Line In Question

Okay, so I was looking around on the forums for a bit just to make sure there wasn't a thread on this before, so I apologize if there is one and I missed it...
My question is this:
I have one set of speakers on my desktop, what I want to do is send the speaker signal from my PC to my MBP. I plug the speaker cable into the MBP line-in and if you were deaf, it would appear to be completely functional as the line-in signal meter in the sound control panel reads that there is signal and matches the sound going through the line, though no audio is actually produced. I have tried changing the output devices as seen in many threads but still no audio.
Please help!

I have one set of speakers on my desktop, what I want to do is send the speaker signal from my PC to my MBP. I plug the speaker cable into the MBP line-in and if you were deaf, it would appear to be completely functional as the line-in signal meter in the sound control panel reads that there is signal and matches the sound going through the line, though no audio is actually produced. I have tried changing the output devices as seen in many threads but still no audio.
You need an application to copy the audio from the input to the speakers (or other audio output). Thie simplest is LineIn. Scroll down on:
<http://www.rogueamoeba.com/freebies/>

Similar Messages

  • Upgrade is on the wrong line. Question.

    My fiance added  a line for me in August/September of 2010. With said line should have came the ability to purchase a new phone. At the time, I didn't have the money and still had a Droid Eris. So I activated the Eris. Now I've cracked the screen and decided I would purchase a new phone (Droid X). But the upgrade is on the primary line, which is her line. So my question is. Can I purchase the Droid X on her upgrade and activate it on my line?

    LukaNeLL wrote:
    My fiance added  a line for me in August/September of 2010. With said line should have came the ability to purchase a new phone. At the time, I didn't have the money and still had a Droid Eris. So I activated the Eris. Now I've cracked the screen and decided I would purchase a new phone (Droid X). But the upgrade is on the primary line, which is her line. So my question is. Can I purchase the Droid X on her upgrade and activate it on my line?
    There should be no need to do this, as you said, because your new line should still have the upgrade eligibility. It should have been added as a new line on a month-to-month contract since you provided your phone. I would call CS and talk to them about that.

  • 2D Line Chart question

    I have Apex 3.1 . I have created a 2D Line chart with for different series (so there are 4 lines on one chart). I also have a Legend on the left side next to the chart to label whatr each line is for. In my query for those lines I have the Name for the Legend as all CAPS but it shows up as first letter capital and the rest lower case. Is there a way to force it to all upper case?
    The second question I have is that underneath the legend I would like to have some type of text box were I can write a couple lines to help explain what is going on in the graph. Is there a way to do that?

    You basically have only a couple of options here:
    First, turn off the labels and possibly turn them into Hints. They wouldn't show on the chart, but when the user held over the data point, a tool tip would appear showing them the valuable.
    Second, adjust elements of the chart. What you are really looking at here is that your data set is causing this specific issue and not the charting engine or anything like that. You could try to manually change the axis max and min to get more spacing, or you could adjust the height of the chart to get more spacing, but this may not be a viable option. You could have one set of labels above the plotted line and another set of labels below the plotted line that way the values do not overlap with anything. However, from a conceptual standpoint, it will be difficult to determine in code which line should have values above and which should have values below. When your data set changes, you may end up with labels in the wrong place if you hard code where they are at.
    The current XML reference can be found at: http://www.anychart.com/products/anychart/docs/xmlReference/index.html however, that is for anychart 5. I'm looking for the link to the earlier versions...
    You can use this to create custom xml where you can adjust the position of the labels.
    Finally, you do not want expand the height of the chart between two points on the Y axis. That would change the structure of the chart and the visual properties of the chart and the shape of the data would be askew. You cannot do this for good reason. You can though use a logrithmic scale. In most cases though, this is not a practical solution. Data sets need to have very specific characteristics in order to be able to merit a logrithmic scale. Most queries require a simple linear scale.
    Austin

