Link between phase and control plan

Hi there!
Someone knows if there is possibility to link a control plan with a phase?
And then approve a phase only if a related control plan is completed?
Thank
Bye
Luciano

Hi,
This is not possible in standard functionality till SAP cProject suite 4.0
Niranjan
Let me know if it helps !!!

Similar Messages

  • Dynamic link between Photoshop and Flash Catalyst does not exist

    Hi,
    I'm a french developer and I have a question.
    I didnt find any Dynamci link between Photoshop and Flash Catalyst.
    Let me explain :
    I have a photoshop file (.psd) and I import it into Flash Catalyst.
    But I have some modification to do on my design file (psd) but the design does not update himself in Flash Catalyst .
    Do you plane to add the possibility ?
    Thanks a lot !
    Clement
    http://www.dator.fr

    Given that you named the class TextDynamicLayout, it implies you are trying to handle wordwrapping text.  That requires handing down the VBox's explicitWidth to the Text controls before they get measured.  Wordwrapping text can be any size so it needs to have its width fixed in order to determine its height.
    The List classes do not support percentages on the renderers.  All renderers are effectively given a size based on the List's size (or DG Column size).  You can see how explicitWidth is handled in the default renderer by looking at the source for ListItemRenderer.as.
    Note that VBox or any container makes for heavy and slow rendering.  That's why the default Flex renderers extend UIComponent and have custom measure() and updateDisplayList() methods.
    Alex Harui
    Flex SDK Developer
    Adobe Systems Inc.
    Blog: http://blogs.adobe.com/aharui

  • Linking between PP and SD tables

    Hai friends,
    I want one link between PP and SD tables. My requirement is i have planned order PLAF table. i want to link Sales table. Please guide me.
    Thanks and Regards
    visvanath

    Hi
    You can simply link the Sales order No and ITEM
    VBAP-VBELN and VBAP-POSNR with the PP order item table
    AFPO-KDAUF and AFPO-KDPOS and get the Pp related info
    or in Sales tables there is a field called AUFNR in VBAP
    use that for PP order number
    SD tables
    http://www.erpgenie.com/abap/tables_sd.htm
    PP tables
    http://www.erpgenie.com/abap/tables_pp.htm
    Regards
    Kiran Sure

  • Is there any Link between BNK_MONI and DMEE

    Hi ,
    I have created EXIT Fucntion Module in DMEE Structure for PAYM Tree Type to udpate value of Reference Text node to show Custom value. Stand alone DMEE works fine for Testng purpose. But It does not work with BNK_MONI .
    I am running following sequence of T Codes :
    RVND --> F8REL --> F111 --> BNK_APP --> BNK_MONI ..
    I want to update one of the fields in output file generated by BNK_MONI .
    Is there any link between BNK_MODI and DMEE ?
    Or shall  I have to Debug background job created by F111 like it is done in case of F110 ?
    Please suggest..
    Edited by: Yogesh Gupte on Jan 27, 2012 6:59 PM

    Hi,
    Deliveries that are created without reference to order , contained movement type because to process a delivery you need to have some of the control criteria that are copied from sales document header to delivery document header, as system processes delivery in that way ,that is why you will find default order type is assigned to the delivery document type ie DL. .which helps the delivery document to process without reference to sales document.
    In Addition to above information,
    In VOV4,
    DL+ NORM +   +    -DLN
    In VOV5,
    For Itemcatagory DLN+        --CN
    From this schedule line category CN,movement type 601 is taken during without reference to order –delivery creation.
    MCM

  • How to create database link between oracle and SQL Server

    Hello Everyone,
    Here i have Oracle Database 9i and SQL Server 2005 databases.
    I have some tables in sql server db and i want to access from Oracle.
    How to create a database link between these two servers
    Thanks,

