KSII actual activity price issue
Hi All
I want system to calculate the activity price automatically after running KSII and should update it in KBK6 so that i can revaluate production order with actuals by running MFN1. Now i have done all the configuration required and my plan cost are getting updated after i run KSPI and same is getting update in KP26 and are also showing in KBK6 under plan cost nd can be seen in Cost center reports under plan cost. Problem is with actuals
I have been reading the forum regarding this issue and all the inputs given by experts is been checked but i think iam missing something either a step in calculating the actuals or may be some tick in configurations
Kindly let me know the solution for an issue iam facing .
Thanks in advance
Invin
Hi Surya
I had already done the setting in OKEW and all splitting structure configuration. Base on that my plan cost is been distrbuted in two different activities. Planning has been done in KP06 and after doing that only i ran the transaction KSPI.
But ya you got a point thats what iam feeling that there is some thing missing in my config settings which i already mentioned in my earlier posts.
What is the prb iam not able to recoganize kindly if you can give me some detailed information what could be the reason?
For your information i would like to tell briefly what i did so far:
1. IN configuration i defined splitting structure Say T1
2. then by selecting T1 i cllicked in assignment and assigned splitting rule say T10
3. then by selecting T10 i clicked on "Selection for assingment" in this screen i mentioned only one cost element say 55000000 in "from value" "to value" and in activity type i mentioned "from" 106010 "to" 106030
4. then i clicked back icon and selected "Splitting rules" which is T10 in my case and method i mentioned is "12- Activiy quanitity" and checkd the box called "Wt- Weighting Indicator"
5. then i selected my rule T10 and clicked on "Selection for rules" and here i mentioned my version that is 0
6. then i did config setting "Assign Splitting Structure to Cost Centers" over here i assined this rule to only one cost center say 31010401 in parameters i selected version radio box and entered 0 there
These all what i did in configuration settings
Now after this i did planning KP06 entered my cost center that is 31010401 and only mentioned my cost element which is 55000000 with my activity type 106010 and 106030 here i didn't took 106020 in consideration. Now these values are coming in my cost center plan report on debit side and then i ran KSPI cost got splitted in both the activiy types in credit side in planning section of cost center but the prb is the same which you know Actuals are not coming
Kindly put a light what could be the reason?
Thanks
Invin
Similar Messages
-
KSS2 KSII Actual activity price calculation
Dear Grus !
I want to carry out actual activity price calculation. I assigned activity type act 100 to act500 to different cost element, and also assigned splitting rule 12.
also entered activity plan price in KP26. cost element planning in KP06.
When I carry out KSS2, system distribute cost of one cost element to activity types according to the target cost maintained in KP06. I want the result that cost distributed as maintained in the splitting rule.
is there any specific configuration that i missed?
Thank you all ~
LynnCheck whether you have maintained the Equivalence number for the activity type and cost center combination in KP26.
Also you have to run the KSPI before running KSII, because KSII result is the iterative one.
Hope this will help you.
Kamlesh -
Actual Activity Price calculation; KSII
Hello,
I am trying to calculate actual activity price but the system does not calculate the price though I have soecified the appropriate price indicator '5' in the Activity type master record.
Any help would be appreciated.
Thanks in advance!Something doesn't seem right here. You created an Activity Price and plugged in the Plan Fixed and Variable price for the Activity in KP26.
So why are you running KSII now? KSII is for Actual Activity Price Calculation, run at month-end after all your POs have been closed and activities booked.
Can you provide additional info.?
Cheers. -
Error while updating the Actual Activity Prices
Dear All,
While calculating the Actual activity prices under test run (KSII) ,the system is calculating the prices correctly, but when I run the KSII after deselecting the test run ,the system is giving the following error message:
Cost center EE04301000 activity type RWKHRS: costs exist although activity 0
Message no. KP250
Diagnosis
The plan or actual activity for cost center EE04301000, activity type RWKHRS is 0. However, costs were planned or posted in period(s) 1.
System Response
The SAP System cannot calculate activity prices for this activity type as this would involve division by zero. The plan or actual costs are ignored in activity price calculation.
Procedure
Check activity price calculation in planning for activity type RWKHRS in cost center EE04301000 and the costs planned for period(s) 1.