  • CFCHART - Line Chart Questions - CF7

    Hi Folks -
    I have a few questions about CFCHART in CF 7 and I am hoping
    that maybe different users can answer them:
    The following questions relate to creating a line chart.
    1) Is there a way to control the gridlines yourself, and not
    use the values for the lines that CFCHART presents?
    1A) If you have to accept the values that CFCHART gives you,
    is there a way to control the actual rounding of the values? Right
    now I am getting 3 decimal places, and I would prefer whole
    numbers.
    2) Is there an issue with displaying negative values? I have
    a chart that ranges from -255 to 100,000 and has 10 grid lines. But
    the -255 does not display. I get 0, the rest of the lines, except
    for the 9th line.
    <cfchart chartheight="300" chartwidth="450" font="@Arial
    Unicode MS" scalefrom="-255" scaleto="100000"
    gridlines="10" xaxistitle="Month" yaxistitle="Total"
    format="png" labelformat="number">
    <cfchartseries type="line" serieslabel="Review">
    <cfchartdata item="Jan" value="2569">
    <cfchartdata item="Feb" value="65535">
    <cfchartdata item="March" value="-57">
    <cfchartdata item="April" value="75778">
    <cfchartdata item="May" value="89955">
    <cfchartdata item="June" value="39898">
    <cfchartdata item="July" value="0">
    <cfchartdata item="August" value="12560">
    <cfchartdata item="Sept" value="-255">
    <cfchartdata item="Oct" value="767">
    <cfchartdata item="Nov" value="6868">
    <cfchartdata item="Dec" value="37352">
    </cfchartseries>
    </cfchart>
    Any and all questions and answers are appreciated.
    Thanks,
    Doug

    You can specify scaleFrom and scaleTo by hardoced values or
    dynamic variables and number of gridlines. If you not specified
    first two attributes, then by default, the minimum is 0 or the
    lowest negative chart data value, and the maximum is the largest
    data value.
    To avoid decimals in your case empirically find good
    combination for your scale, for example from - 500 to 10 000 and
    number of gridlines = 12.

  • New line connection question

    I am currently in the process of moving my exisiting line and broadband over from Sky to BT.
    My current line is connected directly to an exchange which is over 5km away, resulting in very poor and very slow broadband. Even through streets right next to mine have infinity!
    As my current line is an exchange only line (EO) I am not going to be able to get any sort of high speed broadband at any time in the near or distant future
    Hence my question...
    If i request to have a 2nd line installed at my property, is there any way that this line could be connected to a local street cabinet (three within a stones throw of my house) so that I could then get infinity.
    Many thanks

    It all depends on the current line plant.
    If there are spare cables coming from the exchange via the same route your line takes, you'd be connected to one of them. if there are no spare pairs then OR MIGHT connect you to a cab but it's a very long shot.
    There's no way to request this when the order is placed either.
    If you want to say thanks for a helpful answer,please click on the Ratings star on the left-hand side If the the reply answers your question then please mark as ’Mark as Accepted Solution’

  • Sprint line upgrade question

    Hello! 
    I have a question about upgrading a phone on another line with my line's upgrade on Sprint, but let me provide a little information.
    According to Sprint, I can't switch phones from line to line until my rebates have been processed. (up to 30 days) As a Sprint Premier member, I have the annual upgrade price but I don't have any interest in phones that are coming out before I reach the 2 year mark. My sister on my family plan, however, wants another phone but she's only a year into her contract. I would rather use my upgrade to get her a new phone and not waste my yearly upgrade.
    So my question is, since Best Buy does instant rebates, does that allow me to perform the upgrade and switch because of the loophole with the rebates?
    Thanks. 
    P.S. there has got to be another term better than upgrade :-/

    Yes. You'll have no problem doing this.

  • Drag line/connect question

    Hi,
    Is it possible to make a drag line question:
    Attached screenshot is what we want.
    We want to drag a line from left to right and when the question is right, a picture pops up.
    When it is wrong a sentence telling it is wrong will show.
    is this possible within Captivate ?
    Joep

    I managed creating matching questions for someone once (consulting task) using the interactive Drag&Drop widget from InfoSemantics. That was a question that had to lead to reporting, even with partial scoring which is not possible with the default matching question slides. And then you have total control of course. It means that you need knowledge of variables, advanced actions.
    Do you need reporting, or a "zwart-wit" one if everything is correct? Or is just the appearance of the captions important? Maybe then the built in Drag&Drop will suit your needs.
    Lilybiri

  • Line Graph Question: Compare different values thru time ...

