I am getting Licence.Limit.Exceeded errors when FMS had
several hundred connections although I have unlimited connections
licence. Because of this error, FMS rejected all further
connections.
Here is log:
2009-01-30 20:50:41 11220 (i)2651182 (_defaultRoot_,
_defaultVHost_) : Max connections allowed exceeds license limit.
Rejecting connection to : chatapp/_definst_. -
2009-01-30 20:50:41 11220 (w)2641213 Connection rejected by
server. Reason : [ License.Limit.Exceeded ] : (_defaultRoot_,
_defaultVHost_) : Max connections allowed exceeds license limit.
Rejecting connection to : chatapp/_definst_. -
Flash Media Interactive Server 3.0.1
Unlimited connections and bandwidth license.
And I only ran on this problem in some chat rooms
(applications), others work well.
Similar Messages
-
License.Limit.Exceeded with 4x150 users licence and only 300 real users
We have 4x150 users licence, set to unlimited bandwith.
We get these messages in event viewer:
Connection rejected by server. Reason : [
License.Limit.Exceeded ] : (_defaultRoot_, _defaultVHost_) : Max
connections allowed exceeds license limit. Rejecting connection to
: our_app_name/.
It appends a lot since the last few days, even before last
update 2.0.3
At the same time, when we check the administration console,
the number in the _defaultVhost is much lowe than 600, the maximum
number of user that is allowed.
Licences are all OK in the administration console.
We have to restart the Flash server service to correct the
problem.
Please help...Hello mm_Patrick,
Thank you for your interest in this problem.
We restrict multiple access to the same application instance
on our service.
We operate a chat using fms. We experience, from time to
time, an application instance failure which results in the entire
room participants being disconnected. The application instance
however still shows the connections to the room at time of this
failure. The problem starts to compound itself as people try to
access the room ( connect to the application instance ). After the
start of this problem when we look in the admin console the live
log for the application instance does not show any new connection
attempts nor accept or failure to connect but the application
instance registers the connection against the total connect to the
application instance. People are unable to connect to this room. As
they continue to try they increase the connection number registered
for this application instance until the point that the application
instance total connected takes us past our license limit. The
application instance seems to register and collect the connections
even though there is no connection to the application instance. We
then start to see the logging of the license limit exceeded.
Please note that there are no error/warning messages
generated in logs that indicate anything has failed. We can only
determine that a failure once we start to experience the symptoms
described for the application instance.
We have experienced this issue in the past with fcs. It was
not until the last update of fcs that the probem went away.
However, fms 2.0.0 onward has always had this issue for us.
The problem with this issue is that it is difficult to create
and study. We can go 1 hour and crash or we may have success for
over two weeks.
In an attempt to search for a solution to the problem we have
started focussing on this comment in Adobe –TechNote:
http://www.adobe.com/go/d47f06c6
“In Server.xml, find the ResourceLimits node (around
line 181). It contains the Connector node (around line 203). Within
the HTTP node (around line 205), create a new line and insert
MaxConnectionThreads and give it an appropriate value:
<MaxConnectionThreads>20</MaxConnectionThreads>
The default is 10.”
We have found that by adding the change to our HTTP node that
we have lessened the frequency of our problem. Also, we have taken
all remoting away from the time of connection. We now accept all
connections and then do our work after connection.
Another step we have taken to minimize the impact of this
problem is to define the scope as “inst” in the
application.xml. By creating a separate fmscore.exe for each
application instance it gives us the ability to correct a problem
with a faulting application instances without disturbing our entire
server traffic.
Any further insight into this problem would be greatly
appreciated.
Regards,
iGx -
Client license limit exceeded?
Computer #1:
Software: 500 I/O points
Client License: 1
Lookout reports:
2 Processes Running (136 total I/O points)
Process #1 (136 total points, 136 input points, 8 output
points)
Process #2 (0 total points, 0 input points, 0 output points)
Computer #2:
Software: 500 I/O points
Client License: 1
Lookout reports:
2 Processes Running (136 total I/O points)
Process #1 (136 total points, 136 input points, 8 output
points)
Process #2 (0 total points, 0 input points, 0 output points)
Each computer is both a server and client to one another (for mutual
redundancy).
