Material overheads twice please suggest what mistake i did.
      The material overhead percentage rate is 10%.
    As per my client requirement system should calculate components as shown below
    Material cost 100$
    Material overheads 10$
    Labor cost  20$
    Labor overheads 10$
    Please advise its very urgent, your inputs will be rewarded with points.
    Thanks&Regards,
    Spandana.

  • MRP Rescheduling Error with quota arrangement

    Hi i have a problem when using a Quota arrangement in MRP. When i use NME59N to order,the system proposes to bring the first vendor 100% for a month and then the next supplier for a minimal share the following month. the quota is available clearly in PR'S but when converted to PO'S the rescheduling takes the first po as a referrece instead the assigned PR'S.Can any one help me sorting out this?

    When you run ME59N you will convert the requisitions inot POs (the same requisitions that you see in MD04). The vendor assignment is not modified by ME59N. This is already done by the Quota when the MRP runs.
    In ME59N you can control if each requisition will be converted into a single PO, if multiple requisitions are going to be joined and converted into a single PO, etc.
    I am still not sure if your problem is with ME59N or what you don't like is how the vendor is assigned (considering the Quota) when the MRP is executed? If you see in MD04, is the assignment correct? if the vendor assignment that you see in MD04 is not what you want.. then we should find a solution working with the Quota and with the MRP paramenters. Is your problem the vendor assignment that you see in MD04?
    Thansk and Regards,
    Mariano Cabalen

  • Contract With Quota Arrangement

    Hi
    I am using Contract to procure a material from a Vendor.
    Incase if have more than 1 vendor can I use the Quota arrangement ?
    If the PR is created (By MRP) does it consider the Contract ?
    What are the steps involved to work with Quota for Contract.
    Regards
    MM
    Edited by: SAP-MM1 on Sep 18, 2011 2:55 PM

    Dear,
    Contract cannot be used as a source in Quota Arrangemnets.
    Quota arrangements and Contract both are different which you already know and maintained in the system to service different purposes.
    What about - Why can't maintain quota arrangements for all vendors who have contracts [when vendors are different] ?
    Regards,
    Syed Hussain.

  • SNP quota arrangement with fixed lot size

    Hi all,
    i have a question regarding quota arrangement for external procurement in snp heuristic. Whe have 2 sources of suppy created by info record. The quota is 25% for the first and 75% for the second one. In product master there is maintained a fixed lot sice of 500.000. Im wondering that the snp heuristic creates 2 requisitions of 500.000 for each sos at the same day. So we get an serios excess. Any ideas?
    Kind regards,
    Christian

    Hi,
    thanks for reply. Ok, normally net requirement calculation works properly. In case of a shortage the heuristic shall apply an receipt with the fixed lot size wich is maintained in material master. However, in out particular case it generates the double receipt quantity which is not needed at the receipt date.
    The heuristic should do the following:
    Day 01 Stock 100   
    Day 02 DepDmd 20 
    Day 03 DepDmd 20 
    Day 04 DepDmd 20
    Day 05 DepDmd 20
    Day 06 DepDmd 20
    Day 07 PurReq 100 !! Source 1!!
    Day 08 DepDmd 20
    Day xx PurReq 100 !! Source 2!!
    and not:
    Day 01 Stock 100   
    Day 02 DepDmd 20 
    Day 03 DepDmd 20 
    Day 04 DepDmd 20
    Day 05 DepDmd 20
    Day 06 DepDmd 20
    Day 07 PurReq 100 !! Source 1!!
    Day 07 PurReq 100 !! Source 2!!
    Day 08 DepDmd 20
    In this example 100 would be the fixed lot size from material master.
    Best regards,
    Christian

  • How to maintain Quota arrangement with respect to production verson

    Hi,
    I maintained Quota arrangement(without splitting) with respect to the two different production versions of a material and when i checked by running MRP. quota arrangement is not working. the system allocates the demand only to the active production version(which has the current validity period).
    I guess i am missing something, can some one tell me how to maintain the quota arrangement with respect to production versions.
    we have a requirement where a material is manufactured in house and will have 2 different production versions with 2 different validity periods in material master and they need the quota arrangement to work on this material in M.R.P for 2 different production versions.
    I have maintained the quota arrangement usage= 3 in  material master.
    Thanks
    Mahendra

    Hi,
    for the req qty to be distributed between two differnt production vesion, you might have to activate splitting in MEq1.
    Give the min qty as 1, so that you req qty could be distributed between two differnt production version.
    Pls conifm if it is through or if there is any other solution .
    regards
    Harish