    Hi, hope someone can help me I've been looking at examples, but I cant get this to work:
    Here is a link to what the data looks like: http://primolandia.com/line_problem.jpg
    As you can see, I have a table with columns: Team, Date, CriteriaNum1, CriteriaNum2, CriteriaNum3
    One graph per Criteria which compares how each Team did on that Criteria thru time...
    So I want the X axis to have the "Date" and have one line per team showing the value at different times ...
    Any ideas?
    Thank you!!!
    Claudio

    I wish to withdraw this question ... I finally figured out my issue...

  • Line protocol question

    Okay, this might seem like a really stupid question but it's got me stumped.
    What the hell does "line protocol down" mean and how the hell do I fix it? I'm using a Cisco 2500 series router, and it's occuring on serial port 0 on BOTH routers. I've checked, double checked, re double checked, and triple checked (quadruple checked?) the wiring and the physical wiring is fine...
    Can anyone provide any insights to this at all for me? I'd greatly appreciate it.
    TIA

    The line protocol state (up or down) reflects the layer 2 status of the interface. If your serial interface is saying that its state is up/down it means that it knows that it is plugged into something on the interface but that there is a layer 2 connectivity problem.
    The nature of how the router determines the layer 2 status depends somewhat on the type of interface. On Serial interfaces the determination is based on the keepalives. So basically what the router is saying is that keepalives are not working on the router. There are a couple of things that can prevent keepalives on the serial interface, such as different protocols being configured (one end may be Cisco HDLC and the other end is PPP). If it was Frame Relay a mismatch of LMI type may cause it. Given your comment about using 2500 and that both sides are showing protocol down I am going to guesss that you have the routers configured back to back. And I am going to guess that you have not configured clock rate on whichever router has the DCE serial cable connected. When routers are back to back and do not connect to provider equipment, you need one of them to generate clocking (and it needs to be the one with the DCE cable). So check your cables, find which one is DCE, and configure clock rate on that router.
    HTH
    Rick

  • Why all the lines and question marks on my recovered iWeb pages?

    My iWeb recovered pages (which I did find, thanks to several of you) are covered with question marks and horizontal and < and > lines. Why would this happen and how do I know it won't happen when I publish?
    G4 Dual   Mac OS X (10.4.10)   all software updates

    is this what you see:
    http://www.geocities.com/[email protected]/images/badkidblue.jpg
    it was from this thread:
    http://discussions.apple.com/thread.jspa?messageID=2746077&#2746077
    if you see something similar as above, you may have corrupted iweb template, re-install iweb...

  • Line art question

    Do any of the programs in Adobe Creative Cloud have illustrations (clipart) that I can use for graphics in InDesign???
    Also, which of the Creative Cloud programs is the easiest to use for taking apart and recoloring graphics?

    "Easy" is a subjective term.  It really depends on your experience level. Illustrator is the tool of choice for creating vector graphics.
    http://www.adobe.com/products/illustrator/features.html
    If you can't find what you need in AI, you will typically find exactly what you want  at the following royalty free image houses.
    http://www.dreamstime.com/illustrations-clipart-cat172
    http://www.istockphoto.com/search/text/line%20art/filetype/illustrations/source/basic#a37f 921
    http://www.gettyimages.com/creative/frontdoor/istockvectors
    Nancy O.

  • Line Graph Question

    Hi
    I am trying to create a graph where I have 3 data points
    this relates to  inspections
    House number      Items found  date of inspections
    101                                  30              April, 2 2014
    201                                  34            May 1 2014
    Y axis I am showing items found
    x axis I am displaying the House number
    I would like to also display the month the inspection occurred
    A am currently displaying the month in the legend at bottom of page
    But would like to do something like below
    I am getting x and y ok  but not month display (Thanks)
            |
    30    |
    20    |
    10    |__________________________________
                                      101  201      301  302  303
              JAN FEB MAR APR MAY        JUN

    Hi
    I have it in the report header
    I have created a formula to extract the month from inspection date
    I added both the data expert for the x axis sorted original sort
    each month can contain any number or inspections and indicated by different colours on the line
    graph matching the legend colours
    What would be great is if I can delineate where each months data starts and stops
    it's sort of done by the graph now by using different colours but I would like to label it
    tried every option but could not pull it off
    thanks