I keep getting the "Client License
Limit Exceeded" alarm on Computer #1.
Even when Computer #1 takes over all of Computer #2 I/O points - it is still
only 272 I/O points. I have two client licenses.
Why would I get this alarm?I am also receiving this error, what I am trying to do is this;
Using two computers, both with development and runtime licenses and both running the same process gathering data from a remote PLC. There is one occasion that I need to press a button on one process (which alters the state of a flip/flop object) and have it change the state of the flip/flop on the other process. example parameters;
flip/flop name: S14_Trouble_ff
input: S14_Trouble_pb or \\192.168.100.100\process_name\S14_Trouble_pb
When I create this connection to the remote/network process, I receive the Client License Limit Exceeded alarm. Is there a way around this?
Thanks -
Administrative limit exceeded error
On attempting an ldap search command as follows ./ldapsearch -z1000 -b "ou=People,o=abcd.com" "organizationalstatus=manager", I am getting "Administrative limit exceeded" error. The limit is set to 2000 in the console. any help is appreciated. Thanks
hello,
"Administrative limit " may be a SIZE limit , ENTRIES ( number of ) limit or SIZE ( output of ) limit:
From "man" of ldapsearch:
-l timelim time limit (in seconds) for search (default is no limit)
-z sizelim size limit (in entries) for search (default is no limit)
You can use these options when you search.
You may also check the setting of 3 limits above with Admin Console:
Open your directory server (name), Configuration Folder, Performance. On right panel check Client Control folder. You may see:
Size limit
Look-through limit
Time limit
Idle timeout
� The look-through limit specifies the maximum number of entries that will be examined for a search operation.
� The size limit specifies the maximum number of entries the server returns to the client application in response to a search operation.
� The time limit specifies the maximum time the server spends processing a search operation.
� The idle timeout specifies the time a client connection to the server can be idle before the server drops the connection.
If you bind as Directory manager, you may use unlimited resources by default.
Hello,
silvio -
Hello All,
I am trying to execute a custom program with a variant, but I receive the Time limit exceeded error [TIME_OUT].
I am now trying to analyse why this error has occurred as I am a beginner. Any help shall be greatly appreciated.
Regards,
Arpita.
Moderator message: Welcome to SCN!
Moderator message: Please Read before Posting in the Performance and Tuning Forum
Edited by: Thomas Zloch on Oct 20, 2011 2:01 PMHi Ramya,
Your prog running in the back ground, so the time limit of the prog is exceded. Go to sm37 see the prog running time if exceded correct the time.
Regards
Srinu -
Time Limit exceeded error in R & R queue
Hi,
We are getting Time limit exceeded error in the R & R queue when we try to extract the data for a site.
The error is happening with the message SALESDOCGEN_O_W. It is observed that whenever, the timelimit error is encountered, the possible solution is to run the job in the background. But in this case, is there any possibility to run the particular subscription for sales document in the background.
Any pointers on this would be of great help.
Thanks in advance,
Regards,
Rasmi.Hi Rasmi
I suppose that the usual answer would be to increase the timeout for the R&R queue.
We have increased the timeout on ours to 60 mins and that takes care of just about everything.
The other thing to check would be the volume of data that is going to each site for SALESDOCGEN_O_W. These are pretty big BDOCs and the sales force will not thank you for huge contranns time
If you have a subscription for sales documents by business patrner, then it is worth seeing if the business partner subscription could be made more intelligent to fit your needs
Regards
James -
How to eliminate the alarm "Client License Limit Exceeded" in Lookout 6.0.2?
There are 18 Run Time Only Servers, with no clients, running the same application. Right after the installation of the Lookout 6.0.2 software this alarm didn't show up, but after some time it does in all the systems. It makes not too much sense to me because there are no clients at all, thus no client license was purchased and entered/registered.
