Link between HR data and Work center

Dear experts,
We have assigned operators in work center through HRMS. For the purpose of making a report we require the table into which the linking of work center data and the employee is made.
In the table CRHD a field HROID is found.  This is an object id which links the work center with a table either in HR or in PP which provides the link between organisational unit/ employee. Can anybody tell us the name of the table with details?
Please help us.
Thanks
Jaikishan

Dear Vittalji,
Thanks for your prompt response.
Our requirement is as follows:
We need to create a report on details of operations done by each operators / workers for a specified period. For this purpose following assignments are done.
(HR module is not implemented yet.  But we have made attempt to maintain the employee master by customising HR module little bit)
1.  Employee master created in HR. 
2.  Went to work center maintainence (CR02).
3. Selected HRMS button.
4. Selected Work Center option.
5. Clicked on HR work center
6. Given same work center as production work center.
7. Selected 'person' from ALV list data
8. Clicked on create relationship button.
9. Assigned the appropreate persons.
By doing assume this we made assignment of persons to this work center since the name of persons are getting displayed.
We have a report to list out the workcenter wise operation confirmations for analying the daily production.
Now we want to incorporate the operators (persons) name into our report by whom the operation/production was performed.
For this purpose, while refering the table CRHD, found a field HROID (an object id).  To fetch the details of persons / operators those we assigned to the work center we need the tables for linking this field HROID.
Our questions are
1.  Whether the process of assigning   operators above mentioned are correct?
2. What are the table-links for completing our report. i.e. only for work center to concerned operators (HR).
3. What does the HR Work Center mean?
4. What are the difference between HR work center and production work center?
Your help is requested. Points will be rewarded promptly.
Thanks and Regards
Jaikishan

Similar Messages

  • Tables for Basic end date and work center for operation

    Hi!
    I need table name to fetch the basic end date of a maintenance order and maintenance work centers with respect to each operation in maintenance order.
    Regards,
    VM
    Edited by: V M on Jul 20, 2010 7:22 AM
    Edited by: V M on Jul 20, 2010 7:35 AM

    Hi VM,
    Input is Order Number (AUFNR).
    You can find the Basic End date of Order in Table AFKO, filed is GLTRP.
    For work center in Operations, you can use the Table AUFPL from AFKO.
    Pass this AUFPL in AFVC and get the ARBID.
    Then pass this ARBID to CRHD Table as OBJID, and get the work Center (ARBPL)
    Regards,
    MLN Prasad

  • Link between profitability segment and profit center

    Hi
    Could you please let me know where we link the profit center to profitability segment. Please let me know the path and complete steps
    Regards,
    Krishna

    Hi,
    These two are independent entities; there is no link between them.
    Regards,
    Eli

  • Factory Calendar and Work Center

    Dear All
    I am confused between factory calendar and work center working.  Kindly guide me what factory calendar does and what work center does?

    Hello,
    Factory Calander :-- Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc.
    You can create your company factory calendar via transaction code 'SCAL'.
    Assignment of the factory calendar by plant is done in transaction code 'SM30 - V_T001W'.
    An example of a SAP application that uses the factory calendar is the SAP MRP modules.
    Assuming that you have a specified an alternate working Saturday, MRP will postponed the planned orders to the next working day if it happened to falls on a non-working Saturday.
    Work Center :--
    Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    t-code-- CNR1 - Create
    for more information go to this link
    http://help.sap.com/saphelp_smehp1/helpdata/en/40/8ac473d40943ddb23def12bdb33437/content.htm
    Thanks

  • Table link between contract document and billing document

    Hi,
    Please let me know the table link between contract data and its billing plan nnumber.
    Regards,
    bhaarathi.

    VBKD is the Table name
    if Ordertype "G"  <--- that means It is a contract
    From VBAK and VBAP you can get the Contract Details for the Order Type "G"
    Go to Table VBKD, with the contract and get the billing plan .
    FPLNR <--- is the Billing plan
    Here you get the relation Between Contract and Billing Plan

  • Link for Cost Center And Work Center.

