Kp06 - kp26

hi gurus,
i had a confusion in this area.  please let me know the difference.  as per as my knowledge in KP06 u have to give ur COST ELEMENT and COST CENTER,  in KP26 we have to give ATY TYPE and COST CENTER.
in above senario, we have to do planning of SALARY (COST ELEMENT) for DEPTH (COST CENTER)  in KP06.
here we have to do planning for COST ELEMENT or COST CENTER?
in the second senario, whe have to do planning of ACTIVITY TYPE(HOURS) and DEPTH(COST CENTER) in KP26.
means here planning for activity or cost center.
and if we done KP06 and KP26, then what is the uses of KSPI
thanqu
raj

Hi,
When you do your planning in CO, it's done on two levels(dimensions). If you plan, for example, salaries for certain department, you do it for cost element 'Salary' with the combination of cost centre, let's say, 'R&D'. Cost centres are representing organization units, while cost elements are nature of costs. The same attitude stands for activity type. So, your planning is done to the combination of both.
Regards,
Eli

Similar Messages

  • KP06 & KP26 - Proceedure

    hai,
    In KP06 we are planning input based on primary cost element. Sametime in KP26 we are planning the capacity based on secondary cost element. After assigning the same in project, the system displays the detail based on the secondary cost element not on the primary cost element. why it is not showing the primary cost element breakup in Project system?
    After the planning through KP06 & KP26, i am executing the KSPI, this takes some calculation internally for price per unit. What base sstem is calculating the Price per unit?
    Can any one have a explanation on this.
    govind.

    Dear Govind,
    The activity rate will be calculated only based on your secondary element. While creating an Activity type you will be assigning a secondary cost element in the master data, which will capture the cost during confirmation of order. Hence the planning cost by logic will also captured from the secondary cost elements only.
    Reward points if it helped you
    Thanks

  • I want to set EXIT for KP06, KP26, KP46

    Hi Experts.
    I'm in trouble.
    I have to set EXIT that can control "CostCenter" or "CostCenter Group" in KP06, KP26, KP46.
    For Example in KP06,
    if a user inputs cost-center value "100000" in cost center field,
    then error message(error) display below screen (Ex> "It's not correct !!).
    I tried again with Enhancement "COOMKPT4", "COOMKPLV".
    But It's not working.
    (I think it's not suitable for KP06, KP26, KP46. Is it right?)
    And I tried with FIELD-EXIT, but the result is same.
    (and I tried with GGB0, and the devil knows what, the result is same..)
    I'm in trouble.
    Please help me.
    I must set EXIT (or any ways) for KP06, KP26, KP46.
    (Properly speaking, for costcenter for above T-codes)
    I want your detailed explanations to solve this trouble
    Thank you and best regards.
    Mr.Kim.

    Hi,
    i have the same problem,
    have you solved this problem?
    Regards.
    Daniele

  • Variable costs - KP06, KP26

    Hi,
    We have an interesting situation here - it seems as if when the user runs the KSPI transaction, it adjusts the total variable costs on the KP06 screen, and not the price on the KP26 screen, when the volumes are changed.
    Now I can see the advantage for being able to do things this way, but do not know where to do this.
    Have anybody seen the system behave like this?

    What happens, is that the adjustment to the total variable cost happens at the time of KPSI, not KSPI. So if a price has already been created, and changes in the volumes take place, then KPSI will adjust the total variable overheads, to reflect the new volumes.
    However, I have found instances during testing, where the total variable costs change, even though there has been no change in the activity hours. One reason that suggest itself, is that because of change in the capacity resource utilisation, the activity takes place in a different month than previously, even though the total activity for the year is unchanged.
    But we ar emaking use of average prices for activity price calculations, so this should not be causing the problem.
    Any ideas?
    Thanks in advance
    Piet

  • KP06/KP26 Plan Upload

    We have around 40 cost centres for which plan figures need to be uploaded.  Is there any way where we can upload the cost element planning for all these cost centres at a stretch (i.e. rather than uploading the figures for the cost centres one by one for all the cost elements..).

