Link between pe51 and SAP script

I have a requirement for check printing along with remuneration statement.
I have copied the standard sap script f110_prenum_chck into z110_prenum_chck
I am using the standard driver program RFFOUS_C.
My requirement is: Remuneration statement from PE51 should be printed in the top portion of the page and check should be printed in the middle portion. For Remuneration part, I have kept Main Window in position in the script with the element 525-HR as the only active element.
For check portion, everything is working fine as i have customized it accordingly. For remuneration statement Funct. ppl have copied some standard version in PE51 to Z say ZXXX.
but remuneration statement is not getting printed.
How do i trigger ZXXX into z110_prenum_chck without changing the standard program??

Hi Babu,
I never came across this senerio so i have no idea but as per your req i think abaper may help you so kindly contact abap consultant.
Thanks

Similar Messages

  • The relationships and links between the various SAP database tables

    Hi Gurus,
    I am trying to learn the relationships and links between the various SAP database tables (SAP FI-AA, SAP SD, SAP MM, SAP HR and so on) for correctly extracting data from them. Especially I am expressing an interest in the SAP database tables on SAP FI-AA, SAP SD, SAP MM, SAP HR. Could somebody provide me with documentations about the relationships and links between them. I will be very grateful if somebody can provide me with links.
    Thanks and regards
    Sergey

    hi Sergey,
    try
    http://www.erpgenie.com/abap/tables.htm
    http://www.erpgenie.com/abap/tables_fi.htm
    http://abap4.tripod.com/SAP_Tables.html
    http://abap4.tripod.com/Finance_Tables.html
    http://www.auditware.co.uk/SAP/Extras/SAPTables.pdf
    hope this helps.

  • SAP APO Link between pegid and date

    Hi all,
    It's exist a link between pegid and data (order's data)  ??
    Tks,
    bye.

    Please check FM in se37
    /SAPAPO/OM_PEGID_SELECT_ORDERS
    /SAPAPO/OM_PEGID_GET_ORDERS
    Manish

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • Link between GTM and FSCM (sales or purchase order hedging)

    Hi all,
    I am trying for a few days to have SAP GTM working (I am in an IDES ECC6 system, and as far as I know in EhP4 version). The main goal in fact is to test the currency hedging, and therefore to the link GTM and FSCM, either single-sided purchase or sales order, or two-sided . The flow I want is the following :
    -     I buy or sell a product, in GTM, through a trading contract which generates a purchase or sales order.
    -     Automatically a currency hedge is generated to cover the risk, in FSCM, I guess in exposure management.
    -     And then the financial products (derivatives) are generated as well.
    No problem to create the trading contract, no problem to generate the sales or purchase order. But in spite of the (very little) customizing I found in u201CSAP GTM => currency hedgesu201D, and some in FSCM, in u201Ctreasury and risk managementu201D, no way to have this link between GTM and FSCM, no additional document is generated like a Forward Exchange Transaction (I guess I should have this, and then a risk exposure in FSCM).
    Would you have an idea ? Is this customizing, or an additional Business Functions or Extension Set not activated ? SAP says : u201Cit worksu201D, but canu2019t find the way.
    Thank you very much for your help, I am quite looking for this link for a few days now u2026
    Best regards
    Patrick

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • Link  between LANDSCAPE AND R/3

    hi gurus i have doubt. that what is the difference between DEV,QUALITY AND PRODUCTION SERVERS AND DATABASE, APPLIACATION, PRESENTATION.
    initailly while we are in implementation we use DEV,QUALITY AND PRODUTION.
    after impllementation DATABASE, APPLICATION AND PRESENTATION comes into picture. so in landscape good configuration sits in production server. so for end user point of u PRODUCTION SERVER WILL BECOME DATABASE SERVER OR NOT. pls tell me the link between landscape and R/3.
    will reward