Activity Type Planning
Primary Cost Planning
For activity price calculation in actual, actual costs are allocated onto the activity type through splitting, although no activity posting was made on this activity type.
The scenario is that we have 4 activity types and planned costs/activity qty for all the 4 activities and calculated plan prices and posted actual costs for all the four types. Production Order created and confirmed only 3 activities out of 4 activities. And when we calculate the Actual prices for all 4 activities the system is giving the above said message.
Please suggest as how to solve this issue.
Regards
SubbuHi Subbu
The error is very much justified.. If your actual qty for any act type is zero, then division by zero would yield an error during activity price calculatoin
You need to ignore this error, if the zero qty for 4th act type is justified.. System would post act price for remaining 3 act types...
Regards
Ajay M -
Actual Activity Price Calculation
Dear Gurus,
1. I have defined activity type say "Power" through KL01
2. Maintained the planned price through KP26 for the cost center which is going to use this activity type. say
cost center is "CCTR1"
3. Now there is something as actual activity price calculation at period end
4. When i execute through KSII i get the actual price which is the debited cost elements of the "CCTR1"
divided by the Activity Type "Power"
5. The debit balance of cost elements in "CCTR1" is Rs 10000 and activity type consumed through process
order is 200 KWH, hence the Actual price comes to Rs 50 Rs/KWH. While the planned price in KP26 is
Rs 6/KWH
How logical is this....
With Regards,
AmitHi Amit,
Let me give some insight into the Activity price calculation and cost obsorption from Cost Center to Prodcution
1. Normally we incur the production cost through FI like Direct Labor, Power, Indirect Labour and other indirectct production overheads
2. This cost is posted to Production Cost Centers
3. Now this cost need to be obsorbed to product cost using either Activity costing through Routing or Overhead costing using costing sheet.
Since you question is for Activity costing, let us focus only on activity price and absorption to Product Cost
1. All the direct cost that can be tracked with certain reasonability with activity types can be absorbed through activity costing to product costing
2. Now in your case, take for example - the industry you are working is power intensive, then we can track the consumption of Power using activity costing
3. At the first instance, you need to forcast the activity quantities for the month (based on the production planning)
4. Based on this, you forecast the cost that would be incurred for the expected output
5. Calculate planned Acvitiy Unit price and update it in KP26. The updation can be manual or automatic (using Cost Splitting and Price Calculation in case of Activity independant cost planning)
6. For all the activity confirations to the production/process order, the cost obsorption will take place based on the planned price
Actual
7. The cost of the power will be booked in FI and posted to Production Cost Center for the month.
8. The actual Activity quantity will be booked from Production confirmation for the month
9. At the end of the month, you need to do the actual price calculation. This calculation will be based on the TOTAL COST BOOKED FOR THE MONTH TOWARDS POWER FOR THAT COST CENTER DEVIDED BY TOTAL QUANTITY CONSUMPTION RECORDED IN THE COST CENTER
10. Once this is done, You can revaluate the activity quanitities booked on each of the production order.
This is how the activity cost aborption will take place in product costing
Please let me know if you need further details in this regard
Surya -
At the time of actual activity price calculatoin with diffenrent currency
Dear Friends,
I am facing some problems. Followings are the information/Problems:
Controlling Area Currency - USD
Company Code currency - INR
Exchange rate - M type - 46.90
Exchange rate - P type 46.90
This problem is due to problem-1. At the time of actual activity price calculatoin, I am geeting huge price because system has multiplied (problem-1) and now system is taking posted amount in usd to calcualte actual activity price and according to my observation after calcualtion in usd system is converting price into INR
Questions - 1. What is the logic of calculation of actual activity price.
2. As I feel after analyses that sytems is taking posted cost in controlling area currecy and then calculating price and then converting into INR,
Is my theory correct in term of SAP standard functionality. is there any method by when system take only posted figure in inr for activity price calcualtion.
Please reply as soon as possible.
Thanks1. If you are using common controlling area with two different participating company code currency, then you have to use group controlling currency and integrate the other company code currency with parallel currency defined in the FI ledger. Hope this is design principle based on which you have selected group currency.
2. In case group currency controlling then non-participating currency should calculate the activity rates in group currency. Meaning you have define the activity rates at EUR currency and remember this has to accepted globally.
This is key drawback where you cannot define activity rates in INR, whereas there is no option activity type creation to give object currency as INR.