    Use the standard SAP feature for doing this,
    Create a layout in transaction KP34, you can copy from an existing layout like SAP all, ensure to put the integrated excel check on, and while you see the layout the system will generate the file description for it, you can download the excel layout as your upload template, that is across all the cost centers.
    Make a note of the file description and keep the upload file that you have downloaded handy, in kp06 from the menu use
    Extras-->excel Planning --> Upload
    Select the file description tha toyu have made a note of, and upload the file with the filled data,
    You should be able to upload it easily.
    Please let me know if you neeed more clarity
    Thanks
    Naveen

  • KP06 Layouts

    Hi Gurus,
    Can we restrict the display of layouts in KP06.
    Eg: if 5 layouts has been defined for Planner Profile.
          While calling KP06 can we restrict to display only one layout of our choice.

    Hi,
    you define the assignment of planning layouts to planner profiles in:
    Customizing / Controlling / cost center accounting / planning / manual planning / define user-defined planning profiles. There you can maintain for each planner profile, whcyh layout appears for each planning section (eg KP06, KP26,...).
    best regards, Christian
    Edited by: Christian Ortner on May 6, 2010 2:22 PM

  • KP26 Planning - Cost Centre Group

    Hi
    I am trying to enter the plan activity type figures and amount through KP26.  I have selected the standard layout 1-201.  I entered a cost centre group and activity type.  However, when  going inside, It is coming only for a cost cetnre.  Why it is not showing the data input of all cost centres in the selected group ?
    Moderator: Please, avoid asking questions on basic layout of standard transactions

    let me ask one clarification in activity planning.
    There are few cost elements which are directly attributable to Activities and there are others cost elements which are not directly related (fixed). 
    In the above scenario, I hope, I have to use both KP06 & KP26 processes.  In the activity related, I have to use the quanity entry as well as the variable price.  In the KP06, I have to enter only the activity unrelated amount.  Am I correct ?

  • Cost component not splitting at the time of Rune the tine of Cost Estimate

    http//
    Hi,
    We are in developing phase for Product costing for coal mine project ,
    we have raise coal material with Non component BOM , and Routing is only one activity with 400- Raised Coal Qty-MT ,
    We upload the plan with Production cost center -activity type and cost element ( as per cost component -we have 10 cost component  as per below )
    RM - Blasting
    Production Overhead
    Power - Main
    Stores,Spare,Consum
    Repairs & Maint
    Lease & Hire Char-PM
    Power - Auxiliary
    Depreciation
    Over Burden
    Development
    we done the plan for Amount and Qty by KP06,KP26  and update plan price but system not calculate the cost component splitting in cost estimate as per planning while only one item showing for all cost to Production Overhead cost component
    Production Overhead cost component which assign the secondary cost element which is assign to activity type 400
    can any one help me to how we can resolve this issue
    Please find attached document

    Hi,
    Here I am providing the necessity and importance of splitting structure, will share the configuration steps once you go through the following and get the comfort level.
                        Expense Analysis and Splitting in Manufacturing Cost Centers
    Introduction In SAP Cost center work as a cost responsibility center, where all the expenses and cost are stored and analyzed for the purpose of management decision making.
    The cost could be fixed or variable in nature. The difference between variable and fixed costs can be made in various ways in product costing in CO module.
    Fixed costs represent the static costs incurred by the organization, which doesn’t change on the basis on manufacturing activities, which remain constant irrespective of production activities like rent for the premises, salaries of office staff etc.
    On the other hand, variable cost varies based on the level of production activities; if production activities increase then variable cost also increased like electricity consumes raw material charges etc.
    However all the variable cost doesn’t vary in direct proportion by quantity of goods produced.
    In this document will try to define; how the Expenses analysis and splitting of cost done in manufacturing cost centers.
    From controlling prospective, fixed cost remain constant regardless of operating activities, but if these factor changes, variable cost will fluctuate.
    Basically raw material costs represent variable cost, but in this document main focused will be given to distinguish fixed and variable activity cost.
    The segregation between fixed and variable cost is optional and is derived from the configuration and master data configured in cost center accounting and overhead accounting.
    Activity Price:
    There are different methods that could be used in cost center accounting to determine the activity price. The simple way is the manually enter “Fixed” and “Variable” Activity cost (KP26).
    However there are other methods used in Cost center Planning and Budgeting that automatically calculate the fixed and variable activity price.
    Here the focused will be given on Planning and Budgeting activity and automatic calculation of plan activity rate in cost center.
    This method aggregate planned costs by cost element and capacity by plan unit to calculate the activity price.
    Activity independent costs are segregated among different activities based on Splitting Structure, while activity dependent cost directly used for the purpose of variable activity rate calculation.   
    Fixed Activity Cost:
    In product costing all those cost, which doesn’t vary based on the activities in manufacturing cost will represent fixed cost.
    In a manufacturing cost centers there may be two or more activities performed.
    To calculate the activities rate, the fixed costs are distributed to various activities on the basis of Splitting Structure defined for cost center.  
    Variable Activity Cost:
    Variable activity cost, which directly depend upon the activity type and fluctuate based on increase or decrease in manufacturing activities. In SAP variable activity cost are directly linked to the respective activity.
    Activity Prices: Fixed and Variable Split
    In Cost Center Accounting dividing the cost between Fixed and Variable requires appropriate split to be made in the cost entered for the activity. The process is described below:
    i.  Variable cost would be planned at activity level and expenses should be maintained at cost element in the manufacturing cost center by assigning activity and cost element combination.
    In other word, the expenses should be planned on Activity type at the time of primary cost planning (KP06).
    Then the variable activity rates are calculated on Total cost planned at Activity divided by Total number of activity planned at that cost center (i.e. capacity in KP26)
    ii. Fixed cost would be planned at independent of activity type. These costs are maintained in KP06 at cost element level on manufacturing cost center.
    Then the fixed costs are distributed on various activity types on the basis of Splitting structure defined at OKEW.
    In Splitting Structure we define the rules, how the fixed cost will be distributed to Activities. For the purpose of this document, considering split of fixed cost on the basis of Capacity maintained in KP26.
    Regards,
    Pavan kumar Arvapally