    Thanks for Everyone,
    I was struggle with this almost 10 days....
    I created Database link from Oracle to SQL Server
    Now it is fine.........
    Here i am giving my servers configuration and proceedure how i created the db link...@
    Using Generic Connectivity (HSODBC) we can create db link between Oracle and SQL server.
    Machine (1)
    DB Version : Oracle 9.2.0.7.0
    Operating System : HP-UX Itanuim 64 11.23
    IP : 192.168.0.31
    Host : abcdbt
    Machine (2)
    Version : SQL Server 2005
    Operating System : Windows server 2003 x86
    IP : 192.168.0.175
    Host : SQLDEV1
    User/PW : sa/abc@123! (Connect to database)
    Database : SQLTEST (exsisting)
    Table : T (“ T “ is the table existing in SQLTEST database with 10 rows)
    Prerequisites in Machine (2):
    a)     Oracle 10g software
    b)     User account to access SQL Server database (sa/abc@123!)
    c)     Existing SQL Server Database (SQLTEST)
    d) Tables (testing purpose) (T)
    Steps:
    1)     Install Oracle 10.2.0.1 (Only SW,No need of database) *(Machine 2)*
    2)     Create a DSN where your windows Oracle 10g SW resides *(Machine 2)*
    Control panel >> Administrative Tools >> Data Source (ODBC) >> System DSN ADD
    You can follow this link also.....
    http://www.databasejournal.com/features/oracle/article.php/3442661/Making-a-Connection-from-Oracle-to-SQL-Server.htm
    I created DSN as
    DSN name : SQLTEST
    User : SA/abc@123! (Existing user account)
    Host : 192.168.0.175 (machine 2)
    Already I have 1 database in SQL Server with the name SQLTEST
    You can create DSN with different name also (not same as db name also)
    3)     Create a hsodbc init file in $ORACLE_HOME\hs\admin *(Machine 2)*
    Create init<DSN NAME> file
    Ex: initSQLTEST
    Copy inithsodbc to initSQLTEST
    And edit
    initSQLTEST file
    HS_FDS_CONNECT_INFO = SQLTEST    <DSN NAME>*
    HS_FDS_TRACE_LEVEL = OFF*
    save the file....@
    4)     Configure Listener.ora *(Machine 2)*
    LISTENER_NEW =
    (DESCRIPTION_LIST =
    (DESCRIPTION =
    (ADDRESS_LIST =
    (ADDRESS = (PROTOCOL = TCP)(HOST = 192.168.0.175)(PORT = 1525))
    SID_LIST_LISTENER_NEW =
    (SID_LIST =
    (SID_DESC =
    (SID_NAME = SQLTEST) *+< Here SQLTEST is DSN NAME >+*
    (ORACLE_HOME = G:\oracle 10g\oracle\product\10.2.0\db_1)
    (PROGRAM = hsodbc))
    (SID_DESC =
    (SID_NAME = PLSExtProc)
    (ORACLE_HOME = G:\oracle 10g\oracle\product\10.2.0\db_1)
    (PROGRAM = extproc) )
    :> lsnrctl start LISTENER_NEW
    5)     Configure tnsname.ora *(Machine 2)*
    SQLTEST11 =
    (DESCRIPTION =
    (ADDRESS_LIST =
    (ADDRESS = (PROTOCOL = TCP)(HOST = 192.168.0.175)(PORT = 1525))
    (CONNECT_DATA =
    (SERVER = DEDICATED)
    (SERVICE_NAME = SQLTEST))
    (HS=OK)
    :> tnsping SQLTEST11
    If No errors then conti….
    6)     Configure a file *(Machine 1)*
    Cd $TNS_ADMIN ($ORACLE_HOME/network/admin)
    Create a file
    $ vi TEST_abcdbt_ifile.ora
    something=
    (DESCRIPTION=
    (ADDRESS=(PROTOCOL=tcp)(HOST =192.168.0.175) (PORT=1525))
    (CONNECT_DATA=
    (SID=SQLTEST))
    (HS=OK)
    $ tnsping something
    $ sqlplus system/manager
    Your connected to Oracle database *(machine 1)*
    create database link xyz connect to “sa” identified by “abc@123!” using ‘SOMETHING’;
    select * from t@xyz;10 rows selected.
    Thanks,
    Edited by: ram5424 on Feb 10, 2010 7:24 PM

  • Link between PM and HUM

    Dear all,
    In order to implement physical tracability on PM service orders, I need to link HU with PM.
    It seems that it is a standard function in PM like PP-HUM integration.
    Can you give me help some help on this topic ?
    Thanks in advance.
    Best regards
    Dominique Schmitz
    [email protected]

    Hi!
    Thanks for response but which field shows the link between PM and planned order?
    I couldn't find it.
    Best regards,
    Bartek

  • Link between 0RECORDMODE AND  ROCANCEL

    Hi, could you pls explaint the link between 0RECORDMODE and ROCANCEL
    I just dont understand why they are mapped in transferrules. and i dont have the field ROCANCEL field in my datasource. actually what scenario makes 0RECORDMODE and ROCANCEL go together could u pls explain
    Thanks in Advance,
    Pallavi.