Hope this clarifies. -
Actual activity price calculation for production order
Hi
Can any one guide me in how many ways we can assign actual activity price calculation for production order?
I knew only one way by assigning PPP2 costing variant?
I have another doubt is: if we don't mention any material valuation indicator (moving average, standard) in valuation variant, how system will calculate material prices? is there any other way, to recognize the prices by system?
regards,
Ramesh BDear,
Costing variant PPP2 is linked to some valuation variant inn OPL1
System will check the valuation of material and activity according to this valuation variant
For material valuation there are many stg acceding to which system will take the price the raw material,
Valuation strategy for material component
Strategy sequence that determines the valuation of the materials used in the cost estimate.
Use
The materials are valuated using the price in the material master record or the values calculated in a material cost estimate.
Procedure
You can enter a single strategy, or you can enter multiple strategies in the form of a strategy sequence. If you enter multiple strategies, the priority of the strategy determines what price or what values are selected.
Examples
Assume that the following strategy sequence is entered for material valuation:
1. Planned price 1
2. Standard price
3. Moving average price
If the system finds a value in the Planned price 1 field (costing view), this value is taken as the value for valuating the material.
If the system does not find a value, the value in the Standard price field (accounting view) is used.
If the material does not have a standard price, the system uses the value from the Moving average price field.
if you have not mentioned, then system will give error that "valuation stg not found"
Valuation strategy for internal activities and processes-
Strategy sequence that determines how internal activities and processes are valuated in costing.
Use
The activities and business processes used are valuated with the prices from Cost Center Accounting or Activity-Based Costing to determine the production costs or process costs. The prices can either be calculated iteratively through price calculation, or entered manually by the user.
Procedure
You can enter either a single strategy or more than one strategy in the form of a strategy sequence. If you enter more than one strategy, the priority of the strategy determines which price is selected.
Examples
The following strategy sequence is entered:
1. Actual price of the previous period
2. Plan price of the previous period
3. The most current plan price
If the system finds a price for the activity type, this price is used for valuating the internal activities. If no price was calculated for the previous period, the plan price from the previous period is used to valuate the activity type.
If the system cannot find a plan price for the previous period, it looks for a future plan price, using the next price in the posting period to valuate the internal activities. For example, if plan prices have been entered for periods 2 and 3, and a plan price is calculated in period 1 for period 4, the system uses the price from period 3 in accordance with the valuation strategy Most up-to-date plan price.
Again if you have not mentioned, then system will give error that "valuation stg not found".
You can use any costing variant for actual (PPP2)and planned(PPP1) according to your requirement.. check in OPL1 -
Actual Activity Price Layout (KBK6)
Hi Masters:
I have the follow situation:
FI currency = XX (company Code)
CO currency = YY (Controlling Area)
I want to define the actual activity prices using tx KBK6, but it's present a layout with a CO currency. I need to change this, because the users introduce the price data in FI currency. I know that the layout used in this TX is "1-N01", but I've could not find where I can change it (make a copy, change this copy and asociate with a profile).
Caution: In the last time, i have been changing a lot of planing layouts (for example 1-201 has been transformated in Z-201), but mi problem is to find where i can modify the 1-N01 layout.
May someone help me?
Best regards,
Rodrigo, from ChileHi Rodrigo,
Generally, it is not possible to modify the SAP Standard Planning Layouts. The Layout set 1-N01 is a SAP Standard layout and it cannot be found in all the clients. The SAP Standard Planning Layouts are only available in client '000' and not in all the clients. SAP recommends to Import the planning layouts from client 000 and copy them into Z-N01 or so and make changes to the new layout.
You can import the Planning Layouts in IMG Menu Path (Controlling - General Controlling - Production Start Up Preparation - Transport Settings for Planning - Import Standard Planning Layouts.
PLEASE READ THE SAP HELP ON THIS STEP BEFORE YOU PROCEED WITH THE IMPORT.
Once you import the Planning Layout and copy it to a new one, make the changes you require to do and you can assign this new layout in Transaction Code KP34, choose the Profile SAPALL, double click on General Controlling, choose CCtr: Manual actual prices and double click on Layouts for Controlling and here you can assign the new layout.
If you want you can delete 1-N01 from this step too.
Hope this helps. Please assign points accordingly.