How to eliminate this 'false' alarm?
Any help will be appreciated!The design is complex. Within the features, each system collects data in .csv format, and once a day moves a copy of the data collected to some place in the network. Also the systems print to file the events and alarms (once a day as well), then they are copied out with the database to the same place in the network. This folder containing the database and the events-alarms in the network is for other engineers to analize, make calculations, projections, etc. It is weird for me and for the others to have this alarm every day in the events-alarms files of each system.
Each system is independent, doesn't need to have connection with the other systems. There are no clients because the database collection is enough for us. The systems are VERY STABLE, no need to trouble-shoot (remote access), or even checking how they are working. Truly, Lookout shows a good performance with this application. By the way, the application is too extensive, complex, many different things are controlled and monitored, many different communication protocols are used: OPC servers, Serial connections, etc. General speaking, the overall result is excellent. This little, no-reason alarm is the only problem: "Client License Limit Exceeded".
I'll really appreciate any suggestion regarding this issue. -
Message limit exceeded error thrown by Adobe and field becomes blank
Hi,
I'm facing a strange problem with Adobe Forms.
We've created custom MSS scenario to suit customer requirements. In that we are required to display drop down values.
All drop down values and form is displayed <b>correctly the first time</b> i.e. when MODE='CREATE' and EVENT=space. When we click on 'Review' button to review form, a server round trip with 'CHECK' event is correctly performed. However a strange error "Message limit exceeded. Remaining 8 errors not reported." is thrown by Adobe Reader. After clicking 'Ok' all fields on form are cleared.
This message is somehow related to drop downs as I've 8 drop downs on my form. (Checked by removing one drop down and then message came as 7 errors not reported.)
Is it possible that error is being caused by some values in 'ADDITIONAL_DATA' table? Reason is when I removed one set of values (drop down values for one field), form seems to work without error. But there is <b>nothing wrong in values</b> for those drop downs
We are on
NW2004s SP9
Adobe Livecycle Designer 7.1.3129
Adobe Reader 7.0.5
Regards,
AmitHi,
Finally got the solution. It was very simple as compared to the problem.
Firstly the problem, in one of the configuration tables description consisted of "" (ASCII 150) and not "-" (ASCII 45). On looking at it, it appeared exactly the same. I guess drop down values cannot consist characters from extended character set.
Solution was simple, just replaced ASCII 150 with ASCII 45 and rest all worked fine.
Regards,
Amit -
IDoc on outbound side from XI - time limit exceeded error
Hi,
I have a FIle to IDoc scenario and I'm creating there a lot of idocs (20000) in a single push. I'm getting an error "time limit exceeded" on outbound side with red flag in SXMB_MONI. How to increase this limit parameter? Where to do it? - PI? or R/3?
Thank you,
OlianHi,
Check thios below thread..
Re: XI timeout error
/people/michal.krawczyk2/blog/2006/06/08/xi-timeouts-timeouts-timeouts
Regards,
Srini -
TIME LIMIT EXCEEDED ERROR WHILE EXECUTING DTP
Hi gurus,
I Have got an error while executing
The errors are as follows.
1.Time limit exceeded. No return of the split processes
2.Background process BCTL_DK9MC0C2QM5GWRM68I1I99HZL terminated due to missing confirmation
3.Resource error. No batch process available. Process terminated
Note: Iam not executing the DTP as a back ground job.
As it is of higher priority the answers Asap Is appreciated.
Regards
Amar.Hi,
how is it possible to execute a DTP in dialog process. In my mind it is only possible for debugging...
In "Display Data Transfer Process" -> "Goto" -> "Settings for Batch Manger" you can edit settings like Number of Processes or Job Class.
Additional take a look at table RSBATCHPARALLEL and
http://help.sap.com/saphelp_nw04s/helpdata/en/42/f29aa933321a61e10000000a422035/frameset.htm
Regards
Andreas -
Time Limit exceeded error in ALV report
I am gettting error "Time Limit Exceeded" when i execute ALV report. Can i run the program in background and how to do that?. I had already optimized my query in the program but even then i am facing the same issue.