    Hi,
    First: the recrodmode controls how data is posted into cubes or ODS (DSO) Objects.
    Different Chars have different meanings:
    N for new records
    B for Pre Imgages
    ' ' for after images
    R for Reverse Images
    X for Storno
    D for Deletion of a Key (only in ODS possible)
    What extractor delivers what different types pof values can be seen via to tables:
    ROOSOURCE in the source R/3 System.
    There point out th edelta mechanism. With this value, check within Table RODELTAM. There you see the different POSSIBLE Values for ROCANCEL delivered by a DataSource.
    The relevant objekt for the controlling of the mode in BW is the InfoObject 0RECORDMODE. Each ODS (DSO) has this Object. For Logistic-Extractors (except MaterialManagement) 0RECORDMODE should be mapped with ROCANCEL.
    0STORNO generally is an InfoObject for Reports. E.G. Material movements. Stornos are posted in R/3 with particular so called movement types. Each movement typer contains an information if it is of type "Storno". If this is so, the field storno contains an X.
    If you now map the storno field onto 0RECORDMODE, the record is interpreted as a storno record an will be wied blank ini the DataTarget.
    If you have monotone increasing document numbers (like in CO-PA, CO-OM, MM-INV ...) 0RECORDMODE should be left blank. 0STORNO can be used for Reporting then and be filled differently.
    If you can have changes to an already existing document number (like in sales orders or purchase orders) i'd strongly recommend to map 0RECORDMODE onto the delivered ROCALNCEL field.
    also Check
    Refer OSS Note 399739 and 333492
    Thanks..Assign points if helpful.
    ´Tony

  • Link between AFVC and EBAN tables (material report)

    Friends, wanted to check if anyone can provide assistance on table links between AFVC and EBAN.  The requirement is to track material/service quantity, price, etc in comparison with plan version versus PR, PO, GR, etc.  tried retrieving object numbers of WBS and activities using 'get proj info'  bapi and tried passing them in tables COSP/EBAN/COKEY but the essential link between material assigned to network activity and the PR is missing..
    Thanks in anticipation,

    Hi,
    Did you try the link including EBKN. Basically you can pass the network / WBS number in EBKN and get teh PR number and use this detail in to the item table of PR.
    Regards
    Sreekanth

  • Link between HRP1005 and BUKRS

    Hi all,
    I have a requirement, i need to select data from infotype HRP1005(Planned Compensation) based on BURKS in the selection screen.
    Could any one tell me how to link BUKRS to infotype HRP1005.
    existing program statement.
    SELECT *
          INTO itab
          FROM  hrp1005
           WHERE  plvar  = pchplvar
           AND    otype  = c_job
           AND    objid  = btab-job_id
           AND    trfar  IN s_trfar
           AND    begda  LE w_date
           AND    endda  GE w_date.

    There is no direct link between Job and Company Code. A Job describes one or more Positions.  A Position belongs to an Organizational Unit. An Org. Unit is tied to a Company Code through its Account Assignment features.
    ~Suresh

  • Where is link between 0007 and 0008 infotype

    Dear Members,
    Where is link between 0007 and 0008 infotype.How the system automatically populating WORK HOURS/PERIOD AND CAPACITY UTIL .LEVEL.where is integration .
    Regards
    Nandhini

    Hi,
    >For your first question: Working Hours/Period field in IT 0008 is determined by the Planned Working Time infotype  (0007).
    >The Weekly / Monthly Working Hours  field in IT 0007 are system determined the specified value from the work schedule rule. Capacity utilization level is related to Infotype 0008. The relationship is that an employees basic salary and its related components are stored here and are paid based on the working hours of the employee which is obtained from Infotype 0007 and multiplied by the capacity utilzation which under normal circumstances is 100 %. If the employee belonging to the same pay scale group and level works part time say half of the normal time, you can maintain his capacity utilisation as 50% instead of maintaining seperate values in the wage types.
    Regards
    Chandrashekar

  • PS roles for making object links between cProjects and PS

    Hello to everybody!
    Does anybody could give me a favour and tell which role I should grant to the user in order to allow him make object links between cprojects and PS elements from cProjects. I have already granted authorization to CJ01, CJ02, CJ03 and CJ20N transactions, but JA 027 == No authorization for action Display === error message still occurs. SU53 shows that everything is OK. 
    Thank you.

    Hi,
    I´ve the same problem, I´m in tx CJ20N but I don´t know how to add my user in Access Control List (ACL) in CJ20N
    Could you explain me how I can do that?
    thnaks a lot and best regards, Sapera

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • 'Is there a link between OLM and iProcurement'

    I have been asked 'Is there a link between OLM and iProcurement'? The person posing the question is wanting to create trainers as suppliers and I know that the supplier information is shared between OLM and the A/P, A/R and G/L modules and I presume that the link to iProcurement will be via one of these modules however is there a more direct vanilla link between OLM and iprocurement?
    Any help would be great
    Thanks
    DM

    I am afraid there is no link between the iProc and OLM.
    The closest that apps can offer you is that your learner/delegates can be of type external i.e. being an Organization or a Customer. Hence there exists a link for your delegate to be a customer(hz_parties).
    However this might be a future integration i.e. Trainers being suppliers. I am saying so because in 11.5.10 there is a table named OTA_VENDOR_SUPPLIES that has reference to vendor_id. Currently this table is not being used by OLM.
    You may look into the code of packages OTA_VSP_API, OTA_TEA_BUS & OTA_PLE_BUS and see if Oracle's future functionality will converge towards your business requirement.
    Thanks,
    Anil Passi
    http://oracle.anilpassi.com

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

Maybe you are looking for