Link between Rules and Organisation assigned in Rule Modeler

Hi,
Go to Transaction CRMC_BSP_ANALYZE,
Give Application Name: CRMM_ERM_RULES
It will go to Rule Modeler:
In this just click GO button. You will get the Policies. Click on the Policy you will get different rules.
When We drill down the rules and select a rule you can view ACTIONS tab.
In ACTIONS tab you can see Organisation Object and Outgoing E-Mail Address assigned to a selected Rule.
Can you please let me know what is table names and link to get the Organisation Object and Outgoing E-Mail Address.
Thanks a lot in advance.
Best Regards,
Azaz Ali.

Hi Azaz
To find the Organizational Object go to Transaction PPOMA_CRM the details you need are under field "ID"
The Outgoing Email address can be found under transaction CRMC_IC_FROMGRP.
Hope this helps
Regards
Arden

Similar Messages

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • Where is link between 0007 and 0008 infotype

    Dear Members,
    Where is link between 0007 and 0008 infotype.How the system automatically populating WORK HOURS/PERIOD AND CAPACITY UTIL .LEVEL.where is integration .
    Regards
    Nandhini

    Hi,
    >For your first question: Working Hours/Period field in IT 0008 is determined by the Planned Working Time infotype  (0007).
    >The Weekly / Monthly Working Hours  field in IT 0007 are system determined the specified value from the work schedule rule. Capacity utilization level is related to Infotype 0008. The relationship is that an employees basic salary and its related components are stored here and are paid based on the working hours of the employee which is obtained from Infotype 0007 and multiplied by the capacity utilzation which under normal circumstances is 100 %. If the employee belonging to the same pay scale group and level works part time say half of the normal time, you can maintain his capacity utilisation as 50% instead of maintaining seperate values in the wage types.
    Regards
    Chandrashekar

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • How to Assignment between Material and Account Assignment Group

    Hi,
    When we are creating a sales order with material ABCD, then in material line item -->under Billing Document Tab --> in Accounting screen, there is field Acct asgnmt grp (Account Assignment Group).
    From where we can assign between Material and Account Assignment Group, after that it automatically pick in sales order creation.
    Please guide..

    Please refere to below link it may help.
    Re: how to configure new account assignment group of material
    Thanks Dev.

  • Is there any Link between BNK_MONI and DMEE

    Hi ,
    I have created EXIT Fucntion Module in DMEE Structure for PAYM Tree Type to udpate value of Reference Text node to show Custom value. Stand alone DMEE works fine for Testng purpose. But It does not work with BNK_MONI .
    I am running following sequence of T Codes :
    RVND --> F8REL --> F111 --> BNK_APP --> BNK_MONI ..
    I want to update one of the fields in output file generated by BNK_MONI .
    Is there any link between BNK_MODI and DMEE ?
    Or shall  I have to Debug background job created by F111 like it is done in case of F110 ?
    Please suggest..
    Edited by: Yogesh Gupte on Jan 27, 2012 6:59 PM

    Hi,
    Deliveries that are created without reference to order , contained movement type because to process a delivery you need to have some of the control criteria that are copied from sales document header to delivery document header, as system processes delivery in that way ,that is why you will find default order type is assigned to the delivery document type ie DL. .which helps the delivery document to process without reference to sales document.
    In Addition to above information,
    In VOV4,
    DL+ NORM +   +    -DLN
    In VOV5,
    For Itemcatagory DLN+        --CN
    From this schedule line category CN,movement type 601 is taken during without reference to order –delivery creation.
    MCM

  • Link between Class and characteristics created for that class

    Hi All,
    Is there any table that I can look at to find a link between class and the characteristics created for that class. For all the list of characteristics created I am refereing to CABN table but my requirement is to find the logic to see all the characteristics created for a class. Can anyone suggest me the right table to look at?
    Regards,
    Shane

    Hi,
    I would like to thank you for your quick response. So based on your thoughts, here is the process i followed to find the characteristics for a existing class,  took the Internal class number and used the KSML table to find all the Characteristics created for that class.
    To find the list of values assigned to that characteristics, used the AUSP table for that characteristics internal number.
    Thank you again for your inputs
    Shane.

  • Link between code and code groups and inspection type

    Hi All,
    I want to know the link between code and Code Group for UD and inspection type?
    There is an option of choosing Usage selected set in SPRO "Seeting for inspection type".If i dont enter anything there,will it show all the code groups in the system while taking UD?
    Pls guide

    Hi Shreya,
    Yes, the link between code and Code Group for UD and inspection type is specific selection of UD related to specific inspection type.  Ex. there are separate UD codes individually for Goods receipt against PO, Gr against Production or for In-process inspection ets. so If you assign the selected sets at SPRO Inspection type, then while doing UD system will show UD codes related to only that inspection type.
    If you don't enter anything there at SPRO, you will see all the code groups in the system while taking UD and one can get confused in selecting the relevant code.
    so assigning of UD selected sets, plant wise (tick) at " Inspection types" is best practice.
    Best Regards,
    Shekhar

  • Link between 0RECORDMODE AND  ROCANCEL

    Hi, could you pls explaint the link between 0RECORDMODE and ROCANCEL
    I just dont understand why they are mapped in transferrules. and i dont have the field ROCANCEL field in my datasource. actually what scenario makes 0RECORDMODE and ROCANCEL go together could u pls explain
    Thanks in Advance,
    Pallavi.