  • Line chart question

    I have AW 6. I want to make a color line graph (chart) of some temperature data. The Y axis will be the temperature and the X axis will be the date for a month. So it is a simple temperature vs. date line graph. There will be two sets of data placed on this graph - the maximum temperature for the day and the minimum temperature for that same day for each of the days of the month. Therefore two lines will appear on the chart - Max line and Min line. I have been doing this for years and somehow must have formatted to show the Max line in red and the Min line in blue which makes sense. The data for the graph have been taken from a table showing three columns in the order date, max temp, min temp. However, recently most weather data has been reversed showing the lowest (min) temp for the day first since this occurs in the early morning hours of the day so I have decided to go along with this new trend and now have my table in the order date, min temp, max temp. However, now that I have reversed the order, the min temp line appears in red and the max temp line appears in blue. How do I change the colors to the logical blue for min and red for max. I must be missing something very simple here and have checked all the chart options but must be a bit blind or something.

    levlvl wrote:
    How do I change the colors to the logical blue for min and red for max?
    Make sure you have displayed the legend for the chart, and that you have the Tools showing.
    Click on the coloured square for Max in the chart's legend, then click the Pen button in the Tools, then choose the pen colour from the Color palette in the Tools. Click the square for Min and again choose the new Min colour from the palette.
    To change the colour of the data points, double click the coloured square in the chart's legend, then click the coloured square beside "Symbol" in the Char Options (Series) dialogue that opens. That will open a Color palette from which you can choose the same colour as you've set for the line. Use the pop up menu "Edit series:" to switch to the Min series and repeat.
    Regards,
    Barry

  • Line chart question (lines are not connected)

    I have a simply report which basically counts the data by Month and Type. So I have 3 columns: Month, Type, Count (count column has a formula). Then I created a line chart. For some month, some type, there is no data. I noticed in those scenarios, the lines in the chart becomes disconnected. For example, let's say I have Jan, Feb, March, April. There is a type called "User Error". For this type, Jan has 10, Feb has 4, March has no data. April has 4. In the chart, I have month on x-axis. Count on Y-axis. Type is the data stream. So for this type, the line goes from Jan to Feb. It disappears for March and then reappears as a dot for April.
    The line looks like ugly. I would like to have a continuous line. So for March, the line should go to 0 on the Y-axis.
    Does anyone have a suggestion how to do this?

    Hi,
    I think you can solve this with a case statement in the count column:
    CASE
    WHEN "column formula" IS NULL
    THEN 0
    ELSE "column formula"
    END
    Hope this works for you.
    Regards, Tim

  • BB Line Reset Question

    Hi - had issues with BB speed - ip profile was set to only 0.25mbps.  BT did a line reset on Monday lunchtime.  IP profile is still set ot 0.25mbps.  Contacted BT who said it would take 10 days for the line to stabilise and spped will vary in that time.
    Surely the IP Porfile should have been increased as part of the reset or will it automatically increase during the stabilisation period ?  Normal speeds are 2-3mbps.
    Thanks

    ok got them
    ADSL line status
    Connection Information
    Line state
    Connected
    Connection time
    0 days, 00:03:12
    Downstream
    4,608 Kbps
    Upstream
    448 Kbps
    ADSL Settings
    VPI/VCI
    0/38
    Type
    PPPoA
    Modulation
    G.992.1 Annex A
    Latency type
    Fast
    Noise margin (Down/Up)
    6.2 dB / 21.0 dB
    Line attenuation (Down/Up)
    47.0 dB / 29.0 dB
    Output power (Down/Up)
    7.0 dBm / 1.6 dBm
    Loss of Framing (Local/Remote)
    0 / 0
    Loss of Signal (Local/Remote)
    0 / 0
    Loss of Power (Local/Remote)
    0 / 0
    FEC Errors (Down/Up)
    0 / 0
    CRC Errors (Down/Up)
    0 / 0
    HEC Errors (Down/Up)
    0 / 0
    Error Seconds (Local/Remote)
    0 / 0
    Hide Details

Maybe you are looking for