Length changes

Hello - I am importing a .mov into iDVD. My problem is that it changes from 4.7 GB (which is what is should be) to 13 GB and sometimes 25 GB. How is it doing this? I have tried resaving it, starting a new iDVD project, resaving my .mov. I have been using iDVD for years and have never had this problem. Thanks for your help!

iDVD encoding settings:
http://support.apple.com/kb/HT1502?viewlocale=en_US
Short version:
Best Performance is for videos of up to 60 minutes
Best Quality is for videos of up to 120 minutes
Professional Quality is also for up to 120 minutes but even higher quality (and takes much longer)
That was for single-layer DVDs. Double these numbers for dual-layer DVDs.
Professional Quality: The Professional Quality option uses advanced two-pass technology to encode your video (The first pass determines which parts of the movie can be given greater compresson without quality loss and which parts can’t.  The second pass then encodes those different parts accordingly) , resulting in the best quality of video possible on your burned DVD. You can select this option regardless of your project’s duration (up to 2 hours of video for a single-layer disc and 4 hours for a double-layer disc). Because Professional Quality encoding is time-consuming (requiring about twice as much time to encode a project as the High Quality option, for example) choose it only if you are not concerned about the time taken.
In both cases the maximum length includes titles, transitions and effects etc. Allow about 15 minutes for these.
You can use the amount of video in your project as a rough determination of which method to choose. If your project has an hour or less of video (for a single-layer disc), choose Best Performance. If it has between 1 and 2 hours of video (for a single-layer disc), choose High Quality. If you want the best possible encoding quality for projects that are up to 2 hours (for a single-layer disc), choose Professional Quality. This option takes about twice as long as the High Quality option, so select it only if time is not an issue for you.
Use the Capacity meter in the Project Info window (choose Project > Project Info) to determine how many minutes of video your project contains.
NOTE: With the Best Performance setting, you can turn background encoding off by choosing Advanced > “Encode in Background.” The checkmark is removed to show it’s no longer selected. Turning off background encoding can help performance if your system seems sluggish.
And whilst checking these settings in iDVD Preferences, make sure that the settings for NTSC/PAL and DV/DV Widescreen are also what you want.
http://support.apple.com/kb/HT1502?viewlocale=en_US

Similar Messages

  • Infoobject Length changes with ALPHA conversion

    Hi,
    I am facing a problem with changing IO length changes.I need to change the charecteristic XCUST of Length 20 with alpha conv to XCUST of Length 30 with alpha conv.
    When i am trying to do that sytem is asking me to delete the master data as well as transaction data.
    In the cube i have 3 yrs data,that shuld not be disturbed.
    Dear experts is there any way out for this prob. Please suggest with the steps to be followed.
    Thanks,
    CHVR.

    Hi,
    As far as i know, you cannot change the settings of a characteristic without deleting the content.
    I passed trought the same situation and i had to delete the master data + ods data and then change it.
    Sorry.
    Regards

  • How can a make avi files without the length changing?

    I'm hoping someone can help me with this. I'm posting it first here, as the process also involves FinalCut. If there's a better place to get an answer, maybe someone could streer me in that direction.
    I'm doing some subtling which will then be coded onto professional tapes using FCP. I don't have the equipment (digibeta machines) to do that process at my end, so I'm sending the files to a studio and they're going to do the rest for me.
    I have software that'll let me lay down subtitles and then export files with time code, but the software previews with avi files. After messages from the studio telling me that the subtitles were falling out of sync, I finally realized that the avi files I had made from the 30 minute DVD screeners were 4 seconds shorter in length than the material on the screener. I made more and more avi files to double check, each one came out 4 seconds shorter than it should have been. So that's my problem.
    Does anyone know of a way to convert DVD (or VOB) files to avi without losing any time? Alternatively, does anyone know of a program for subtitling that works straight from DVDs? (I looked into Belle Nuit Subtitler, but it's impossible to tell how it works without paying for it and waiting three or four days for the order to manually process.)
    Thanks for any help and sorry my question is so convoluted.