    Hi Krishna,
    I think you are trying to mix 2 questions.
    Well you can frame the questions like this:
    1) Difference between Development, Quality and Production Servers
    2) Database, application and presentation layer.
    Well the point1) refers to Landscape. What happens is when are working for any end to end implemetation or support project we need certain instances so we can have instances like Development, Quality and Production. we have got different instances because we need to test whether the changes made are working as per the requirements.
    Point 2)  refers to R/3 technology.
    SAP R/3 is based on a three tier client/server technology. Typically, it is made up of three functionally distinct layers namely: the user interface, business logic and database.
    The user interface, which is otherwise known as the presentation server displays the interface for users' communication with the SAP system. It is often referred to as the SAP GUI. As a matter of fact, it is a program called sapgui.exe. The application server is where the business logic and data manipulation takes place. Data processing, SAP administration tasks and client request/feedback management are handled within the business layer. The database layer is synonymous to the database server and it typically acts as a data repository for tables and other database objects and structures.
    Ideally, an R/3 system is composed of one database server, one or more application servers and one or more presentation servers.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Link between reports and universes and universe name change

    I want to change a universe name.
    What is the impact on my WebI reports and DeskI reports ?
    Is it risky ? Will the link between reports and universes be saved ?
    Does someone know how the link between reports and universes works for WebI reports and DeskI reports ?
    Thanks

    Hello Umberto,
    I recommend to post this query to the [WEBI|SAP BusinessObjects Web Intelligence; and [DESKI|SAP BusinessObjects Desktop Intelligence; forums.
    These forums are monitored by qualified technicians and you will get a faster response there.
    Also, all Webi and Deski queries remain in one place and thus can be easily searched in one place.
    Best regards,
    Falk

  • How to customize the link between archivelink and Alfresco

    hi,
    We are using Alfresco as content manager and we want to scan the invoices according to the "Late Storage with Bar Codes in FI" scenario [http://help.sap.com/saphelp_470/helpdata/en/46/c4317ffc4b11d195650000e82deb58/frameset.htm].
    Each scanned invoice will be stored in Alfresco as a pdf file and we want to be able to display it from the sap 'display FI document' transaction (thru 'environment' menu / Additional assignments/object links).
    my question is how to make the bridge between sap archivelink and Alfresco for this display ?
    how to customize link between archivelink and Alfresco ? Is it possible with customizing only or is it necessary to buy third party software ?
    we are working in 4.7.

    Hi,
    Apparently you need an interface between SAP and Alfresco that implements SAP archivelink.
    Once that is in place you can configure a repository in OAC0.
    At the link below you find a link to a PDF
    http://forums.alfresco.com/en/viewtopic.php?f=14&t=13502
    Our company had an own content repository software. It used KGS SAPALINK to make the connection with SAP.
    Furthermore CTAC seems to have done development to connect SAP and Alfresco.
    Currently we are looking for a new repository system as well. A couple of weeks ago management decided that within some departments Alfresco will be the standard DMS. It would be great if we could use it as content server as well.
    Kind Regards
    Edmond

  • Broken Link between Base and Target document in 'Copy To' option

    Hi Folks,
    One of our client has been facing a peculiar issue. When the 'Copy To'  function is used to Copy document from Sales Order to Delivery and recently one instance of 'Copy To' from Delivery to A/R Invoice ,the base document got copied to the target document in each case but there was no trace of any Base Ref. left in the Target document( either in row level or Remarks), thereby the link between the Base and Target document got broken.The Base document remains with status as open.The same base document when tried again to 'Copy To', it creates the link between Base and new Target document.
    This instance had occurred recently 3- 4 times in a span of 3 months or so. In normal circumstance this never happens. The client is pretty sure they have used 'Copy To' option to copy the document from Base to Target.
    Any hints or possible reasons if one can highlight would be appreciable.
    The current version used is SAP B1 8.82 PL11 and it was upgraded more than a year back.
    Regards,
    Bharath

    Hi,
    All the data in Sales Order and Delivery are matching one to one in terms of row details,
    and Document header level.
    The missing data was Base Ref. data and Del.Date didn't get copied from base to target as shown in screen shot.
    Also i have checked it earlier regarding change of target document row details like changing item, but this will only remove the link of that particular row and remaining row link remains intact, but in this case there are many items and it doesn't seem user will have changed in all the rows.
    Regards,
    Bharath