    Hi,
    First: the recrodmode controls how data is posted into cubes or ODS (DSO) Objects.
    Different Chars have different meanings:
    N for new records
    B for Pre Imgages
    ' ' for after images
    R for Reverse Images
    X for Storno
    D for Deletion of a Key (only in ODS possible)
    What extractor delivers what different types pof values can be seen via to tables:
    ROOSOURCE in the source R/3 System.
    There point out th edelta mechanism. With this value, check within Table RODELTAM. There you see the different POSSIBLE Values for ROCANCEL delivered by a DataSource.
    The relevant objekt for the controlling of the mode in BW is the InfoObject 0RECORDMODE. Each ODS (DSO) has this Object. For Logistic-Extractors (except MaterialManagement) 0RECORDMODE should be mapped with ROCANCEL.
    0STORNO generally is an InfoObject for Reports. E.G. Material movements. Stornos are posted in R/3 with particular so called movement types. Each movement typer contains an information if it is of type "Storno". If this is so, the field storno contains an X.
    If you now map the storno field onto 0RECORDMODE, the record is interpreted as a storno record an will be wied blank ini the DataTarget.
    If you have monotone increasing document numbers (like in CO-PA, CO-OM, MM-INV ...) 0RECORDMODE should be left blank. 0STORNO can be used for Reporting then and be filled differently.
    If you can have changes to an already existing document number (like in sales orders or purchase orders) i'd strongly recommend to map 0RECORDMODE onto the delivered ROCALNCEL field.
    also Check
    Refer OSS Note 399739 and 333492
    Thanks..Assign points if helpful.
    ´Tony

  • Link between AFVC and EBAN tables (material report)

    Friends, wanted to check if anyone can provide assistance on table links between AFVC and EBAN.  The requirement is to track material/service quantity, price, etc in comparison with plan version versus PR, PO, GR, etc.  tried retrieving object numbers of WBS and activities using 'get proj info'  bapi and tried passing them in tables COSP/EBAN/COKEY but the essential link between material assigned to network activity and the PR is missing..
    Thanks in anticipation,

    Hi,
    Did you try the link including EBKN. Basically you can pass the network / WBS number in EBKN and get teh PR number and use this detail in to the item table of PR.
    Regards
    Sreekanth

  • Linking between LQUA and RMCLM

    Hi all,
    Can anyone please tell me the linking between LQUA and RMCLM?
    Thanks and regards,
    Ridhima.

    Hi Chintamani,
    Actually I need CLASS TYPE (Batch Classification assigned e.g. BATCH and FIN_GOODS_BATCH, MSD_VENDOR_BATCH, VENDOR_BATCH) for a particular Material and Batch number.
    Thanks,
    Ridhima.

  • Link between HRP1005 and BUKRS

    Hi all,
    I have a requirement, i need to select data from infotype HRP1005(Planned Compensation) based on BURKS in the selection screen.
    Could any one tell me how to link BUKRS to infotype HRP1005.
    existing program statement.
    SELECT *
          INTO itab
          FROM  hrp1005
           WHERE  plvar  = pchplvar
           AND    otype  = c_job
           AND    objid  = btab-job_id
           AND    trfar  IN s_trfar
           AND    begda  LE w_date
           AND    endda  GE w_date.

    There is no direct link between Job and Company Code. A Job describes one or more Positions.  A Position belongs to an Organizational Unit. An Org. Unit is tied to a Company Code through its Account Assignment features.
    ~Suresh

  • Establish the link between equipment and its standby equipmnent

    Dear experts
    How to establish the link between equipment and its standby equipmnent in SAP?
    For example, I have one pump in a plant and also i have a standby pump installed next to it...now i would like to establish a relation between these two inorder to track them.
    I tried linking them as subequipments, but logically that is not sub equipment.
    what is the best way to do it?
    Regards

    Praveen,
    Equipment & Standby equipments are  installed on same Function location.
    There are below workarounds for solutions.
    1. Use Position Number
    2. Use A,B,C indicator with Running & Standby status
    2. Use link if it is applicable.
    3. Use classification system & provide characteristic as Running / Standby
    Further u can assign the System condom which is equivalent to equipment running  or stop condition during transactional data creation like order..
    If it is running it indicates it is working.
    If it is in stop condition then at that time it is in standby mode.
    Thanks,
    Ramesh

  • What is link between SD and Internal order

    hi sap garus
    can baby explain the link between Sd and internal Orders.
    advance thanks
    suresh

    Hi,
    What link exactly do you have in mind? You can assign a sales order to internal order, if that's your question.
    Regards,
    Eli

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

Maybe you are looking for

  • HT4108 can't video out to tv.

    Have apple digital connectors.Using new adapter on Itouch 5g. Could get video out w/ITouch 4g. Is the adapter to 30pin causing issue

  • In OSB , xquery issue with large volume data

    Hi , I am facing one problem in xquery transformation in OSB. There is one xquery transformation where I am comparing all the records and if there are similar records i am clubbing them under same first node. Here i am reading the input file from the

  • What are the bugs in N95 8G new firmware V15?Let'...

    what are the bugs in N95 8G new firmware V15?

  • Declarative Security, Authorization and SSL

    Hi all, I'm trying to find the most elegant and simple way to restrict access to my web content and I'd like to have your opinion on how to make it better or how other solve similar tasks. The situation is: My web-site (Tomcat 5.5/JBoss) has 50% of p

  • Creating a graph with 2 Axis

    Post Author: KatyLu CA Forum: Xcelsius and Live Office I am really struggling with how to create a graph with 2 Axises.  I have changed my Excel sheet around numerous ways and am unable to get it to work for me, does anyone have any insight on how I