  • Source determination with referance to quota arrangement

    Dear all
    I had created quota for vendor A & Vendor B for a material M100, I had also defined quota arrangement usage in SPRO ( 3),
    While creation of PR for this material M100, I had selected the tick for source determination, But still system is not determining the source.
    Here one more observation is if I create the info record the source is determined from info record & the details are updated in quota.
    Can some one help me which other things I need to check, so that the source is automatically determined by system from quota arrangement.
    Thanks in advance
    Regards
    Pravin

    HI,
    If MIGO is done for the P.O all the datas are updated in the Purchase order history.
    When you are doing MIRO , it will take what you have entered in  the MIGO only.
    Please try
    G.Ganesh Kumar

  • Error with LSMW IDOC method while maintaining Quota arrangement

    Hi
    I am trying to create LSMW using IDOC method for maintaining quota Arrangment.
    I used the standard Message type LPIEQU. Idoc is getting generated and when i tried to process this IDOC i am getting error "Function module not allowed: BAPI_IDOC_INPUT1".
    I used the process code as "BAPI" in message type LPIEQU configuration in WE20.
    If anyone faced this issue please let me know the reason for the error.
    sakthi.K

    see OSS Note 198252 - Special features of POI message category LOI*
    The message categories named are part of the POI (Production Optimization interface) interface.This interface and the message categories contained in it were developed for the transfer to non-R/3 systems.Therefore, an inbound processing in the R/3 system is not planned.

  • Quota arrangement - winning contract is not auto assign in SC

    My Problem: Winning contract is not auto assign to Shopping cart
    I created a Quota Arrangement (QA). It contains 2
    contracts, for example in line item 1, contain Contract with Supplier
    'A', with target percentage of 60%. In line item 2, contain Contract with
    Supplier 'B', with target percentage of 40%. I did not specify any quotabase quantity.
    For your info, the contract for Supplier 'A" is a Purchasing Contract,
    with target value of 80 (currency Malaysian Ringgit). Contract for
    Supplier 'B' has target value of 20 (currency Malaysian Ringgit). When Icreate a Shopping Cart, with quantity 5 (each-EA) and price per unit is
    2
    (Malaysian Ringgit), total is MYR10. When I go to Source of Supply tab,
    the system showed 2 suppliers from the 2 contracts. It did not
    automatically assigned to the winning contract. We still have to choose
    which contract to be assigned. I created another SC after that until theContract exceeded quantity, but the system does not proposed winning
    contract automatically. Please help.
    Cheers
    AIN

    yes, the contract have company code

  • Process Quota Arrangement

    In SAP SRM 210 training material, page 334 (under main topic Unit 8: Sourcing), it is clearly stated that every requirement fitting a quota arrangement is sourced automatically by the system. But that did not happen in our system implementation (assuming standard SAP is used and no configuration needed). The picture captured in the training material SRM210, page 334 showed that, in Process Quota Arrangement, at Quota Arrangement item level, there are 3 columns in which values are updated. The value will be updated in the 3 columns after Purchase Order created with refer to quota based vendor selection. The 3 columns are Release Quantity, Current Percentage and Target Percentage. After PO created, system gives current release quantity and current percentage in the quota arrangement. However, in the real implementation, I did not see the column available for automatically update except the target percentage column. We want to see if the Quota Arrangement updates the column Release Quantity and Current Percentage but both columns are not updated. We use standard SAP-SRM7.0, but the result is not as the same in the SAP SRM210 training material, provided by SAP.
    Anyone know the solution?

    In SAP SRM 210 training material, page 334 (under main topic Unit 8: Sourcing), it is clearly stated that every requirement fitting a quota arrangement is sourced automatically by the system. But that did not happen in our system implementation (assuming standard SAP is used and no configuration needed). The picture captured in the training material SRM210, page 334 showed that, in Process Quota Arrangement, at Quota Arrangement item level, there are 3 columns in which values are updated. The value will be updated in the 3 columns after Purchase Order created with refer to quota based vendor selection. The 3 columns are Release Quantity, Current Percentage and Target Percentage. After PO created, system gives current release quantity and current percentage in the quota arrangement. However, in the real implementation, I did not see the column available for automatically update except the target percentage column. We want to see if the Quota Arrangement updates the column Release Quantity and Current Percentage but both columns are not updated. We use standard SAP-SRM7.0, but the result is not as the same in the SAP SRM210 training material, provided by SAP.
    Anyone know the solution?