  • CO-period lock for planning on company code level

    Hello,
    I would like to ask you for assistence.
    We would like to have the possiblity to lock the CO-periods on company code levels. For actual values, it is possible to arrange this within the validation. However, for plan values the validation is not active.
    I have read about possibility to enhance an user exit for paritcular planning transactions (KP06, KP26 etc.), but I can't find it anymore.
    Does anybody from you have experience with this, eventually is there another option?
    Thanks in advance
    Peter

    I have had a similiar problem and contact to remote consulting from SAP. They offered a modification (10-15 days if I remember correctly) to make CO period lock company code depending.
    If I remember correctly, his name was Valentin (in Germany).
    However: if newGL is active with real-time integration and also plan transfer, I think it should be possible to lock in FI.
    regards
    Bjoern

  • Costing Data: UOM Conversion for Activities

    Hi Experts,
    I would like to know what transaction (or if there's a transaction/table) to check the UOM conversion of activities in the costing data (tcode CK11N). Let say the activity HEAT, conversion from KWH <-> GJ? Thanks so much!
    Best Regards,
    Kurtt

    Hi,
    The UOM conversion is maintained in the SPRO.
    But for costing the unit is maintain in Activity say POWER as unit H
    But in the production they maintain the receipe activity unit for POWER as unit MIN.
    So when you upload the KP06 & KP26 with activity qty,the activity qty should maintain in H.
    So when you have the cost run in CK11 then the system will capture automatically for the per ton production the consumption of power activity in MIN.
    So if you want to know the what is conversion factor then it is standard UOM definition in SPRO.
    SAP NetWeaver--General Settings---Check Units of Measurement
    Regards,
    Raj

  • Activity Type Price

    Is it possible to maintain  Activity Type Price in Currency other than Co Code and Cont Area?
    If yes then How?

    Hi,
    Check with this.The activity amount you are planning in KP06 & KP26 with activity quantity & after run KSPI the rate will calculate & appear in KP26.
    Now when you update the KP06 or KP26 it is based on the costcenter only.
    Now do one thing even though your controlling area currency is different,now change the currency in cost center master data.Now do the update in KP06 & KP26 & try withh KSPI now check what curremcy it is updated in KP26.
    Regards,
    Raj

  • Copa actual and planning data

    Hi,
    May I know if I am correct for the below where
    1)
    KE26 or KE21N is meant for correction of actual data in copa and
    KE13N or KEPM is to load copa planning to copa
    2) we have many planning tcode like kpf6, kp06, kp26.
    what is the difference between them and ke13n/kepm?
    thanks

    KE13N is for mass upload of Plan data into COPA, COPA planning os for operating margin planning this is different from cost planning in controlling
    KEPM is for input of planning data by the users in the system
    Thanks
    Naveen

  • Actual Cost Machine hours is zero (After confirmation)