    The best solution to my particular problem seemed to be putting the avi file on the timeline in FCP, selecting it, the choosing "Duration" from the "Modify" menu and resizing it to the length it should have been.
    I'm actually getting a friend to adjust most of the files in Premiere with his PC as I'm still on a G4 PowerBook and the rendering time for the avi files before I can manipulate them was half a day each. (Premiere has a similar feature.)
    Thanks again to Andy for the MPEG Streamclip tip...it looks like it'll be useful in the future, and it's free! Cinematize also looked like it could have helped, but the demo mode only let me test 10 second exports at a time and that wasn't really enough for me to tell if the length changed or not. Didn't buy it this time around.
    I also get the point that there must be a lot of people who use the term "urgent" to mean "hurry up and help me, I don't have time to read" with prolific good Samaratians no doubt tired of being bossed around in that way.
    Fair enough.
    Anyway, the "Duration" option within FCP is one way to fix DVD burns and other format conversions that come out with different time spreads from the original. Rendering can take time on slower Macs though.

  • Issue on column length changing in HANA

    Hi Experts,
    I encounter the following issues.
    1. Try to create a column table with a DATE type column, and insert some values.
    CREATE COLUMN TABLE test1(D DATE);
    INSERT INTO test1(D) VALUES (CURRENT_DATE);
    SELECT D, length(D) FROM test1;
    The result would be like:
    D                      length(D)
    Dec 8, 2014     10
    2. Try to change the type of column D from DATE to NVARCHAR(8), and it did work.
    ALTER TABLE TEST1 ALTER(D NVARCHAR(8));
    SELECT D, length(D) FROM test1
    The result would be like:
    D                      length(D)
    2014-12-08      10
    3. Try to insert a string with more than 8 characters into table, but failed.
    insert into TEST1 values(to_nvarchar(current_date));
    Could not execute 'insert into TEST1 values(to_nvarchar(current_date))' in 258 ms 23 µs .
    SAP DBTech JDBC: [274]: inserted value too large for column: Failed in "D" column with the value '2014-12-08'
    Questions:
    Why is it possible that HANA still keeps the original record of DATE type with length greater than 8(in this case 10) after the column type has changed to NVARCHAR(8)? I assume it would either not allow to change the column type from DATE to NVARCHAR(8) because it contains a record with length greater than 8, or it would just drop the record or change it to other format, something like that?
    Appreciated for any input.
    Thanks and Regards,
    Aron

    Dear Aron,
    In the first step you inserted the current date and you got the result on select. in DB date is stored in internal format like 20141208. so the total length is 8.
    In the second case you changed the type to CHAR 8 and the data stored in the DB is also having length of 8.
    In the third case you tried to insert '2014-12-08', since the type is CHAR, now the length is of your input is 10, it will consider the - also. that is the reason for this error.  Not sure how you got the length 10 on select.
    Regards,
    Rahul

  • Input Filed Length Changes in SAP Table How to maintain in WDJ

    hi ,
    i have scenario where we are having the scenario like dat ..
    container id with 10 chars previousl y in sap system
    currently from sap they have changed the length to 20 char in sap tablle.
    from web dynpro java we have set length 20 char .
    scenario: user can enter text from web dynpro view (portal form ) when click on ok it will save in sap table.
    example
    we are entering  text   testbyvenkatreddy
    click on save
    testbyvenk
    now i need to display the full 20 char length
    can inputs ?
    Regards ,
    venkat p

    Hi ,
    actually the user can enter the value from portal ie thru web dynpro form
    example :
    'testbyvenkatreddy'
    when user clicks on save .
    it will call bapi  and update the database the same value will be updated in portal ..
    but it is taking only 10 char when we put an external breakpoint  in BAPI  we observed the input to the bapi is going only 10 char  even we have more than 10 char .
    From SAP system side they have changed  only char length 10 to 20 thts it ...
    they didn't changed  the filed name or structure only they changed in dataelement ..
    is we need reimport the bapi agian or  reboot the server ?
    wht we need to do exactly  we are on support project having lots of bapis in single application ...
    regards ,
    venkatp

  • Idoc segment field length changes

    Hi friends,,
    I am new to idoc.
    My requirement is in my segment
    i am having 5 fields and also this segment is already realeased one.
    i wnat to change the field length from 10 to 20 . how to do this ?
    actually what i did is
    1. i cancel the release for that segment.
    2. in that field inside the dataelement i changed the field length from 10 to 20.
    3. data elemnt get chaged from 10 to 20 but Export length for that field in Idoc segment still retain the 10 only
    can you plz how to resolve this
    deva

    Hi,
    The way you used is right. ( cancel release or create a new segment )
    After you cancel release, try delete that field, and insert a new one.
    If it isn't valid still,  create a new segment instead.
    Regards
    Sam

  • Characteristic length Change

    Hi All,
    i have changed one characteristic length from4 to 10 which is not having any attributes.
    the transport import was failed in quality system giving message SID table need to adjust in quality system.
    to adjust the table we use T-Code SE14, but in quality system we dont have access to this tcode.
    i tried by re importing the transport request , but no use.
    please suggest if there any alternative way is there to adjust the table.
    Thanks
    Krishna.