  • Subcon Quota Arrangement behavior during MRP

    Dear Gurus,
    Currently, we have a scenario wherein during subcon process there can be 3 Vendors active. During MRP, we would like to have an output as per below:
    Requirement: 1500
    Vendor A: capacity 500 - priority 1
    Vendor B: capacity 700 - priority 2
    Vencor C: capacity 500 - priority 3
    If I run MRP, I would like system to have PR's Vendor A with 500 then as the Vendors capacity is only 500 the remaining requirement should be passed on the succeding vendors. So from my example, Vendor B should have 700 and Vendor C should have 300.
    Is this possible using Quota Arrangement. I was trying to test but I cannot get my desired result.
    Please note that the settings in the material master is already set to Quota usage 4 and the lotsize is weekly with splitting quota activated.
    Thanks,
    Raymond
    Edited by: Raymond on Oct 10, 2011 11:17 AM

    Hi,
    Yes I have maintained below in MEQ1 just for testing but I cannot get the desired result:
                      Quota Percentage        Maximum Lot size      Priority
    Vendor A:   100                                 500                           1
    Vendor B:    100                                 700                          2
    Vendor C:                                           500                          3
    Set-up Weekly lotsize with splitting quota and quota usage 4.
    But during MRP execution, I think the system splits the requirement quantity into 2 and distribute to Vendor A and Vendor B then if it reached maximum lotsize it proposed to vendor C.
    our requirement is first to consider Vendor A then Vendor B then Vendor C according to maximum lot size and priority.
    Any idea if this is possible?
    Thanks,
    Raymond

  • Hello, everybody,  help me with quota arragement and release Purchase Order

    Hello everybody:
            When maintain Quota arrangement today, a warning message poped up saying Quota arrangement for Material X10002 in plant 1855 not active. but X10002 does exist, I can maitnain it with MM02. 
             Why this happened? everyone.
             what's more,  all purchase order can not be released  with me29n , but ok with me28. why is it so  ? thank  you in advance, everybody. couldn't thank you more.

    Hi,
    Regarding your 2 nd Query.
    ME29N - Indidual Release
    Suppose when my PO is subjected to three release code, this transaction gives me an option to release the three levels altogether by the highest level ( ie the three level release will be able to perform the release if R1 and R2 have not released )
    ME28 - Collective Release.
    This needs to be released by inidviuals using their release code independently thereby the release is possible only with the three levels releases the same.
    The names given to transaction codes is a little bit confusing unless until you are clear about the fucntionality.
    Regards,
    DilliB

  • Subcontract MRP Area with quota usage - urgent

    We have a subcontractor supplying assembly X which in turn require us to supply component Y to the subcontractor. We have two vendor for supplying component Y to subcontractor. Scheduling agreement with component vendors are set up for direct delivery to subcontractor. Both the scheduling agreements are included in the source list with MRP indicator 2. Quota arrangement is set up for the component.
    We have set subcontractor MRP area and assigned the same to component Y material master. Special procurement key 20 is assigned in subcontractor MRP area. Quota usage and source list are duly enabled. Quota usage indicator is 3 which provides for MRP, PR, schedule line etc.,
    When we run MRP ffor component Y for subcontract MRP area, system is generating schedule line for but without update quota file. Further, the scheduling agreement picked up is not of the correct vendor as per Quota logic.
    Does SAP support quota usage with subcontract MRP area. If not, is there a work around.
    Shall appreciate urgent response

    Dear Ravi,
    you will get a seperate location product for your material. MRP areas in apo are represented by a seperate location (type 1007 = storage location mrp area). You can transfer your ecc mrp areas via cif (CFM1). The master data you maintain in mrp section of the material master in R/3 will be trasfered to that location product. Furthermore you can maintain it manually in apo MAT1 (location = name of your mrp area). That technique provides you the possibility to maintain different parameters for the plant and the mrp area.
    Kind regards,
    Christian

Maybe you are looking for

  • Totally confused with iCloud and multiple devices

    Ok, So we have two each of the iPods, iPads and now iPhones.  Do we all share the same iCloud? Can we share apps through the cloud? How do I switch my iPad to the new one I got to give this one to my son. I am so new to all this apple stuff. Only bee

  • Operations manager failed to run a wmi query for wmi events (0x800706ba)

    Hi everyone, I've been working on this issue for a while and I am still no closer to finding out what the problem is.  If anybody can offer any other advice or things to check, I'm all ears. I'm running SCOM 2012 R2 with UR2, and the Cluster Manageme

  • Screen painter form

    is possible to use a screen painter form in the wizard that create user defined object? and then replace the new form in the user menu? regards

  • Microsoft SQL server 2012 express

      i recently downloaded ENU\x86\SQLEXPR_x86_ENU.exe and ENU\x86\SQLManagementStudio_x86_ENU.exe from microsoft SQL server 2012 from official download centre page. First i installed SQLEXPR_x86 (database engine) with mixed mode authentication, then i

  • Anyone have a link to download 7.6?

    I really am getting tired with all of the network connection issues with 7.7. Ever since I installed it, it's been nothing but one problem after another. If anyone could please post a link for itunes 7.6, it would be greatly appreciated.