    Dear Guru,
    We are implementing PP module and product costing. We enter the budget with activity type in KP06 & KP26. After confirmation, the actual cost in machine hours is zero but not in electricity or steam. Why the actual cost is zero in activity type machine (we enter the actual qty machine hours) ...
    May you assist me to solve this issue
    Thanks
    Maju S

    Dear Umapathi G & Shaubhik
    Thanks for your replay.I have checked the Control key is marked for costing and the cost center is assigned correctly and we have executed the KPSI before and I found the fixed price for Machine hours in tcode KSBT and cost center is not locked for posting secondary CE
    For additional information, we have 3 activity type, Machine hour, Electricity and steam. The actual cost for electricity and steam are not problem, only for actual cost activity machine is zero. The issue only for activity type for machine.
    May you have me to give the other solution to be checked
    Thanks for your replay and I am really appreciate it
    Maju S

  • Activity Rate change

    Hello Gurus,
    I want to know how to change the activity price rate manually and also
    Last month production order also I want to change the new activity rate (confirmed orders)
    Can anyone give me the clarity on this,
    (because I have confused on the below t code KP06,KP26 ,KBK6,KSII,KPSI,MFN1)
    Regards
    Sri

    Hello Sri
    Changing the price in KP26 now will not serve any purpose. You can not run the standard cost run at back date. The standard cost takes the planned activity price (if so configured). So your standard cost will remain  the same. As far as charging to production orders is concerned, this will be taken care of by the revaluation. It does not make any difference if you update the KP26 plan and then confirm the production orders and then run the revaluation or you run the revaluation now. The total amount of the activities will be the same.
    So I suggest you run the cycle for revaluation at actual prices rather than changing the KP26 rate. For the next month you may update the KP26 plan. The T. Codes you use for the entire cycle are as below:
    KSU5 Execute actual assessment cycle (If you have assessment cycles defined)
    KSS2 Actual cost splitting
    KSII Actual price determination
    CON2 Actual revaluation of orders
    This is a month end process.
    Trust this helps.
    Best,
    Sangram

  • KSP4, KSVB, KSUB

    Gurus,
    Now that I have populated values through KP06, KP26, KP46.
    I'm trying to go ahead with KSP4, KSVB, KSUB
    The case with KSP4 is that I try to run all of the cost centers and the result the system gives is 'NO ERRORS' but also not relevant.
    What does not relevant mean here?
    And what is the purpose of this TCode KSP4
    Kindly also give a detailed procedure for the other two TCodes as well.
    Thanks, points available..

    Hi:
    Fot T.code KSP4 - Overhead ,Refer to sap.help
    http://help.sap.com/erp2005_ehp_02/helpdata/EN/a9/ab75da414111d182b10000e829fbfe/frameset.htm
    For T.code KSVB - Distribution ,Refer to this documentation
    http://help.sap.com/erp2005_ehp_02/helpdata/EN/08/514e2e43b511d182b30000e829fbfe/frameset.htm
    For T.code KSUB,Refer to this documentation
    http://help.sap.com/erp2005_ehp_02/helpdata/EN/08/514e3b43b511d182b30000e829fbfe/frameset.htm
    Please let me know  if you need more information.
    Assign points if useful.
    Regards
    Sridhar M

Maybe you are looking for

  • Can't activate after ios6

    I cant activate my iphone 3gs after i accidentaly updated to ios 6. i can't even reach the homescreen during the initial setup. Pls. i need some help!!

  • How to get monthwise opening qty / value for previous years

    I do not get the month wise opening quantity and values for the items for the previous years using the below query. How i can modify this query to get opening qty / value of any year less than current year. Yogesh SELECT OPN_ITEM_CODE, --------------

  • Resetting air-ap1131ag-e-k9 to default configuration.

    I am having a small problem resetting the AP to default config. Off course I have tried the cisco way but the AP still retains some parts of old config. Can someone tell me how to full (clean) reset the AP? Thanks, Piotr, p.s. can option 43 for dhcp

  • I want to upgrade my computer

    I got the HP 2000-2d24dx about a year or two ago and it's a great computer but when it comes to online gaming and gaming in general it lags a lot. I wanted to know what I can upgrade in my computer to make it faster and smoother. I am a computer noob

  • Trying to trace inputs to physical modules

    Hello all, I recently was assigned to a project that had some LabVIEW code already set up, along with the physical system the code is meant to be controlling.  The system uses 3 NI cards, NI 9221, NI 9474, and NI 9422 : http://sine.ni.com/nips/cds/vi