Thnaks,
Madhav Nanduri -
Activate actual activity price
Dear All,
when I execute transaction CON2.the system has erreor system information as follows.
"Revaluation at actual prices not possible in version 0, fiscal year 2007"
so my question is "If activate actual activity price,how to configure version 0?"
thanks!Hi Fanny,
For configuartion, please refer the following path.
Project System-Costs-Create CO versions
Here click on version 0 and configure.
Regards
Tushar
P.S. Reward points for useful answers. -
Actual Activity allocation and Planned and actual activity comparison issue in Product Costing
Friends,
I have tried to explain the issue i am facing currently under Product Costing......
1.Cost Component Structure
10 – Material
20 – Labour
30 – Diesel
40 – Electricity
2.KP26 – Planned under Fixed Price
Labour – 2.0 HR
Diesel – 1.0 HR
Electricity – 5.0 HR
3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
Like;
1 E LAB10 994310 2.00 2.00 AED 1.0 HR Labour Cost New
2 E DIE20 994320 5.00 5.00 AED 1.0 HR Diesel Cost New
3 E ELE30 994330 1.00 1.00 AED 1.0 HR Electricity Cost
4 M 1100000042 5.00 0.00 AED 1 PC RAW MATERIAL BAKERY CONSUMED
5 G 994201 0.00 0.00 AED Depriciation Cost
6 G 994202 0.00 0.00 AED Sales & Distribution Cost
13.00 AED
4.When I do process order Cost analysis for the produced goods it shows me different figures as my
BOM – RM is 1100000042 1 Quantity
Routing – All activity time is 1 Hr
40002 RAW MATERIAL BAKERY CONSUMED 1005/1100000042 5.00
40015 COST OF GOODS MANUFACTURED 1005/4400000071 13.00-
994310 Labour Cost New CBAKYPDDXB/LAB10 1.33
994320 Diesel Cost New CBAKYPDDXB/DIE20 3.33
994330 Electricity Cost CBAKYPDDXB/ELE30 0.67
2.67- AED
Note :- As per my understanding it should be
Labour Cost New 2.00
Diesel Cost New 5.00
Electricity Cost 1.00
5.Now after Process Order confirmation
40002 RAW MATERIAL BAKERY CONSUMED 1005/1100000042 5.00
40015 COST OF GOODS MANUFACTURED 1005/4400000071 00.00
994310 Labour Cost New CBAKYPDDXB/LAB10 4.00
994320 Diesel Cost New CBAKYPDDXB/DIE20 5.00
994330 Electricity Cost CBAKYPDDXB/ELE30 2.00
16.00
6.For Month end actual Activity calculation and load the activaty actual rates on product
I have configured the system in below manner
1 Work center = Mapped to 1 Production Cost center
Three Different Activities mapped to Secondary Cost Element with 43 Category
For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
Category 42 Like; 994215-Electricity Cost All
One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
Product/Order
7.Assessment Cycle Details
Controlling Area 1000 Controlling Area
Cycle ZELE01 Status Reviewed
Start Date 01.01.2014 To 31.10.2014
Text Elec. Cost Allocation to PROD
IND- Interactive
Assessment CEle 994215 Electricity Cost All
Sender
Cost Center CBAKYDXBAD
Cost Element 40204
Receiver
Cost Center CBAKYPDDXB
Tracing Factor
Var.portion type – Actual Activity
Selaction Criteria
Activity Type - ELE30
Receivers Tracing Factor
Cost Ctr Factor per 100
CBAKYPDDXB 100
8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
After Cycle run when I follow below procedure
KSS2 Actual cost splitting
CBAKYPDDXB Production Dxb LAB01 183.33
CBAKYPDDXB Production Dxb DIE02 183.33
CBAKYPDDXB Production Dxb ELE03 183.33
CBAKYPDDXB Production Dxb DIE20 183.33
CBAKYPDDXB Production Dxb ELE30 183.33
CBAKYPDDXB Production Dxb LAB10 183.35
1100.00
Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
But I want to post that cost only to ELE30 Activity and not for all
When I RUN KSSI for actual Price determination system shows
OTy Object Name AUn Act Qty Total price Price (Fixed) PUnit
ATY CBAKYPDDXB/DIE20 Production Dxb HR 5.0 366.66 366.66 10
ATY CBAKYPDDXB/ELE30 Production Dxb HR 2.0 916.65 916.65 10
ATY CBAKYPDDXB/LAB10 Production Dxb HR 2.0 916.75 916.75 10
2200.06
2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
After revaluation of the process order system posting below values
40002 RAW MATERIAL BAKERY CONSUMED 1005/1100000042 5.00 5.00
40015 COST OF GOODS MANUFACTURED 1005/4400000071 13.00- 13.00-
994310 Labour Cost New CBAKYPDDXB/LAB10 1.33 183.35
994320 Diesel Cost New CBAKYPDDXB/DIE20 3.33 183.33
994330 Electricity Cost CBAKYPDDXB/ELE30 0.67 183.33
2.67- 542.01
Production Variance is posted as 542.01….