You can process the alv in background by pressing F9...I guess that the output would be available as a spool in SP01.
You may need to re-check your query...And also, review the alv catalog and any events you are using....
Greetings,
Blag. -
Time Limit exceeded Error while updating huge number of records in MARC
Hi experts,
I have a interface requirement in which third party system will send a big file say.. 3 to 4MB file into SAP. in proxy we
used BAPI BAPI_MATERIAL_SAVEDATA to save the material/plant data. Now, because of huge amount of data the SAP Queues are
getting blocked and causing the time limit exceeded issues. As the BAPI can update single material at time, it will be called as many materials
as we want to update.
Below is the part of code in my proxy
Call the BAPI update the safety stock Value.
CALL FUNCTION 'BAPI_MATERIAL_SAVEDATA'
EXPORTING
headdata = gs_headdata
CLIENTDATA =
CLIENTDATAX =
plantdata = gs_plantdata
plantdatax = gs_plantdatax
IMPORTING
return = ls_return.
IF ls_return-type <> 'S'.
CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
MOVE ls_return-message TO lv_message.
Populate the error table and process next record.
CALL METHOD me->populate_error
EXPORTING
message = lv_message.
CONTINUE.
ENDIF.
Can any one please let me know what could be the best possible approach for this issue.
Thanks in Advance,
Jitender
Hi experts,
I have a interface requirement in which third party system will send a big file say.. 3 to 4MB file into SAP. in proxy we
used BAPI BAPI_MATERIAL_SAVEDATA to save the material/plant data. Now, because of huge amount of data the SAP Queues are
getting blocked and causing the time limit exceeded issues. As the BAPI can update single material at time, it will be called as many materials
as we want to update.
Below is the part of code in my proxy
Call the BAPI update the safety stock Value.
CALL FUNCTION 'BAPI_MATERIAL_SAVEDATA'
EXPORTING
headdata = gs_headdata
CLIENTDATA =
CLIENTDATAX =
plantdata = gs_plantdata
plantdatax = gs_plantdatax
IMPORTING
return = ls_return.
IF ls_return-type <> 'S'.
CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
MOVE ls_return-message TO lv_message.
Populate the error table and process next record.
CALL METHOD me->populate_error
EXPORTING
message = lv_message.
CONTINUE.
ENDIF.
Can any one please let me know what could be the best possible approach for this issue.
Thanks in Advance,
JitenderHi Raju,
Use the following routine to get fiscal year/period using calday.
*Data definition:
DATA: l_Arg1 TYPE RSFISCPER ,
l_Arg2 TYPE RSFO_DATE ,
l_Arg3 TYPE T009B-PERIV .
*Calculation:
l_Arg2 = TRAN_STRUCTURE-POST_DATE. (<b> This is the date that u have to give</b>)
l_Arg3 = 'V3'.
CALL METHOD CL_RSAR_FUNCTION=>DATE_FISCPER(
EXPORTING I_DATE = l_Arg2
I_PER = l_Arg3
IMPORTING E_FISCPER = l_Arg1 ).
RESULT = l_Arg1 .
Hope it will sove ur problem....!
Please Assign points.......
Best Regards,
SG -
Budget Exceeded error with message No BP 602
Hi Experts,
I am facing a budget exceeding error: Ntwk actvty 6000001 0020 budget exceded year 2009.
following is the settings
Availability control against: Overall
Availability control against: Budget
Availability Control in the Controlling Area Currency:
Activation type: Automatic activation during budget allocation
Usage level in %: 0,00
The project is P.0001
Top lvl P.0001
WBS P.0001.1
Network Activity (External services) 6000001 0010 PR-($40000) PO($20000) & Service entery done with same amount($20000).