    Hi Krishna,
    Data deletion alone doesn't help. you need to manually adjust the table in SE14.
    We did the same thing in our prouduction also. we didn't had auth to SE14 and we had to take lot of approvals to get that. i don't think we have another way of doing it ( apart from SE14).
    Good that you IO is not a MD object. May i know if this infoobject is an attribute of any other MD object?
    if so you need to adjust the P table of that MD infoobject as well. else just adjust the SID table of this IO alone.
    Here is what you need to do in QA and Prod.
    Import the TR ( will obviously fail) -> go to SE14-> give the SID table ->delete data radio button-> Adjust and activate database
    Reimport the TR. the TR should go well.
    Note: you don't need to delete any TD from any datatarget where this IO is used. Reduction in length of IO requires data deletion but not in the other case.
    Regards,
    Sudheer.
    Edited by: Sudheer Kumar Kurra on Jan 27, 2011 1:48 PM
    Edited by: Sudheer Kumar Kurra on Jan 27, 2011 3:15 PM

  • Custom IDOC type Segment-field length change

    Hello,
    We have a custom segment developed for triggering Outbouds. I'm tring to change the Field length of a deta element used for one of the fields in the segment.
    But after chaning the data element and activating it also, the changes are not effecting in WE31/ in the structure of the segment.
    Process I'm following:
    we31 <segment>
    ......cancel release
    Change data element and activate
    ....set release.
    Please suggest if something else can be done
    Thanks,
    Lucky.

    > @Sarvesh: The IDOC segment has been released.  I also re-imported the IDOC into XI - is that what you mean by 'reloaded'?
    No, re-importing in XI is different from reloading the metadata into ABAP stack of XI using IDX2 transaction. So if you have not done this, then this could be the main reason of truncating the length.
    Regards,
    Sarvesh

  • Transitions w/o clip length change?

    I think I recall seeing in a post on this forum instruction on how to add transitions, or at least some transitions without changing the affected clip duration.
    But, of course, I've forgotton.
    Comments and suggestions appreciated.
    C

    When you add a transition it does not alter the length of the clip (or the length of the video) but some of the clip may be partially obscured by the transition.

  • Why are my region lengths changing?

    Doing takes for a guitar solo yesterday, I had all my take folders on the same track. When I was doing my comping I noticed that some of the region lengths of takes further along in the song were changed. At first I thought I may have accidendally selected them all when I clicked on the track, but the same thing happened when I made sure I only had one take folder selected.
    Is this a Logic 8 glitch, or am I doing something wrong?

    Thanks for the added clarifications Noel. Can you perhaps explain to me how the behaviour of the color sampler in the info palette is actually desirable?
    Let's look at my example again. When I am trying to make an adjustment and I'm looking at my color sampler targets, I _must_ have my adjustment layer selected. Target #1 is pointed over a white pixel. Regardless of which layer I have selected, that pixel is white. I can't imagine a scenario in which the readout should be anything other than 255,255,255. That's not a feature, that's a design mistake.
    If I want to see, in the readout, the value of the background image's pixel, then I should hide the layer that contains that white shape. Then, that pixel is no longer white, and the color sampler readout should reflect that. Makes sense.
    If you truly and honestly believe that users are interested in the color that is a result of compositing all the layers below (and including) the currently selected adjustment layer when they are plaing with the adjustment layer controls, then the UI must temporarily hide any layers above that color sampler as soon as I select the adjustment layer. This is the only correct UX design in that scenario - so that the color sampler once again reflects exactly what is "true" - namely the pixel color on the screen that it is sampling.
    And if you re-read that last paragraph you will intuitively know that that would be crazy. I mean, there's no way that a user would want to have the UI hide any layers just because he's clicked on the Adjustment Layer - he probably wants to see the adjustment in the context of the entire composition. If he wanted to hide those other layers, he'd do it himself.
    I urge you to reconsider this from the perspective of a real-world user and consider logging this as a bug. I just can't see any way that it isn't a mistake.