I strongly believe there is some issue in configuration for activity allocation….
Main issue is
Point No. 4 – Different Figures in Process Order Cost Analysis
Point No. 7 – Assessment cycle run
Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
Thanks
Sagar ChinchkarDear Rajneesh,
I have made the changes as suggested....
It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
I have also maintained cost center splitting structure for ELE30 Activity allocation.
Structure Z1
Splitting structure for AT
Assignment 10
Electricity Cost
100
Allocation for ELE
Cost Element
994215
Activity Type
ELE30
Splitting Rule
100
Allocation for ELE
12
Activity quantity
Version 0
In my case actual activity confirmed is 3.1 for 2 orders in period 5
Order 1 - QTY 2
Order 2 - QTY 1.1
Total actual Electricity exp is 1150 in period 5
followed procedure to post actual activity on product is mentioned below
KSS2 Actual cost splitting - Result as expected 1150 for ELE30
KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
QTY 3.1 Tot Price 3,709.68 Planned(FIX) 3,709.68 Per Units 10
(System is doing 1150/3.1*10=3709.68)
3.CON2 Actual revaluation of orders
Here while reevaluating the Process Orders system calculation is different
Order 1 - QTY 2 - 558.00
Order 2 - QTY 1.1 - 407.56
Total - 965.57
4. After CON2 system is changing the value of other activities like
LAB10 - Actual confirmed Value 10 to 0
DIE20 - Actual confirmed Value 10 to 0
Which should not be the case....
PL Act Var
40002
RAW MATERIAL BAKERY CONSUMED
1005/1100000042
10.00
15.00
50.00
40015
COST OF GOODS MANUFACTURED
1005/4400000074
26.00-
26.00-
994201
Depriciation Cost
WMBDDEP01
1.00
0.00
100.00-
994202
Sales & Distribution Cost
WMBDS&A01
1.00
0.00
100.00-
994310
Labour Cost New
CBAKYPDDXB/LAB10
4.00
0.00
100.00-
994320
Diesel Cost New
CBAKYPDDXB/DIE20
10.00
0.00
100.00-
994330
Electricity Cost
CBAKYPDDXB/ELE30
2.00
408.06
20,303.00
If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
What setting is required in current system.....
Million thanks in advance....
Regards
Sagar Chinchkar -
Actual activity price does not exist for cost center / activity type
Hi,
We are trying to upload the time sheet related data(number of hours an employee workred on a project) ect from Non SAP to SAP.
We have used a customized program and have loaded the data from se38.
All this HR data will be saved in CAT2
Later we transfer the time related data into SAP FI/CO using CAT7.
+When tested with a couple of employees time sheets, they got uploaded in SE38 proerly and when transfered it through CAT7 it was properly taking the hour*rate is cost and was reflecting in the respective cost element.
For a few time sheets in SE38 we were getting an error saying that the cost center(100501)/ activity type(EAT001) does not exist for 2010.
Hence we have taken, FY 2010, the cost centes and activity types in KP26 and have given the planned Activity as 1. No planned cost in KP06.
We have run the price calculation forr the FY 2010.
Then we were able to uplaod the time sheets, but when we tried to transfer the data through CAT7, it throws an error saying no activity price exist for cost center 100501/ activity type EAT001. If I ignore the warning an proceed, no amount is being calculated.
When uploaded employee time sheets before, all the cost were getting claculated and were entering into the respective cost elements, but now no amounts are being calculated and it is taking Zero.