Network Activity (External services) 6000001 0020 PR-($1)
Actual $20000
Commitment 20001
Assigned 40001
Available $49
Now we updated the budget as below:
The original budget was 40050 in IM then modified to 45050 and distributed in CJ30.
When we try to update the Service PR with 49 or more dollars, gives error in commitments and when the log checked, the budget exceeding message is there, if the PR updated with 48 USD, it gives the budge is exhausted.
40050(Old Budget)-40001 (assigned) = 49 USD. Which means, the supplement of the 5000USD is not considered.
Run the CJEN and CJBN to reconstruct the project but no use.
Please help me out where to check and what went wrong. its in client prd.
Regards,
GaneshHi,
You said in reports and in CJ31 , it is showing 60049 as available. I am confused here......including additional budget , total budget you gave is 45000. Then how it can show 60049 which more than Original Budget ?
Have you distributed additional budget to the WBSE for which Service P.R is being raised ?
What is distributable budget at the level of the WBSE for which P.R is being created in CJ30 ?
What Is available budget against the WBSE for which P.R is being created in S_ALR_87013558. ?
May be it will be of saome help for you.
Thanks
Saikishore.Ganga -
What is Bandwidth Limit Exceeded error?
I was trying to go into "http://laparrillaonline.com/". Instead a window popped up stating " 509 Bandwidth Limit Exceeded and below it said:
The server is temporarily unable to service your request due to the site owner reaching his/her bandwidth limit. Please try again later. Apache/1.3.39 Server at laparrillaonline.com Port 80
Is it my computer or his server that exceeded it?
Thank youThank you!! I went into Panic Mode after "....Limit Exceeded...". I feel foolish, and as my daughters would say: Duh....
-
I am using TB 31.3.0 with Mail Merge 3.9.1. I routinely send an email to 435 members of an volunteer emergency responders group that I coordinate. I do so using a .csv list with mail merge. While there were no problems in the past, more recently the mail merge function will hang after sending a varied number of messages successfully and I get the following error message:
"An error occurred sending mail. The mail server sent an incorrect greeting: 4.3.2 connection rate exceeded.."
There is an "OK" button in the error message pop up that can be clicked to resume the mail merge process. It would appear that if I click the "OK" button immediately whenever the error message is received I must do so frequently and some members do not receive their email. If I delay clicking the "OK" button, I found that I only needed to click the "OK" button twice to send to all the members.
An on line search suggests this is the result of some sort of throttling by my ISP, Sonic.net. There is also this comment: "If you are receiving this error, you are likely using mailing list software which cannot decipher the temporary fail codes. If so, you will need to set your software to slow down its delivery rate and/or reduce the number of active connections per remote host."
I am not super technical. Is it realistic to think that I can tweak mail merge to that I do not have to babysit my email to this group?then I suggest you send using a mail provider that is not actively trying to block your outgoing mail. Or use a yahoo / google groups mailing list feature so you only send a single mail.
Or use a free account from the likes of http://www.ymlp.com/ who limit free account mailing lists to 1000 subscribers. ( Googled them this morning)
Maybe you are looking for
-
How to hide a variable in the query?
Hello everyone, I don't know if my framing would be correct but i would like to explain my problem first. I have a query with a variable in the result but with defaulted values. I don't want this variable to pop up when i am running a report. I
-
We have some entries posted to this vendor X at the time of initial upload (2006), which are showing as open item in the vendor line item details. The accounting entry is passed as follows: Dr Initial Bal-creditors A/C Cr Vendor A/C We want to clear
-
Good day, I did a FILE-RFC-FILE scenario and my file sender adapter returns the error "Error: com.sap.aii.af.service.cpa.impl.exception.CPAObjectKeyException: Value of key must not be null: ObjectId". I got hold of blog with the similar error(JDBC -
-
2 ISP load balancing and redundancy
Hello!! Our small company has about 40 branches spreaded within city. Branches are connected by optic wire supplied by our ISP. So in ISP our branches are located in one VLAN. From every branch we created VPN tunnel to our server room in central offi
-
HT1386 iTunes isn't up to date