  • Link Between PSA and Data Targets

    Hi Experts,
    Could you please help me is there any table which will have PSA & data target (Cube or ODS) details.
    I know the table which will have data target manage screen details and other table wil give the details like data loaded into till PSA.
    But i want to know any SAP table will have link between PSA & data target.
    I want to know if the request is loaded till PSA or it is loaded into data target.
    Any table will give details like PSA request no, if target is there then some kind of flag like....
    Please let me know if any one know the table which will have PSA as well as Data target details.
    Thaks in Advance
    Shaik

    Hi,
    I clearly mentioned im aware of Manage screen details table, i want link between PSA and Data target table which will return if requst loaded till PSA or PSA & target.
    Im using BI 7.0 .
    Regards
    Shaik

  • Link between data table sap

    hye!
    i want to know how to make a link between datatable in sap R/3.
    For exemple: i'm loocking to the table MARC in this table there is a lot of area: MAXLZ,EISBE... and for the table MARA there is the following areas: MTART,MEINS...;
    i want to find the link between that 2 tables ( my project is to extract data from sap )

    Hi!
    The common field of MARA and MARC is MATNR - you can join the two tables by this field.
    <a href="http://www.sapgenie.com/abap/tables_mm.htm">This</a> english site has some very nice overview pictures of tables connections, here e.g. for master data and purchasing.
    Regards,
    Christian

  • Userexits and sap scripts in PP module

    Can anyone give me some examples of user exits and sap scripts in PP module? I need it for my resume. I appreciate your responses.

    Dear,
    Principle of Dual Control provides an application the option of validating certain process flows with a principle of multiple control.
    Please refer this link,
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPPDC/PPPDC.pdf
    Regards,
    R.Brahmankar

  • Establish the link between equipment and its standby equipmnent

    Dear experts
    How to establish the link between equipment and its standby equipmnent in SAP?
    For example, I have one pump in a plant and also i have a standby pump installed next to it...now i would like to establish a relation between these two inorder to track them.
    I tried linking them as subequipments, but logically that is not sub equipment.
    what is the best way to do it?
    Regards

    Praveen,
    Equipment & Standby equipments are  installed on same Function location.
    There are below workarounds for solutions.
    1. Use Position Number
    2. Use A,B,C indicator with Running & Standby status
    2. Use link if it is applicable.
    3. Use classification system & provide characteristic as Running / Standby
    Further u can assign the System condom which is equivalent to equipment running  or stop condition during transactional data creation like order..
    If it is running it indicates it is working.
    If it is in stop condition then at that time it is in standby mode.
    Thanks,
    Ramesh

  • What is link between SD and Internal order

    hi sap garus
    can baby explain the link between Sd and internal Orders.
    advance thanks
    suresh

    Hi,
    What link exactly do you have in mind? You can assign a sales order to internal order, if that's your question.
    Regards,
    Eli

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

Maybe you are looking for

  • Icon in ALV top-of-page

    Hello All, I created an ALV report which included the traffic light icons to indicate the status of some internal requests.  My original "legend" in FM REUSE_ALV_COMMENTARY_WRITE was just text based, but now users are requesting to have the legend co

  • Can't download video file sent to me

    My friends send me videos vis Skype but I can only view these videos on Skype. There seem to be no option to download sent videos to my device (laptop, tablet, phone). Is there a way? It was possible with previous Skype versions, by simply right clic

  • Connecting Samsung 50 inch plasma 5054

    I connected my new Core 2 Duo Mac Mini to my Samsung 5054 50 inch plasma. However, if I check the overscan checkbox in the system preferences, the screen is clipped at the edges and I can't see the outside extremeties. If I uncheck the the overscan c

  • Unzip files

    Can someone please tell me if there is an easy way to unzip files with the hardware/software that comes with an Apple OSX SnowLeopard?  If so, I would appreciate very simple step by step instructions as to how to do this as I am fairly ignorant about

  • Web Dynpro Java with Adaptive Model

    when i Created Web Dynpro Java with an Adaptive Model I got  Some error in webdynpro.  the error is com.sap.dictionary.runtime.DdException: Type com.sap.cust.model.types.Zcustdata does not exist what would be the problem . can u anybody please help m