When checked the previous years data i.e, 2009 all amounts are fine, in KSII I can see the activity quantity filled with some numbers in 2009, where from are they comming? I have checked KBk6 nothing was mentioned.
PLease assit
Regards,
shilpaHi
I never used CAT* though, but the error means that you need to maintain a activity price in KBK6 (Actual price)
Regards
Ajay M -
Dear All,
We are into cement industry and we are following the Process Order as a cost object.
Here I have an issue where in when we have process order and Activities also got confirmed now when I am seeing the cost analysis system is not showing the Activity prices in Actual.
As per the process before running the splitting structure system should consider the plan price and it show the same as Actual Activity but in the system it is not showing any values.
All the values are showing as u201C0u201D.
Can anyone help me out to resolve this issue.
Thanks in advance for your great support.
Thanks,
KK.Hi,
check SAPNET notes 155282 and 380282 they can be really helpful for your analysis why the cost are missing.
BR Christian -
How to calculate actual activity price using cost center balance
I have a problem,the case is that: i have two pro.order. orderA settlement to cost center M; orderB is a standard pro.ord,and the work center of orderB link to cost center M. when i calculate the actual activity revaluation.the activity price update the PRO.ordA and B,and the cost center is zero.
when i settlement the order A,the cost center M is not balance,so i must calculate the actual activity revaluation again.
now,i want to calculate the actual activity revaluation from the cost center's balance,not the Dredit balance.so how can i calculate the actual activity revaluationdid you also assigned the cost centre to splitting structure?
what is not working? the cost are equally distributed on both activities? -
Actual activity price not updating in production order
Hi All,
I am facing one problem, that actual price for activities are not updating in production order while plan price are updated. Earlier both plan and activity prices were getting upadated but now actual price is not updating for any material. I have tried at the same material also but it is not getting updated. Actual hours are updated in confirmation of production order but not price. If somebody could suggest the reason it will be great.Dear Nitin,
Thanx to all for valuable input. Problem is solved.
Nice to see That your problem is solved
But Can you let the Forum Members know
where was the exact problem & how it is solved
Regards
Madhu Kumar -
"Active angles" aren't actually active (screensaver issue)
Hello,
I have only one active angle (this is the literal translation, from Italian, of the angles that trigger an event in OS X) in OS X Mavericks: the lower left angle, which is scheduled to start the screensaver.
It actually doesn't. Nothing starts when I put the mouse cursor in it.
How can I solve this? I've tried disabling the active angle (under System Preferences -> Desktop and Screensaver -> Active Angles) and then reenabling it again, but with no effort.
Thanks in advance.
TyrexionibusWhat happens by removing the .plist files is it deletes the preferences settings for those system applications and they are automatically replaced with default settings after a restart or log-out/log-in.
This usually fixes problems with corrupt preferences. It is safe to do because you can simply move the preferences files (labeled with .plist extension) to the desktop and if it doesn’t solve the problem, the files can be moved back into the original Preferences folder to replace the newly created one(s), thus restoring the original preference settings.
Happy to hear you found a solution for your problem.
Maybe you are looking for
-
[SOLVED] Firefox 2.0.0.8 Font Issues
Update: Updating to Firefox 2.0.0.8-2 fixes this problem. I upgraded from Firefox 2.0.0.7 to 2.0.0.8 and am now experiencing some strange font problems. The font spacing is completely messed up in 2.0.0.8. Anyone else experiencing this? Here's how it
-
Is there a way to restore an erased history?
My kids have recently started erasing the history on my computer. I want to go back and see what they are looking at. Is there any way to restore a history once it has been cleared? Thanks
-
How to call google map in mapviewer application?
Hi i want to use google map as the base map in my mapviewer application, on which i can do all the analysis provided by mapviewer like geocoding tool etc. how can i do it? if anyone can help?
-
Java code to establish connection between 2 computers through phoneline
Hi, We are working on a small project which transfers files through phonelines using modems. We are planning to use remote method invocation (RMI) technology. The file transfering code is working fine. But my problem is how to establish connection be
-
Produciton workflow couldnt able to process emails
Hi All, Please help me on this, Produciton workflow couldnt able to process emails, Following is the error am getting in logfile [Jan 14, 2011 10:55:57 AM GMT+00:00]:1295002557936:Thread[outboundThreadGroup1,5,outboundThreadGroup]:0:-1:usstlz-pinfsi0