  • Task Name - Field length Change

    Can we change the task name length for team members when adding a new task?
    Regards, Syed Faizan ur Rehman, CBPM®,PRINCE2®, MCTS

    Hi Syed,
    If you want to change the task field length, it is not possible. It is a native field which is predefined in the system.
    But if you want to change the length of the task name itself (for example "design" by "system design"), then it it possible since what matters is the task UID and not the task name.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Using photos and after adding transitions the clip length changes

    I am making a movie on imovie 11 and as I am adding transitions and music each time I add or change the clip duration changes.  I have it set at a particular time but it changes regardless.  I keep having to change durations of transitions and photo clips in order to bring it back. 

    Try this...
    Click EDIT/TRANSITION OVERLAP
    FULL will borrow frames from the photos to make the transition. The project gets shorter.
    HALF will add frames to the transition so that the project stays the same overall length.

  • Transition length changes when timeline length changes

    When I have a transition that's, say, 1.5 seconds and I extend the timeline, the transition will change in length so the motion looks ridiculously slow.  I find myself either spending a lot of time adjusting transition lengths or else finding ways to keep the total timeline length the same (to the detriment of the content).  Is there any way to "lock down" the transition length when I need to change the timeline length?  Locking the object with the little padlock doesn't do it.
    Thanks!

    Hi Amy,
    Indeed that is possible, because it is locked to the end of the slide, agree, only way to change a locked item.
    Understand that when having to copy slides, that will have different durations later on, you prepare the 'mother' slide, inclusive all the wanted effects before copying. For objects that are displayed for the rest of the slide, changing the slide duration will change the duration of the effects.
    I do not exactly know what you need for your projects, perhaps an alternative I'm using often could help: Instead of copying the slide with all its objects, I'll set the objects that have to appear for the 8-10 following slides to show for the rest of the project, instead of for the rest of the slide. They will show up on each slide where they are visible with the same effect and the same timing, whatever the duration of the slide. Drawbacks: after those slide you'll have to hide them on the next slide (advanced actions on Enter Slide with lot of Hides), and when copying slides, use Insert New slide should copy as much as possible.
    Just an idea,
    Lieve

  • Default jpg or still length change

    I did a search for this topic and came up with nothing. Is there a way I can change the default length of various things from FCE titles, imported .jpg's, freeze frames, and so forth?
    They all seem to come to 10 seconds, which is longer than we usually want them. We then cut them down to size EACH time we bring them into the sequence. Our work here would go a lot faster if we could change the default to 4-5 seconds.
    Thanks

    User Preferences/Editing panel lets you set Still/Freeze Duration. That's for importing new still images and creating freeze frames. Titles are fixed at 10 seconds, but using superimpose will take the duration from the underlying image.

  • Enfore passowrd length change 8 to 12

    Hello,
    I changed sign on password length 8 to 12 character in system profile.
    how to enforce the user to change password which they had 8 character password?
    or how can enforce the user to reset the password?
    Please advice me
    Thanks

    Hi;
    Please check below note
    How To Force All Applications Users To Change Their Password? [ID 414976.1]
    Regard
    Helios

Maybe you are looking for

  • Ejb accessing the deployment descriptor

    My ejb needs to be able to access the deployment descriptor to retrieve some user information needed to connect to a web service. What is the best way to do this? I know servletts can do this, and if necessary, I could have my servlet retrieve the in

  • Validate Settlement Rule In Internal Order

    Hi Experts, I have requirement to validate settlement rule entered by user in IW31/IW32. Currently, if the entered total settlement rule percentage is not 100% (more or less), message KD042 will occur as information message and user still can be proc

  • No Sound During DVD Playback

    I have a new HP elitebook 8460p and there is no sound during DVD playback. Is there a setting I may be able to change? Here is a list of things I've tried and pertinent information: - Confirmed all system mute settings are off (e.g., not muted) - Con

  • Adobe Reader 8.1.2 - Error 1304.Error writing file

    I keep getting an error as follows wvery time i try and download Adobe Reader 8.1.2: Error 1304.Error writing file C:\ProgramData\Adobe\Acrobat\8.0\Replicate\Security\directories.acrodata. Verify that you have access to that directory. I run Vista 64

  • SSIS Can I redirect row AND fail the component?

    Hi All, I have been looking at redirecting errors rows in SSIS and such and I am not finding exactly what I am looking for and I am wondering if it is possible. What I would like to do is: If I have a component loading data or whatever if there is an