    Dear Experts,
    Can you Provide me the Link for Cost Center And Work Center.
    Regads,
    Jyoshna

    Dear Experts,
    I got the answer for the Link Between Cost Center And Work Center.
    By using CR03   T Code we can see the Display Work Center : Cost Center Assignment Screen will appear.
    we need to select the costing tab, We can find Cost Center .
    Thanks & Regards
    Jyoshna

  • Relation between Purchase Order and Work Order Tables

    Hi,
    I am trying to create a Func Module as following.
    Input : Purchase Order Number, Material Number and Item Number. (Either Item Number or Material Number shall be entered. Output a message if both are blank).
    Out put : PO Number, Line item Number, Status of the PO, Material Number / Equipment Number, Work Order Number, Work Center and Cost Center, Person responsible from Work Center.
    Is there any link between EKKO, EKPO and AUFK, AFPO?
    Can you please help me. or suggest if there is any other way I can do this.
    Thanks in advance.
    Hanuma

    Pls let me close this.

  • Link between Schedule lines and delivery quantity

    Hi all,
    At the item level in a sales order, can anyone tell me the link between schedule line data and delivered quantity.
    Schedule line data can be found in VBEP and delivery qty can be found in LIPS. But I want the link between the two. For which partcular date in the schedule line item the delivery qty is displayed.
    Thanks in advance.

    Hi Amol and Rahul,
    Actually I dont want the link between sale order and delivery, I want the link between schedule line dates and delivery qty.
    Hope I am clear.
    Thanks in advance.
    Edited by: Rajini R M on Sep 11, 2008 6:12 AM

  • Link between ABC Indicator and Priority

    Hi friends,
    My client requires the Link between ABC Indicator and Priority. i.e., While creation of notification, based on the ABC indicator assigned in the Equipment, Priority should be selected.
    Is it possible, if possible please help me out to resolve this issue.
    With Best Regards,
    Dev

    Hello,
    Yes you can acheive this by Development use the Below User Exit or Fubctional Module to get it done
    User Exit-->QQMA0014 QM/PM/SM: Checks before saving a notification
    BADI-->NOTIF_EVENT_SAVE Change When Saving Notification
    When Notification create against the Equipment which Having ABC Indicator it will stop Notification while Saving the Notification By checking The ABC Indicator on Equipment and Proposes Priority which You already defined in Configuration with Proposed New Dates for Notification Completion Dates.Notification save allowed once you fill Exact value of Priority.
    Regards,
    Rakesh

  • Where is link between plant vendor and plant code

    Where i can find linke between plant vendor and plant code.

    Hi,
    Go to XK02,
    In Purchasing Data of Vendor Master, in menu Extras > Add. Purchasing Data
    It is stored in Table LFA1 and field is WERKS

  • Link between Business area and Material master

    Hi guys
    Is there a link between Busines area and material master, i am getting an error when I am trying to Move part of material stock from unrestricted stock to Project stock by 411/Q.
    Error
    Business area xx changed to yy
    Ideas?
    sam

    Hi
    Yes Business area has a link with MMR
    Business area determination is through by three rules
    1. Plant and item division
    2. Sales area( sales orgdistribution channeldivision )
    3. Sales org, distribution channel and item division
    Here item division means the division in MMR that is basic data 1 tab and sales org 1 tab
    This division field forms the main link between Business area and MMR
    Regards
    Raja

  • Work Schedule in HR Master Data Feeding Work Center!

    Hi,
    I have several questions on how work schedule in HR master data relates to the work center for capacity planning.
    1. How do we assign the employee to a work center? is that in the HR master data or work center or some other transaction?
    2. If we can assign an employee to a work center, how the work schedule in the HR master data feeds the work center capacity? Is there any button that I can control whether I want to feed the work center capactiy from HR master data work schedule or from manual input directly to work center?
    3. If I can feed the HR master data work schedule to work center, what do I need to do to reflect the vacation time or sick time which is not in the work schedule in the HR master data to the work center?
    Thanks,
    Ting

    Hi,
    For starters, please take a look at the following discussion:
    Logistics Work Center and HR Work center.
    Credits: SDN members
    Hope this helps.
    Donnie

  • Diff between header line and work area.

    Diff between header line and work area.

    Hi,
    These are table with header line.
    DATA: T_TABLE type table of <table_name> with header line.
    data: begin of t_table occurs 0,
                  field1 type ...
                  field2 type ...
                  field3 type ...
          end of t_table.
    <b>The result is:</b>
    <u><b>TABLE</b></u>    
    FIELD NAME  |FIELD1|FIELD2|FIELD3|  
    HEADER LINE |EE1   |EE2   |EE3   | <---- Line 5 content
               1|AA1   |AA2   |AA3   |  
               2|BB1   |BB2   |BB3   |  
               3|CC1   |CC2   |CC3   |
               4|DD1   |DD2   |DD3   |
               5|EE1   |EE2   |EE3   |
    These are table without header line.
    DATA: T_TABLE type table of <table_name>.
    DATA: T_TABLEX LIKE TABLE OF t_table.
    <b>The result is:</b>
    <u><b>TABLE</b></u>    
    FIELD NAME  |FIELD1|FIELD2|FIELD3|  
                     0|---   |---   |---   | <---- No header Line
                     1|AA1   |AA2   |AA3   |  
                     2|BB1   |BB2   |BB3   |  
                     3|CC1   |CC2   |CC3   |
                     4|DD1   |DD2   |DD3   |
                     5|EE1   |EE2   |EE3   |
    These are work areas:
    Tables <table>.
    DATA: wa type <table>.
    DATA: wa like t_table.
    DATA: wa type line of <table>.
    <b>The result is:</b>
    <u><b>WORK AREA</b></u>  
    |EE1   |EE2   |EE3   | <---- Content
    Regards.
    Marcelo Ramos

  • Link between PDS name and resource

    Hi folks,
    I've established a link between /SAPAPO/TRPROD and Setup Matrices using PDS name and resource to use in a custom extractor for BI. This works well starting out at /SAPAPO/TRPROD and working my way over to the Setup Matrix tables using function modules BAPI_PDSSRVAPS_GETLIST and BAPI_RSSRVAPS_GETLIST.
    Now I want to validate that it's correct that I'm getting 0 results in a test system. Since /SAPAPO/TRPROD has some 3000 entries and /SAPAPO/SET_MID only 2, I figured it'd be easier if I take those two matrices and see if I can link them back to /SAPAPO/TRPROD (where I won't get any results). Does this make sense so far?
    Moving on ... I've found that in table /SAPAPO/RES_HEAD I can find the resource associated with a Setup Matrix. I can't figure out though how to link the resources to the PDS. Any ideas?

    Hi Jan!
    You say that you want to link the resources with the PDS, right? Do you mean that you want to find a way to discover the resource associated with the PDS activities? If so, you can do that by reading the activity information of the PDS and getting the resource maintained there...
    But I don't fully understand your business requirement... So let me know if I got your issue wrong.
    Will

  • Link between notification number and meter reading order in ISU

    what is the link between notification number and meter reading order in ISU. i have written a program to close all open notifications but now i want the program to close only notifications with closed meter reading orders but i cant find the link between meter  reading order and notification

    HI timothy
    you can tell me how do you solved this issue?
    how i can match reading Order with the order in Work Management?
    i need some configuration?
    thanks in advance
    Miguel

Maybe you are looking for

  • [svn:osmf:] 15864: FM-505: Add text to link instead of displaying URL

    Revision: 15864 Revision: 15864 Author:   [email protected] Date:     2010-05-02 19:21:01 -0700 (Sun, 02 May 2010) Log Message: FM-505: Add text to link instead of displaying URL Ticket Links:     http://bugs.adobe.com/jira/browse/FM-505 Modified Pat

  • Can't sync photos to my PC running Windows 7

    I have a Windows PC running Windows 7. I used to  be able to sync photos from my iPhone 3GS through iTunes, but now I can't get the photos to sync. When I used to connect my iPhone, I used to get a prompt to download the photos to a new folder in Win

  • I can't do it! It's not letting me? what do i do now?

    I can't do it! It's not leting me! What do i do now? HELP!

  • Material master  - problem with event viewcreated

    I have created a WF with a start event ZBUS1001-ViewCreated. ZBUS1001 is a copy of object BUS1001006. If I trigger the event manually, or test the wf, than it works fine. I've linked this event properly (or just I hope), but when I start MM01 to crea

  • Enhanced Podcasts not working in 10.4.4 Firefox?

    Every iWeb podcast page I've visited in Firefox 1.5 loads the QuickTime movie and shows an image and the playhead for a split second before being covered up by the QuickTime question mark image which links to the Quicktime download page. http://web.m